Attachment 6- Scope -L6002265P.pdf
PDF 64 KB Posted
- Attached to
- USAG-S MARFOR Repair/Reno
- Solicitation number
- W91WFU26QA012
About this file
This is a Scope of Work document for a federal repair project at Panzer Kaserne, Building 2901, managed by the Directorate of Public Works. Project L6-00226-5P addresses brown water issues through comprehensive water line replacement in the basement of the facility.
The work encompasses replacement of the main water pipe with an integrated cold water filter and pressure reducer, replacement of pipes and valves on the cold water distributor, replacement of the hot water boiler feeding pipe and all connected distribution lines (approximately 85 meters of cold, hot, and circulation lines using materials such as Mepla pipes), replacement of shut-off valves in various diameters, insulation of all new water pipes and shut-off valves, pipe labeling, installation of a new circulation pump, commissioning of fire alarm technician services as needed, closure of any opening holes created during work, functional and leak testing of all new pipes and valves, and final cleaning. The contractor must remove all equipment and government or private property prior to construction. The period of performance is 100 calendar days following task order award, with an estimated on-site construction duration of approximately 10 working days excluding delivery time. No inventory lists, as-built drawings, or OEM manuals are required. No special security measures are specified for this project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work
PROJECT #: L6-00226-5P
LOCATION BLDG / ROOM SHORT DESCRIPTION TYPE
Panzer Kaserne 2901 Repair by Replacement Water Lines Repair
On this Date the DPW Project Manager met with the Customer to confirm the scope of requested work.
The Scope of work planned for by the Directorate of Public Works is as follows:
Work Description
Repair by Replacement Water Lines because of brown water!
Basement:
Replace the main Water Pipe with the Cold water filter with integrated pressure reducer and with the suitable shut-off valves.
Replacing the pipes and valves on the Cold water distributor.
Replacing the hot water boiler feeding pipe,and all pipes from the hot water boiler to the water consumer as possible (cold, hot, and circulation lines approx. 85m each, For example Mepla pipes.)
Replace all shut-off valves of various diameters.
Insulate all water pipes after installing the new water pipes and shut-off valves as necessary.
Pipes must be labeled Installing a new circulation pump adapted to the existing situation.
Commissioned the fire alarm technician as necessary.
Anny opening holes need to be properly closed.
After completion, functional and leak testing of all new pipes and valves.
Final cleaning.
Required Days after Task Order Award (Period of Performance):
» Government «
100 Calendar Days Inventory list: not required
As Builts Drawings: not required OEM Manuals: not required
INFO: (Space is provided below for Information and/or additions to the Scope of Work)
- The estimated construction time (on-site) for this Project will be approx. 10 Working days without delivery time.
- All Equipment and Government/private Property has to be removed by the Customer prior construction.
- No special security measures required for this project unless specifically stated.
File details come from the government source that posted it. Updated .