Attachment 5- SRSO Submittal Checklist.pdf
PDF 68 KB Posted
- Solicitation number
- 1240LU26Q0068
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Submittal Checklist for the Salmon River Seed Orchard Disconnect and Electrical Life Safety Rehab project that consolidates submittal requirements from the Project Manual. The checklist is organized by specification section, submittal type, item description, timing, and notes to guide contractors on required documentation throughout project phases.
Preconstruction submittals include action items spanning sections 01 3000, 06 1000, and 26 (electrical divisions). Required preconstruction documents consist of a tabular submittal schedule with sequential numbering; product data and shop drawings for wiring diagrams and calculations; manufacturer's certificates and technical data for wood preservative materials and concrete products; product data for service entrance equipment, conduit, panelboards, breakers, disconnects, and Motor Control Centers with wire size, grounding, and breaker sizing calculations; product data for raceways, wireways, enclosures, and cabinets; shop drawings for grounding systems showing locations and details with UL/IEEE compliance documentation; product information for electrical cabinets and enclosures with outdoor use justification; shop drawings for equipment frames and disconnect frames with dimensions and mounting details; and product data for enclosed switches including electrical schematics. During construction, draft and final panel directories must be submitted and coordinated with the Government. Closeout submittals require certificates, test reports, and inspection reports; feeder test results and torque logs with signed reports; grounding field test reports and as-built drawings including resistance values and rod locations; field quality-control test reports with procedures and results; and operation and maintenance data with wiring diagrams, spare parts lists, and warranty information.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SRSO Submittal Checklist This checklist consolidates submittal requirements from the Project Manual sections for the Salmon River Seed Orchard Disconnect and Electrical Life Safety Rehab project.
Section Submittal Type
Item / Description Timing Notes
01 3000 Action Submittal Schedule (tabular)
Preconstruction Include all items, sequential numbering
01 3000 Action Product Data, Shop Drawings, Wiring
Diagrams Wiring Calculations
Preconstruction mark items clearly
06 1000 Action Product Data on wood preservative materials
Preconstruction Technical data required
06 1000 Action Manufacturer's Certificate for wood products, Concrete Products
Preconstruction Certify compliance
26 0100 Action Product Data for service entrance equipment, conduit, panelboards, breakers, disconnects, Motor Control Centers
Preconstruction Include calculations for wire size, grounding, breaker sizing 26 0500 Action Product Data for conduit, raceways, fittings, wire, cable
Preconstruction Manufacturer's literature
26 0526 Action Product Data for ground rods, electrode conductors, ground bus
Preconstruction Include UL/IEEE compliance
26 0526 Action Shop Drawings for grounding system
Preconstruction Show locations and details
26 0533 Action Product Data for raceways, wireways, enclosures, cabinets
Preconstruction Include plans and details for custom enclosures
26 2716 Action Product information for electrical cabinets/enclosures
Preconstruction Outdoor use justification
26 2716 Action Shop drawings for equipment frame and disconnect frame
Preconstruction Include dimensions and mounting details
26 2816 Action Product Data for enclosed switches
Preconstruction Include electrical schematics 26 0100 During
Construction Panel Directories (Draft and Final) During
Construction Coordinate with
Government 01 3000 Closeout Certificates, Test Reports, Inspection Reports
Closeout Submit as specified in individual sections
26 0500 Closeout Feeder test results and torque log
Closeout Submit signed reports
26 0526 Closeout Field test reports and As- Built drawings
Closeout Include resistance values and rod locations
26 2816 Closeout Field quality-control test reports
Closeout Include procedures and results 26 2816 Closeout Operation and maintenance data, wiring diagrams
Closeout Provide spare parts list and warranty