Attachment 5 _ 95_ CD Submission Requirements.pdf
PDF 134 KB Posted
- Solicitation number
- 36C77624R0008
About this file
This document outlines 95% construction document submission requirements for a Department of Veterans Affairs project to demolish an existing medical building and construct a new clinic at the Ralph H. Johnson VA Medical Center in Charleston, South Carolina. The submission must include narrative reports addressing design requirements and recommendations, half-size construction drawings in AutoCAD Revit format, a custom edited VA master specification and submittal list organized by division and specification, and a CD containing all drawings in multiple formats as well as specifications, cost estimates, construction plans, quality assurance documentation and design calculations. The related federal contract opportunity is to provide pre-solicitation services for the C1DA--Demolish MB and Construct New Clinic Minor Design - Myrtle Beach CBOC project through the Department of Veterans Affairs Technology Acquisition Center Austin.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ralph H. Johnson VAHCS 109 Bee St. 8/21/23 Charleston, SC 29401
Attachment D
95% CD Submission Requirements
Deliver the following (labeled with 95%-CD submission) and include this attachment as a checklist with your submission:
• 1 copy of a narrative report forwarding the 65%-DD submission addressing items listed in the design requirements and any additional A/E recommendations. The report shall identify potential bid deducts, VA and IPT agreed on FFE & Construction Phasing Plans, and any design calculations or analysis.
• 1 half size set of all drawings (blueline copies) required by project, produced on AutoCAD Revit software.
• 1 copy of custom edited VA Master Specification to be used for this project and a master submittal list identifying all the submittals required to be submitted by the contractor for review. The list shall be organized by division and specification and include submittals, certifications, shop drawings, tests, samples, and inspections required per drawing and specification section.
• 1 CD containing o All drawings in Autodesk Revit, 2D AutoCAD, and pdf format.
o All specifications and master submittal list in Microsoft Word and pdf format.
o Narrative report in pdf format.
o Updated cost estimate prepared in pdf format.
o Finalized PCRA Plan.
o Finalized FFE & Construction Phasing Plans.
o PG-18-15, Executed QA/QC Plan, documenting that a thorough review and coordination have been completed.
o PG-18-15, Volume C checklists, completed and signed.
o PG-18-15, Design Review Checklists, completed and signed.
o Checklist of all contractor-required construction submittals, certifications, tests, and inspections in an Excel spreadsheet format.
o All design related calculations.
• Construction plan showing temporary conditions for construction, per phase, to ensure general conditions, construction safety requirements are designed, identified, and specified.