Attachment 6 - General Floorplan - A2634_USP25_floorplan_update_TRAHAN_240216 (2).pdf
PDF 9 MB Posted
- Attached to
- Expo 2025 Operation Services Federal contract opportunity
- Solicitation number
- 19AQMM25R0050
About this file
This document contains the floor plans for the USA Pavilion at the Expo 2025 in Osaka, Japan. The floor plans show the layout and room configurations for the various spaces within the pavilion, including the VIP lounge, meeting rooms, kitchen, restaurant, retail area, and multipurpose room. The multipurpose room can accommodate up to 295 people for a standing reception, 132 for a seated dinner, and 120 for a talk/lecture. The restaurant seating area has a capacity of 60 people. The document also includes information on the occupancy for different areas of the pavilion.
The related federal contract opportunity is a solicitation for Expo 2025 Operation Services, issued by the Department of State Office of Acquisition Management. The solicitation number is 19AQMM25R0050, and it requests proposals for the operation of the USA Pavilion at the Expo 2025 in Osaka.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFQ Questions and Government Responses.xlsx | XLSX spreadsheet | |
| 19AQMM25R0050-0001.pdf | ||
| Attachment 1 - Statement of Objectives (SOO).docx | DOCX document | |
| Attachment 4 - USA Pavilion EXPO_2025_Sponsorship_Matrix_Monetary.pdf | ||
| Expo 2025 Guideline Attachments 49 - 99.zip | ZIP file | |
| Attachment 3 - USA Pavilion EXPO_2025_Sponsorship_Matrix_In-Kind.pdf | ||
| Expo Guideline Attachments 1- 48.zip | ZIP file | |
| Expo 2025 Guidelines Attachments 100 - 147.zip | ZIP file | |
| 19AQMM25R0050.pdf | ||
| Attachment 5 - Cleaning Floorplan - A2634_ESG_PRM_OPS_FP_ALC_240502_For Information.pdf | ||
| Attachment 8 - Suggested Inventory List.xlsx | XLSX spreadsheet | |
| Attachment 2 - Pricing Template.xlsx | XLSX spreadsheet | |
| Attachment 7 - FFE Matrix - A2634_ESG_PRM_FFE_Matrix_ALC_240228.xlsx | XLSX spreadsheet |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OSAKA EXPO 2025
Design Update February 16, 2024
2FEBRUARY 16, 2024
Floor Plan Ground Floor Plan
VIP
Performer
Staff
Exhibition
UP
UP
UP
UP
UP
DOS
STAFF
MEETING
ROOM
VIP LOUNGE
DCG
CG
VIP STAIRS
TEA ROOM /
PROTOCOL
KITCHEN
RESTAURANT
RETAIL /
PASSPORT
WC
WC
WC
WC
WC
SPARK
SPARK
OPS
MECH
ELEC.
WATER TANK
MECH.
STAFF SUITE
CR #2
CR #1
MEP
SECURITY
UNIFORM
WC
WC
DRESSING
ROOM
GREEN
ROOM WC
STORE
STAGE
ENTRY
STAIRS
AV
DW
VOID
VOID
ELEVATOR
OPS
DIRECTOR
OFFICE 2
OFFICE 1
TRAVEL
NATURE
OUTDOOR
LOUNGE
PRE-EVENT
VIP STAIRS
MULTI-PURPOSE
WC
WC
STORAGE
CATERING
LOBBY
STORAGE
MEP
CRESCENDO
SPACE 2
SPACE 1
ELEVATOR
ELEC
56.8 m²
STAGE
15.6 m²
GREEN RM
16.7 m²
DRESSING RM
13.9 m²
SEC.
29.6 m²
MECH.
40.9 m²
UNIFORM
28.5 m²
STAFF
WC
WC
CR
CR
48.8 m²
OPS
46.4 m²
ELEC.
WC
STORE RM
62.5 m²
RETAIL
ST N
9.0 m²
AV
18.8 m²
WATER TANK
28.3 m²
MECH.
VOID
160.2 m²
KITCHEN
84.1 m²
RESTAURANT
WC
WC
ELEVATOR
DW
VOID
ENTRY
SPARK
ST S
1:20
1:13
1:15
1:14
1:20
1:20
1:14
1:14
SPARK
PICK-UP
WINDOW
RAISED
LOADING DOCK
OPS DIR.
01S.03.02
11.0 m²
AV
15.1 m²
AV
CONCEALED
VIP DOOR
8.3 m²
OFFICE 1
8.4 m²
OFFICE 2
18.7 m²
MTG RM
13.3 m²
TEA RM
39.1 m²
VIP LOBBY
9.7 m²
DCG
9.8 m²
CG
WC
WC
52.4 m²
DOS
22.5 m²
MTG RM
39.8 m²
CATERING
43.2 m²
STORAGE
78.9 m²
MEP
TRAVEL
CRESCENDO
SPACE 2
SPACE 1
ST N
ST S
NATURE
1:21
1:20
1:14
1:14
1:14
OPEN
OPEN
ELEVATOR
ROOF
OPEN
ROOF
1:20
1:20
1:20
1:20
1:20
31.3 m²
ELEC/IT
1:24
142.2 m²
MULTI-PURPOSE
ROOM
59.9 m²
PRE-EVENT
BAR
WC
WC
8.2 m²
STORAGE
LOBBY
DW
54.3 m²
OUTDOOR LOUNGE
16740
14610
JOIN US
SEALKEY NOTESGENERAL NOTES
date phase title client number production architect VICTOR F. TRAHAN, III, FAIA revision date number
FOR COORDINATION
PURPOSES ONLY
NOT FOR CONSTRUCTION
1.
TA
DRAFT 02.15.2024
USA PAVILION EXPO 2025 OSAKA
USDOS
DD COORDINATION DRAFT
PROGRAM P.001
1A PROGRAM AXON - L01
2A PROGRAM AXON - L02
1 : 200
2 PROGRAM PLAN - L02
1 : 200
1 PROGRAM PLAN - L01
MTG ROOM Not Placed STAFF/DOS Not Placed VIP LOBBY Not Placed MTG ROOM Not Placed STORE Not Placed PRE-EVENT Not Placed MULTI-PURPOSE Not Placed
ELEC. 2.8 m² AV 9.0 m² OFFICE 1 8.3 m² KITCHEN 160.2 m² RESTAURANT 84.1 m² RETAIL 62.5 m² ELEC. 46.4 m² OPS 48.8 m² SEC. 13.9 m² MECH. 29.6 m² UNIFORM 40.9 m² STAFF 28.5 m² MEP Not Enclosed DRESSING RM 16.7 m² GREEN RM 15.6 m² STAGE 56.8 m² AV 11.0 m² MTG RM 18.7 m² OFFICE 2 8.4 m² AV 15.1 m² CG 9.8 m² DCG 9.7 m² DOS 52.4 m² MECH. 28.3 m² OPS DIR. 10.5 m² WATER TANK 18.8 m² SPARK 26.7 m² SPARK 26.4 m²
ELEC/IT 31.3 m² CRESCENDO 153.5 m² STORAGE 8.2 m² LOBBY 14.9 m² CATERING 39.8 m² STORAGE 43.2 m² MEP 78.9 m² TRAVEL 199.9 m² NATURE 142.3 m² SPACE 1 74.2 m² SPACE 2 79.2 m²
UP
UP
UP
UP
DOS
STAFF
MEETING
ROOM
VIP LOUNGE
DCG
CG
VIP STAIRS
TEA ROOM /
PROTOCOL
KITCHEN
RESTAURANT
RETAIL /
PASSPORT
WC
WC
WC
WC
WC
SPARK
SPARK
OPS
MECH
ELEC.
WATER TANK
MECH.
STAFF SUITE
CR #2
CR #1
MEP
SECURITY
UNIFORM
WC
WC
DRESSING
ROOM
GREEN
ROOM WC
STORE
STAGE
ENTRY
STAIRS
AV
DW
VOID
VOID
ELEVATOR
OPS
DIRECTOR
OFFICE 2
OFFICE 1
TRAVEL
NATURE
OUTDOOR
LOUNGE
PRE-EVENT
VIP STAIRS
MULTI-PURPOSE
WC
WC
STORAGE
CATERING
LOBBY
STORAGE
MEP
CRESCENDO
SPACE 2
SPACE 1
ELEVATOR
ELEC
56.8 m²
STAGE
15.6 m²
GREEN RM
16.7 m²
DRESSING RM
13.9 m²
SEC.
29.6 m²
MECH.
40.9 m²
UNIFORM
28.5 m²
STAFF
WC
WC
CR
CR
48.8 m²
OPS
46.4 m²
ELEC.
WC
STORE RM
62.5 m²
RETAIL
ST N
9.0 m²
AV
18.8 m²
WATER TANK
28.3 m²
MECH.
VOID
160.2 m²
KITCHEN
84.1 m²
RESTAURANT
WC
WC
ELEVATOR
DW
VOID
ENTRY
SPARK
ST S
1:20
1:13 1:15
1:14
1:20
1:20
1:14
1:14
SPARK
PICK-UP
WINDOW
RAISED
LOADING DOCK
OPS DIR.
01S.03.02
11.0 m²
AV
15.1 m²
AV
CONCEALED
VIP DOOR
8.3 m²
OFFICE 1
8.4 m²
OFFICE 2
18.7 m²
MTG RM
13.3 m²
TEA RM
39.1 m²
VIP LOBBY
9.7 m²
DCG
9.8 m²
CG
WC
WC
52.4 m²
DOS
22.5 m²
MTG RM
39.8 m²
CATERING
43.2 m²
STORAGE
78.9 m²
MEP
TRAVEL
CRESCENDO
SPACE 2
SPACE 1
ST N
ST S
NATURE
1:21
1:20
1:14
1:14
1:14
OPEN
OPEN
ELEVATOR
ROOF
OPEN
ROOF
1:20
1:20
1:20
1:20
1:20
31.3 m²
ELEC/IT
1:24
142.2 m²
MULTI-PURPOSE
ROOM
59.9 m²
PRE-EVENT
BAR
WC
WC
8.2 m²
STORAGE
LOBBY
DW
54.3 m²
OUTDOOR LOUNGE
16740
14610
JOIN US
SEALKEY NOTESGENERAL NOTES
date phase title client number production architect VICTOR F. TRAHAN, III, FAIA revision date number
FOR COORDINATION
PURPOSES ONLY
NOT FOR CONSTRUCTION
1.
TA
DRAFT 02.15.2024
USA PAVILION EXPO 2025 OSAKA
USDOS
DD COORDINATION DRAFT
PROGRAM P.001
1A PROGRAM AXON - L01
2A PROGRAM AXON - L02
1 : 200
2 PROGRAM PLAN - L02
1 : 200
1 PROGRAM PLAN - L01
MTG ROOM Not Placed STAFF/DOS Not Placed VIP LOBBY Not Placed MTG ROOM Not Placed STORE Not Placed PRE-EVENT Not Placed MULTI-PURPOSE Not Placed
ELEC. 2.8 m² AV 9.0 m² OFFICE 1 8.3 m² KITCHEN 160.2 m² RESTAURANT 84.1 m² RETAIL 62.5 m² ELEC. 46.4 m² OPS 48.8 m² SEC. 13.9 m² MECH. 29.6 m² UNIFORM 40.9 m² STAFF 28.5 m² MEP Not Enclosed DRESSING RM 16.7 m² GREEN RM 15.6 m² STAGE 56.8 m² AV 11.0 m² MTG RM 18.7 m² OFFICE 2 8.4 m² AV 15.1 m² CG 9.8 m² DCG 9.7 m² DOS 52.4 m² MECH. 28.3 m² OPS DIR. 10.5 m² WATER TANK 18.8 m² SPARK 26.7 m² SPARK 26.4 m²
ELEC/IT 31.3 m² CRESCENDO 153.5 m² STORAGE 8.2 m² LOBBY 14.9 m² CATERING 39.8 m² STORAGE 43.2 m² MEP 78.9 m² TRAVEL 199.9 m² NATURE 142.3 m² SPACE 1 74.2 m² SPACE 2 79.2 m²
3FEBRUARY 16, 2024
Floor Plan Ground Floor Plan - North
VIP
Performer
Staff
Exhibition
UP
UP
UP
DOS
STAFF
MEETING
ROOM
VIP LOUNGE
DCG
CG
VIP STAIRS
TEA ROOM /
PROTOCOL
KITCHEN
RESTAURANT
RETAIL /
PASSPORT
WC
WC
WC
WC
WC
SPARK
SPARK
OPS
MECH
ELEC.
WATER TANK
MECH.
STAFF SUITE
CR #2
CR #1
MEP
SECURITY
UNIFORM
WC
WC
DRESSING
ROOM
GREEN
ROOM WC
STORE
STAGE
ENTRY
STAIRS
AV
DW
VOID
VOID
ELEVATOR
OPS
DIRECTOR
OFFICE 2
OFFICE 1
TRAVEL
NATURE
OUTDOOR
LOUNGE
PRE-EVENT
VIP STAIRS
MULTI-PURPOSE
WC
WC
STORAGE
CATERING
LOBBY
STORAGE
MEP
CRESCENDO
SPACE 2
SPACE 1
ELEVATOR
ELEC
56.8 m²
STAGE
15.6 m²
GREEN RM
16.7 m²
DRESSING RM
13.9 m²
SEC.
29.6 m²
MECH.
40.9 m²
UNIFORM
28.5 m²
STAFF
WC
WC
CR
CR
48.8 m²
OPS
46.4 m²
ELEC.
WC
STORE RM
62.5 m²
RETAIL
ST N
9.0 m²
AV
18.8 m²
WATER TANK
28.3 m²
MECH.
VOID
160.2 m²
KITCHEN
84.1 m²
RESTAURANT
WC
WC
ELEVATOR
DW
VOID
ENTRY
SPARK
ST S
1:20
1:13
1:15
1:14
1:20
1:20
1:14
1:14
SPARK
PICK-UP
WINDOW
RAISED
LOADING DOCK
OPS DIR.
01S.03.02
11.0 m²
AV
15.1 m²
AV
CONCEALED
VIP DOOR
8.3 m²
OFFICE 1
8.4 m²
OFFICE 2
18.7 m²
MTG RM
13.3 m²
TEA RM
39.1 m²
VIP LOBBY
9.7 m²
DCG
9.8 m²
CG
WC
WC
52.4 m²
DOS
22.5 m²
MTG RM
39.8 m²
CATERING
43.2 m²
STORAGE
78.9 m²
MEP
TRAVEL
CRESCENDO
SPACE 2
SPACE 1
ST N
ST S
NATURE
1:21
1:20
1:14
1:14
1:14
OPEN
OPEN
ELEVATOR
ROOF
OPEN
ROOF
1:20
1:20
1:20
1:20
1:20
31.3 m²
ELEC/IT
1:24
142.2 m²
MULTI-PURPOSE
ROOM
59.9 m²
PRE-EVENT
BAR
WC
WC
8.2 m²
STORAGE
LOBBY
DW
54.3 m²
OUTDOOR LOUNGE
16740
14610
JOIN US
SEALKEY NOTESGENERAL NOTES
date phase title client number production architect VICTOR F. TRAHAN, III, FAIA revision date number
FOR COORDINATION
PURPOSES ONLY
NOT FOR CONSTRUCTION
1.
TA
DRAFT 02.15.2024
USA PAVILION EXPO 2025 OSAKA
USDOS
DD COORDINATION DRAFT
PROGRAM P.001
1A PROGRAM AXON - L01
2A PROGRAM AXON - L02
1 : 200
2 PROGRAM PLAN - L02
1 : 200
1 PROGRAM PLAN - L01
MTG ROOM Not Placed STAFF/DOS Not Placed VIP LOBBY Not Placed MTG ROOM Not Placed STORE Not Placed PRE-EVENT Not Placed MULTI-PURPOSE Not Placed
ELEC. 2.8 m² AV 9.0 m² OFFICE 1 8.3 m² KITCHEN 160.2 m² RESTAURANT 84.1 m² RETAIL 62.5 m² ELEC. 46.4 m² OPS 48.8 m² SEC. 13.9 m² MECH. 29.6 m² UNIFORM 40.9 m² STAFF 28.5 m² MEP Not Enclosed DRESSING RM 16.7 m² GREEN RM 15.6 m² STAGE 56.8 m² AV 11.0 m² MTG RM 18.7 m² OFFICE 2 8.4 m² AV 15.1 m² CG 9.8 m² DCG 9.7 m² DOS 52.4 m² MECH. 28.3 m² OPS DIR. 10.5 m² WATER TANK 18.8 m² SPARK 26.7 m² SPARK 26.4 m²
ELEC/IT 31.3 m² CRESCENDO 153.5 m² STORAGE 8.2 m² LOBBY 14.9 m² CATERING 39.8 m² STORAGE 43.2 m² MEP 78.9 m² TRAVEL 199.9 m² NATURE 142.3 m² SPACE 1 74.2 m² SPACE 2 79.2 m²
4FEBRUARY 16, 2024
Floor Plan Ground Floor Plan - South
VIP
Performer
UP
UP
UP
DOS
STAFF
MEETING
ROOM
VIP LOUNGE
DCG
CG
VIP STAIRS
TEA ROOM /
PROTOCOL
KITCHEN
RESTAURANT
RETAIL /
PASSPORT
WC
WC
WC
WC
WC
SPARK
SPARK
OPS
MECH
ELEC.
WATER TANK
MECH.
STAFF SUITE
CR #2
CR #1
MEP
SECURITY
UNIFORM
WC
WC
DRESSING
ROOM
GREEN
ROOM WC
STORE
STAGE
ENTRY
STAIRS
AV
DW
VOID
VOID
ELEVATOR
OPS
DIRECTOR
OFFICE 2
OFFICE 1
TRAVEL
NATURE
OUTDOOR
LOUNGE
PRE-EVENT
VIP STAIRS
MULTI-PURPOSE
WC
WC
STORAGE
CATERING
LOBBY
STORAGE
MEP
CRESCENDO
SPACE 2
SPACE 1
ELEVATOR
ELEC
56.8 m²
STAGE
15.6 m²
GREEN RM
16.7 m²
DRESSING RM
13.9 m²
SEC.
29.6 m²
MECH.
40.9 m²
UNIFORM
28.5 m²
STAFF
WC
WC
CR
CR
48.8 m²
OPS
46.4 m²
ELEC.
WC
STORE RM
62.5 m²
RETAIL
ST N
9.0 m²
AV
18.8 m²
WATER TANK
28.3 m²
MECH.
VOID
160.2 m²
KITCHEN
84.1 m²
RESTAURANT
WC
WC
ELEVATOR
DW
VOID
ENTRY
SPARK
ST S
1:20
1:13
1:15
1:14
1:20
1:20
1:14
1:14
SPARK
PICK-UP
WINDOW
RAISED
LOADING DOCK
OPS DIR.
01S.03.02
11.0 m²
AV
15.1 m²
AV
CONCEALED
VIP DOOR
8.3 m²
OFFICE 1
8.4 m²
OFFICE 2
18.7 m²
MTG RM
13.3 m²
TEA RM
39.1 m²
VIP LOBBY
9.7 m²
DCG
9.8 m²
CG
WC
WC
52.4 m²
DOS
22.5 m²
MTG RM
39.8 m²
CATERING
43.2 m²
STORAGE
78.9 m²
MEP
TRAVEL
CRESCENDO
SPACE 2
SPACE 1
ST N
ST S
NATURE
1:21
1:20
1:14
1:14
1:14
OPEN
OPEN
ELEVATOR
ROOF
OPEN
ROOF
1:20
1:20
1:20
1:20
1:20
31.3 m²
ELEC/IT
1:24
142.2 m²
MULTI-PURPOSE
ROOM
59.9 m²
PRE-EVENT
BAR
WC
WC
8.2 m²
STORAGE
LOBBY
DW
54.3 m²
OUTDOOR LOUNGE
16740
14610
JOIN US
SEALKEY NOTESGENERAL NOTES
date phase title client number production architect VICTOR F. TRAHAN, III, FAIA revision date number
FOR COORDINATION
PURPOSES ONLY
NOT FOR CONSTRUCTION
1.
TA
DRAFT 02.15.2024
USA PAVILION EXPO 2025 OSAKA
USDOS
DD COORDINATION DRAFT
PROGRAM P.001
1A PROGRAM AXON - L01
2A PROGRAM AXON - L02
1 : 200
2 PROGRAM PLAN - L02
1 : 200
1 PROGRAM PLAN - L01
MTG ROOM Not Placed STAFF/DOS Not Placed VIP LOBBY Not Placed MTG ROOM Not Placed STORE Not Placed PRE-EVENT Not Placed MULTI-PURPOSE Not Placed
ELEC. 2.8 m² AV 9.0 m² OFFICE 1 8.3 m² KITCHEN 160.2 m² RESTAURANT 84.1 m² RETAIL 62.5 m² ELEC. 46.4 m² OPS 48.8 m² SEC. 13.9 m² MECH. 29.6 m² UNIFORM 40.9 m² STAFF 28.5 m² MEP Not Enclosed DRESSING RM 16.7 m² GREEN RM 15.6 m² STAGE 56.8 m² AV 11.0 m² MTG RM 18.7 m² OFFICE 2 8.4 m² AV 15.1 m² CG 9.8 m² DCG 9.7 m² DOS 52.4 m² MECH. 28.3 m² OPS DIR. 10.5 m² WATER TANK 18.8 m² SPARK 26.7 m² SPARK 26.4 m²
ELEC/IT 31.3 m² CRESCENDO 153.5 m² STORAGE 8.2 m² LOBBY 14.9 m² CATERING 39.8 m² STORAGE 43.2 m² MEP 78.9 m² TRAVEL 199.9 m² NATURE 142.3 m² SPACE 1 74.2 m² SPACE 2 79.2 m²
5FEBRUARY 16, 2024
Floor Plan Second Floor Plan
VIP
Performer
UP
UP
UP
DOS
STAFF
MEETING
ROOM
VIP LOUNGE
DCG
CG
VIP STAIRS
TEA ROOM /
PROTOCOL
KITCHEN
RESTAURANT
RETAIL /
PASSPORT
WC
WC
WC
WC
WC
SPARK
SPARK
OPS
MECH
ELEC.
WATER TANK
MECH.
STAFF SUITE
CR #2
CR #1
MEP
SECURITY
UNIFORM
WC
WC
DRESSING
ROOM
GREEN
ROOM WC
STORE
STAGE
ENTRY
STAIRS
AV
DW
VOID
VOID
ELEVATOR
OPS
DIRECTOR
OFFICE 2
OFFICE 1
TRAVEL
NATURE
OUTDOOR
LOUNGE
PRE-EVENT
VIP STAIRS
MULTI-PURPOSE
WC
WC
STORAGE
CATERING
LOBBY
STORAGE
MEP
CRESCENDO
SPACE 2
SPACE 1
ELEVATOR
ELEC
56.8 m²
STAGE
15.6 m²
GREEN RM
16.7 m²
DRESSING RM
13.9 m²
SEC.
29.6 m²
MECH.
40.9 m²
UNIFORM
28.5 m²
STAFF
WC
WC
CR
CR
48.8 m²
OPS
46.4 m²
ELEC.
WC
STORE RM
62.5 m²
RETAIL
ST N
9.0 m²
AV
18.8 m²
WATER TANK
28.3 m²
MECH.
VOID
160.2 m²
KITCHEN
84.1 m²
RESTAURANT
WC
WC
ELEVATOR
DW
VOID
ENTRY
SPARK
ST S
1:20
1:13
1:15
1:14
1:20
1:20
1:14
1:14
SPARK
PICK-UP
WINDOW
RAISED
LOADING DOCK
OPS DIR.
01S.03.02
11.0 m²
AV
15.1 m²
AV
CONCEALED
VIP DOOR
8.3 m²
OFFICE 1
8.4 m²
OFFICE 2
18.7 m²
MTG RM
13.3 m²
TEA RM
39.1 m²
VIP LOBBY
9.7 m²
DCG
9.8 m²
CG
WC
WC
52.4 m²
DOS
22.5 m²
MTG RM
39.8 m²
CATERING
43.2 m²
STORAGE
78.9 m²
MEP
TRAVEL
CRESCENDO
SPACE 2
SPACE 1
ST N
ST S
NATURE
1:21
1:20
1:14
1:14
1:14
OPEN
OPEN
ELEVATOR
ROOF
OPEN
ROOF
1:20
1:20
1:20
1:20
1:20
31.3 m²
ELEC/IT
1:24
142.2 m²
MULTI-PURPOSE
ROOM
59.9 m²
PRE-EVENT
BAR
WC
WC
8.2 m²
STORAGE
LOBBY
DW
54.3 m²
OUTDOOR LOUNGE
16740
14610
JOIN US
SEALKEY NOTESGENERAL NOTES
date phase title client number production architect VICTOR F. TRAHAN, III, FAIA revision date number
FOR COORDINATION
PURPOSES ONLY
NOT FOR CONSTRUCTION
1.
TA
DRAFT 02.15.2024
USA PAVILION EXPO 2025 OSAKA
USDOS
DD COORDINATION DRAFT
PROGRAM P.001
1A PROGRAM AXON - L01
2A PROGRAM AXON - L02
1 : 200
2 PROGRAM PLAN - L02
1 : 200
1 PROGRAM PLAN - L01
MTG ROOM Not Placed STAFF/DOS Not Placed VIP LOBBY Not Placed MTG ROOM Not Placed STORE Not Placed PRE-EVENT Not Placed MULTI-PURPOSE Not Placed
ELEC. 2.8 m² AV 9.0 m² OFFICE 1 8.3 m² KITCHEN 160.2 m² RESTAURANT 84.1 m² RETAIL 62.5 m² ELEC. 46.4 m² OPS 48.8 m² SEC. 13.9 m² MECH. 29.6 m² UNIFORM 40.9 m² STAFF 28.5 m² MEP Not Enclosed DRESSING RM 16.7 m² GREEN RM 15.6 m² STAGE 56.8 m² AV 11.0 m² MTG RM 18.7 m² OFFICE 2 8.4 m² AV 15.1 m² CG 9.8 m² DCG 9.7 m² DOS 52.4 m² MECH. 28.3 m² OPS DIR. 10.5 m² WATER TANK 18.8 m² SPARK 26.7 m² SPARK 26.4 m²
ELEC/IT 31.3 m² CRESCENDO 153.5 m² STORAGE 8.2 m² LOBBY 14.9 m² CATERING 39.8 m² STORAGE 43.2 m² MEP 78.9 m² TRAVEL 199.9 m² NATURE 142.3 m² SPACE 1 74.2 m² SPACE 2 79.2 m²
6FEBRUARY 16, 2024
Floor Plan Second Floor Plan - North
VIP
Performer
UP
UP
UP
DOS
STAFF
MEETING
ROOM
VIP LOUNGE
DCG
CG
VIP STAIRS
TEA ROOM /
PROTOCOL
KITCHEN
RESTAURANT
RETAIL /
PASSPORT
WC
WC
WC
WC
WC
SPARK
SPARK
OPS
MECH
ELEC.
WATER TANK
MECH.
STAFF SUITE
CR #2
CR #1
MEP
SECURITY
UNIFORM
WC
WC
DRESSING
ROOM
GREEN
ROOM WC
STORE
STAGE
ENTRY
STAIRS
AV
DW
VOID
VOID
ELEVATOR
OPS
DIRECTOR
OFFICE 2
OFFICE 1
TRAVEL
NATURE
OUTDOOR
LOUNGE
PRE-EVENT
VIP STAIRS
MULTI-PURPOSE
WC
WC
STORAGE
CATERING
LOBBY
STORAGE
MEP
CRESCENDO
SPACE 2
SPACE 1
ELEVATOR
ELEC
56.8 m²
STAGE
15.6 m²
GREEN RM
16.7 m²
DRESSING RM
13.9 m²
SEC.
29.6 m²
MECH.
40.9 m²
UNIFORM
28.5 m²
STAFF
WC
WC
CR
CR
48.8 m²
OPS
46.4 m²
ELEC.
WC
STORE RM
62.5 m²
RETAIL
ST N
9.0 m²
AV
18.8 m²
WATER TANK
28.3 m²
MECH.
VOID
160.2 m²
KITCHEN
84.1 m²
RESTAURANT
WC
WC
ELEVATOR
DW
VOID
ENTRY
SPARK
ST S
1:20
1:13
1:15
1:14
1:20
1:20
1:14
1:14
SPARK
PICK-UP
WINDOW
RAISED
LOADING DOCK
OPS DIR.
01S.03.02
11.0 m²
AV
15.1 m²
AV
CONCEALED
VIP DOOR
8.3 m²
OFFICE 1
8.4 m²
OFFICE 2
18.7 m²
MTG RM
13.3 m²
TEA RM
39.1 m²
VIP LOBBY
9.7 m²
DCG
9.8 m²
CG
WC
WC
52.4 m²
DOS
22.5 m²
MTG RM
39.8 m²
CATERING
43.2 m²
STORAGE
78.9 m²
MEP
TRAVEL
CRESCENDO
SPACE 2
SPACE 1
ST N
ST S
NATURE
1:21
1:20
1:14
1:14
1:14
OPEN
OPEN
ELEVATOR
ROOF
OPEN
ROOF
1:20
1:20
1:20
1:20
1:20
31.3 m²
ELEC/IT
1:24
142.2 m²
MULTI-PURPOSE
ROOM
59.9 m²
PRE-EVENT
BAR
WC
WC
8.2 m²
STORAGE
LOBBY
DW
54.3 m²
OUTDOOR LOUNGE
16740
14610
JOIN US
SEALKEY NOTESGENERAL NOTES
date phase title client number production architect VICTOR F. TRAHAN, III, FAIA revision date number
FOR COORDINATION
PURPOSES ONLY
NOT FOR CONSTRUCTION
1.
TA
DRAFT 02.15.2024
USA PAVILION EXPO 2025 OSAKA
USDOS
DD COORDINATION DRAFT
PROGRAM P.001
1A PROGRAM AXON - L01
2A PROGRAM AXON - L02
1 : 200
2 PROGRAM PLAN - L02
1 : 200
1 PROGRAM PLAN - L01
MTG ROOM Not Placed STAFF/DOS Not Placed VIP LOBBY Not Placed MTG ROOM Not Placed STORE Not Placed PRE-EVENT Not Placed MULTI-PURPOSE Not Placed
ELEC. 2.8 m² AV 9.0 m² OFFICE 1 8.3 m² KITCHEN 160.2 m² RESTAURANT 84.1 m² RETAIL 62.5 m² ELEC. 46.4 m² OPS 48.8 m² SEC. 13.9 m² MECH. 29.6 m² UNIFORM 40.9 m² STAFF 28.5 m² MEP Not Enclosed DRESSING RM 16.7 m² GREEN RM 15.6 m² STAGE 56.8 m² AV 11.0 m² MTG RM 18.7 m² OFFICE 2 8.4 m² AV 15.1 m² CG 9.8 m² DCG 9.7 m² DOS 52.4 m² MECH. 28.3 m² OPS DIR. 10.5 m² WATER TANK 18.8 m² SPARK 26.7 m² SPARK 26.4 m²
ELEC/IT 31.3 m² CRESCENDO 153.5 m² STORAGE 8.2 m² LOBBY 14.9 m² CATERING 39.8 m² STORAGE 43.2 m² MEP 78.9 m² TRAVEL 199.9 m² NATURE 142.3 m² SPACE 1 74.2 m² SPACE 2 79.2 m²
7FEBRUARY 16, 2024
Floor Plan Second Floor Plan - South
VIP
Performer
ELEVATOR
39.1 m²
VIP LOBBY
13.3 m²
TEA RM
52.4 m²
DOS
9.7 m²
DCG
9.8 m²
CG
WC WC
OCCUPANCY = 60
AR
T
W
AL
L
RE
CE
PT
IO
N
FL AG D IS PL A Y
PRESENTATION DISPLAY
MOON ROCK
DISPLAY
5460 3900
364 0
7 28 0 2 58 0
2 58 0
22.5 m²
MTG RM
PH
O TO
CO P IE R
39.8 m²
CATERING
43.2 m²
STORAGE
ELEVATOR
DW
142.2 m²
MULTI-PURPOSE
ROOM
54.3 m²
OUTDOOR LOUNGE
3.7 m²
WC
3.7 m²
WC
8.2 m² STORAGE 14.9 m²
LOBBY
59.9 m²
PRE-EVENT
9.4 m²
BAR
OCCUPANCY = 69
OCCUPANCY = 106
FLAG DISPLAY
FLAG DISPLAY
DISPLAY
AR
T W
AL L
AR
T W
AL L
AR
T W
AL L
BAR STOOL SEATING
9100 9020
728 0
5 46 0
ART WALL
16740
1 46 1 0
ELEC.
00N.03.01
ELEVATOR
13.3 m²
TEA RM
9.7 m²
DCG
9.8 m²
CG
3.7 m²
WC
3.7 m²
WC
OCCUPANCY = 60
AR
T
W
AL
L
AR
T
W
AL
L
MOON ROCK
DISPLAY
FL
AG
D
IS
PL
AY
PRESENTATION DISPLAY
PH
OT
O
CO
PI
ER
22.5 m²
MTG RM
RE
CE
PT
IO
N
52.4 m²
DOS
18.7 m²
MTG RM
8.4 m²
OFFICE 2
8.3 m²
OFFICE 1
1 :A.610
5 :A.610
1 :A.553
2 :A.5623 :A.610
5 :A.572
3 :A.572
2 :A.572
1 :A.572
4 :A.572
1 :A.574
SEALKEY NOTESGENERAL NOTES
date phase title client number production architect VICTOR F. TRAHAN, III, FAIA revision date number
FOR COORDINATION
PURPOSES ONLY
NOT FOR CONSTRUCTION
1.
TA
DRAFT 02.15.2024
USA PAVILION EXPO 2025 OSAKA
USDOS
DD COORDINATION DRAFT
VIP - PROPOSED P.006
1 : 100
3 L01 - VIP OP2
1 : 100
5 L02 - VIP OP2
1 : 100
1 L01 - VIP OP2 Copy 1
8FEBRUARY 16, 2024
Floor Plan VIP suite
Ground Floor Second Floor
VIP
9FEBRUARY 16, 2024
Multipurpose room test fits
Layout - Standing Reception Layout - Talk/LectureLayout - Seated Dinner Occupancy = 120 Occupancy = 295 Occupancy = 132
10FEBRUARY 16, 2024
Multipurpose room test fits - dining
Layout - Seated Dinner Layout - Seated DinnerLayout - Seated Dinner
16 74 0
14 61 0
16 74 0
14 61 0
16 74 0
14 61 0
SEAL
KEY NOTES
GENERAL NOTES
date phase title client number production architect
VICTOR F. TRAHAN, III, FAIA
revision date number
FOR COORDINATION
PURPOSES ONLYNOT FOR CONSTRUCTION
1.
TA
DRAFT
02.15.2024
USA PAVILION EXPO 2025 OSAKA
USDOS
DD COORDINATION DRAFT
Multi-Purpose Room
Program - dining test fits
P.005
1 : 50
1 PROGRAM PLAN - L02 Layout- Dining - Grid Copy 1
1 : 50
2 PROGRAM PLAN - L02 Layout- Reception - Grid Copy 1
1 : 50
3 PROGRAM PLAN - L02 Layout-Lecture - Grid Copy 1
Occupancy = 112
14 x 72” tables - 8 seats @ 28” spacing
Occupancy = 126
14 x 72” tables - 9 seats @ 25” spacing
Occupancy = 130
13 x 80” tables - 10 seats @ 25” spacing
16 74 0
14 61 0
16 74 0
14 61 0
16 74 0
14 61 0
SEAL
KEY NOTES
GENERAL NOTES
date phase title client number production architect
VICTOR F. TRAHAN, III, FAIA
revision date number
FOR COORDINATION
PURPOSES ONLYNOT FOR CONSTRUCTION
1.
TA
DRAFT
02.15.2024
USA PAVILION EXPO 2025 OSAKA
USDOS
DD COORDINATION DRAFT
Multi-Purpose Room
Program - dining test fits
P.005
1 : 50
1 PROGRAM PLAN - L02 Layout- Dining - Grid Copy 1
1 : 50
2 PROGRAM PLAN - L02 Layout- Reception - Grid Copy 1
1 : 50
3 PROGRAM PLAN - L02 Layout-Lecture - Grid Copy 1
16740
1461 0
16 74 0
14 61 0
16 74 0
14 61 0
SEAL
KEY NOTES
GENERAL NOTES
date phase title client number production architect
VICTOR F. TRAHAN, III, FAIA
revision date number
FOR COORDINATION
PURPOSES ONLYNOT FOR CONSTRUCTION
1.
TA
DRAFT
02.15.2024
USA PAVILION EXPO 2025 OSAKA
USDOS
DD COORDINATION DRAFT
Multi-Purpose Room
Program - dining test fits
P.005
1 : 50
1 PROGRAM PLAN - L02 Layout- Dining - Grid Copy 1
1 : 50
2 PROGRAM PLAN - L02 Layout- Reception - Grid Copy 1
1 : 50
3 PROGRAM PLAN - L02 Layout-Lecture - Grid Copy 1
84.1 m²
RESTAURANT
WC
WC
KITCHEN
11FEBRUARY 16, 2024
Floor Plan Restaurant Seating
Restaurant Seating Occupancy = 60
File details come from the government source that posted it. Updated .