Attachment 11 - SEED Project 2026 Niagara SABER - RVKQ 24-0010 Install Isolation Valve B919 OWS- SOW SABER.pdf

PDF 223 KB Posted

Attached to
2026 SABER IDIQ - (Simplified Acquisition of Base Engineering Requirements)
Solicitation number
FA667026Q0015
Issued by

About this file

This is a Statement of Work (SOW) for Task Order RVKQ 24-0010 to supplement a SABER contract for work at Niagara Falls Air Reserve Station, issued 2 June 2025.

The contractor shall furnish and install a 10-inch isolation post indicating gate valve on the effluent side of an underground oil water separator at Building B919. Primary work scope includes: excavating and exposing existing 10-inch effluent side piping; selectively demolishing and removing existing effluent piping, valves, electrical components, and supports; cutting existing 10-inch piping and installing new 10-inch isolation post indicating gate valve with couplings; providing and installing new piping, couplings, valve box, blocking, supports for proper drainage and valve operation; performing a leak test with potable water to verify valve operability; and backfilling, compacting, and restoring the area with topsoil to existing grade, including reseeding. The contractor must obtain a utility dig permit from 914 Civil Engineering Squadron prior to excavation and is responsible for marking utilities and maintaining markups during construction. All open excavations must conform to current OSHA requirements.

Environmental requirements include collecting, containerizing, and disposing of all waste materials off-base, maintaining a clean work area daily, and properly characterizing, packaging, labeling, and manifesting wastes in compliance with federal, state, and local regulations. Anticipated waste is non-hazardous. The contractor must recycle or divert waste as practical, submit quarterly Waste/Recycle Materials Logs, comply with green purchasing requirements per Executive Order 13101, and immediately report any suspected asbestos-containing materials to base environmental and safety personnel. Required submittals include work schedule, waste logs, valve product data, warranty documentation, valve operations and maintenance manuals, and hazardous material safety data sheets with material volumes.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

To Supplement SABER Contract

For Task Order

RVKQ 24-0010 Install Isolation Valve B919 Oil Water Separator

2 June 2025

1. SUMMARY OF WORK: The Contractor shall furnish and install all material, equipment, components, parts, tools, labor, transportation, hauling, disposal/recycling, cleaning, inspection, testing, commissioning, training, reporting, etc., necessary to perform this project as described in the contract-delivery order, including this Statement of Work and any / all applicable federal, state and local laws, regulations, and standards. Unless otherwise stated, any / all requirement for contractor to remove and properly dispose of / recycle off base, and to furnish and install / incorporate any / all new materials / equipment / components needed to properly complete the work item; any Government furnished property and / or reinstallation of existing materials / equipment / components shall be as stated / specified herein. Contractor shall submit materials / methods for approval prior to ordering and / or incorporation into the work; at a minimum, submittals shall include product literature, SDS, standard color, texture and style samples / swatches / boards, and place of origin / manufacture. Demolished materials, waste / debris is property of the contractor, unless otherwise stated herein; contractor is responsible for proper disposal / recycling of such materials off base; such materials shall be promptly removed from the installation and shall not be stored / stockpiled unless submitted and approved for such. Contractor is responsible for verification of all details, measurement, etc., prior to ordering materials and execution of work.

2. Provide and install 10” isolation post indicating gate valve on the effluent side of an underground oil water separator at B919.

3. Excavate and expose existing 10” effluent side piping to the oil water separator tank.

4. Selectively demolish, remove, and properly dispose of the existing effluent piping, valves, electrical, supports, etc. as needed to accommodate installation of the post indicating isolation gate valve.

5. Cut existing 10” effluent piping and install new 10” isolation post indicating gate valve and couplings.

914 MSG / CEC

Niagara Falls Air Reserve Station 2405 Franklin Drive Niagara Falls, New York 14304-5063

RVKQ 24-0010 – Install Isolation Valve B919 OWS

6. Provide and install new piping, couplings, valve box, blocking, post indicating isolation gate valve and supports for proper drainage and valve operation.

7. The contractor must obtain a utility dig permit from 914 CES prior to any excavation work.

8. The contractor is responsible for marking utilities and maintaining all mark outs during all construction.

9. All open excavations, shoring, bracing and underpinning shall conform to all current applicable OSHA requirements.

10. Perform leak test with potable water by isolating the newly installed valve to ensure the valve is operational and in working order.

11. Backfill, compact and restore area with topsoil to existing grade. Reseed and return the project area back to its original state.

12. Environmental Protection

12.1. Collect, containerize and properly dispose of all waste materials generated from the project off base, including but not limited to construction material, pipe, fittings and potential contaminated soil.

12.2. Ensure the work area is clean and free of all debris at the end of each workday.

12.3. The Contractor shall be responsible for characterization, storage, describing, packaging, labeling, marking, and placarding of wastes. The Contractor shall characterize the waste as required by the disposal facility. Any analytical results shall be forwarded to 914 MSG/CEV for review and approval. Waste shall not leave the base until approval has been obtained from 914 MSG/CEV. It is anticipated the waste will be characterized as non-hazardous. The Contractor shall manifest, pack, ship and dispose of all waste in compliance with Federal, State and local laws and regulations.

12.4. Comply with Base standards for storage of hazardous materials. Bulk materials and wastes must be secured and stored under cover. Maintain supplies on hand to contain and cleanup any spills generated by the Contractor’s activities. Report any spills to the Base Environmental office in accordance with Base’s Spill Prevention Plan.

12.5. Contractor is to recycle or divert as much waste as practical.

12.6. Quarterly the Contractor must submit the Waste / Recycle Materials Log for

Contractors with a list of materials disposed and recycled.

RVKQ 24-0010 Install Isolation Valve B919 OWS

12.7. Green Purchasing: The Contractor shall comply with the Green Purchasing requirements of the contract. Known / possible EPA Comprehensive Procurement Guideline, USDA Biobased, Green Seal Energy Star, etc., items. Recycled materials must be used to fullest extent in accordance with Executive Order 13101.

The EPA web-site, http://www.epa.gov/cpg, can be accessed for further instruction on what is an EPA-designated material.

12.8. An asbestos survey was not completed in any of the mentioned work areas. The contractor shall immediately contact 914 MSG/CEV and 914 MSG/SGPB prior to disturbance if any asbestos containing materials are suspected.

13. Submittals

13.1. In addition to any submittals required by the general contract, provide the following project specific submittals for government review and approval prior to initiating work:

13.1.1. Work Schedule

13.1.2. Waste Logs

13.1.3. Valve product data

13.1.4. Valve warranty

13.1.5. Valve O&M Manuals

13.1.6. Hazardous Material Safety Data Sheets (SDS) and volumes of materials used.

14. Attachments

14.1. Attachment 1 OWS As built

14.2. Attachment 2 Site Layout Piping Diagram

http://www.epa.gov/cpg