Attachment 6 _ 100_ CD Submission Requirements.pdf
PDF 133 KB Posted
- Solicitation number
- 36C77624R0008
About this file
This document outlines requirements for a 100% construction document submission for a demolition and construction project at the Ralph H. Johnson VA Medical Center in Charleston, South Carolina. It requires delivery of a narrative report addressing items in the design requirements and additional architect-engineer recommendations, including potential bid deducts, recommended construction phasing, and design calculations. It also requires one half-size set of drawings in AutoCAD Revit format, a custom edited VA master specification, and a submittal list organized by division and specification identifying all contractor submittals, certifications, shop drawings, tests, samples, and inspections. Additional requirements include providing all drawings, specifications, reports, cost estimates, quality assurance/quality control documentation, and design calculations in specified digital formats.
The related federal contract opportunity is a pre-solicitation notice for a project to demolish an existing medical building and construct a new clinic at the Myrtle Beach Community Based Outpatient Clinic.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ralph H. Johnson VAHCS 109 Bee St. 8/21/23 Charleston, SC 29401
Attachment E
100% CD Submission Requirements
Submit complete documents for final review prior to solicitation. Deliver the following (labeled with 100%-CD submission) and include this attachment as a checklist with your submission:
• 1 copy of a narrative report forwarding the 95%-CD submission addressing items listed in the design requirements and any additional A/E recommendations. The report should include identifying potential bid deducts, recommended construction phasing based upon discussions with the IPT, and any design calculations or analysis.
• 1 half size set of all drawings (blueline copies) required by project, produced on AutoCAD Revit software.
• 1 copy of custom edited VA Master Specification to be used for this project and a master submittal list identifying all the submittals required to be submitted by the contractor for review. The list shall be organized by division and specification and include submittals, certifications, shop drawings, tests, samples, and inspections required per drawing and specification section.
• 1 CD containing o All drawings in Autodesk Revit, 2D AutoCAD, and pdf format.
o All specifications in Microsoft Word and pdf format.
o Narrative report in pdf format.
o Updated cost estimate prepared in pdf format.
o PG-18-15, Executed QA/QC Plan, documenting that a thorough review and coordination have been completed.
o PG-18-15, Volume C checklists, completed and signed.
o PG-18-15, Design Review Checklists, completed and signed.
o Checklist of all contractor-required construction submittals, certifications, tests, and inspections in an Excel spreadsheet format.
o All design related calculations.