This document is a set of electrical construction drawings and specifications for the Salmon River Seed Orchard at the Nez Perce-Clearwater National Forests in Lucile, Idaho (45.579682°N, -116.297671°W).

The project involves the disconnect and electrical life safety rehabilitation of the seed orchard's pump station. The base bid scope includes removal of existing overhead electrical service, wiring trough, plywood backboard, and one combination motor controller/pump control unit; installation of new underground service from the utility meter to a new 400-ampere, 480-volt, 3-phase fused disconnect switch; installation of new wiring trough and a stanchion mounting assembly for three motor control centers; and field verification of electrical characteristics for three existing pumps. Two bid options provide for replacement of additional existing motor controller/pump control units. The project specifies use of 500 kilogram-circular mil copper conductors with #3 ground in 4-inch conduit for approximately 10 feet and 55 feet of runs. Construction details include installation of three 12-foot pressure-treated posts with grounding electrode systems, trenching requirements, and electrical device mounting specifications. All work must comply with the National Electrical Code and manufacturers' installation procedures. The project includes a one-year materials and equipment guarantee and requires the electrical contractor to coordinate closely with the utility company and government representatives throughout installation.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT LOCATION

UNITED STATES DEPARTMENT OF AGRICULTURE

FOREST SERVICE

NEZ PERCE-CLEARWATER NATIONAL FORESTS Northern Region Region 1

SEED ORCHARD

DISCONNECT AND

ELECTRICAL LIFE

SAFETY REHAB

SALMON RIVER SEED

ORCHARD

NEZ PERCE-CLEARWATER

NATIONAL FORESTS

01/2026 8

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

DATENO. REVISION / ISSUE

TITLE SHEET

AND INDEX

S.GRAVES

Q.SMITH

T1.0

SEED ORCHARD DISCONNECT AND

ELECTRICAL LIFE SAFETY REHAB

SALMON RIVER SEED ORCHARD

LUCILE, IDAHO

I HAVE REVIEWED THE TECHNICAL ASPECTS OF THESE DRAWINGS:

FOREST ENGINEER

RECOMMENDED BY:

ENGINEERING / REGIONAL SPECIALIST

THESE DRAWINGS COMPLY W/ THE FOREST PLAN AND

PROJECT SPECIFIC NEPA DOCUMENTATION:

LINE OFFICER

APPROVED BY:

DIRECTOR OF ENGINEERING

DATE

DATE

DATE

DATE

SHEET SHEET NUMBER DESCRIPTION

1 T1.0 TITLE SHEET AND INDEX

G1.0 SEED ORCHARD PUMP STATION SITE3

E1.0 EXISTING SITE CONFIGURATION4

E2.0 ELECTRICAL DEMOLITION5

E2.1 ELECTRICAL NEW WORK6

E3.0 ELECTRICAL RISER DIAGRAM7

E3.1 ELECTRICAL DETAILS8

N1.0 NOTES ELECTRICAL

DRAWING INDEXPROJECT LOCATION:

LATITUDE: 45.579682

LONGITUDE: -116.297671

TRAVEL DIRECTIONS:

TRAVEL 32 MILES SOUTH OF GRANGEVILLE ON

US HIGHWAY 95 TO FOREST ROAD 1187 ON THE RIGHT.

TURN ONTO SEED ORCHARD ROAD. TRAVEL APPROX.

80 FEET TO THE ROAD ON THE RIGHT THAT TAKES

YOU TO THE PUMPING STATION APPROX. 0.1 MILES IN.

AutoCAD SHX Text

SALMON RIVER SEED ORCHARD

AutoCAD SHX Text

PROJECT LOCATION

AutoCAD SHX Text 1/23/26 17:35 SGRAVES C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO 17:35 SGRAVES C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO 17:35 SGRAVES C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO SGRAVES C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO SGRAVES C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO ELECTRICAL DRAWINGS - FINAL 11-14-2025.DWG;;

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

DRAFTED BY:

AutoCAD SHX Text

STAMPS, LOGOS, AND SEALS

AutoCAD SHX Text

PROJECT NAME

AutoCAD SHX Text

DRAWING TITLE

AutoCAD SHX Text

CHECKED

AutoCAD SHX Text

ARCHIVE NO.

AutoCAD SHX Text

SUB SHEET NO.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text

DATE

AutoCAD SHX Text

ISSUE 1 01/26

Northern Region Region 1

SEED ORCHARD

DISCONNECT AND

ELECTRICAL LIFE

SAFETY REHAB

SALMON RIVER SEED

ORCHARD

NEZ PERCE-CLEARWATER

NATIONAL FORESTS

01/2026 8

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

DATENO. REVISION / ISSUE

NOTES ELECTRICAL

S.GRAVES

Q.SMITH

N1.0

AutoCAD SHX Text 1/28/26 15:42 SGRAVES C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO 15:42 SGRAVES C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO 15:42 SGRAVES C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO SGRAVES C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO SGRAVES C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO ELECTRICAL DRAWINGS - FINAL 11-14-2025.DWG;;

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

DRAFTED BY:

AutoCAD SHX Text

STAMPS, LOGOS, AND SEALS

AutoCAD SHX Text

PROJECT NAME

AutoCAD SHX Text

DRAWING TITLE

AutoCAD SHX Text

CHECKED

AutoCAD SHX Text

ARCHIVE NO.

AutoCAD SHX Text

SUB SHEET NO.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text

DATE

AutoCAD SHX Text 6.

AutoCAD SHX Text 7.

AutoCAD SHX Text 8.

AutoCAD SHX Text 9.

AutoCAD SHX Text 10.

AutoCAD SHX Text 11.

AutoCAD SHX Text

DRAWINGS, BUT NECESSARY TO FULLY COMPLETE THE WORK SHALL BE FURNISHED.

AutoCAD SHX Text

AND THAT ANY MATERIAL OR WORK NOT SPECIFICALLY MENTIONED OR SHOWN ON THE

AutoCAD SHX Text

A. IT IS THE INTENT THAT THE FOREGOING WORK SHALL BE COMPLETE IN EVERY RESPECT

AutoCAD SHX Text %%uFINALLY:

AutoCAD SHX Text

EQUIPMENT FURNISHED AND/OR INSTALLED BY HIM.

AutoCAD SHX Text

DAMAGE TO PREMISES CAUSED BY DEFECTS IN WORKMANSHIP OR IN THE WORK OR

AutoCAD SHX Text

PERIOD SHALL BE CORRECTED AT THIS CONTRACTOR'S EXPENSE.

AutoCAD SHX Text

ONE (1) YEAR FROM DATE OF ACCEPTANCE. DEFECTS WHICH APPEAR DURING THAT

AutoCAD SHX Text

A. MATERIALS, EQUIPMENT AND INSTALLATION SHALL BE GUARANTEED FOR A PERIOD OF

AutoCAD SHX Text %%uGUARANTEE:

AutoCAD SHX Text

PROGRESSES.

AutoCAD SHX Text

D. ELECTRICAL CONTRACTOR SHALL RECORD ALL FIELD CHANGES IN HIS WORK AS THE JOB

AutoCAD SHX Text

CONDITION OF ALL DEVICES AND EQUIPMENT PRIOR TO PERFORMING WORK.

AutoCAD SHX Text

C. THE LOCATION OF DEVICES AND EQUIPMENT SHOWN ON THE DRAWINGS ARE APPROXIMATE.

AutoCAD SHX Text

MOTOR STARTERS, TIME CLOCKS, AND DISCONNECT SWITCHES.

AutoCAD SHX Text

NAMEPLATES AS TO NAME AND/OR FUNCTION; DISTRIBUTION PANEL, LIGHTING PANELS,

AutoCAD SHX Text

B. THE FOLLOWING EQUIPMENT SHALL BE IDENTIFIED WITH ENGRAVED BAKELITE

AutoCAD SHX Text A.

AutoCAD SHX Text %%uSERVICES:

AutoCAD SHX Text

CONDUIT, DUCTS OR APPROVED RACEWAYS.

AutoCAD SHX Text

WHEREVER THEY RUN ALONG SIDE OR ACROSS SUCH LINES. CONDUCTORS SHALL BE IN

AutoCAD SHX Text

EXPOSED CONDUIT SHALL BE IN STRAIGHT LINES PARALLEL WITH OR AT RIGHT ANGLES

AutoCAD SHX Text

BUT NOT TO PIPING. ALL CONDUIT SHALL BE CONCEALED WHEREVER POSSIBLE.

AutoCAD SHX Text

INSTALLATION OF WORK AND SHALL BE FASTENED TO STEEL, CONCRETE OR WOOD,

AutoCAD SHX Text

MISCELLANEOUS STEEL SUCH AS CHANNELS, RODS, ETC., NECESSARY FOR THE

AutoCAD SHX Text

OPERATING, SERVICING, MAINTAINING AND REPAIRING. HANGERS SHALL INCLUDE ALL

AutoCAD SHX Text

ALL ELECTRICAL WORK SHALL BE INSTALLED SO AS TO BE READILY ACCESSIBLE FOR

AutoCAD SHX Text %%uINSTALLATION:

AutoCAD SHX Text

INSTALLATION WITH OWNER AND POWER COMPANY AS REQUIRED.

AutoCAD SHX Text

PROVIDED BY THE ELECTRICAL CONTRACTOR. CLOSELY CO-ORDINATE ENTIRE

AutoCAD SHX Text

SPECIFICALLY NOTED AS BEING BY THE OWNER OR POWER COMPANY SHALL BE

AutoCAD SHX Text

A. PROVIDE ELECTRICAL SERVICE AS SHOWN ON THE DRAWINGS. ALL WORK NOT

AutoCAD SHX Text

SERVICES:

AutoCAD SHX Text

B. JUNCTION, PULL BOXES AND COVERS SHALL BE GALVANIZED STEEL, CODE GAUGE SIZE.

AutoCAD SHX Text

KNOCKOUT.

AutoCAD SHX Text

A. OUTLET BOXES AND COVERS SHALL BE GALVANIZED, ONE-PIECE PRESSED STEEL

AutoCAD SHX Text %%uBOXES:

AutoCAD SHX Text

COMBINATION STARTERS, WHEN USED, SHALL CONTAIN FUSIBLE SWITCHES.

AutoCAD SHX Text

MAGNETIC MOTOR STARTERS SHALL BE USED FOR INTEGRAL HORSEPOWER MOTORS,

AutoCAD SHX Text

PHASE STARTERS SHALL BE PROVIDED WITH OVERLOAD DEVICES IN EACH PHASE.

AutoCAD SHX Text

HORSEPOWER MOTORS. SINGLE PHASE STARTERS SHALL BE SQUARE D OR EQUAL. THREE

AutoCAD SHX Text

B. MANUAL MOTOR STARTERS WITH OVERLOAD PROTECTION MAY BE USED FOR FRACTIONAL

AutoCAD SHX Text

HORSEPOWER RATED AS MANUFACTURED BY SQUARE D, GOULD, ITE OR EQUAL.

AutoCAD SHX Text

AND AS REQUIRED BY CODE. SWITCHES SHALL BE HEAVY DUTY, LOAD AND

AutoCAD SHX Text

A. PROVIDE SAFETY AND DISCONNECT SWITCHES, FUSED, AS CALLED FOR ON DRAWINGS

AutoCAD SHX Text %%uSAFETY SWITCHES:

AutoCAD SHX Text

"LITE-LOCK" OR LIQUIDTIGHT FOR #8 AND LARGER.

AutoCAD SHX Text

B. WIRE CONNECTORS SHALL BE EQUAL BY SCOTCHLOK FOR #6 AND SMALLER AND T & B

AutoCAD SHX Text

ANY TYPE SHALL BE IN CONDUIT. GENERAL WIRING SHALL BE THW OR THHN (ALUMINUM

AutoCAD SHX Text

BE NEW AND SHALL BE BROUGHT TO THE SITE IN UNBROKEN PACKAGES. ALL WIRING OF

AutoCAD SHX Text

SHALL BE #12 EXCEPT #14 MAY BE USED FOR CONTROL. ALL WIRE AND CABLE SHALL

AutoCAD SHX Text

SMALLER SHALL BE SOLID. #8 AND LARGER SHALL BE STRANDED. MINIMUM WIRE SIZE

AutoCAD SHX Text

A. WIRE SHALL BE SINGLE CONDUCTOR COPPER WITH 600 VOLT INSULATION. #10 AND

AutoCAD SHX Text %%uWIRE:

AutoCAD SHX Text

PVC - SCHED. 40

AutoCAD SHX Text A.

AutoCAD SHX Text 4.

AutoCAD SHX Text 3.

AutoCAD SHX Text 2.

AutoCAD SHX Text 1.

AutoCAD SHX Text B.

AutoCAD SHX Text

MC

AutoCAD SHX Text

EMT

AutoCAD SHX Text

GALV. RIGID STEEL OR EMT W/ W.P. FITTINGS

AutoCAD SHX Text %%uTYPE OF CONDUIT

AutoCAD SHX Text

BRANCH CIRCUITS (CONCEALED)

AutoCAD SHX Text

SUPPLY TO DISTRIBUTION PANELS

AutoCAD SHX Text

UNDERGROUND

AutoCAD SHX Text

MASONARY, OR OUTDOORS

AutoCAD SHX Text

BURIED IN CONCRETE OR

AutoCAD SHX Text %%uAPPLICATION

AutoCAD SHX Text

CIRCUITS, UNLESS OTHERWISE SPECIFIED.

AutoCAD SHX Text

A. THE TYPE OF CONDUIT SHALL BE AS FOLLOWS FOR ALL FEEDERS AND DISTRIBUTION

AutoCAD SHX Text %%uCONDUITS:

AutoCAD SHX Text

CAUSE FOR REJECTION WITHOUT REVIEW BY THE GOVERNMENT.

AutoCAD SHX Text

REVIEWED AND APPROVED THEM. LACK OF SUCH CONTRACTOR'S APPROVAL WILL BE

AutoCAD SHX Text

SHALL BEAR STAMP OF THE GENERAL CONTRACTOR SHOWING THAT HE HAS

AutoCAD SHX Text

FOR APPROVAL. SUBMITTALS SHALL BE IN ACCORDANCE WITH GENERAL CONDITIONS AND

AutoCAD SHX Text

SUBMIT MATERIAL LIST AND SHOP DRAWINGS FOR MAJOR EQUIPMENT TO THE GOVERNMENT

AutoCAD SHX Text %%uSHOP DRAWINGS:

AutoCAD SHX Text

A. SECURE AND PAY FOR ALL REQUIRED PERMITS AND INSPECTION CERTIFICATES. ALL

AutoCAD SHX Text %%uPERMITS:

AutoCAD SHX Text

D. ALL WORK TO BE IN ACCORDANCE WITH NATIONAL ELECTRIC CODE (LATEST EDITION).

AutoCAD SHX Text

STRINGENT.

AutoCAD SHX Text

NATIONAL ELECTRICAL CODE AND OTHER APPLICABLE CODES, WHICHEVER ARE MORE

AutoCAD SHX Text

APPROVED ITEMS AND SHALL BE SIZED IN CONFORMITY WITH REQUIREMENTS OF THE

AutoCAD SHX Text

SHALL BE NEW AND SUCH AS APPEAR ON THE UNDERWRITERS LABORATORIES LIST OF

AutoCAD SHX Text

MATERIALS, PRODUCTS AND EQUIPMENT, INCLUDING ALL COMPONENTS THEREOF,

AutoCAD SHX Text

SHOWN, NOTED OR SCHEDULED FOR A COMPLETE AND FINISHED INSTALLATION.

AutoCAD SHX Text

FURNISH ALL LABOR, MATERIALS, EQUIPMENT AND TOOLS TO PERFORM ELECTRICAL WORK

AutoCAD SHX Text

OF KNOWLEDGE OF EXISTING CONDITIONS. FIELD VERIFY ALL ELECTRICAL EQUIPMENT

AutoCAD SHX Text

A. CONTRACTOR SHALL VISIT SITE PRIOR TO BIDDING. BIDS SHALL SERVE AS EVIDENCE

AutoCAD SHX Text %%uSCOPE OF WORK:

AutoCAD SHX Text 5.

AutoCAD SHX Text

CONDUCTORS ARE NOT PERMITTED).

AutoCAD SHX Text

TO COLUMN LINES OR BEAMS AND SEPARATED AT LEAST 3 INCHES FROM WATER LINES

AutoCAD SHX Text

CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION, ORIENTATION, CONFIGURATION, AND

AutoCAD SHX Text B.

AutoCAD SHX Text

FOR THE SAME PERIOD, THE ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ANY

AutoCAD SHX Text

BRANCH CIRCUITS (EXPOSED)

AutoCAD SHX Text

EMT

AutoCAD SHX Text

%%UNOTES ELECTRICAL

AutoCAD SHX Text

E. ALL ELECTRICAL EQUIPMENT SHALL BE INSTALLED IN STRICT COMPLIANCE WITH THE

AutoCAD SHX Text

MANUFACTURER'S INSTALLATION PROCEDURES.

AutoCAD SHX Text

F. THE ELECTRICAL CONTRACTOR SHALL PROVIDE ALL LABOR AND MATERIALS NECESSARY

AutoCAD SHX Text

FOR A COMPLETE ELECTRICAL SYSTEM, WHETHER SPECIFIED OR IMPLIED.

AutoCAD SHX Text

SUBMIT ALL SHOP DRAWINGS ELECTRONICALLY.

AutoCAD SHX Text B.

AutoCAD SHX Text AND SITE CONDITIONS INCLUDING, BUT NOT LIMITED TO, ELECTRICAL SERVICE SIZE, CAPACITY, AutoCAD SHX Text

DISTANCES, AND ELECTRICAL EQUIPMENT CHARACTERISTICS (WIRE SIZES AND LOADS).

AutoCAD SHX Text C.

INSPECTIONS SHALL BE PERFORMED BY AN APPROVED THIRD-PARTY INSPECTOR.

SITE MAP

Region 1

SEED ORCHARD

DISCONNECT AND

ELECTRICAL LIFE

SAFETY REHAB

SALMON RIVER SEED

ORCHARD

NEZ PERCE-CLEARWATER

NATIONAL FORESTS

01/2026 8

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

DATENO. REVISION / ISSUE

SEED ORCHARD PUMP

STATION SITE

S. GRAVES

Q SMITH

G1.0

NO SCALE

Lucile, Idaho Salmon River Seed Orchard Pump Station Site

LEGEND

1 ENTRANCE

2 ROAD TO SEED ORCHARD

3 ROAD TO PUMP STATION SITE

4 ICL&P POWER POLE AND TRANSFORMER

5 RIVER RAW WATER INTAKE PIPE

6 PUMP STATION

7 FOREST SERVICE POLE AND ELECTRICAL CONTROL PANELS

8 HIGHWAY 95 RIGHT-OF-WAY (R.O.W.)

9 SALMON RIVER

AutoCAD SHX Text

STATE HIGHWAY 95

AutoCAD SHX Text

GATES

AutoCAD SHX Text P

AutoCAD SHX Text P

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text 1/23/26 17:35 SGRAVES C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO 17:35 SGRAVES C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO 17:35 SGRAVES C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO SGRAVES C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO SGRAVES C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO ELECTRICAL DRAWINGS - FINAL 11-14-2025.DWG;;

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

DRAFTED BY:

AutoCAD SHX Text

STAMPS, LOGOS, AND SEALS

AutoCAD SHX Text

PROJECT NAME

AutoCAD SHX Text

DRAWING TITLE

AutoCAD SHX Text

CHECKED

AutoCAD SHX Text

ARCHIVE NO.

AutoCAD SHX Text

SUB SHEET NO.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

DATE

SEED ORCHARD

DISCONNECT AND

ELECTRICAL LIFE

SAFETY REHAB

SALMON RIVER SEED

ORCHARD

NEZ PERCE-CLEARWATER

NATIONAL FORESTS

01/2026 8

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

DATENO. REVISION / ISSUE

EXISTING SITE

CONFIGURATION

S.GRAVES

Q.SMITH

E1.0

PLAN NOTES

1 EXISTING POLE-MOUNTED ELECTRIC UTILITY METER AND TRANSFORMERS

2 EXISTING OVERHEAD POWER LINE TO BE REMOVED UNDER BASE BID

3 EXISTING WIRING TROUGH TO BE REMOVED UNDER BASE BID

4 EXISTING PLYWOOD MOUNTING BOARD TO BE REPLACED UNDER BASE BID

5 EXISTING COMBINATION MOTOR CONTROLLER/PUMP CONTROL TO BE REPLACED UNDER BASE BID

6 EXISTING COMBINATION MOTOR CONTROLLER/PUMP CONTROL TO BE REPLACED UNDER BID OPTION 1

7 EXISTING COMBINATION MOTOR CONTROLLER/PUMP CONTROL TO BE REPLACED UNDER BID OPTION 2

8 EXISTING PUMPS TO REMAIN

9 EXISTING CHECK VALVE AND VALVE BOX TO REMAIN

10 EXISTING CONCRETE PAD TO REMAIN

11 EXISTING SHED ROOF TO BE REPLACED BY GOVERNMENT

12 EXISTING WATER LINE TO REMAIN

EXISTING SITE CONFIGURATION

APPROXIMATE SCALE: 1/4" = 1'-0"

(APPROXIMATE SCALE HAS BEEN ESTIMATED

BASED ON PHOTOGRAPHIC EXAMINATION

13 EXISTING POLE TO BE REMOVED UNDER BASE BID

AND KNOWN EQUIPMENT SIZES)

AutoCAD SHX Text P

AutoCAD SHX Text P

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text 1/23/26 17:35 SGRAVES C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO 17:35 SGRAVES C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO 17:35 SGRAVES C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO SGRAVES C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO SGRAVES C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO ELECTRICAL DRAWINGS - FINAL 11-14-2025.DWG;;

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

DRAFTED BY:

AutoCAD SHX Text

STAMPS, LOGOS, AND SEALS

AutoCAD SHX Text

PROJECT NAME

AutoCAD SHX Text

DRAWING TITLE

AutoCAD SHX Text

CHECKED

AutoCAD SHX Text

ARCHIVE NO.

AutoCAD SHX Text

SUB SHEET NO.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

SEED ORCHARD

DISCONNECT AND

ELECTRICAL LIFE

SAFETY REHAB

SALMON RIVER SEED

ORCHARD

NEZ PERCE-CLEARWATER

NATIONAL FORESTS

01/2026 8

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

DATENO. REVISION / ISSUE

ELECTRICAL

DEMOLITION

S.GRAVES

Q.SMITH

E2.0

DEMOLITION NOTES

1 REMOVE EXISTING OVERHEAD ELECTRICAL SERVICE IN ITS ENTIRETY FROM LOAD SIDE OF

POLE-MOUNTED METER BASE TO THE CONNECTION WITH EXISTING WIRING TROUGH INCLUDING

EXISTING WEATHERHEAD, RIGID CONDUIT, AND SUPPORT POLES.

REMOVE EXISTING WIRING TROUGH AND EXISTING WIRING CONNECTIONS TO THE THREE

COMBINATION MOTOR CONTROLLERS/PUMP CONTROLS.

REMOVE EXISTING PLYWOOD BACKBOARD AND ALL SUPPORTING PIPES AND POLES. PIPES AND POLES

SHALL BE CUT OFF FLUSH WITH THE EXISTING CONCRETE PAD. CONTRACTOR SHALL PROVIDE

TEMPORARY SUPPORTS FOR EACH OF THE COMBINATION MOTOR CONTROLLERS/PUMP CONTROLS.

REMOVE EXISTING COMBINATION MOTOR CONTROLLER/PUMP CONTROL IN ITS ENTIRETY.

REMOVE EXISTING COMBINATION MOTOR CONTROLLER/PUMP CONTROL IN ITS ENTIRETY IF BID

OPTION 1 IS ACCEPTED.

REMOVE EXISTING COMBINATION MOTOR CONTROLLER/PUMP CONTROL IN ITS ENTIRETY IF BID

OPTION 2 IS ACCEPTED.

ELECTRICAL DEMOLITION PLAN

APPROXIMATE SCALE: 1/4" = 1'-0"

(APPROXIMATE SCALE HAS BEEN ESTIMATED

BASED ON PHOTOGRAPHIC EXAMINATION

AND KNOWN EQUIPMENT SIZES)

AutoCAD SHX Text P

AutoCAD SHX Text P

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text 1/23/26 17:35 SGRAVES C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO 17:35 SGRAVES C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO 17:35 SGRAVES C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO SGRAVES C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO SGRAVES C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO ELECTRICAL DRAWINGS - FINAL 11-14-2025.DWG;;

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

DRAFTED BY:

AutoCAD SHX Text

STAMPS, LOGOS, AND SEALS

AutoCAD SHX Text

PROJECT NAME

AutoCAD SHX Text

DRAWING TITLE

AutoCAD SHX Text

CHECKED

AutoCAD SHX Text

ARCHIVE NO.

AutoCAD SHX Text

SUB SHEET NO.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

SEED ORCHARD

DISCONNECT AND

ELECTRICAL LIFE

SAFETY REHAB

SALMON RIVER SEED

ORCHARD

NEZ PERCE-CLEARWATER

NATIONAL FORESTS

01/2026 8

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

DATENO. REVISION / ISSUE

ELECTRICAL

NEW WORK

S.GRAVES

Q.SMITH

E2.1

CONSTRUCTION NOTES

CONSTRUCTION NOTES (CONTNUED)

ELECTRICAL NEW WORK PLAN

APPROXIMATE SCALE: 1/4" = 1'-0"

(APPROXIMATE SCALE HAS BEEN ESTIMATED

BASED ON PHOTOGRAPHIC EXAMINATION

AND KNOWN EQUIPMENT SIZES)

PROVIDE AND INSTALL NEW UNDERGROUND SERVICE FROM THE LOAD SIDE OF THE

POLE-MOUNTED UTILITY METER TO THE NEW POST MOUNTED DISCONNECT SWITCH.

PROVIDE AND INSTALL NEW NEMA TYPE 4, 400A, 480V, 3 PHASE FUSED DISCONNECT SWITCH.

PROVIDE AND INSTALL NEW UNDERGROUND SERVICE FROM THE DISCONNECT SWITCH

TO THE NEW WIRING TROUGH.

PROVIDE AND INSTALL NEW WIRING TROUGH.

PROVIDE AND INSTALL NEW STANTION MOUNTING ASSEMBLY SUITABLE FOR THREE

NEMA TYPE 4 MOTOR CONTROL CENTERS (MCCs). SEE "ELECTRICAL DEVICE MOUNTING

DETAIL" ON SHEET E3.1 FOR REFERENCE. CONTRACTOR SHALL PROVIDE DRAWING

AND EQUIPMENT CUT SHEETS FOR ACTUAL PROPOSED MOUNTING CONFIGURATION.

CONTRACTOR SHALL FIELD VERIFY THE ELECTRICAL CHARACTERISTICS OF EACH OF THE

THREE EXISTING PUMPS TO DETERMINE THE PROPER SIZE REQUIREMENTS AND CONTROL

ELEMENTS FOR EACH OF THE NEW MOTOR CONTROL CENTERS. NEW MOTOR CONTROL

CENTERS SHALL MATCH OR EXCEED THE EXISTING CONTROL CHARACTERISTICS OF THE

EXISTING MCCs.

PROVIDE AND INSTALL NEW NEMA TYPE 4 MOTOR CONTROL CENTER AND MAKE ALL FINAL

WIRING CONNECTIONS TO THE PUMP UNDER BASE BID.

PROVIDE AND INSTALL NEW NEMA TYPE 4 MOTOR CONTROL CENTER AND MAKE ALL FINAL

WIRING CONNECTIONS TO THE PUMP UNDER BID OPTION 1.

PROVIDE AND INSTALL NEW NEMA TYPE 4 MOTOR CONTROL CENTER SUITABLE FOR FUTURE

50 HP MOTOR LOAD UNDER BID OPTION 2. FINAL WIRING CONNECTIONS TO THE NEW MOTOR

LOAD WILL BE COORDINATED BY THE GOVERNMENT UNDER A FUTURE CONTRACT OPTION 2.

PROVIDE AND INSTALL 36" TALL PROTECTIVE BOLLARDS. BOLLARDS SHALL BE 4" DIAMETER

CONCRETE-FILLED STEEL PIPES EXTENDING A MINIMUM OF 36" IN THE GROUND. BOLLARDS

SHALL BE PAINTED YELLOW OPTION 2.

AutoCAD SHX Text P

AutoCAD SHX Text P

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text 1/28/26 15:42 SGRAVES C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO 15:42 SGRAVES C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO 15:42 SGRAVES C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO SGRAVES C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO SGRAVES C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO ELECTRICAL DRAWINGS - FINAL 11-14-2025.DWG;;

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

DRAFTED BY:

AutoCAD SHX Text

STAMPS, LOGOS, AND SEALS

AutoCAD SHX Text

PROJECT NAME

AutoCAD SHX Text

DRAWING TITLE

AutoCAD SHX Text

CHECKED

AutoCAD SHX Text

ARCHIVE NO.

AutoCAD SHX Text

SUB SHEET NO.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

SEED ORCHARD

DISCONNECT AND

ELECTRICAL LIFE

SAFETY REHAB

SALMON RIVER SEED

ORCHARD

NEZ PERCE-CLEARWATER

NATIONAL FORESTS

01/2026 8

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

DATENO. REVISION / ISSUE

ELECTRICAL

RISER DIAGRAM

S.GRAVES

Q.SMITH

E3.0

TO PUMP

TO PUMP

TO PUMP

MOTOR

CONTROL

CENTER

TO BE

REPLACED

UNDER

BID

OPTION 2

MOTOR

CONTROL

CENTER

TO BE

REPLACED

UNDER

BID

OPTION 1

MOTOR

CONTROL

CENTER

TO BE

REPLACED

UNDER

BASE

BID

NEW WIRING TROUGH

400A, 480V, 3Ø

FUSED

DISCONNECT

SWITCH

(4) 500KCMIL + #3g IN 4"C (4) 500KCMIL + #3g IN 4"C

UTILITY POLE

UTILITY

METER

GRADE

RISER NOTES

1 THIS RISER DIAGRAM AND THE STATED WIRE SIZES ARE BASED ON LIMITED FIELD DATA

AND THE ASSUMPTION THAT THE INCOMING ELECTRICAL SERVICE IS 480Y/277 V CT

SERVICE, 3-PHASE. CONTRACTOR SHALL FIELD VERIFY SIZE , TYPE, AND DISTANCES OF

EXISTING ELECTRICAL SERVICE AND SHALL COORDINATE ANY REQUIRED WIRE SIZE

CHANGES WITH THE FOREST SERVICE REPRESENTATIVE PRIOR TO ORDERING AND/OR

INSTALLING WIRING.

APPROXIMATELY 10 FEET APPROXIMATELY 55 FEET

AutoCAD SHX Text 1/23/26 17:35 SGRAVES C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO 17:35 SGRAVES C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO 17:35 SGRAVES C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO SGRAVES C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO SGRAVES C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO ELECTRICAL DRAWINGS - FINAL 11-14-2025.DWG;;

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

DRAFTED BY:

AutoCAD SHX Text

STAMPS, LOGOS, AND SEALS

AutoCAD SHX Text

PROJECT NAME

AutoCAD SHX Text

DRAWING TITLE

AutoCAD SHX Text

CHECKED

AutoCAD SHX Text

ARCHIVE NO.

AutoCAD SHX Text

SUB SHEET NO.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

30"

6' MAX.

36" MIN

12"

MOTOR

PUMP

CONTROL

TO BE

REPLACED

UNDER

BASE BID

MOTOR

PUMP

CONTROL

TO BE

REPLACED

UNDER BID

OPTION 1

NEW WIRING TROUGH

400 AMP,

480 VOLT,

3 PHASE

SERVICE

DISCONNECT

6" MIN

MOTOR PUMP

CONTROL

TO BE

REPLACED

UNDER BID

OPTION 2

INSTALL 3 12' 4"X6"

PRESSURE TREATED

POSTS IN COMPACTED

GRAVEL.

INSTALL

ALUMINUM

FENCE CAP

ON TOP OF

POSTS

5' MAX.

USE 3 - 12" SONO TUBES

TO POUR CONCRETE

RATED FOR FINAL

STRENGTH OF 5,000 psi.

INSTALL 3 - 8" RINGS OF

REBAR TIED TOGETHER BY

4 24" #4 REBAR.

6" MIN

24" MIN

18" MIN

TRENCHING DETAIL NOTES

1. SINGLE 4 INCH CONDUIT AS SHOWN.

2. BURIAL DEPTH IS 24 INCHES MINIMUM TO TOP OF

CONDUIT.

3. CONDUIT SHALL NOT BE LOCATED AN CLOSER THAN 6

INCHES FROM ANY SIDEWALL OR BOTTOM OF TRENCH.

4. DETECTABLE WARNING TAPE SHALL BE INSTALLED 12

INCHES BELOW GROUND SURFACE.

DETECTABLE WARNING TAPE

COMPACTED BACKFILL

BEDDING MATERIAL

UNDISTURBED GROUND

CONDUIT

SLIGHTLY MOUNDED FINISH

Northern Region Region 1

SEED ORCHARD

DISCONNECT AND

ELECTRICAL LIFE

SAFETY REHAB

SALMON RIVER SEED

ORCHARD

NEZ PERCE-CLEARWATER

NATIONAL FORESTS

01/2026 8

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

DATENO. REVISION / ISSUE

ELECTRICAL

DETAILS

S.GRAVES

Q.SMITH

E3.1

ELECTRICAL DEVICE MOUNTING DETAIL

SCALE: NOT TO SCALE

TRENCHING DETAIL

SCALE: NOT TO SCALE

TYPICAL INSTALLATION DETAIL FOR GROUNDING ELECTRODES

SCALE: NOT TO SCALE

AutoCAD SHX Text 1/28/26 15:42 SGRAVES C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO 15:42 SGRAVES C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO 15:42 SGRAVES C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO SGRAVES C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO SGRAVES C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO C:\USERS\SGRAVES\BOX\7300BUILDINGSSTRUCTURES (PINYON BOOKSHELF FOLDERS U)\7310-30PROJECTS\DEF.MAINT.PROJ\SO-RO-FW\25-SRSO-DISCONNECTINSTALLATION\FINAL DRAWINGS - 11-14-2025\SRSO ELECTRICAL DRAWINGS - FINAL 11-14-2025.DWG;;

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

DRAFTED BY:

AutoCAD SHX Text

STAMPS, LOGOS, AND SEALS

AutoCAD SHX Text

PROJECT NAME

AutoCAD SHX Text

DRAWING TITLE

AutoCAD SHX Text

CHECKED

AutoCAD SHX Text

ARCHIVE NO.

AutoCAD SHX Text

SUB SHEET NO.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text

DATE

AutoCAD SHX Text

EXOTHERMIC WELD

AutoCAD SHX Text

DIRECT BURIAL OR

AutoCAD SHX Text

ROCK

AutoCAD SHX Text

BOTTOM

AutoCAD SHX Text

ALL CLAMPS

AutoCAD SHX Text

SUITABLE FOR

AutoCAD SHX Text

AutoCAD SHX Text O

AutoCAD SHX Text

GROUNDING ELECTRODE

AutoCAD SHX Text

CONDUCTORS

AutoCAD SHX Text

2 1/2 FT.

AutoCAD SHX Text

NOTE: GROUNDING RODS SHALL BE MINIMUM

AutoCAD SHX Text

3/4" DIAMETER X 10' LONG COPPER-CLAD

AutoCAD SHX Text

STEEL GROUND ROD. GROUNDING CONDUCTORS

AutoCAD SHX Text SHALL BE MINIMUM 300kCMIL OR AS REQUIRED BY

SECTION 260526. SUBMIT CALCULATIONS FOR SIZE.

SRSO Electrical Drawings - Final 1-27-2025-T1.0
Sheets and Views
T1.0
SRSO Electrical Drawings - Final 1-27-2025-N1.0
Sheets and Views
N1.0
SRSO Electrical Drawings - Final 1-27-2025-G1.0
Sheets and Views
G1.0
SRSO Electrical Drawings - Final 1-27-2026-E1.0
Sheets and Views
E1.0
SRSO Electrical Drawings - Final 1-27-2026-E2.0
Sheets and Views
E2.0
SRSO Electrical Drawings - Final 1-27-2026-E2.1
Sheets and Views
E2.1
SRSO Electrical Drawings - Final 1-27-2026-E3.0
Sheets and Views
E3.0
SRSO Electrical Drawings - Final 1-27-2026-E3.1
Sheets and Views
E3.1
SRSO Electrical Drawings - Final 1-28-26-E2.1.pdf
Sheets and Views
E2.1
SRSO Electrical Drawings - Final 1-28-26-E3.0.pdf
Sheets and Views
E3.0
SRSO Electrical Drawings - Final 1-28-26-N1.0.pdf
Sheets and Views
N1.0
SRSO Electrical Drawings - Final 1-28-26-E3.1.pdf
Sheets and Views
E3.1
2026-02-11T16:25:33-0800
SUSAN GRAVES
2026-03-23T08:04:01-0400
WILLIAM RIDENHOUR
2026-03-23T10:45:52-0700
JEFFREY SHINN
2026-03-23T13:40:23-0600
CORRINE KEGEL

File details come from the government source that posted it. Updated .