Attachment 7 - DBA NY20260011 Heavy and Highway 30 July 2026.pdf

PDF 50 KB Posted

Attached to
2026 SABER IDIQ - (Simplified Acquisition of Base Engineering Requirements)
Solicitation number
FA667026Q0015
Issued by

About this file

This is a General Decision wage determination document (NY20260011) issued by the U.S. Department of Labor's Wage and Hour Division, effective July 30, 2026, establishing prevailing wage rates for heavy and highway construction work in Niagara County, New York.

The document sets forth hourly wage rates and fringe benefit amounts for numerous construction trades and classifications, with rates effective on various dates ranging from January 1, 2025 through July 1, 2025. Key classifications include boilermakers ($39.35/hour), electricians ($44.20/hour for standard electricians up to $64.59/hour for cable splicers in specialized applications), carpenters ($41.19/hour), ironworkers ($36.25/hour), laborers ($26.00-$31.00/hour depending on classification), painters ($33.00-$34.68/hour), plumbers ($42.20/hour), roofers ($34.96-$35.11/hour), truck drivers ($32.00-$49.23/hour depending on type), and numerous equipment operators ($28.53-$48.46/hour depending on classification and equipment). Fringe benefits are specified separately for each classification. The determination has undergone three modifications since its initial publication on January 30, 2026. The document also incorporates Executive Order 13706 regarding paid sick leave (1 hour per 30 hours worked, up to 56 hours annually) and Executive Order 13658 regarding minimum wage ($13.65/hour through December 31, 2026). Unlisted classifications may be added after award through labor standards contract clauses, and provisions are included for wage determination appeals to the Wage and Hour Division and Administrative Review Board.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

"General Decision Number: NY20260011 07/30/2026

State: New York

Construction Types: Heavy and Highway

Counties: New York Counties of Niagara

Heavy Construction

Highway Construction

Modification Number Publication Date 1 01/30/2026 2 05/18/2026 3 07/30/2026

BOIL0007-001 01/01/2025

Rates Fringes

BOILERMAKER.........................................$ 39.35 33.18

BRNY0045-002 07/01/2023

Rates Fringes

MARBLE MASON........................................$ 36.85 30.80

POINTER, CLEANER AND CAULKER........................$ 36.82 31.33

BRNY0045-002 07/01/2024

Rates Fringes

BRICKLAYER, STONEMASON..............................$ 37.44 32.71

TILE & TERRAZZO WORKER..............................$ 37.85 31.80

TILE, MARBLE & TERRAZZO FINISHER....................$ 34.71 17.54

CARP0276-015 07/01/2024

Rates Fringes

CARPENTER...........................................$ 41.19 29.81

CARPENTER: PILEDRIVER...............................$ 41.19 31.55

ELEC0237-001 05/26/2025

Rates Fringes

ELECTRICIANS........................................$ 44.20 32.90

ELEC1249-003 05/05/2025

Rates Fringes

ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC

SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE

NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC

MONITORING SYSTEMS AND ROAD WEATHER INFORMATION

SYSTEMS FLAGMAN FOOTNOTE: A. NEW YEAR'S DAY,

MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,

THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S

DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR

THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY

FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED

THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER

THE HOLIDAY.........................................$ 31.72 29.87

ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC

SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE

NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC

MONITORING SYSTEMS AND ROAD WEATHER INFORMATION

SYSTEMS GROUNDMAN (TRUCK DRIVER) FOOTNOTE: A.

NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,

LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS

PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY,

ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES

AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF

NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY

BEFORE OR THE DAY AFTER THE HOLIDAY.................$ 42.29 30.66

ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC

SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE

NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC

MONITORING SYSTEMS AND ROAD WEATHER INFORMATION

SYSTEMS GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER

UNIT) FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL

DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,

CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY,

DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF

THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR

OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE

WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY...$ 47.57 31.03

ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC

SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE

NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC

MONITORING SYSTEMS AND ROAD WEATHER INFORMATION

SYSTEMS LINEMAN & TECHNICIAN FOOTNOTE: A. NEW

YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR

DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS

PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY,

ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES

AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF

NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY

BEFORE OR THE DAY AFTER THE HOLIDAY.................$ 52.86 35.60

ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC

SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE

NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC

MONITORING SYSTEMS AND ROAD WEATHER INFORMATION

SYSTEMS MECHANIC FOOTNOTE: A. NEW YEAR'S DAY,

MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,

THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S

DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR

THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY

FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED

THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER

THE HOLIDAY.........................................$ 42.29 30.66

ELEC1249-004 05/05/2025

Rates Fringes

ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND

UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND

ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK

INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE,

FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT

BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE

OF GROUND FAULT PROTECTION AND FIBER OPTIC

CAPABILITIES : LINEMAN AND TECHNICIAN FOOTNOTE:

A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY,

MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR

DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION

DAY FOR THE PRESIDENT OF THE UNITED STATES AND

ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE,

PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO

DAYS AFTER THE HOLIDAY..............................$ 61.56 36.21

ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND

MAN TRUCK DRIVER FOOTNOTE: A. PAID HOLIDAYS:

NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD

FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING

DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE

PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR

THE GOVERNOR OF NEW YORK STATE, PROVIDED THE

EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER

THE HOLIDAY.........................................$ 49.25 31.15

ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES;

RAILROAD CATENARY INSTALLATION AND MAINTENANCE,

THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED

TRANSMISSION CONDUIT AND CABLE INSTALLATIONS

(INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT

BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE

OF GROUND FAULT PROTECTION AND FIBER OPTIC

CAPABILITIES), PIPETYPE CABLE INSTALLATION AND

MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE

BONDING OF RAILS; PIPETYPE CABLE INSTALLATION

GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT)

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY,

PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY,

INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,

CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT

OF THE UNITED STATES AND ELECTION DAY FOR THE

GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE

WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE

HOLIDAY.............................................$ 49.25 31.15

ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER

(Substation:).......................................$ 63.14 33.82

ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER

(Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails;

Pipetype cable installation)........................$ 64.59 42.92 ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :).....................................$ 35.34 30.12

ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN

(Substation:).......................................$ 35.34 30.12 ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation).......................................$ 35.34 30.12

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING

MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)....$ 55.40 31.78

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING

MACHINE OPERATOR (Substation:)......................$ 55.40 31.78

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING

MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails;

Pipetype cab........................................$ 55.40 31.78

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK

DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :).........................$ 49.25 31.15

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK

DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails;

Pipetype cable installat............................$ 49.25 31.15

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK

DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :).....................................$ 49.25 31.15

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK

DRIVER (TRACTOR TRAILER UNIT) (Substation:).........$ 49.25 31.15 ELECTRICIAN, LINE CONSTRUCTION: LINEMAN &

TECHNICIAN (Substation:)............................$ 61.56 36.21 ELECTRICIAN, LINE CONSTRUCTION: LINEMAN &

TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails;

Pipetype cable ins..................................$ 61.56 36.21 ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :).....................................$ 49.25 31.15

ELECTRICIAN, LINE CONSTRUCTION: MECHANIC

(Substation:).......................................$ 49.25 31.15 ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation).......................................$ 49.25 31.15

ELEC1249-008 01/01/2025

Rates Fringes

ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV

FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A.

NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY,

DECORATION DAY, INDEPENDENCE DAY, LABOR DAY,

VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER

THANKSGIVING, CHRISTMAS DAY.........................$ 40.81 6.99

ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV

FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW

YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY,

DECORATION DAY, INDEPENDENCE DAY, LABOR DAY,

VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER

THANKSGIVING, CHRISTMAS DAY.........................$ 20.53 6.39

ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV

FIBEROPTICS CABLE AND EQUIPMENT INSTALLER

REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT

OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD

FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR

DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER

THANKSGIVING, CHRISTMAS DAY.........................$ 38.73 6.93

ENGI0017-007 07/01/2025

Rates Fringes

POWER EQUIPMENT OPERATOR GROUP A1 (HEAVY AND

HIGHWAY CONSTRUCTION) BACKFILLERS, BACKHOES,

AUTOMATIC BATCH PLANT OPERATOR, BLACK-TOP

SPREADERS, BULLDOZERS, CMI GRADING MACHINES,

CABLEWAYS, CLAMBUCKETS, COMBINATION HOE BOOM OR

SHOVEL BOOMATTACHED (EXCEPT FARM TYPE CRAWLER OR

RUBBER TIRED TRACTOR UNLESS USED WITH HYDRAULIC

BACK-HOE), COMPRESSOR (WITH PAING BREAKER

ATTACHED), CONCRETE MIXERS (ONE YARD AND OVER),

CONCRETE PLANNER, CONCRETE PUMP (TRUCK MOUNTED),

CONCRETE SPREADER OPERATOR, CRANE WORK, CRANES

(OVERHEAD OR BRIDGE), CRANE OPERATOR (OVER 100,

200, 300 FEET BOOMS EARN PREMIUMS AS NOTED HEREIN),

DERRICKS, DRAGLINES, EUCLID TYPE BELT LOADERS,

FINISHING MACHINE OPERATORS, FORK-LIFTS AND HOISTS

9 WHEN LIFTING MATERIAL AT AN ELEVATION HIGHER THAN

TWENTY-FIVE FEET), FORM PULLER, GENERATOR AND

COMPRESSOR (POWER DRIVEN-WHEN USED SIMULTANEOUSLY

AND FOR ANY MAKE OF PORTABLE CONCRETE BATCHING

MACHINE), GRADERS, GRADERS (WITH BULLDOZER BLADES),

HOISTS (MULTIPLE DRUM WITH AIR COMPRESOR WHEN USED

SIMULTANEOUSLY FOR MORE THAN ONE PURPOSE), HOISTS -

SINGLE DRUM WHEN USED TO HOIST STEEL), HYDRAULIC

CONCRETE JOINT HAMMERS, HYDRAULIC ROCK DRILL

(INGERSOLL-RAND LM 500 TYPE), HYDRO-AXE, KOLMAN

LOADERS, LOADERS (FRONT & BACK - EXCEPT SMALL

TYPE), LUBRICATION ENGINEERS, MECHANIC, PAVEMENT

BREAKER (EXCEPT HAND OPERATED PAVEMENT BREAKERS),

PILE DRIVING RIGS, PIPE PUSHING RIGS, PIPE PUSHING

MACHINES (MECHANICL AND HYDRAULIC), POST DRIVERS

(EXCEPT TRUCK MOUNTED POST DRIVERS), REAPIR WORK ON

MAINTENANCE WORK UNDER THE SUPERVISION OF A MASTER

MECHANIC, ROLLERS (ALL) (ON FINISH BLACKTOP),

SCOOPMOBILES (ALL), SCRAPTER (EITHER DOUBLE OR

SINGLE BOWL), S-240 LAZER-GUIDED SCREED, SHOVELS,

SNOW-LOADER, STEEL ERECTION, STONE CRUSHERS

(PORTABLE), STONE SPREADERS (POWER DRIVEN),

TRACTORS USE DIN CONJUNCTION WITH SCRAPER WAGONS

(ALL), TREE BANDIT OR SIMILAR CHIPPER, TRANCHERS

(WHEN EXCAVATION OVER SIX FEET IN DEPTH), TUNNEL

MUCKING MACHINES, VIBRATORS (SELF-PROPELLED

RIDING), WELDER NOTES: HAZARDOUS WASTE

2.50 ZONE PAY: CRANE BOOM PREMIUM FOR BOOM AND

JIB 100-199 FT (1.00 OVER GROUP A) CRANE BOOM

PREMIUM FOR BOOM AND JIB 100-199 FT (1.50 OVER

GROUP A) CRANE BOOM PREMIUM FOR BOOM AND JIB

100-199 FT (2.00 OVER GROUP A)...................$ 47.39 34.84

POWER EQUIPMENT OPERATOR GROUP B (HEAVY AND HIGHWAY

CONSTRUCTION) AIR COMPRESORS (OVER 165 CU. FT),

BOBCAT TYPE SKID LOADER, COMPRESSORS WHEN USED IN

BANKS OF TWO AND NOT OVER THREE WITHIN A FIFTY FOOT

RADIUS AND IF FUEL IS STORED, IT WOULD BE STORED

WITHIN THE SAME RADIUS, CONCRETE BLOWERS, CONCRETE

PUMPS, CONVEYORS, CRAWLER OR RUBBER TIRE TRACTOR

(SMALL FARM TYPEWITH BLADE OR BUCKET NOT TO EXCEED

0.5 YD CAPACITY), EARTH DRILLS (ALL), ELEVATORS

(ALL), FORKLIFT WHILE USED TO LIFT MATERIAL NOT

OVER 25 FT, GUNNITE MACHINES, HEATERS (GASOLINE

-USE IN BANKS OF TWO AND NOT OVER THREE WITHIN AN

AREA OF ONE HUDNRED FOOT RADIUS, HIGHLIFT HOISTS

WHILE USED TO LIFT MATERIAL NOT OVER 25 FT,

MATERIAL HOISTS, SINGLE DRUM HOIST FOR HOISTING

MATERIALS OTHER THAN STEEL, LATOURNEAU

TURNATRAILERS, LIGHT AND POWER SYSTEMS 9 GAS OR

DIESEL DRIVEN - TEMPORARY 25 KW CAPACITY OR OVER),

LOADERS 9 SMALL FRONT OR BACK), LOCOMOTIVE, PARTS

ROOM - WHEN A PARTS ROOM IS MANNED IT SHALL BE AN

ENGINEER, PAVEMENT BUSTERS, PIN PULLSER, POST

DRIVERS 9 TRUCK MOUNTED), PUG MACHINE, PUMS OVER 4

INCHES, (ROAD ROLLERS EXCEPT ON FINISH BALCKTOP,

ROAD WIDENER MOUNTED ON A LOADER, ROLLES (SELF

PROPELLED - NOT ON FINISH BLACKTOP AND UNDER 7

TONS), SCOOPMOBILES - WHEN USED AS A STATION ARY

HOIST, OR ONE USED TO LIFT MATERIAL NOT IN EXCESS

OF 25 FEET, SNOW-GO, STONE CRUSHERS AND WINCH

HOISTS MOUNTED ON TRUCKS, TRACTORS, TRENCHERS

EXCAVATING UP TO 6 FT DEEP), TRENCHERS ON THE BACK

OF A JEEP, WELDING MACHINES (FOR 2 BUT NOT OVER 3

GASOLINE OR DIESEL DRIVEN), WINCH TRACTORS NOTES:

HAZARDOUS WASTE 2.50 ZONE PAY:

CRANE BOOM PREMIUM FOR BOOM AND JIB 100-199 FT

(1.00 OVER GROUP A) CRANE BOOM PREMIUM FOR BOOM

AND JIB 100-199 FT (1.50 OVER GROUP A) CRANE

BOOM PREMIUM FOR BOOM AND JIB 100-199 FT (2.00

OVER GROUP A).......................................$ 42.89 34.84

POWER EQUIPMENT OPERATOR MASTER MECHANIC (HEAVY AND

HIGHWAY CONSTRUCTION) NOTES: HAZMAT PREMIUM

3.00 ZONE PAY: ADD $1.00 TO GROUP A -

LONG BOOM CRANE PREMIUM 100 FT - 199 FT ADD $1.50

TO GROUP A- LONG BOOM CRANE PREMIUM 200 FT - 299 FT

ADD $2.00 TO GGROUP A - LONG BOOM CRANE PREMIUM

300 FT AND OVER FOOTNOTE: A. PAID HOLIDAYS:

NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY;

LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY PROVIDED

EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE

HOLIDAY. TUNNEL AND SHAFT

CLASSIFICATIONS.....................................$ 48.46 34.84

POWER EQUIPMENT OPERATOR: GROUP A HEAVY AND

HIGHWAY CONSTRUCTION NOTES: HAZARDOUS

WASTE 2.50 ZONE PAY: CRANE BOOM PREMIUM FOR

BOOM AND JIB 100-199 FT (1.00 OVER GROUP A)

CRANE BOOM PREMIUM FOR BOOM AND JIB 100-199 FT

(1.50 OVER GROUP A) CRANE BOOM PREMIUM FOR BOOM

AND JIB 100-199 FT (2.00 OVER GROUP A)...........$ 47.39 34.84

ENGI0017-008 07/01/2016

Rates Fringes

POWER EQUIPMENT OPERATOR: TUNNEL AND SHAFT: MASTER

MECHANIC NOTES: HAZMAT PREMIUM $3.00 ZONE PAY:

ADD $1.00 TO GROUP A - LONG BOOM CRANE PREMIUM

100 FT - 199 FT ADD $1.50 TO GROUP A- LONG BOOM

CRANE PREMIUM 200 FT - 299 FT ADD $2.00 TO

GGROUP A - LONG BOOM CRANE PREMIUM 300 FT AND OVER

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY;

MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY;

THANKSGIVING DAY; CHRISTMAS DAY PROVIDED EMPLOYEE

WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY.

TUNNEL AND SHAFT CLASSIFICATIONS....$ 38.06 28.10

POWER EQUIPMENT OPERATOR:, TUNNEL AND SHAFT: GROUP

A NOTES: HAZMAT PREMIUM 3.00 ZONE

PAY: ADD $1.00 TO GROUP A - LONG BOOM CRANE

PREMIUM 100 FT - 199 FT ADD $1.50 TO GROUP A-

LONG BOOM CRANE PREMIUM 200 FT - 299 FT ADD $2.00

TO GGROUP A - LONG BOOM CRANE PREMIUM 300 FT AND

OVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S

DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY;

THANKSGIVING DAY; CHRISTMAS DAY PROVIDED EMPLOYEE

WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY..$ 36.29 28.10

POWER EQUIPMENT OPERATOR:, TUNNEL AND SHAFT: GROUP

A1 CRANE (UNDERGROUND), FRONT END LOADER (TUNNEL

AND SHAFT), HOIST (2 OR 3 DRUM), MAINTENANCE

ENGINEER (TUNNEL AND SHAFT), MINING MACHINE (MOLE

AND SIMILAR TYPES), MOTOR MAN, MUCKING MACHINE,

SHOVEL, TRIPPER/MAINTENANCE ENGINEER (TUNNEL AND

SHAFT), TUNNEL SHOVEL NOTES: HAZMAT PREMIUM

3.00 ZONE PAY: ADD $1.00 TO GROUP A -

LONG BOOM CRANE PREMIUM 100 FT - 199 FT ADD $1.50

TO GROUP A- LONG BOOM CRANE PREMIUM 200 FT - 299 FT

ADD $2.00 TO GGROUP A - LONG BOOM CRANE PREMIUM

300 FT AND OVER FOOTNOTE: A. PAID HOLIDAYS:

NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY;

LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY PROVIDED

EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE

HOLIDAY.............................................$ 39.29 28.10

POWER EQUIPMENT OPERATOR:, TUNNEL AND SHAFT: GROUP

B AUTOMATED CENTRAL MIX CONCRETE PLANT, BACKHOE

(TOPSIDE), BORING MACHINE, COMPRESSORS (4 OR LESS,

EXCEEDING 2,000 C.F.M. COMBINED CAPACITY, BUT NOT

TO EXCEED 5,000 C.F.M. WITH A DISTANCE NOT TO

EXCEED 1,500 FEET), CONCRETE PUMP, CRANE (TOPSIDE,

FRONT END LOADER (TOPSIDE), GRAYCO EPOXY MACHINE,

HOIST (2 OR 3 DRUM -- TOPSIDE), MAINTENANCE

ENGINEER (TOPSIDE), MAINTENANCE GREASE MAN,

PERSONNEL HOIST, PUMP CRETE, SHOTCRETE MACHINE,

SHOVEL (TOPSIDE) NOTES: HAZMAT PREMIUM

3.00 ZONE PAY: ADD $1.00 TO GROUP A - LONG

BOOM CRANE PREMIUM 100 FT - 199 FT ADD $1.50 TO

GROUP A- LONG BOOM CRANE PREMIUM 200 FT - 299 FT

ADD $2.00 TO GGROUP A - LONG BOOM CRANE PREMIUM

300 FT AND OVER FOOTNOTE: A. PAID HOLIDAYS:

NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY;

LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY PROVIDED

EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE

HOLIDAY.............................................$ 34.58 28.10

POWER EQUIPMENT OPERATOR:, TUNNEL AND SHAFT: GROUP

C COMRPESSORS (4 NOT TO EXCEED 2,000 C.F.M.

COMBINED CAPACITY OR 3 OR LESS WITH MORE THAN 1,200

C.F.M. BUT NOT TO EXCEED 2,000 C.F.M. WITH A

DISTANCE FOR COMPRESSORS), DUST COLLECTORS,

GENERATORS, PUMPS, WELDING MACHINES (4 OF ANY TYPE

OR COMBINATION) WITH A DISTANCE NOT TO EXCEED 1,500

FEET; CONVEYOR, ELECTRIC PUMP USED INCONJUNCTION

WITH WELL POINT SYSTEM GROUT PUMP OVER 5 CUBIC FEET

(MANUFACTURER'S RATING), HYDRO-BLASTER, MOTORIZED

FORM CARRIER, TRUCK CRANE OILER, WELL POINT NOTES:

HAZMAT PREMIUM 3.00 ZONE PAY:

ADD $1.00 TO GROUP A - LONG BOOM CRANE PREMIUM 100

FT - 199 FT ADD $1.50 TO GROUP A- LONG BOOM CRANE

PREMIUM 200 FT - 299 FT ADD $2.00 TO GGROUP A -

LONG BOOM CRANE PREMIUM 300 FT AND OVER FOOTNOTE:

A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY;

INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY;

CHRISTMAS DAY PROVIDED EMPLOYEE WORKS THE DAY

BEFORE AND THE DAY AFTER THE HOLIDAY................$ 28.53 28.10

IRON0009-003 07/01/2025

Rates Fringes

IRONWORKER..........................................$ 36.25 33.12

IRONWORKERS: (SHEETER)..............................$ 36.25 33.12

LABO0091-002 07/01/2017

Rates Fringes

LABORER COMPRESSED AIR GROUP 1 TOP LABORERS

FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY,

MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY,

THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY...$ 26.00 35.96

LABORER GROUP 1 (HEAVY & HIGHWAY CLASSIFICATIONS)

COMMON LABORERS, MULTI-TRADE TENDER,

DECONTAMINATION OF ALL MACHINES, HORIZONTAL

DIRECTIONAL DRILL/LOCATOR; ALL TERRAIN VEHICLES

WITH ATTACHMENTS/ALL WHEEL OR TRACK TYPES

FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY,

MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY,

THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY...$ 26.00 35.96

LABORER GROUP 2 (HEAVY & HIGHWAY CLASSIFICATIONS)

POTMAN, PIPELAYERS, PAVEMENT BREAKERS OR BUSTERS,

JACKHAMMER OPERATORS; BARCO RAMMERS; CHAIN SAW;

POWDER MONKEY; BLACK TOP RAKERS; SCALERS; DRILL

TENDERS; MORTAR MIXERS; CONCRETE POLISHING MACHINE;

OPERATION & MAINTENANCE OF ALL ROBOTIC REMOTE

SYSTEMS IN HAZARDOUS ENVIRONMENT; MEN WORKING FROM

SWINGING SCAFFOLD BO'SNS CHAIR, SUSPENDED CAGE OR

BUCKET; ALL OTHER OPERATORS OF MECHANICAL TOOLS,

INCLUDING VIBRATORS REGARDLESS OF TYPE OF POWER AND

BOAT MEN; OPERATION OF ALL TYPES OF VIDEO MACHINERY

USED IN THE INSPECTION OF PIPE; WORK IN CAISSONS

BELOW 8 FEET; CONCRETE MOTOR BUGGY FOOTNOTE: A.

PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY,

INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY,

CHRISTMAS DAY, AND ELECTION DAY.....................$ 26.30 35.96

LABORER GROUP 3 (HEAVY & HIGHWAY CLASSIFICATIONS)

RESPIRATOR REQUIRED FOR BUSTING FOOTNOTE: A. PAID

HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY,

INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY,

CHRISTMAS DAY, AND ELECTION DAY.....................$ 26.50 35.96

LABORER GROUP 4 (HEAVY & HIGHWAY CLASSIFICATIONS)

FORM SETTER; ROAD FINISHER; GUNNITE NOZZLEMAN;

SANDBLASTERS; BURNING TORCH; CONCRETE SAW

OPERATORS; UTILITY PILE DRIVER; TREE TOPPER; GROUT

MACHINE AND GROUT PUMP OPERATOR FOOTNOTE: A. PAID

HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY,

INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY,

CHRISTMAS DAY, AND ELECTION DAY.....................$ 26.60 35.96

LABORER GROUP 5 (HEAVY & HIGHWAY CLASSIFICATIONS)

LASER BEAM OPERATOR FOOTNOTE: A. PAID HOLIDAYS:

NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR

DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION

DAY.................................................$ 26.85 35.96

LABORER GROUP 6 (HEAVY & HIGHWAY CLASSIFICATIONS)

WELDERS; WAGON DRILL & AIR TRACK DRILL; SELF

CONTAINED DRILL; RESPIRATOR REQUIRED DUE TO

ATMOSPHERIC CONDITIONS (EXCLUDING RESPIRATORS

REQUIRED FOR HAZARDOUS WASTE & TOXIC MATERIALS,

ASBESTOS ABATEMENT OR LEAD ABATEMENT) FOOTNOTE:

A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY,

INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY,

CHRISTMAS DAY, AND ELECTION DAY.....................$ 27.00 35.96

LABORER GROUP 7 (HEAVY & HIGHWAY CLASSIFICATIONS)

CHEMICAL WASTE - MEN WORKING WITH HAZARDOUS WASTE &

TOXIC MATERIALS OR IN AREAS OF RADIOACTIVE MATERIAL

& ASBESTOS; THE REMOVAL OF ASBESTOS FROM ROOFS,

CEILINGS, PIPES, WALLS, BOILERS ETC., AND ALL

MACHINERY, & THE RECOVERING OF SAME; REMOVAL OF

LEAD FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY,

MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY,

THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY...$ 28.00 35.96

LABORER GROUP 8 (HEAVY & HIGHWAY CLASSIFICATIONS)

GRADE CHECKER & BLASTER FOOTNOTE: A. PAID

HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY,

INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY,

CHRISTMAS DAY, AND ELECTION DAY.....................$ 28.60 35.96

LABORER GROUP 9 (HEAVY & HIGHWAY CLASSIFICATIONS)

SUPPLIED AIR RESPIRATORS FOOTNOTE: A. PAID

HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY,

INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY,

CHRISTMAS DAY, AND ELECTION DAY ...................$ 31.00 35.96

PAIN0004-002 05/01/2025

Rates Fringes

PAINTERS: HEAVY & HIGHWAY CONSTRUCTION: BRUSH &

ROLLER (TOWNSHIPS OF HARTLAND, LOCKPORT NORTH

TONAWANDA, NEWFANE, PENDLETON, ROYALTON, SOMERSET

AND THE EASTERN HALVES OF CAMBRIA AND WILSON)......$ 33.00 28.21

PAINTERS: HEAVY & HIGHWAY CONSTRUCTION:

DRYWALL/TAPING (TOWNSHIPS OF HARTLAND, LOCKPORT

NORTH TONAWANDA, NEWFANE, PENDLETON, ROYALTON,

SOMERSET AND THE EASTERN HALVES OF CAMBRIA AND

WILSON).............................................$ 34.00 28.51

PAINTERS: HEAVY & HIGHWAY CONSTRUCTION:

WALLCOVERING (TOWNSHIPS OF HARTLAND, LOCKPORT

NORTH TONAWANDA, NEWFANE, PENDLETON, ROYALTON,

SOMERSET AND THE EASTERN HALVES OF CAMBRIA AND

WILSON).............................................$ 33.00 28.21

PAIN0004-005 05/01/2025

Rates Fringes

PAINTERS: PAINTERS (TOWNSHIPS OF LEWISTON, NIAGARA

FALLS, PORTER, WHEATFIELD AND THE WESTERN HALVES

OF CAMBRIA AND WILSON).............................$ 33.00 28.21

PAINTERS: SPRAYING, PAPERHANGERS, SAND-BLASTING,

SWINGING SCAFFOLD (TOWNSHIPS OF LEWISTON, NIAGARA

FALLS, PORTER, WHEATFIELD AND THE WESTERN HALVES

OF CAMBRIA AND WILSON).............................$ 33.00 28.21

PAINTERS: TAPERS (TOWNSHIPS OF LEWISTON, NIAGARA

FALLS, PORTER, WHEATFIELD AND THE WESTERN HALVES

OF CAMBRIA AND WILSON).............................$ 34.00 28.51

PAIN0004-011 05/01/2025

Rates Fringes

GLAZIER.............................................$ 34.68 27.64

PLAS0111-002 07/01/2025

Rates Fringes

CEMENT FINISHER.....................................$ 33.55 34.17

PLUM0022-005 04/29/2024

Rates Fringes

PLUMBER AND STEAMFITTER (ZONE 1)....................$ 42.20 29.80

ROOF0074-002 06/01/2024

Rates Fringes

ROOFERS: COMPOSITION................................$ 34.96 26.03

ROOFERS: SLATE & TILE...............................$ 35.11 26.03

SFNY0669-001 01/01/2026

Rates Fringes

SPRINKLER FITTER....................................$ 47.85 28.94

SHEE0071-002 05/27/2024

Rates Fringes

SHEET METAL WORKER..................................$ 39.50 29.18

TEAM0449-003 07/01/2025

Rates Fringes

TRUCK DRIVERS: INCLUDES SINGLE AXLE DUMP AND

OFF-HIGHWAY DUMP TRUCKS (HEAVY & HIGHWAY) WORK ON

A HAZARDOUS WASTE SITE THEN ADDITIONAL $2.00 PER

HOUR. FOOTNOTE: A. PENSION $54.00 PER DAY B.

PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY,

INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,

CHRISTMAS DAY PROVIDED THE EMPLOYEE HAS WORKED THE

WORKING DAY BEFORE AND AFTER THE HOLIDAY............$ 49.23 8.75

TEAM0449-006 06/01/2025

Rates Fringes

TRUCK DRIVERS: DUMP TRUCK ONLY, EXCLUDES SINGLE

AXLE DUMP AND OFF-HIGHWAY DUMP TRUCKS FOOTNOTE: A.

PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY,

INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,

CHRISTMAS DAY PROVIDED THE EMPLOYEE HAS WORKED THE

WORKING DAY BEFORE AND AFTER THE HOLIDAY............$ 32.00 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually.

Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).

The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than SU, UAVG, SA, or SC denotes that a union rate was prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.

0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.

Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:

UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.

The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The SU identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007 6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.

SU wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).

State Adopted Rate Identifiers

The SA identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.

The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the SA identifier took effect under state law in the state from which the rates were adopted.

WAGE DETERMINATION APPEALS PROCESS

1) Has there been an initial decision in the matter? This can be:

a) a survey underlying a wage determination

b) an existing published wage determination

c) an initial WHD letter setting forth a position on a wage determination matter

d) an initial conformance (additional classification and rate) determination

On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:

Branch of Wage Surveys Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage Determinations.

Requests can be submitted via email to BCWD-Office@dol.gov or by mail to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Requests for review and reconsideration can be submitted via email to dba.reconsideration@dol.gov or by mail to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210.

END OF GENERAL DECISION"

File details come from the government source that posted it. Updated .