This document is a Performance Requirements Summary Table for the Propulsion Test Facility (PTF) Complex Operations & Maintenance contract. The table details 15 key performance areas with specific objectives, performance standards, and monitoring methods for PTF contractors. Critical performance requirements include:
Contractors must perform routine maintenance, facility management, documentation, testing process reviews, instrumentation updates, facility upgrades, logistics, network management, software development, testing services, equipment services, design and systems engineering, cyber functions, contract reporting, training, property management, quality surveillance, and security compliance. Each requirement has stringent performance standards, including 0 safety incidents, 100% compliance with regulations, 95-100% timeliness, and 100% quality, with monitoring conducted through direct oversight and management information systems (MIS). The performance areas cover technical, operational, administrative, and safety aspects of managing the Propulsion Test Facility complex.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 7.18.25 Update_N6660425R0330_PTF_QA.xlsx | XLSX spreadsheet | |
| 7.17.25 Update_N6660425R0330_PTF_QA.xlsx | XLSX spreadsheet | |
| Amendment 0001_FAR Clause 52.222-42.pdf | ||
| Amendment 0001_FAR Clause 52.229-3.pdf | ||
| Amendment 0001_FAR Clause 52.216-4.pdf | ||
| Amendment 0001_N6660425R0330_PTF_QA.xlsx | XLSX spreadsheet | |
| Amendment 0001_Section L Offeror Instructions.pdf | ||
| Attachment 9_Section M.pdf | ||
| Attachment 2_DD254.pdf | ||
| Attachment 4_GFP.pdf | ||
| N6660425R0330.pdf | ||
| Attachment 5_Govt Property_Redacted.pdf | ||
| Attachment 7_WD 2015-4089 Rev No. 29 dtd 12232024.pdf | ||
| Attachment 8_Section L.pdf | ||
| Attachment 1_SOW.pdf | ||
| Attachment 10_NUWCDIVNPT Cost Proposal Spreadsheet.xlsx | XLSX spreadsheet | |
| Exhibit A_CDRLs.pdf | ||
| Attachment 3_List of Approved Key Personnel.docx | DOCX document |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3 v1.3_JANUARY2023
Performance Requirements Summary Table
Requirement (Task number and title from SOW/PWS)
CDRL
(if applicable)
Performance Objective Performance
Standard
Acceptable Quality
Level (AQL)
Monitoring Method
4.1.1 – Routine Maintenance
A009-10
Propulsion Test Facility (PTF) contractors perform routine maintenance per the Routine Maintenance Plan (RMP) mutually agreed upon by the Government and the Contractor.
0 Safety Incidents, 100% certification with federal, state, and local regulation.
95% - Timeliness
100% - Quality
Direct Oversight, Management Information Systems
(MIS)
4.1.2 – Facility Issues, Engineering Changes & Breakdown
Maintenance
A011-15
PTF contractors respond to facility issues per the PTF Issue Tracker, and complete all requirements detailed therein
0 Safety Incidents, 100% certification with federal, state, and local regulation, technical data integrity, and customer satisfaction
95% - Timeliness
100% - Quality
Direct Oversight, MIS
4.1.3 – Facility Documentation
A016
PTF contractors complete and deliver all drawings, diagrams, models, procedures, and other technical data stipulated in assigned Engineering Change Requests (ECR) or TRs.
100% compliance with local guidance and engineering best practices (per the ADs).
Free of technical errors.
95% - Timeliness
100% - Quality
Direct Oversight, MIS
4.1.4 – Testing Process Review
Participation A017
PTF contractors provide status updates on responsible projects ahead of testing review events, provide content and feedback for review presentations, and participate in testing reviews as applicable to their assigned tasking.
100% compliance with local guidance and engineering best practices (per the ADs).
Free of technical errors
95% - Timeliness
100% - Quality
Direct Oversight, MIS
4.1.5 – Facility Instrumentation
A009, A014
PTF contractors update and maintain the instrumentation database as directed by ECRs, RMP or approved Instrumentation Plans.
100% compliance with local guidance and engineering best practices (per the ADs).
Free of technical errors
95% - Timeliness
100% - Quality
Direct Oversight, MIS
4.1.6 – Facility Upgrades
A014 PTF contractors plan, engineer, implement, and execute facility
100% compliance with local
95% - Timeliness
Direct Oversight, MIS upgrades as assigned through the ECR and TR systems.
guidance and engineering best practices (per the ADs).
Free of technical errors.
100% - Quality
4.1.7 – Logistics A018
PTF contractors manage the Purchase Request (PR) database, obtain quotes as required, order, and deliver material, and transport material between NUWC and contractor site, or vendor location, as required.
100% compliance with local guidance
95% - Timeliness
100% - Quality
Direct Oversight, MIS
4.1.8 – Network & Website
Management A027, 36
PTF contractors maintain, update and service all workstations, peripherals, databases and software that make up the PTF Closed Enclave network, the PTF Website, and the PTF’s NREN stations.
100% compliance with local guidance and engineering best practices (per the ADs).
Free of technical and clerical errors.
95% - Timeliness
100% - Quality
Direct Oversight, MIS
4.1.9 – Software A027, 36
PTF contractors develop, upgrade, and maintain all PTF control and instrumentation software using the LabView Real Time programming language for use on the PTF Closed Enclave.
100% compliance with local guidance and engineering best practices (per the ADs).
Free of technical and clerical errors.
95% - Timeliness
100% - Quality
Direct Oversight, MIS
4.2 – Testing Services
A001-008
PTF contractors perform testing as directed by the PTF Task Request (TR) system, IAW the AD documents referenced in the applicable TR.
0 Safety Incidents, 100% certification with federal, state, and local regulation, technical data integrity, and customer satisfaction
95% - Timeliness
100% - Quality
Direct Oversight, MIS, Customer Feedback
4.3 – Test Equipment
Services
A019, 21-
PTF contractors provide Test Equipment Services as assigned through the TR system.
100% compliance with engineering best practices.
Free of technical errors or breakdowns upon delivery.
95% - Timeliness
100% - Quality
Direct Oversight, MIS
4.4 – Torpedo Test Equipment Services (Firm
Fixed Price)
PTF contractors provide Test Equipment Services as assigned through the TR system.
100% compliance with engineering
95% - Timeliness
Direct best practices.
Free of technical errors or breakdowns upon delivery.
100% - Quality
4.5.1 – Design Engineering
Services
A014, 19, PTF contractors provide design engineering services and deliverables as assigned through the TR system and the requirements contained therein.
100% compliance with local guidance and engineering best practices (per the ADs).
Free of technical or clerical errors.
95% - Timeliness
100% - Quality
Direct Oversight, MIS
4.5.2 – Systems Engineering
Services A014, 20
PTF contractors provide systems engineering services and deliverables as assigned through the TR system, and the requirements contained therein.
100% compliance with local guidance and engineering best practices (per the ADs).
Free of technical and clerical errors.
95% - Timeliness
100% - Quality
Direct Oversight, MIS
4.5.3 – Digital Engineering
Services
A020, 25, PTF contractors provide digital engineering services and deliverables as assigned through the TR system, and the requirements contained therein.
100% compliance with local guidance and engineering best practices (per the ADs).
Free of technical and clerical errors.
95% - Timeliness
100% - Quality
Direct Oversight, MIS
4.6 – CWF A026
PTF contractors performing cyber functions shall be trained and qualified, and the contractor shall adhere to the CWF reporting requirements.
100% compliance with local guidance and engineering best practices (per the ADs).
Free of technical and clerical errors.
95% - Timeliness
100% - Quality
Direct Oversight, MIS
5.1 – Contract Status Reporting
A028
PTF contractors provide status reports on budgeting, schedule, manpower, and material procurements as determined by the SOW and any applicable TRs and the requirements contained therein.
Free of clerical errors
95% - Timeliness
100% - Quality
Direct Oversight, MIS
5.2 – Training A029, 30, PTF contractors comply with local training regulations and safety guidance. Provide proof of personnel compliance on months when training is completed.
100% compliance with local guidance
100% Timeliness
Direct
7.0 - Property A031, 32
PTF contractors provide a monthly inventory of all Government Furnished Property (GFP) available at the contractor site, and all Contractor Managed Material (CMM) available at the PTF site.
Free of clerical errors
100% Timeliness
Direct Oversight, MIS
8.0 – Quality Surveillance and
Performance Standards
PTF contractors provide deliverables on time, free of technical and clerical errors.
Contractors manage activities such that work is delivered on-time and within budget, with regular ongoing communication, and complying with all local guidance.
100% compliance with local guidance and engineering best practices (per the ADs).
Free of technical and clerical errors.
95% - Timeliness
100% - Quality
Direct Oversight, MIS
10.0 Security
Compliance
PTF contractors perform all operations in compliance with local physical and cyber security guidance.
100% compliance with local guidance
95% - Timeliness
100% - Quality
Direct