Attachment 1 - Offerors Information.docx
DOCX document 29 KB Posted
- Attached to
- B1651 HVAC Federal contract opportunity
- Solicitation number
- FA667525Q0001
About this file
This document is the Offeror's Information for Solicitation FA667525Q0001 for the replacement of a 14-ton R-410A VRF Heat Recovery Condensing unit and a 6-port Mode Control Unit (MCU) for Air Force Building #1651 at the Naval Air Station Joint Reserve Base in Fort Worth, Texas.
The solicitation requires a turnkey project to replace the HVAC equipment in accordance with the attached Statement of Work. The requested pricing is for a firm fixed price, with the contractor required to begin performance within 10 calendar days and complete the work within 90 calendar days after receiving the Notice to Proceed, unless the performance period is negotiated. The government will consider a commercial warranty and FOB Destination pricing terms unless otherwise specified by the offeror. The solicitation is being issued by the 301st Contracting Flight of the Department of the Air Force Reserve Command.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| NAS JRB Bldg 1651 Fort Worth Submittal - VRF June 2016.pdf | ||
| NAS JRB Bldg 1651 RFI1 FA667525Q0001.pdf | ||
| NAS JRB Bldg 1651 SYSTEM.2.COMPONENT.LOCATION.pdf | ||
| FA667525Q0001-SITE VISIT-SIGN IN SHEET.pdf | ||
| FA667525Q0001-B1651 HVAC-Combined Synopsis Solicitation.docx | DOCX document | |
| Attachment 3- B1651 HVAC- Brand Name Justification.pdf | ||
| Attachment 5-Service Wage Det-Tarrant-22JUL2024.pdf | ||
| Attachment 7-B1651 HVAC-AF 3000.pdf | ||
| Attachment 2-B1651 HVAC Statement of Work-24SEP2024.pdf | ||
| Attachment 4 - Provisions and Clauses.pdf | ||
| Attachment 6-B1651 HVAC- RFI.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION FA667525Q0001
OCTOBER 22, 2024
B1651 HVAC
Offeror’s Information
Offeror Name & Address:
POC:
CAGE:
Phone:
UEI:
E-Mail:
ITEM
NUMBER
| Description |
| QUANTITY |
| UNIT |
| UNIT |
PRICE
TOTAL
PRICE
| 0001 |
| Turnkey replacement of one each, 14-ton R-410A VRF Heat Recovery Condensing unit and one each six port Mode Control Unit (MCU) in accordance with Attachment 2-B1651 HVAC Statement of Work-24SEP2024. |
Product Service Code: N041 Pricing Arrangement: Firm Fixed Price
| 1 |
| LOT |
Warranty (Please use this line to state your standard commercial warranty).
| YEARS |
| N/A |
| N/A |
Total
Delivery Date:
The contractor shall begin performance within 10 calendar days and complete it within 90 calendar days after receiving Notice to Proceed.
This performance period is |_| mandatory, |X| negotiable.
NOTE: If the “negotiable” block is checked, please complete the following if you disagree with aforementioned performance period:
|X| Request performance period be changed to:
PAYMENT TERMS & DELIVERY:
The Government shall consider your “DISCOUNT TERMS” to be NET 30 unless following block is marked and filled-in completely:
|_| Use the following DISCOUNT TERMS for this offer:
days; Net 30
The Government shall consider this offer to be FOB Destination unless following block is marked and filled-in completely:
| |_| FOB Other: |
| Not Applicable |
ADDITIONAL INFORMATION (for Offeror Use):
{Insert Name}
DATE
{Insert Title}
File details come from the government source that posted it. Updated .