Attachment 4 - Specifications.pdf

PDF 463 KB Posted

Attached to
Nez Perce-Clearwater NF - Seed Orchard Disconnect and Electrical Life Safety Rehab
Solicitation number
1240LU26Q0068
Issued by

About this file

This is a Project Manual containing specifications for an electrical disconnect and life safety rehabilitation project at the Salmon River Seed Orchard located at 11905 US-95 in Lucile, Idaho, under the jurisdiction of the Nez Perce-Clearwater National Forests. The project involves transitioning overhead power to underground service at the meter and includes comprehensive electrical system upgrades.

The specifications detail work across multiple divisions including administrative requirements, temporary facilities and controls, demolition, rough carpentry, and extensive electrical work. Key electrical requirements include installation of rigid metal conduit (RMC) and PVC conduit, proper grounding and bonding systems with ground resistance testing (maximum 5 ohms), service equipment modifications, panelboards with directory labeling, circuit breakers, enclosed switches rated for 400+ amps at 600 volts, and support structures using pressure-treated posts and galvanized steel channel. The project requires coordination with Idaho County Light and Power (208-983-1610), third-party electrical inspections, all work performed by Idaho-licensed electricians, and submission of detailed shop drawings, wiring diagrams, as-built documentation, and operation and maintenance manuals. Testing and commissioning activities include load balancing demonstrations, system startup verification, and staff training. The contractor bears responsibility for trenching, utility coordination via 811 Call-Before-You-Dig, damage repair to existing buried utilities, proper trench bedding and compaction, and site restoration including seeding. Environmental protections address spill prevention, hazardous material handling, waste removal, and compliance with OSHA, NEC, and Forest Service regulations.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT MANUAL FOR:

Seed Orchard Disconnect and Electrical Life Safety Rehab

Date: 1/4/2026

Salmon River Seed Orchard

45.579682, -116.297671

11905 US-95

Lucile, ID 83542

Nez Perce - Clearwater National Forests

1008 Highway 64 Kamiah, ID

Phone: 208-935-4261

USFS Salmon River Seed Orchard Electrical Disconnect

Table of Contents

PROCUREMENT AND CONTRACTING REQUIREMENTS

SPECIFICATIONS TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT & CONTRACTING REQUIREMENTS

DIVISION 01 -- GENERAL REQUIREMENTS

01 3000 - Administrative Requirements

01 5000 - Temporary Facilities and Controls

01 7000 - Execution and Closeout Requirements

DIVISION 02 -- EXISTING CONDITIONS

02 4100 - Demolition

DIVISION 06 -- WOOD, PLASTICS, AND COMPOSITES

06 1000 - Rough Carpentry

DIVISION 26 -- ELECTRICAL

26 0010 - General Electrical Requirements

26 0100 – Common Work Results For Electrical

26 0500 – Conductors, Cables, and Raceways

26 0526 – Grounding and bonding for electrical Systems

26 0533 – Conduit, Boxes, and Covers for Electrical Systems

26 2716 – Electrical Cabinets and Enclosures

26 2816 – Enclosed Switches

END OF SECTION

USFS Salmon River Seed Orchard Electrical Disconnect

01 3000 – 1 Administrative Requirements

SECTION 01 3000 ADMINISTRATIVE REQUIREMENTS

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Electronic documentation.

B. Preconstruction meeting.

C. Construction progress schedule.

D. Requests for interpretation

E. Submittals.

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION

3.01 ELECTRONIC DOCUMENTATION

A. Contract documents: All drawings, specifications, addenda and change orders that document work to be done.

B. All documents transmitted for the purposes of administration of the contract are to be in electronic (PDF) format.

1. Besides submittals for review, information, and closeout, this procedure applies to requests for information (RFI's) progress documentation, contract modification documents (e.g. supplementary instructions, change proposals, change orders), applications for payment, field reports and meeting minutes, and any other document any participant wishes to make part of the project record.

3.02 PRECONSTRUCTION MEETING

A. USFS Contracting Officer will schedule a meeting after Notice of Award.

B. Attendance Required:

1. USFS Contracting Officer.

2. USFS Contracting Officer’s Representatives

3. General Contractor.

4. All major sub-contractors.

C. Agenda:

1. Execution of USFS Contracting Officer-General Contractor Agreement.

2. Distribution of Contract Documents.

3. Submission of list of subcontractors, list of products, and progress schedule.

4. Designation of personnel representing the parties to Contract.

5. Procedures and processing of: submittals, substitutions, applications for payments, field decisions, change orders, and contract closeout procedures.

6. Schedule.

D. Contracting Officer’s Representative will record minutes and distribute copies within seven days after meeting to participants, with one electronic copy to each participant, and those affected by decisions made.

3.03 CONSTRUCTION PROGRESS SCHEDULE- Preinstallation meeting

A. Electrical Preconstruction Conference: Schedule conference with the Government and Idaho County Light and Power, not later than 7 days after notice to proceed. This meeting may be coincident with the Preconstruction Meeting. Agenda topics include, but are not limited to, 01 3000 – 2 Administrative Requirements the following:

1. Electrical installation schedule.

2. Status of power system evaluation.

3. Utility work coordination and class of service request.

4. Close out inspection and activities.

5. Conduct and submit results of contractor’s site review/inspection before submitting product data and shop drawings for electrical equipment.

B. If schedule requires revision after review, submit revised schedule within 7 days of the notice to proceed.

C. Contracting Officer Representative will record minutes and distribute copies within seven days after meeting to participants, with one electronic copy to each participant, and those affected by decisions made.

3.04 REQUESTS FOR INTERPRETATION (RFI).

A. RFI: Request for clarification of specifications or drawings in writing to the Contracting Officer.

1. Preparation: Prepare an RFI immediately upon discovery of a need for interpretation of contract documents. Failure to submit a RFI in a timely manner is not a legitimate cause for claiming additional costs or delays in execution of the work.

a. Each specific request requires an individual RFI which includes the contract number, Contract Name, USFS Contracting Officer's, and General Contractor's names, and the RFI item.

b. Highlight items requiring priority or expedited response.

2. RFI Log: Contractor will prepare and maintain a tabular log of RFIs for the duration of the project.

a. Indicate current status of every RFI. Update log promptly and on a regular basis.

b. Note dates of when each request is made, and when a response is received.

B. Review Time: USFS Contracting Officer will respond and return RFIs to General Contractor within 5 business days of receipt. For the purpose of establishing the start of the mandated response period, RFIs received after 12:00 noon will be considered as having been received on the following regular working day.

C. Equivalent or equal: Product of like type and function that complies with all applicable provisions of drawings and specifications and which has been approved as substitute for specified item.

3.05 SUBMITTALS

A. Submit to USFS Contracting Officer for review a schedule for all submittals in tabular format.

B. SUBMITTAL PROCEDURES

1. Transmit each submittal in PDF format with a copy of approved submittal form. All submittals over 8 Mb shall be setup on a share file site and access granted through email with folder’s link for download.

2. Sequentially number the submittals forms. Revise submittals with original number and a sequential alphabetic suffix.

3. Use the following format for the information with each submittal:

01 3000 – 3 Administrative Requirements

a. Project Name

b. Contract Number

c. Name of Contracting Officer (CO)

d. Name of Contracting Officer’s Representative (COR)

e. Name of Prime Contractor

f. Name of firm or entity that prepared the submittal

g. Submittal Date

h. Unique Submittal Number

i. Type of Submittal

j. Name or mark each piece of equipment, supply, or material

k. Reference the drawing, detail and specification section number for each submittal.

4. Submittals shall be complete, clearly show item used, size, dimensions, capacity, rough in, etc., as required for complete product check and installation inspection.

Manufacturer’s literature showing more than one item shall be clearly marked as to which item is being furnished, or it will be rejected and returned without review.

5. Original Shop Drawings shall be accurate documentation of the contractor’s interpretation of the contract documents and site conditions.

a. Wiring Diagrams or Schematics for each electrical box or panel will be provided prior to installation and are considered to be shop drawings.

b. Generic Product Data, non-project-specific information submitted as shop drawings do not meet the requirements for shop drawings

6. When Certificates, Test reports, Inspection reports are specified in individual sections, submit to Forest Service Contracting Officer for review

7. Each submittal shall be thoroughly checked by the Contractor for compliance with the contract document requirements, accuracy of dimensions, relationship to the work of other trades, and conformance with sound safe practices for installation.

8. On each submittal, clearly indicate deviations from requirements in the Contract Documents, including minor variations and limitations; include relevant additional information and revisions, other than those requested on previous submittals. Indicate by highlighting on each submittal or noting on attached separate sheet.

C. Review time: USFS Contracting Officer will acknowledge receipt and review. For each submittal for review, allow 5 business days for comment. USFS Contracting Officer will review each submittal, and approve, or take other appropriate action. Submittals received after 12:00 noon will be considered as having been received on the following regular working day.

1. When revised for resubmission, identify all changes made since previous submission.

01 5000 - USFS Salmon River Seed Orchard Disconnect and Electrical

01 5000 - 1 Temporary Facilities and Controls

SECTION 01 5000 - TEMPORARY FACILITIES AND CONTROLS

A. Project Site Conditions.

B. Temporary Utilities.

C. Temporary Barriers and Security.

D. Safety and Protection Devices.

E. Fire Control

F. Archeological Preservation

G. Landscape Preservation

H. Environmental Protection

I. Waste Removal.

1.02 PROJECT SITE CONDITIONS

A. LOCATION: Site is located just outside of the Highway 95 Right of Way Corridor on Forest Service Land on Federal Property.

B. WATER: site has no potable water.

C. POWER: is overhead power, and will be changed to underground at the meter.

D. FLOODING: Site is located within the 500Year Flood plan, but can be susceptible to localized weather events.

E. CLIMATE: The site is located in a warm semi arid area of Idaho. Winter lows are in the 30’s and summer highs are in the upper 90’s. Site has a lot of sun exposure in the late afternoon with UV indices in the High level most of the spring, summer, and fall.

1.03 TEMPORARY UTILITIES

A. USFS Contracting Officer may provide the following:

1. Permission to install a temporary office/job trailer on the project site.

2. Use of electrical power, consisting of connection to existing facilities for basic construction operations. This does not include power for any on-site temporary living facilities for construction personnel.

3. Non-Potable water service is available at the Seed Orchard Warehouse.

B. Contractor is responsible for their own power, water, sanitation facilities, and enclosures for work at the site and will maintain site daily in a clean and sanitary condition.

C. ATTENTION: Telecommunication service can be difficult due to remote nature of the site and deep canyon. Contractor will need to find a method of communication that will be reasonable and prompt.

D. Contractor shall completely remove temporary installations when no longer needed and the premises shall be completely clean, patched, and refinished to match adjacent areas.

1.04 TEMPORARY BARRIERS & SECURITY

A. Contractor will provide barriers to prevent unauthorized entry to construction areas and areas that could be hazardous to USFS employees on site or the public.

01 5000 - 2 Temporary Facilities and Controls

B. Barriers should:

1. Not impede the Government’s use of seed orchard site.

2. Protect adjacent properties from damage from construction operations and demolition.

3. Protect vehicular traffic, stored materials, site, and structures from damage.

4. Provide security adequate to protect contractor’s work, existing facilities, and operations from unauthorized entry, vandalism, or theft.

5. Provide a location for parking vehicles and equipment during project.

1.05 SAFTEY AND PROTECTION DEVICES

A. The Contractors shall provide their own ladders, scaffolds, harnesses, etc. for access to their work in various portions of the site as required.

B. All construction methods and procedures shall be in compliance with applicable OSHA regulations, 29 CFR art 1926 and Part 1910. Provide appropriate safety barricades and signs to protect the public from construction hazards.

C. The Electrical Contractor shall provide all necessary first aid, fire extinguishers Class ABC, and special hazard mitigations as may exist in their work area in accordance with good and safe practices and as required by occupational safety authorities.

D. The Contractor shall remove all temporary safety devices and fences when no longer needed, they shall be removed by the Contractor.

1.06 FIRE CONTROL (FS 236-1)

A. Contractor's Responsibility for Contractor-Caused Fires. The Contractor, whether or not directed by the Forest Service, shall immediately extinguish, without expense to the Government, all fires on or in the vicinity of the project which are caused by Contractor's employees, whether set directly or indirectly as a result of Contractor operations. The Contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation resulting from fires set or caused by the Contractor's employees or resulting from contract operations.

B. Fire Protection Requirements - Fire Plan. At all times during closed fire season period, as specified by State law, the Contractor shall comply with each of the following provisions to the extent applicable to his operation under the contract.

1. Fire Extinguishers and Tools on Mobile or Stationary Equipment. Each unit of powered equipment used in connection with this contract, including automobiles, trucks, tractors, etc., shall be equipped with serviceable tools and fire extinguishers as follows:

• One - fire extinguisher, dry chemical type of not less than 2-1/2 pound capacity with 4 BC or higher rating.

• One - water container (at least 1-gallon capacity)

2. Power saws. For each power saw used in connection with this contract, the following will be provided:

• One - Fire extinguisher, containing not less than 8 ounces of extinguisher fluid, or a dry chemical powder-type of not less than 1-pound capacity. The extinguisher must be immediately accessible to the saw operator at all times.

• Any fueling or refueling of a power saw shall only be done in an area which has first been cleared or is free of all material capable of carrying fire; power saw shall be moved at least 10 feet from place of fueling before starting.

01 5000 - 3 Temporary Facilities and Controls

C. Smoking. Smoking shall not be permitted within the contract area except on surfaced or dirt roads, at landings, within closed vehicles, in camps, or at other posted places, and shall never be allowed while working or traveling on foot or within 15 feet of building openings.

1.07 ARCHEOLOGICAL PRESERVATION

A. Confine operations to within the cleared construction areas. Any work outside the proposed construction area must be approved by the contracting officer. Any work must be halted if artifacts are uncovered, and reported immediately to the CO or delegated representative.

1.08 LANDSCAPE PRESERVATION

A. Do not operate equipment or otherwise disturb the natural vegetation and soil beyond the construction limits. Repair any damage to vegetation or structures outside the project limits as directed by the Contracting Officer

1.09 ENVIRONMENTAL PROTECTION

A. Prevention of Oil Spills. The contractor is required to have a spill plan. When storage facilities for oil or oil products are on site, appropriate preventive measures shall be taken to insure that any spill of such oil or oil products does not enter any stream or any other body of water. If a spill of petroleum product should occur in water, immediately notify the Contracting Officer and appropriate state agencies.

B. Service all equipment only in the areas approved by the Contracting Officer. If the total oil or oil products storage exceeds 1320 gallons or if any single container exceeds a capacity of 660 gallons, prepare a Spill Prevention Control and Countermeasures (SPCC) Plan. Meet all applicable EPA requirements (40 CFR 112) including certification by a registered professional engineer.

C. Contractor shall ensure that all personnel involved in handling and packaging the hazardous waste are trained for the level of expertise required for the proper performance of the task and, in particular, in the areas of chemical incompatibility, general first aid procedures, and spills. Provide handling and personal protective equipment appropriate to ensure safe handling of the hazardous waste according to 29 CFR 1910.120). Notify the Forest Service of all hazardous material that may be brought onto the National Forest.

D. The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. The contractor must clean up spills or leaks in a manner that complies with Federal, state, and local laws and regulations and to the satisfaction of the CO. When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.

1.10 WASTE REMOVAL

A. Provide means of removing mud from vehicle wheels before entering highways.

B. Provide waste removal facilities and services as required to maintain the site in clean and orderly condition.

C. Provide containers with lids, clean up trash and contract debris every day. Remove trash from Forest Service property at the end of each work week and dispose in a legal manner, do not burn or bury.

01 5000 - 4 Temporary Facilities and Controls

PART 3 EXECUTION - NOT USED

01 7000 - USFS Salmon River Seed Orchard Disconnect and Electrical 01 7000 - 1

Execution and Closeout Requirements

SECTION 01 7000 - EXECUTION AND CLOSEOUT REQUIREMENTS

A. Project Conditions.

B. Coordination.

C. Examination and Layout.

D. General installation requirements.

E. Closeout procedures.

F. System startup.

G. Demonstration and instruction.

H. Operation and Maintenance Manuals.

I. Maintenance.

1.02 PROJECT CONDITIONS

A. USFS will continue to utilize the upper site during construction. Construction operations must be coordinated with USFS. Provide 48-hour advance notification for major operations that will disturb utilities to the site.

B. Contractor shall Inspect site plan, indicate areas for temporary construction, stockpiling, and field offices.

C. Final site shall be graded to drain.

1. Protect the site from running water, provide water barriers to protect the site from soil erosion.

2. Maintain excavations free of water by providing, operating, and maintaining pumping equipment as needed.

3. Periodically inspect earthwork to detect evidence of erosion and sedimentation and promptly apply corrective measures.

D. Protect the site from fire and other structures from electrical emergencies.

1. Take precautions to reduce the potential for electrical failure, arcing, etc.

E. Pollution Control: Provide methods, means, and facilities to prevent contamination of soil, water, and atmosphere from discharge of noxious, toxic substances, and pollutants produced by construction operations. Comply with federal, state, and local regulations should hazardous spills occur.

1.03 COORDINATION

A. Coordinate all work to place in service underground power and electrical service disconnect and then rewire boxes/panels to run onsite equipment.

B. Coordinate scheduling, submittals, and work to ensure an efficient and orderly sequence of installation and construction elements, with provisions for accommodating items installed later.

C. Notify the Government and the Utility company, Idaho County Light and Power, 48 hours prior to working on the contract. Inform utility of contract scope and comply with their requirements (Idaho County Light & Power Phone: 208-983-1610, ask for Justin Mignerey; Cell 208-507-0247).

D. Coordinate space requirements, supports, and electrical work that are indicated on drawings. Follow routing indicated for conduit and wiring, as closely as practicable

Orchard Disconnect and Electrical 01 7000 - 2 to the drawings. Utilize spaces efficiently to maximize accessibility for future maintenance, and for repairs.

E. Coordinate completion, inspection, clean-up, and closeout on site.

PART 2 PRODUCTS – NOT USED

3.01 EXAMINATION AND LAYOUT

A. Site Verification: It shall be the responsibility of the Contractors to examine and refer to all drawings and specifications for construction conditions which may affect the scope of the project.

1. Verify existing site conditions, dimensions, development, and fixed improvements prior to the start of work.

2. Verify that existing substrate is capable of structural support or attachment of new work being applied or attached.

3. Verify field measurements before confirming product orders or beginning fabrication, to minimize waste due to over-ordering or mis-fabrication.

4. Verify that utility requirements and characteristics of the new equipment are compatible with existing utilities.

5. Verify the locations of existing utilities onsite using Dig Line or other means to determine other existing underground or overhead utilities.

6. Verify that utility services are available, of the correct characteristics, and in the correct locations.

7. The Electrical Contractor shall verify and examine drawings and specifications for conditions which may affect the scope of Electrical, Communications, Electronic Safety and Security work. Inspect the existing facilities for verification of present conditions. Make proper provisions for these conditions in performance of the work.

B. Protect permanent reference points should they exist. If existing survey hubs are dislocated, hire a Professional Land Surveyor to reset permanent survey hubs.

C. Establish elevations, lines and levels on trenching for conduit burial.

3.02 GENERAL INSTALLATION REQUIREMENTS

A. Install products as specified in individual sections, in accordance with manufacturer's instructions and recommendations, and to avoid waste.

B. Make vertical elements plumb and horizontal elements level. Install equipment and fittings, neatly aligned with adjacent vertical and horizontal lines, unless otherwise indicated.

C. Perform whatever cutting and patching is necessary to:

1. Fit products together and integrate with other existing conditions.

2. Repair areas adjacent to cuts to maintain safe conditions.

3. Repair work damaged by new work.

4. Remove and replace defective and non-complying equipment.

D. Fit work watertight for pipes, sleeves, conduits, and other penetrations through surfaces boxes or buildings.

Orchard Disconnect and Electrical 01 7000 - 3

E. Install location tapes and record final depths on as-builts.

3.07 CLOSEOUT PROCEDURES

A. Notify USFS Contracting Officer when work is considered ready for substantial completion inspection.

B. Correct items of work listed in correction punch list and comply with requirements for access to USFS Contracting Officer.

C. Submit written certification, that contract documents have been reviewed, work has been inspected, and that work is complete in accordance with contract documents, manufacture’s recommendation, and third-party inspector. Indicating it is ready for USFS Contracting Officer's final inspection.

1. Furnish a copy of test procedures and results.

2. Field quality test reports.

3. Furnish a copy of a the third party Electrical inspection results.

D. Records and Documents:

1. At beginning of work, Contractor shall set aside one complete set of drawings which shall be maintained to complete "As-Built" set. Drawings, these shall be updated daily in a neat and legible manner and shall not be used for any other purpose. Drawings, specification, change orders, etc. shall be maintained at job site and available for review at any time.

2. Show dimensioned location and routing of all electrical work that will become permanently concealed, cast in concrete or buried underground.

3. Show complete routing and sizing of any significant revisions to systems shown.

4. Show provisions for future connection, referenced to building lines or approved benchmarks.

5. Provide wiring diagrams for all individual communications systems as installed.

Identify all components and show all wire and terminal numbers and connections.

6. Warranty the Contractor shall guarantee that all materials and labor installed are new and of first quality and that any material or labor found defective shall be replaced without cost to the Forest Service (F.S.) within one (1) year after substantial completion of the Contract or one (1) full season of heating and cooling operation, whichever is the greater. The guarantee shall list the date of the beginning of the one (1) year period, which shall be the date that the Substantial Completion Certificate is issued.

E. Final acceptance by the C.O. will not occur until all operating instructions are provided to the CO and Operating Personnel thoroughly indoctrinated in the operation of all electrical equipment by the Contractor.

3.03 SYSTEM STARTUP

A. Verify that tests, meter readings, and specified electrical characteristics agree with those required by the equipment or system manufacturer.

B. Verify that wiring and support components for equipment are complete and sound.

C. Adjust operating products and equipment to ensure smooth and unhindered operation.

D. Coordinate and execute start-up procedures with the presence of the USFS Contracting Officer or the Contracting Officer’s Representative.

E. Submit a written statement that equipment or system has been properly installed and

Orchard Disconnect and Electrical 01 7000 - 4 is functioning correctly.

3.04 DEMONSTRATION AND INSTRUCTION

A. Provide a qualified person who is knowledgeable about the equipment to perform the demonstration and instruction for Government personnel including Contracting Officer’s Representative, Site Manager, and Maintenance Personnel.

B. Demonstrate start-up, operation, control, adjustment, troubleshooting, servicing, maintenance, and shutdown of each item of equipment at scheduled time, at equipment location (demonstration may be recorded).

C. For equipment or systems requiring seasonal operation, perform demonstration for other seasonal workers within six months if necessary.

3.06 OPERATION AND MAINTENANCE MANUALS

A. Operation and Maintenance Manuals (O&M Manuals) shall contain:

1. Names and contact information for the Contracting Officer, Contracting Officer’s Representative, District Ranger, and Site Manager.

2. Names and contact information for the Contractor or Electrician.

3. Product data for installation, maintenance and operations for each piece of equipment.

4. As-Built Wiring Diagrams/Drawings.

5. Equipment start-up and inspection certificates

6. Parts lists

7. Copies of equipment warranties

8. Independent test results

B. Prior to final payment a final electronic copy of the O&M manual and three printed copies shall be furnished to the C.O. Printed copies shall be commercial quality 8-1/2” x 11” folder a labeled “Salmon River Seed Orchard Irrigation Pump Electrical System.”

3.08 MAINTENANCE

A. Maintenance Period: Not less than one year from the date of Substantial Completion.

02 4100 - USFS Salmon River Seed Orchard Disconnect and

02 4100 - 1 Demolition

SECTION 02 4100 – DEMOLITION

A. General Procedures and project conditions

B. Selective demolition of elements for alteration purposes

C. Debris and waste removal

1.02 RELATED REQUIREMENTS

A. Section 01 5000

B. Section 01 7000.

3.01 GENERAL PROCEDURES AND PROJECT CONDITIONS

A. Comply with applicable codes and regulations for demolition operations and safety of adjacent structures and the public.

1. Obtain required permits.

2. Provide, erect, and maintain temporary barriers and security devices.

3. Do not close or obstruct public roadways without permits from authority having jurisdiction.

B. Protect existing structures and other elements to remain in place and not removed.

1. Provide bracing and shoring.

2. Prevent movement or settlement of adjacent structures.

3. Stop work immediately if adjacent structures appear to be in danger.

C. Hazardous Materials:

1. If hazardous materials are discovered during removal operations, stop work and notify USFS Contracting Officer; hazardous materials include regulated asbestos containing materials, lead, PCBs, and mercury.

3.02 SELECTIVE DEMOLITION FOR ALTERATIONS

A. Existing construction and utilities indicated on drawings are based on casual field observation and existing record documents only.

1. Verify construction and utility arrangements are as indicated.

2. Report discrepancies to Contracting Officer before disturbing existing installations.

3. Beginning of demolition work constitutes acceptance of existing conditions that would be apparent upon examination prior to starting demolition.

B. Remove existing work as indicated and required to accomplish new work.

3.03 DEBRIS AND WASTE REMOVAL

A. Remove debris, trash, and demolished materials from site and dispose of legally off of Forest service lands.

B. Leave site in clean condition, raked and ready for seeding.

Disconnect and Electrical 26 1000-1

Rough Carpentry

SECTION 06 1000 - ROUGH CARPENTRY

A. Reference standards

B. Action Submittals

C. General Requirements

D. Exposed Timbers

E. Construction Panels

F. Concrete

G. Accessories

H. Factory Wood Treatment

I. Installation General

J. Installation of Posts

K. Installation of construction panels

L. Tolerances.

1.02 REFERENCE STANDARDS

A. ASTM A153/A153M - Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware; 2016a.

B. ASTM E84 - Standard Test Method for Surface Burning Characteristics of Building Materials; 2018b.

C. AWPA U1 - Use Category System: User Specification for Treated Wood; 2017.

D. PS 1 - Structural Plywood; 2009.

E. WWPA G-5 - Western Lumber Grading Rules; 2017.

1.03 ACTION SUBMITTALS

A. Product Data: Provide technical data on wood preservative materials, Concrete, Rebar

B. Manufacturer's Certificate: Certify that wood products supplied for rough carpentry meet or exceed specified requirements.

PART 2 PRODUCTS

2.01 GENERAL REQUIREMENTS

A. Grading Agency: Any grading agency whose rules are approved by the Board of Review, American Lumber Standard Committee (www.alsc.org) and who provides grading service for the species and grade specified; provide lumber stamped with grade mark unless otherwise indicated.

B. Delivery and Storage: Cover wood, metal, and concrete products to protect against moisture. Support stacked products to prevent deformation and to allow air circulation.

2.02 EXPOSED TIMBERS

A. Wooden Posts: Comply with PS 20 and requirements of specified grading agencies.

1. 4”x6” pressure treated, ground contact -wooden posts UC4b, Copper Nampthenate

B. Submit manufacturer's certificate that products meet or exceed specified

Disconnect and Electrical 26 1000-2 requirements, in lieu of grade stamping.

C. Moisture Content: Kiln-dry (20 percent maximum).

D. Surfacing: S4S.

E. Species: Douglas Fir.

F. Grade: No. 1 & BTR.

2.03 CONSTRUCTION PANELS

A. Kiosk Back board: APA 5/8” B-B Marine Grade 4x8: rated Sheathing, exposure class:

Exposure 1, Thickness: 5/8”.

B. Electrical Mounting Boards: PS 1 A-D plywood, 3/4 inch thick; flame spread index of 25 or less, smoke developed index of 450 or less, when tested in accordance with ASTM E84.

2.04 CONCRETE

A. Cast in place concrete

1. Compressive strength 5,000 PSI strength at 28 days.

2. Packaged Concrete: ASTM C387.

3. Water: Potable.

B. Reinforcement

1. Vertical Bars : #4 ASTM AGrade 60.

2. Rings/Stirrups : #3 8” ring or 8”x8” Square.

3. Ties Gauge 16, ASTM A 853.

C. Sonotube

1. Diameter 12”

2. Depth Minimum 36” below surface.

3. Moisture resistance.

4. Free of damage

2.05 ACCESSORIES

A. Fasteners and Anchors:

1. Provide fabricated post bases, column caps, beam seats, etc as indicated in drawings.

2. Metal and Finish: Hot-dipped galvanized steel complying with ASTM

A153/A153M for high humidity and preservative-treated wood locations, unfinished steel elsewhere.

3. Anchors: Simpson Strong-Tie CB galvanized column base for 4X6” lumber or an approved equal that resists twisting and wind loads.

B. Hangers: Hot dipped galvanized steel, sized to suit framing conditions. Provide type indicated in the drawings.

C. Slotted-Steel Channel: Flange edges turned toward web, and 9/16-inch diameter slotted holes at a maximum of 2 inches on center in webs. Strength rating to suit structural loading.

D. Slotted Channel Fittings and Accessories: Recommended by the manufacturer for use with the type and size of channel with which used.

1. Materials: Same as channels and angles, except metal items may be stainless steel.

E. Adhesives: Waterproof, air cure type, cartridge dispensed; adhesives designed for subfloor applications and complying with either ASTM C557 or ASTM D3498.

Disconnect and Electrical 26 1000-3

2.06 FACTORY WOOD TREATMENT

A. Treated Lumber and Plywood: Comply with requirements of AWPA U1 - Use Category System for wood treatments determined by use categories, expected service conditions, and specific applications.

B. Preservative-Treated Wood: Provide lumber and plywood marked or stamped by an ALSC-accredited testing agency, certifying level and type of treatment in accordance with AWPA standards.

3.01 INSTALLATION - GENERAL

A. Select material sizes to minimize waste.

B. Reuse scrap to the greatest extent possible; clearly separate scrap for use on site as accessory components, including: shims, bracing, and blocking.

3.02 INSTALLATION POSTS

A. Place sonotube plumb and secure prior to pour.

B. Install reinforcement cage : (4) #4 vertical bast with #3 rings at 12” OC with Rebar ties.

C. Use rebar spaces to maintain setback distances.

D. Pour concrete continuously for each sonotube. Vibrate or tap sides to eliminate voids in mixture.

E. Finish top to shed water, ensure post connection is installed prior to finishing.

F. Cure for 7 days prior to mounting posts.

3.03 INSTALLATION OF CONSTRUCTION PANELS

A. Communications and Electrical Room Mounting Boards: Secure with screws to studs or posts with edges over firm bearing; space fasteners at maximum 24 inches on center on all edges and into studs in field of board.

3.04 TOLERANCES

A. Variation from Plane (Other than Floors): 1/4 inch in 10 feet maximum, and 1/4 inch in 30 feet maximum.

Disconnect and Electrical 26 0010-1

General Requirements of Electrical Work

SECTION 26 0010 - GENERAL REQUIREMENTS OF ELECTRICAL WORK

1.01 SECTIONS

A. Summary

B. Definitions

C. Codes, Standards, and Regulations

D. Fees, Permits, and Inspections

E. Intent of Specification and Drawings

F. Contractor’s Responsibility

G. Materials and Equipment

H. Site Examination

I. Installation of Electrical work

J. Project completion and Demonstration.

1.02 SUMMARY

A. This section specifies supplemental requirements generally applicable to the work specified in Division 26. This section is also referenced by related work specified in other Divisions. The requirements listed in this section are supplemental to the Division 01 General Requirements.

B. Electrical, Electronic Safety and Security work for this project shall include all items, articles, materials and the associated labor mentioned, schedules or shown in these specifications and in the accompanying drawings.

C. Furnish and install all equipment, materials and any incidental items required by good practice to complete the systems described herein.

1.03 DEFINITIONS - Throughout contract documents these words and phrases are used:

A. Cable: In accordance with NIST NBS Circular 37 and IEEE standards, in the United States for the purpose of interstate commerce, the definition of "cable" is (1) a conductor with insulation, or a stranded conductor with or without insulation (single-conductor cable); or (2) a combination of conductors insulated from one another (multiple-conductor cable).

B. Demolition: Carefully disconnect and remove items. All reasonable caution shall be taken to avoid damaging removed equipment and to retain its operability.

C. Conductor: In accordance with NIST NBS Circular 37 and IEEE standards, in the United States for the purpose of interstate commerce, the definition of "conductor" is (1) a wire or combination of wires not insulated from one another, suitable for carrying an electric current; (2) (National Electrical Safety Code) a material, usually in the form of wire, cable, or bar, suitable for carrying an electric current; or (3) (general) a substance or body that allows a current of electricity to pass continuously along it.

D. Enclosure: The case or housing of an apparatus, or the fence or wall(s) surrounding an installation, to prevent personnel from accidentally contacting energized parts or to protect the equipment from physical damage. Types of enclosures and enclosure covers include the following:

1. Cabinet: An enclosure that is designed for either surface mounting or flush mounting and is provided with a frame, mat, or trim in which a swinging door or

Disconnect and Electrical 26 0010-2 doors are or can be hung.

2. Concrete Box: A box intended for use in poured concrete.

3. Conduit Body: A means for providing access to the interior of a conduit or tubing system through one or more removable covers at a junction or terminal point. In the United States, conduit bodies are listed in accordance with outlet box requirements.

4. Conduit Box: A box having threaded openings or knockouts for conduit, EMT, or fittings.

5. Cutout Box: An enclosure designed for surface mounting that has swinging doors or covers secured directly to and telescoping with the walls of the enclosure.

6. Device Box: A box with provisions for mounting a wiring device directly to the box.

7. Junction Box: A box with a blank cover that joins different runs of raceway or cable and provides space for connection and branching of the enclosed conductors.

8. Pull Box: A box with a blank cover that joins different runs of raceway and provides access for pulling or replacing the enclosed cables or conductors.

9. Termination Box: An enclosure designed for installation of termination base assemblies consisting of bus bars, terminal strips, or terminal blocks with provision for wire connectors to accommodate incoming or outgoing conductors, or both.

E. Furnish: Purchase material as shown and specified, and place material to approved location on site or elsewhere as noted or agreed upon.

F. Install: Set in place and connect, ready for use and in complete and properly operating finished condition.

G. Provide: Furnish and install with all products, labor, sub-contracts, and appurtenances required for a complete and properly operating, finished condition.

H. Remove back to source: Remove all conduit and wire back to panelboard or last live device.

I. Rough-in: Provide conduit raceway system with junction boxes, fittings, straps, bushings, etc., for future installation of wiring, devices, disconnects and breakers.

Provision shall be made in panelboard (hardware, etc.) for future installation of breakers.

J. Sheath: A continuous metallic covering for conductors or cables.

K. UL Category Control Number (CCN): An alphabetic or alphanumeric code used to identify product categories covered by UL's Listing, Classification, and Recognition Services.

L. Voltage Class: For specified circuits and equipment, voltage classes are defined as follows:

1. Serviceable Voltage - Arranged so that component or product in question may be properly removed and replaced without disassembly, destruction or damage to surrounding installation.

2. Control Voltage: Having electromotive force between any two conductors, or between a single conductor and ground, that is supplied from a battery or other Class 2 or Class 3 power-limited source.

3. Line Voltage: (1) (controls) Designed to operate using the supplied low-voltage

Disconnect and Electrical 26 0010-3 power without transformation. (2) (transmission lines, transformers, SPDs) The line-to-line voltage of the supplying power system.

4. Low Voltage (LV): Having electromotive force between any two conductors, or between a single conductor and ground, that is rated above 30 V but not exceeding 1000 V.

5. Medium Voltage (MV): Having electromotive force between any two conductors, or between a single conductor and ground, that is rated greater than 1 kV but not exceeding 69 kV.

6. High Voltage: (1) (circuits) Having electromotive force between any two conductors, or between a single conductor and ground, that is rated above 69 kV but not exceeding 230 kV. (2) (safety) Having sufficient electromotive force to inflict bodily harm or injury.

M. Wire: In accordance with NIST NBS Circular 37 and IEEE standards, in the United States for the purpose of interstate commerce, the definition of "wire" is a slender rod or filament of drawn metal. A group of small wires used as a single wire is properly called a "stranded wire." A wire or stranded wire covered with insulation is properly called an "insulated wire" or a "single-conductor cable." Nevertheless, when the context indicates that the wire is insulated, the term "wire" will be understood to include the insulation.

N. Post: Includes wooden pressure treated posts or stantion metal post.

1.04 CODES, STANDARDS AND REGULATIONS

A. Perform all work in strict accordance with all applicable national, state and local codes; including, but not limited to latest legally enacted editions of following codes:

1. NEC- NFPA 70, National Electric Code

2. National Electrical Safety Code – NESC, ANSI-C2

3. International Building Code – IBC

4. International Fire Code – IFC

5. International Energy Conservation Code – IECC

B. Standards - Reference to standards infers that installation, equipment and material shall be within limits for which it was designed, tested and approved, in conformance with current publications and standards of following organizations:

1. American National Standards Institute – ANSI

2. American Society for Testing and Materials – ASTM

3. American Society of Heating Refrigerating and Air Conditioning Engineers – ASHRAE (Standard 90-75)

4. Institute of Electrical and Electronics Engineers – IEEE

5. Insulated Cable Engineers Association – ICEA

6. National Electrical Contractors Association – NECA

7. National Electrical Manufacturers' Association – NEMA

8. National Fire Protection Association – NFPA

9. Occupational Safety and Health Administration – OSHA

10. Underwriters' Laboratories, Inc. – UL

11. Standards and Requirement of the Serving Utilities

Disconnect and Electrical 26 0010-4

C. Regulations - Layout has been performed in accordance with applicable regulations and guidelines noted above. Contractor shall carefully apply these regulations and bring any discrepancies to immediate attention of Contracting Officer (C.O.).

1.05 FEES, PERMITS, AND INSPECTIONS

A. Electrical Contractor shall pay for all utility fees and permits in connection with electrical work. Fees shall include any or all connection fees or other inspection fees that are required to be paid before systems can be connected or used.

B. Schedule for third party electrical inspections with local electrical inspector, Electrical Engineer, or other Licensed Electrician. Provide inspection to C.O. including all items of discrepancy noted by inspector.

C. Deliver all inspection certificates or reports to C.O. prior to final acceptance of work.

1.06 INTENT OF SPECIFICATIONS AND DRAWINGS

A. Plans and specifications are intended to result in complete electrical installation in full compliance with all applicable codes, standards and ordinances. Drawing may not be to scale, or code and should be used as a location guide for the improvement.

B. Drawings are partly diagrammatic and do not show routing of conduits, exact location of products, or installation features in exact detail. Locations of devices, fixtures and equipment are approximate unless dimensioned.

C. Diagrams and control schematics are not to scale and do not show physical arrangement of equipment. Do not use diagrams or schematics to obtain lineal conduit and cabling distances, verify in the field all dimensions.

D. In event that discrepancies of any kind exist or required items/details have been omitted, Contractor shall notify C.O. in writing of discrepancy or omission at least ten days prior to bid date. Failure to do so shall be construed as willingness of Contractor to supply all necessary materials and labor required for proper completion of work.

1.07 CONTRACTOR’S RESPONSIBILITY - Contractor shall be responsible for installation of complete and functional piece of work in accordance with true intent of contract documents. Provide all incidental items required for complete installation and satisfactory operation of all equipment, whether or not specifically noted in contract documents.

A. QUALIFICATIONS

1. Contractor shall employ on this project a capable and experienced foreman and such skilled workmen as may be required for various classes of work to be performed.

2. Where special skills and certification are required, Contractor shall ensure that work is performed by individuals with required experience, skill and certification.

B. LICENSING AND CERTIFICATION - All Division 26 work shall be accomplished by Electricians, licensed by State of Idaho, and skilled in their craft. Electrician may elect to hire subcontractors for portions of work who are not licensed electricians, but have required certificates and are over seen by a licensed electrician.

C. COORDINATION

1. Contractor shall consult all contract documents, shop drawings of other trades, and actual building dimensions to predetermine that his work and equipment will fit as planned. Do not scale drawings for fabrication. No extra payment will be issued for materials or items which do not fit because of Contractor's failure to

Disconnect and Electrical 26 0010-5 verify as-built building dimensions.

2. Contractor shall check location and dimensions of fixtures, outlets, equipment, conduit, etc., to determine they clear all openings, structural members, piping, ducts and miscellaneous equipment having fixed locations, so correct clearances and connections can be made.

3. Changes in location of electrical work, necessary due to obstacles or installation of other trades shown on contract documents, shall be made by Electrical Contractor at no extra cost.

2.01 MATERIALS AND EQUIPMENT

A. Electrical equipment may be installed with manufacturer’s standard finish and color except where specific color, finish or choice is indicated. If the manufacturer has no standard finish, equipment shall have a prime coat and two finish coats of gray enamel.

B. This Contractor shall be responsible for materials and equipment installed under this contract. Contractor shall also be responsible for the protection of materials and equipment of the Forest Service from damage as a result of the contractor’rk.

C. Store materials and equipment on raised platforms and protect them from weather by means of waterproof covers. Coverings shall permit circulation of air around the materials to prevent condensation of moisture. Screen or cap openings in equipment to prevent the entry of vermin.

3.01 SITE EXAMINATION

A. Prior to submitting bid, Contractor shall visit site of proposed work and familiarize himself with conditions affecting work. Allowance shall be made in bid for these conditions and no additional allowance shall be granted because of lack of knowledge of such conditions.

B. Contractor shall verify all measurements for products and materials at the building site.

3.02 INSTALLATION OF ELECTRICAL WORK

A. Unless more stringent requirements are specified in the Contract Documents or manufacturers' written instructions, comply with NFPA 70 and NECA NEIS 1 for installation of Work specified in Division 26. Consult CO for resolution of conflicting requirements.

3.03 PROJECT COMPLETION AND DEMONSTRATION

A. TESTING

1. Prior to final test, all switches, panelboards, devices, and fixtures shall be in place.

2. Contractor will engage qualified electrical testing and inspecting Agency/Utility to administer and perform tests and inspections.

3. At completion of work, or upon request from C.O., place entire electrical installation, and/or any portion thereof, in operation to demonstrate satisfactory operation.

4. Inspection reports will be submitted to Contracting Officer.

B. ADJUSTMENTS

Disconnect and Electrical 26 0010-6

1. Make all changes necessary to balance connected electrical loads on complete system. Arrange for balanced conditions of circuits under connected load demands, as contemplated by normal working conditions. Final load and balance test shall be demonstrated in presence of C.O.

2. Immediately correct all deficiencies which are evidenced during tests and repeat tests until system is approved. Do not cover or conceal electrical installations until satisfactory tests are made and approved.

C. DEMONSTRATION

1. The system training is intended to familiarize the F.S. operating and maintenance staff with all systems requiring maintenance. Training is to be provided after the systems are in place and operational, after issues noted during commissioning have been resolved, and before final acceptance.

D. AT COMPLETION OF WORK

1. Clean equipment of dirt and debris, including interior of panels, outlet boxes, etc.

Remove labels from and clean all fixture lenses.

2. Remove materials, scraps, etc., relative to this work and leave premises in clean and orderly condition.

Disconnect and Electrical 26 0100-1

Common Work Results for Electrical

SECTION 260100 - COMMON WORK RESULTS FOR ELECTRICAL

PART 1 - GENERAL

1.01 SUMMARY

A. This section includes requirements for basic electrical materials and methods and includes:

1. Service Equipment

2. Panelboards.

3. Circuit breakers.

4. Supporting Devices.

5. Electrical Identification.

6. Outlet, Pull, and Junction Boxes

7. Device plates and covers.

8. EPO Shunt Trip Switches.

9. Start/Stop Control Switch.

10. Emergency Stop Mushroom Pushbutton.

11. Cleaning of existing Electrical Equipment.

1.02 WORK INCLUDED

A. As specified and as shown, furnish, install, test, and place in satisfactory and successful operation all equipment, materials, devices, and necessary appurtenances to provide a complete and operable electrical system. The work also includes the completion of those details of electrical work not mentioned or shown which are necessary for the successful operation of all electrical systems.

1.03 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specifications, apply to Division 26 Sections.

B. All work shall meet requirements of governing codes and regulations, NFPA 70-2020 (NEC), NEC, and NESC, and NECA standard of installation.

1.04 QUALITY ASSURANCE

A. Advise the Contracting Officer of conflicting codes or conflicts between codes and drawings and specifications.

B. UL Listing: All electrical materials and equipment shall meet requirements of the applicable standards of UL, if UL standards exist for such materials and equipment.