Attachment 5-Scope-L6001256P.pdf
PDF 64 KB Posted
- Attached to
- USAG-S MARFOR Repair/Reno
- Solicitation number
- W91WFU26QA012
About this file
This is a Scope of Work document for a repair project managed by the Directorate of Public Works (DPW) at Panzer Building, Room 2901, 3rd Floor.
The project involves replacement of carpet on the 3rd floor, including offices and hallway. Work tasks include removal and disposal of old carpet and baseboard; provision and installation of new substructure and carpet tiles (Atlas 863 holunder color with matching baseboard gekettelte style, 10cm high); adjustment of all doors and transition bars as necessary; and final cleaning. In Room 305, carpet replacement extends only to the bar. The contractor must provide at least two weeks' advance notice to the customer's point of contact with a construction timeframe. The customer is responsible for clearing cabinets prior to construction and disconnecting/reconnecting electronic devices. The Fire Department must be informed when smoke detectors are disconnected. Parking lots will be closed for construction dumpster placement and material loading/unloading. All equipment and tools must be checked; tools cannot be equipped with Bluetooth or Internet. The estimated on-site construction duration is approximately 10 working days, excluding delivery time. The period of performance is 60 calendar days from task order award. Inventory lists, as-built drawings, and OEM manuals are not required. No special security measures are required unless specifically stated.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work
PROJECT #: L6-00125-6P
LOCATION BLDG / ROOM SHORT DESCRIPTION TYPE
Panzer 2901 3rd floor replacement of carpet Repair
On this Date the DPW Project Manager met with the Customer to confirm the scope of requested work.
The Scope of work planned for by the Directorate of Public Works is as follows:
Work Description replacement of carpet 3rd floor, including offices and hallway. (please see attachment) remove and disposal old carpet and remove and disposal old carpet baseboard provide and install new substructure and carpettiles, (col./Kugelgarn, Atlas 863 holunder), Baseboard “gekettelte” , high 10cm, (Color-matched to the floor) in Rm#305 carpet will be changed just until bar if necessary adjust all doors and all transition bars inform customer at least 2 weeks before start work and provide time frame to customers POC move and remove furniture back to place, customer clears cabinet prior construction customer need to plug out all electronic devices and then plug in back themselves fire Department need to be informed, when disconnect smoke detectors parking lots will be closed for construction dumpster and loading and unloading of material, clarify POC material and tools are checked, (tool is not allowed to be equipped with Bluetooth and Internet) perform final cleaning, Required Days after Task Order Award (Period of Performance):
» Government «
60 Calendar Days Inventory list: not required
As Builts Drawings: not required OEM Manuals: not required
INFO: (Space is provided below for Information and/or additions to the Scope of Work)
- The estimated construction time (on-site) for this Project will be approx. 10 Working days without delivery time.
- All Equipment and Government/private Property has to be removed by the Customer prior construction.
- No special security measures required for this project unless specifically stated.