This document is a Request for Information/Clarification (RFI) form related to a federal contract opportunity for the replacement of a HVAC system in Air Force Building #1651 at the Naval Air Station Joint Reserve Base in Fort Worth, Texas. The key details are:
The 301st Contracting Flight is requesting quotes for a turnkey project to replace one 14-ton R-410A VRF Heat Recovery Condensing unit and one six port Mode Control Unit (MCU) for the HVAC system in Air Force Building #1651. The contractor is required to complete and submit this RFI form to the Contracting Officer with any requests for information or clarification. The government will then evaluate the RFI and provide a formal response. The contractor must review the government's response and indicate if a change order or cost increase is anticipated. Further instructions are provided on the process for submitting the reviewed RFI form back to the Contracting Officer.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| NAS JRB Bldg 1651 SYSTEM.2.COMPONENT.LOCATION.pdf | ||
| NAS JRB Bldg 1651 RFI1 FA667525Q0001.pdf | ||
| NAS JRB Bldg 1651 Fort Worth Submittal - VRF June 2016.pdf | ||
| FA667525Q0001-SITE VISIT-SIGN IN SHEET.pdf | ||
| Attachment 2-B1651 HVAC Statement of Work-24SEP2024.pdf | ||
| Attachment 5-Service Wage Det-Tarrant-22JUL2024.pdf | ||
| Attachment 7-B1651 HVAC-AF 3000.pdf | ||
| Attachment 4 - Provisions and Clauses.pdf | ||
| FA667525Q0001-B1651 HVAC-Combined Synopsis Solicitation.docx | DOCX document | |
| Attachment 1 - Offerors Information.docx | DOCX document | |
| Attachment 3- B1651 HVAC- Brand Name Justification.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR INFORMATION / CLARIFICATION FORM
FOR CONTRACTOR USE ONLY
CONTRACT NO: RFI NUMBER: DATE (MM/DD/YY)
SUBJECT: DRAWING REFERENCE / DETAIL:
ATTACHMENT SENT UNDER SEPARATE
COVER(__)
RESPONSE NEEDED BY:
REQUEST:
PROPOSED SOLUTION (If applicable):
TO(Contracting Officer): 301 CONF/PK FROM (Contractor):
DATE (MM/DD/YY) TYPE OR PRINT NAME AND TITLE SIGNATURE:
REQUEST FOR INFORMATION / CLARIFICATION FORM
FOR GOVERNMENT USE ONLY
FROM CONTRACTING
TO:
For Evaluation and Action
DATE (MM/DD/YY) TYPE OR PRINT NAME AND TITLE SIGNATURE:
RFI RESPONSE / CLARIFICATION (refer to page 2)
RFI RESPONSE / CLARIFICATION:-
Government to complete following sections:
TO:(AF Contracting Office)
DATE (MM/DD/YY) TYPE OR PRINT NAME AND TITLE SIGNATURE:
TO:(Contractor)
DATE (MM/DD/YY) TYPE OR PRINT NAME AND TITLE SIGNATURE:
CONTRACTOR REVIEW
After reviewing the Government response, does the contractor anticipate A change order will be required? YES NO There will be an increase in the cost of the project? YES NO
Reviewer:
DATE (MM/DD/YY) TYPE OR PRINT NAME AND TITLE SIGNATURE:
*Contractor- return reviewed form to Contracting Officer. Should the review results in YES for either of the two questions, if any further action is required by the contractor (i.e. submission of change proporsal), they will be notified by the contracting office.
| TOContractor: |
| Reviewer: |
| Text1: |
| Text2: 001 |
| Date3_af_date: |
| Text4: |
| Text5: |
| Check Box6: Off |
| Date7_af_date: |
| Text9: |
| Text10: |
| Text11: |
| Text12: |
| Date13_af_date: |
| Text14: |
| Text16: |
| Date17_af_date: |
| Text18: |
| Text20: |
| Date21_af_date: |
| Text22: |
| Date24_af_date: |
| Text25: |
| Check Box27: Off |
| Check Box28: Off |
| Check Box29: Off |
| Check Box30: Off |
| Date31_af_date: |
| Text32: |
File details come from the government source that posted it. Updated .