Attachment 2 Pricing Schedule.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- Blue Ridge Community College (BRCC)
- Solicitation number
- 70FBR425B00000009
- Issued by
-
Federal Emergency Management Agency
About this file
The file is a Pricing Schedule for a Parking Lot Paving Construction Project (Solicitation Number: 70FBR425B00000009) issued by the Federal Emergency Management Agency (FEMA) for Blue Ridge Community College. The project involves resurfacing and striping the parking lot, which was damaged during Hurricane Helene, with specific line items including site preparation, removal of existing pavement, installation of new asphalt pavement, striping, signage installation, and regulatory compliance. The project is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside with an estimated construction value between $250,000 and $500,000.
Key project dates include a site visit on August 07, 2025, a deadline for questions on August 11, 2025, bid submission deadline on August 15, 2025, and a 45-day performance period from August 18, 2025, to October 01, 2025. The pricing schedule provides a template for offerors to complete with unit prices for eight specific work items, including lump sum and per square yard pricing. Contractors must be verified SDVOSBs in the System for Award Management (SAM) and located in the disaster counties declared in DR4827NC, with the primary contact being Victor Hinojosa from FEMA.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Parking Lot Paving Construction Project | |
| Attachment 2: | Pricing Schedule |
| Solicitation Number: | 70FBR425B00000009 |
| Title: | Parking Lot Paving Construction Project |
| Offeror Name: | [Insert Offeror's Name] |
| Offeror Address: | [Insert Offeror's Address] |
| Itemized Pricing Schedule: | |||||
| Item No. | Description of Work | Unit | Quantity | Unit Price ($) | Total Price ($) |
| 1 | Site Preparation and Grading | LS | 1 | [Insert Unit Price] | [Insert Total Price] |
| 2 | Removal of Existing Pavement | SY | [Insert Quantity] | [Insert Unit Price] | [Insert Total Price] |
| 3 | Installation of New Asphalt Pavement | SY | [Insert Quantity] | [Insert Unit Price] | [Insert Total Price] |
| 4 | Striping and Marking of Parking Spaces | LS | 1 | [Insert Unit Price] | [Insert Total Price] |
| 5 | Installation of Required Signage | EA | [Insert Quantity] | [Insert Unit Price] | [Insert Total Price] |
| 6 | Compliance with Federal, State, and Local Regulations | LS | 1 | [Insert Unit Price] | [Insert Total Price] |
| 7 | Compliance with Davis-Bacon Act | LS | 1 | [Insert Unit Price] | [Insert Total Price] |
| 8 | Preparation and Submission of As-Built Drawings | LS | 1 | [Insert Unit Price] | [Insert Total Price] |
| Total Project Cost: | $ - 0 | $ - 0 |
| Description | Amount ($) |
| Subtotal | [Insert Subtotal] |
| Contingency (if applicable | [Insert Contingency Amount] |
| Total Cost | $ - 0 |
| Notes: | |
| 1 | LS: Lump Sum |
| 2 | SY: Square Yard |
| 3 | EA: Each |
| Offeror Certification: | |
| By submitting this pricing schedule, the offeror certifies that the prices provided are accurate and reflect the full scope of work as described in the Statement of Work (SOW). |
| Offeror Signature: | [Insert Signature] |
| Date: | [Insert Date] |
This Pricing Schedule should be filled out by the offeror with the appropriate unit prices and total prices for each item. The total project cost should be calculated based on the sum of all items, including any contingency amounts if applicable. The offeror should sign and date the schedule to certify the accuracy of the pricing information provided.