This is a Scope of Work document for a federal facilities repair project, Project #L6-00095-6P, managed by the Directorate of Public Works for a 3rd floor bathroom remodel at Building Panzer, Room 2901. The work is classified as a Repair type project with a 60 calendar day period of performance following task order award.
The scope encompasses comprehensive bathroom renovation including removal and reinstallation of the existing toilet stall, demolition and disposal of drywall and door materials, complete removal and replacement of floor and wall tiles with sealing, installation of water and sewer lines with necessary valves, two urinals with infrared flushers, two partition walls, two sinks with single-handle faucets, and an under-sink hot water tank if required. Additional work includes installation of mirrors with lighting above sinks, concealment of all pipes behind a false wall with inspection door access, inspection of drinking fountain drain pipes, full wall painting including sloped sections, functional and leak testing of all new systems, door adjustment to accommodate new tile flooring, coordination with fire alarm system technician if necessary, and final cleaning. An inventory list is required prior to final inspection, OEM manuals must be provided prior to final inspection, and As-Built drawings are not required. The estimated on-site construction duration is approximately 10 working days excluding delivery time. The customer must remove all equipment and government or private property prior to construction commencement.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work
PROJECT #: L6-00095-6P
LOCATION BLDG / ROOM SHORT DESCRIPTION TYPE
Panzer 2901 / Bathroom Remodel 3rd Floor Bathroom Repair
On this Date the DPW Project Manager met with the Customer to confirm the scope of requested work.
The Scope of work planned for by the Directorate of Public Works is as follows:
Work Description
Remodel 3rd Floor Bathroom:
Remove the toilet stall and store it.
Reinstall the toilet stall once all work is complete.
Remove the dry wall and door and dispose it.(Waste container needed) Remove all floor tiles and PVC flooring and dispose of them.
Completely retile the floor and seal it.
Tile the walls as agreed with the customer.
Install water and sewer lines, including the necessary valves, two urinals with infrared flusher and two partition walls, two sinks with single-handle faucets, and an under-sink hot water tank if needed.
Install two mirrors with lighting above the sinks.
Hide all pipes (valves behind inspection door) behind a false wall.
Check the pipes running from the ceiling to the drain of the drinking fountain.
Paint the entire wall, including the sloped section.
After completion, functional and leak testing of all new pipes, valves and connections.
Adjust the entry door to fit the new tile floor if necessary.
Request fire alarm system technician if necessary.
Final cleaning.
Required Days after Task Order Award (Period of Performance):
» Government «
60 Calendar Days Inventory list: required prior Final Inspection
As Builts Drawings: not required OEM Manuals: required prior Final Inspection
INFO: (Space is provided below for Information and/or additions to the Scope of Work)
- The estimated construction time (on-site) for this Project will be approx. 10 Working days without delivery time.
- All Equipment and Government/private Property has to be removed by the Customer prior construction.
- No special security measures required for this project unless specifically stated.