Attachment 5 FLOORING MATOC SAMPLE PROJECT.pdf
PDF 23 MB Posted
- Attached to
- FLOORING SERVICES MATOC
- Solicitation number
- COF25RFP0001
- Issued by
- El Paso County, Colorado
About this file
This is a Scope of Work (SOW) document for a flooring replacement project at Building 1220 on Fort Carson, Colorado, issued by the Directorate of Public Works under contract number DPW24-065. The project involves removing and replacing carpet flooring and cove bases in various rooms on the second floor, specifically in rooms 201-259, fax/copier room, and hallways. The contractor is required to furnish all labor, materials, tools, transportation, and equipment for the job, install 24"x24" carpet tiles, 6" cove base, and floor transition strips, and prepare subfloors by leveling and cleaning prior to installation. The work also includes moving furniture, minimizing dust during demolition, and phasing the work to reduce disruptions.
The project is part of an Intergovernmental Support Agreement (IGSA) between the US Army and the City of Fountain, with the contract number W0VNAA-IGSA-A60RD-21-0003. The City of Fountain must provide a one-year warranty on all materials and workmanship, with any repairs during that period receiving an additional one-year warranty. The contractor must comply with federal, state, and local public health regulations, DOD and Army guidelines, and submit various documents including a work schedule, flooring and cove base samples, weekly progress reports, and a warranty letter. All subcontractors must be selected through a competitive bidding process, and the project requires strict adherence to installation security and access requirements, including background checks and restrictions on employee eligibility.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 3 MATOC Will Not Compete.docx | DOCX document | |
| Attachment 4 MATOC PPQ.docx | DOCX document | |
| FLOORING MATOC RFP.docx | DOCX document | |
| Attachment 1 MATOC Safety Requirements.doc | DOC document | |
| Attachment 2 MATOC Accident Prevention Plan Review Checklist.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET NUMBER:
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
S C
A L
E
F E
B
A B
A M
B A
A B
A M
B A
J S
O S
A
D A
T E
IN
IT
IA
L
S R
E V
IS
IO
N D
E S
C R
IP
T
IO
N
G - 1.1
G E
N E
R A
L N
O T
E S
D P
W
-0
R P
R F
L O
O R
IN
G
B
F O
R T
C A
R S
O N
C
O L
O R
A D
O
D
IR
E C
T O
R A
T E
O F
P U
B L
IC
W
O R
K S
SCOPE OF WORK
2.
1. Furnish all labor, materials, tools, transportation and equipment to remove and replace carpet flooring and cove bases on various rooms.
11. Dispose of all debris and material off-post in accordance with local regulations.
10. Install floor strips transition where needed to accommodate transition from one type of flooring to another.
9. Install 6” cove base, color and type shall be part of the submittals.
Install 24”x 24” carpet tiles as shown in the floor plans. Tiles samples shall be provided to U.S Government for final selection, as part of submittals. 8.
Prepare subfloors, level, and clean prior to installation. Contractor to minimize dusts during demo work by instaling temporary barriers within the work areas.7.
hallways.
6.1 ROOMS 201, 202, 203, 204, 205, 206, 207, 208, 208, 210, 214,220, 226, 227, 235, 236, 237, 238, 241, 243, 244, 245, 246, 248, 249, 253, 254, 255, 256, 257, 258, 259, fax/copier rm, and all
Remove and dispose of existing carpet and cove bases from various rooms listed below:6.
5. Contractor to phase work accordingly in order to minimize furniture movement and work disruptions.
4. Move furnitures, cabinets to clear work areas.
3. The Contractor shall adhere to all of the regulations and information provided in the Construction Drawings General Notes.
The Contractor shall adhere to Construction Drawings for all work locations, quantities, dimensions and types.
GENERAL NOTES:
2. The Contractor agrees to comply with Federal, State and Local public health regulations and also shall comply with DOD and Army Public Health Regulations and guidance.
1. The Contractor shall provide all submittals as specified in the submittal register.
CMRC D
57C
69B
CMRC E
9 7907
78037905
75027
74247426
79167918
CMRC F
0 3867
7105 7011
7015640 6 3
16 3909
6 7938
CMRC HT7530
CMRC J7488
89 2
7813 7
6 7
74927
2653206
15 92096 4 26336
69A
3865 38877
7007 3750
9 64
2 5A7022 3710
3 2452
63586348
1 6
2 6 3 6
65036
3 6
63956
5 3
6333 6995699369916989
63466330 6344
6990 69866988 6984 6985
9 29992
69446915
63056303
96913
6972 6973
2691 9
37016
245563
7 69826518
6928 6978
7 6979
27586434
63996
6176 2030617 8 9061
5 618
0 2420
86222
2257 2361
24912077
60446042 6084
60436
215420
609260946036 6034
6011 2
85817 583
05641
25635
1 581
5 19
56575
9 1
5820 582
5655 5713
21582
6 5
7 5813
5 5621
5706 5812
16035 60936
488548
488348794877 4881
41580
2 14
01 5
57275626 59
0 14
815580394725
4705 64
80314727
48824878 4880
6 1046
4911 4917
4851485348554857
484893
82125
4729 4702
7 1
0 8099
4823 4728
500 82108021
7228 7
8007342
4366 43
4 4
43334325 43294331
5 6924
700264
CMRC G
CMRC I
66315
0 6
209A
24296
8 6430
4 6
69256927
44815
16429
643564
R G
4 18
49144912
4901 4
5725 5
4 6
09 5
57B
345077
57A
63A
65A
4811 75
22557
58255717
25637
4 59
6863 6867
21 3192
6519 63
5 2132
691869206922
242424
4915 13
95616
8 18
A
68246
06822
6853685
CMRC K
CMRC B
CMRC A
6970 6971
15005
68726871
68456847
68516849
68986868
68436841
68626860 6864
7919 7
11 1
2 4
43734363
683568376833 6839
41 6437
24546
8038 8157
69646957
407405
69666968
56954
36952
16950
40 20
43754365
10584
24276
7 6
6980 6981 63226324
350 4
B
P E S P
69346905
69C
63B
5 5
5 4
4616450
4688 46
4528 4525 451 9 4515
6 4475
4460446
4482 4480
4433 4435 4437 4443
44024401
440844074406
44234421
4456 4454
44514450
44164415
5404 5406 5408 5410
5403 540554075409
54385440
54425431
5433543554375439
5454 5458 546054
54565456
54525450
9097A
7904-T
7900-T
7901-T
OPEN STORAGE
OPEN STORAGE
OPEN STORAGE
OPEN STORAGE
OPEN STORAGE
OPEN STORAGE
OPEN STORAGE
OPEN STORAGE
OPEN STORAGE
OPEN STORAGE
OPEN STORAGE
OPEN STORAGE
OPEN STORAGE
OPEN STORAGE
OPEN STORAGE
OPEN STORAGE
OPEN STORAGE
OPEN STORAGE
OPEN STORAGE
OPEN STORAGE
OPEN STORAGE
STUMPF
N O
RTH
A
LL
W
O
RTH
ALL
W
O
RTH
SOUTH ALLWORTH
A L
B A
N E
S E
REGENTS
G U
A D
A L
C A
N A
L
T H
O R
N E
S H
E M
IN
G A
R C
IA
MABRY
BELLRICHARD
F U
N K
T E
V
IS
K H E S
A N
H
DEVENS
BARGER
M A
R T
IN
E Z
O
CONNELL
OLD HOSPITAL
FALAISE GAP
GRANDSTAFF
MCNERNEY
BOEBLIN
GEN
WOODFILL
MCCOY
FORT
M A
R A
U D
E R
R E
M A
G E
N
L
IN
D S
T R
O M
V E
R D
U N
W E T Z E L
N
ELS
O N
M C
M A
H O
N
2ND
R A
ID
E R
W
IC
K E R S H
A M
W A
L L
A C
E
S U T H E
R L A
N D
CARPENTER
C H
IL
E S
J U
S T C
A U
S E
A T
T U
G R
O V
E
H A
R R
L
IG
H T F
IG
H T
E R
K W
A
JA
L E
IN
S H
E R
ID
A N
W A
R E
B
INCHON
P E
R S
H
IN
G
V
IC
T O
R Y
KISKA
B
IA
K
H O
G A N
Q U
IN
N
B A
R K E L E
Y
L E
Y T E
CONCRETE TANK TRAIL
S P E
C K E
R
COLEMAN
H O
U R G
L A
S S
MARNE
P A
N A
M A
S K Y R
A
ID
E R
B R
IS
E N
O
OLD R
ELIA
BLE
JE
D
B U
R G
H
K A P
IS
A
KAROPCZYC
SASSER
A R
G O
N N
E
NORMANDY
HWY 83
B A
D T
O E
L Z
ELWELL
M
IN
IC
K
M
ANHART
BURRIS
EVANS
S A
M H
O U
S T
O N
IW
O J
IM
A
FL
IN
T
MT
LA
DI
FE
NSA
HUGHES
FORCE
P
IC
A T
IN
N Y
JOHNSON
H U
E R
T G
E N F
O R
E S
T
R A
Y H
E L
W
IG
S A P P E
R L
P
W E S
T O
N
W O
M A
C K
P R
U S S
M A N
M
IS
T E R
O S
A N
M C
D O
N
ALD
G R
A N T
P O L
IO
LONG
CAREY
ELL
IS
Y A N
O
FE
LKI
NS
C O
B R
A
MCCULLOUGH
L E
N G
G R
IE
S
PROVID
E C
OMFORT
P O
R T E R
T R
IP
P
KIMBRO
MOLNAR
S H
E A
Y A B E S
C H
O S
IN
M A
G R
A T H
OKINAWA
C H
R
IS
T
IE
1ST
H O
L L
A N
D
IA
M E
K O
N G
M A
N
IL
A
SMITH
BELCHER
B E
N N
IN
G
JOEL
B A S T
O G
N E
HARE
W
IL
L E
T T
ST. LO
TI
TU
S
IR
W
IN
U
TA
H B
E A C
H
RED DAWN
COCHRANE
BAYONET
K
IT C
A R S O
N
C H
E R
B O
U R
G
IR
O
N F
IG
H T E
R
A A
C H
E N
V
IK
IN
G H
A M
M E
R
HW
Y 16
BERGFUHRER
A R
D E
N N E S
BENNETT
H W
Y
B U
T T S
Ta n k T ra il
N O
R
AD
I-2
0 37501250 1250
SCALE: 1" = 1250'
N
IN
T E R S T A T E
PROJECT LOCATION MAP
SHEET INDEX
FLOOR PLANA - 1.0 - 1.2
GENERAL NOTESG - 1.0 - 1.2
TITLE SHEETT - 1.0
EXIT 135
EXIT 132
GATE 3
GATE 4
GATE 1
GATE 5
GATE 20
PROJECT LOCATION
PLAN DATE: 20 FEB 2025
RPR, FLOORING, B1220
DPW24-065
IGSA #: IGSA-A60RD-21-DPW-002
CITY OF FOUNTAIN
E
S
IG
N E
D B
Y
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
S C
A L
E
F E
B
A B
A M
B A
A B
A M
B A
J S
O S
A
D A
T E
IN
IT
IA
L
S R
E V
IS
IO
N D
E S
C R
IP
T
IO
N
G - 1.0
G E
N E
R A
L N
O T
E S
D P
W
-0
R P
R F
L O
O R
IN
G
B
F O
R T
C A
R S
O N
C
O L
O R
A D
O
D
IR
E C
T O
R A
T E
O F
P U
B L
IC
W
O R
K S
- WILDLIFE: NO CONCERNS.
- WATERSHED/WETLANDS: NO CONCERNS
- FORESTRY: NO CONCERNS.
- CULTURAL RESOURCES: NO CONCERNS.
- INVASIVE PLANTS/PEST MANAGEMENT: NO CONCERNS
- RESOURCE CONSERVATION AND RECOVERY ACT (RCRA): NO CONCERNS.
- ABOVE AND BELOW GROUND STORAGE TANKS: NO CONCERNS.
- INSTALLATION RESTORATION PROGRAM (IRP): NO CONCERNS
- ASBESTOS/LEAD/TOXICS: NO CONCERNS.
- STORMWATER: FORT CARSON STORMWATER: NO CONCERNS
- WASTEWATER/DRINKING WATER: NO CONCERNS
IN NEPA #:2021-27mg. THE TASK ORDER REQUIREMENTS ARE LISTED BELOW:
1. THIS PROJECT IS SUBJECT TO ALL ENVIRONMENTAL REGULATIONS AND REQUIREMENTS AS ENUMERATED BY THE FORT CARSON DPW ENVIRONMENTAL DIVISION, ENVIRONMENTAL:
NEED VALIDATED BY A DOD COMPONENT FOR ONE-TIME, INTERMITTENT, OR ROUTINE PHYSICAL ACCESS TO AN ARMY INSTALLATION.
2. NON CAC-HOLDING VISITORS, CONTRACTOR EMPLOYEES, VENDORS, AND OTHER PERSONNEL AS DESCRIBED IN PARAGRAPH 8-4 OF AR 190-13, MUST HAVE A
DOD ID CARD.
OF A VALID PURPOSE FOR ENTRY FOR ALL PERSONNEL WHO DO NOT POSSESS A CAC, ANOTHER FEDERAL PERSONAL IDENTITY VERIFICATION CARD, OR OTHER
THE NATIONAL CRIME INFORMATION CENTER INTERSTATE IDENTIFICATION INDEX (NCIC - III), THE TERRORISM SCREENING DATA BASE (TSDB) AND DETERMINATION
1. COMMANDERS AND DIRECTORS WILL NOT GRANT VISITORS UNESCORTED INSTALLATION ACCESS WITHOUT THE REQUIRED IDENTITY PROOFING, VETTING AGAINST
INSTALLATION ACCESS AR 190-13:
TEMPORARILY MISPLACED IT.
USE GATE 1 VISITOR CENTER WHERE THE NCIC CHECK WILL BE DONE AND A DAY PASS ISSUED. THIS ALSO APPLIES TO ALL THOSE WHO HAVE A VALID ID, BUT HAVE
6. COMMERCIAL VEHICLES AND VENDORS WILL USE GATE 3 WHERE THE NCIC CHECK WILL BE DONE “IN--LANE”AND A DAY PASS WILL BE ISSUED. FOR VISITOR ACCESS, AND CREDENTIALS FOR A ONE-STOP NCIC III CHECK AND ACCESS CARD WITH PHOTO ISSUE.
FOUNTAIN EMPLOYEE. THE CITY OF FOUNATIN OR SUBCONTRACTOR EMPLOYEES WILL GO DIRECTLY TO GATE 1 VISITOR CENTER WITH THEIR SIGNED FC FORM 2036-E
FOUNTAIN EMPLOYEE). THE GOVERNMENT REPRESENTATIVE WILL VERIFY NEED FOR FORT CARSON ACCESS, DIGITALLY SIGN AND EMAIL BACK TO THE CITY OF
PDF FORMAT ELECTRONICALLY BY EMAIL TO THE GOVERNMENT REPRESENTATIVE FOR APPROVAL AND DIGITAL SIGNATURE. (THE SPONSOR CAN BE A CITY OF
INFORMATION AND PROVIDE TO THE CONTRACTOR PROJECT MANAGER OR DESIGNATED POC. THE CONTRACTOR WILL PROVIDE THE COMPLETED FORM IN
CONTRACTOR WILL FILL OUT FC FORM 2036-E REQUEST FOR FORT CARSON INSTALLATION ACCESS CONTROL CARD, WITH ALL RELEVANT CONTRACTOR
IN ACCORDANCE WITH STATUS OF FORCES AGREEMENTS AND OTHER THEATER REGULATIONS. THE PROCESS FOR OBTAINING AN ACCESS PASS IS AS FOLLOWS: THE
INSTALLATION/FACILITY ACCESS AND LOCAL SECURITY POLICIES AND PROCEDURES (PROVIDED BY GOVERNMENT REPRESENTATIVE), OR, AT OCONUS LOCATIONS, 2036-E) AND TERRORIST SCREENING DATABASE (TSDB) (ARMY DIRECTIVE 2014-05/AR 190-13), APPLICABLE INSTALLATION, FACILITY AND AREA COMMANDER
IDENTIFICATION INDEX (NCIC-III). THIS IS DONE BY COMPLETING A REQUEST FOR A FORT CARSON INSTALLATION ACCESS CONTROL CARD (FC FORM FC FORM
INSTALLATION, THEY SHALL COMPLY WITH ADJUDICATION STANDARDS AND PROCEDURES USING THE NATIONAL CRIME INFORMATION CENTER INTERSTATE
5. FOR THE CONTRACTOR AND ALL ASSOCIATED SUBCONTRACTOR EMPLOYEES THAT DO NOT REQUIRE A CAC CARD, BUT REQUIRE ACCESS TO A DOD FACILITY OR
LATER THAN (90) CALENDAR DAYS AFTER TASK ORDER NOTICE TO PROCEED (NTP).
NOTICE TO PROCEED (NTP) AND WITHIN (60) CALENDAR DAYS OF NEW EMPLOYEES COMMENCING PERFORMANCE WITH THE RESULTS REPORTED TO THE IGSA-TR NO
INSTRUCT EMPLOYEES TO REPORT SUSPICIOUS ACTIVITY TO THE IGSA-TR. THIS TRAINING SHALL BE COMPLETED WITHIN (60) CALENDAR DAYS OF TASK ORDER
BY THE REQUIRING ACTIVITY ATO). THIS LOCAL DEVELOPED TRAINING WILL BE USED TO INFORM EMPLOYEES OF THE TYPES OF BEHAVIOR TO WATCH FOR AND
4. THE CONTRACTOR AND ALL ASSOCIATED SUBCONTRACTORS SHALL BRIEF ALL EMPLOYEES ON THE LOCAL IWATCH PROGRAM (TRAINING STANDARDS PROVIDED
OPSEC AWARENESS TRAINING.
MUST COMPLETE LEVEL I OPSEC TRAINING WITHIN (30) CALENDAR DAYS OF THEIR REPORTING FOR DUTY. ALL CONTRACTOR EMPLOYEES MUST COMPLETE ANNUAL
AWARENESS TRAINING IS AVAILABLE AT THE FOLLOWING WEBSITE: HTTP://JKO.JTEN.MIL . PER AR 530-1, OPERATIONS SECURITY, NEW CONTRACTOR EMPLOYEES
TO THE IGSA-M WITHIN (30) CALENDAR DAYS AFTER COMPLETION OF TRAINING BY ALL EMPLOYEES AND SUBCONTRACTOR PERSONNEL. ANTI TERRORISM LEVEL I
FOUNTAIN SHALL SUBMIT CERTIFICATES OF COMPLETION FOR EACH AFFECTED CONTRACTOR EMPLOYEE AND SUBCONTRACTOR EMPLOYEE, TO THE IGSA-TR OR
AREAS SHALL COMPLETE ANTI TERRORISM LEVEL I AWARENESS TRAINING WITHIN (60) CALENDAR DAYS AFTER TASK ORDER NOTICE TO PROCEED (NTP). THE CITY OF
3. ALL CONTRACTOR EMPLOYEES, TO INCLUDE SUBCONTRACTOR EMPLOYEES, REQUIRING ACCESS TO ARMY INSTALLATIONS, FACILITIES AND CONTROLLED ACCESS
MAY REQUIRE CHANGES IN THE CONTRACTOR'S SECURITY MATTERS OR PROCESSES.
HQDA AND/OR LOCAL POLICY. SHOULD THE FORCE PROTECTION CONDITION (FPCON) AT ANY INDIVIDUAL FACILITY OR INSTALLATION CHANGE, THE GOVERNMENT
SECURITY OFFICE. THE CONTRACTOR'S WORKFORCE MUST COMPLY WITH ALL PERSONAL IDENTITY VERIFICATION REQUIREMENTS AS DIRECTED BY DOD, TO MEET INSTALLATION ACCESS REQUIREMENTS TO BE ACCOMPLISHED BY INSTALLATION PROVOST MARSHAL OFFICE, DIRECTOR OF EMERGENCY SERVICES OR
OR AREA. THE CONTRACTOR AND ALL ASSOCIATED SUBCONTRACTOR EMPLOYEES SHALL PROVIDE ALL INFORMATION REQUIRED FOR BACKGROUND CHECKS
2. THIS STANDARD LANGUAGE IS FOR THE CONTRACTOR'S EMPLOYEES WITH AN AREA OF PERFORMANCE WITHIN ARMY CONTROLLED INSTALLATION, FACILITY
THE TASK ORDER.
LIFE OF THE TASK ORDER. THE CONTRACTOR SHALL MAINTAIN VEHICLE REGISTRATION, INSURANCE AND DRIVER CERTIFICATIONS FOR THE DURATION OF
INSURANCE, AS WELL AS, DRIVER IDENTIFICATION AT TIME OF THE PROPOSAL SUBMISSION AND MUST MAINTAIN THE LEVEL OF SECURITY REQUIRED FOR THE
1. ALL CONTRACTOR PERSONNEL PERFORMING WORK UNDER THIS TASK ORDER MUST BE ABLE TO DOCUMENT APPROPRIATE VEHICLE REGISTRATION AND
ANTI-TERRORISM / FORCE PROTECTION REQUIREMENTS:
1. NOT APPLICABLE
AS-BUILT REQUIREMENTS AND CADD/GIS STANDARDS:
BRIDGES, LATEST EDITION.
FOR DIRECTION. AT A MINIMUM, CODES SHALL INCLUDE: ALL APPLICABLE ICC CODES, LATEST EDITION AND CDOT STANDARD SPECIFICATIONS FOR ROADS AND
IS A CONFLICT BETWEEN THE CODES AND THE INFORMATION PROVIDED BY THE GOVERNMENT, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE IGSA-M
RESPONSIBLE TO RESEARCH ALL APPLICABLE CODES TO MEET TASK ORDER REQUIREMENTS AND PROVIDE A SAFE AND USEABLE FINISHED PRODUCT. IF THERE
1. WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE MOST CURRENT APPLICABLE CODES AT TIME OF NOTICE TO PROCEED (NTP). THE CONTRACTOR IS
CODES AND STANDARDS:
.PHASING OF WORK SHALL BE THE CONTRACTOR'S RESPONSIBILITY 3.
2. WORK HOURS MAY BE ADJUSTED WITH WRITTEN APPROVAL FROM THE IGSA-M.
1. STANDARD WORKING HOURS SHALL BE MONDAY - FRIDAY (0700 - 1700), LESS FEDERAL HOLIDAYS.
WORK PERIODS/PHASING:
REGULATIONS AND GUIDANCE.
9. THE CONTRACTOR SHALL COMPLY WITH FEDERAL, STATE AND LOCAL PUBLIC HEALTH REGULATIONS AND ALSO COMPLY WITH DOD AND ARMY PUBLIC HEALTH
PUBLIC THROUGHOUT THE DURATION OF THE PROJECT. SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
8. THE CONTRACTOR SHALL COMPLY WITH EM 385-1-1, AR 385-10, OSHA 29 CFR 1910/1926 AND MAINTAIN SAFE WORKING CONDITIONS FOR BOTH EMPLOYEES AND THE
OF OFF POST.
7. UNLESS OTHERWISE NOTED, ALL CONSTRUCTION DEBRIS, SPOILS AND REMOVALS SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE DISPOSED
INTERFERE WITH OR HINDER THE PROGRESS OF THE COMPLETION OF WORK BEING PERFORMED BY OTHER AGENCIES OR CONTRACTORS.
6. OTHER CONSTRUCTION AGENCIES/CONTRACTORS MAY BE WORKING IN THE VICINITY OF THE PROJECT. THE CONTRACTOR SHALL CONDUCT WORK SO AS TO NOT
THE PLAN SHALL INCLUDE PROCEDURES FOR PROMPTLY REPAIRING UTILITY BREAKS MADE BY THE CONTRACTOR.
5. THE CONTRACTOR SHALL HAVE CONTINGENCY PLANS FOR CONTINUING WORK DURING UTILITY OUTAGES CAUSED BY THE CONTRACTOR OR OUTSIDE FORCES.
THE FORT CARSON FIRE DEPARTMENT, FIRE PREVENTION OFFICE AT FIRE STATION #33, BLDG 9665, FORT CARSON, CO, (719) 503-3473.
SPARKS SUCH AS CUTTING METAL, WELDING, ETC. PERMITS ARE REQUIRED BEFORE WORK MAY COMMENCE. HOT WORK PERMIT CAN BE OBTAINED THROUGH
4. THE CONTRACTOR SHALL OBTAIN A HOT WORK PERMIT NO LATER THAN (2) WEEKS PRIOR TO CONDUCTING ANY TYPE OF HOT WORK OR WORK THAT MAY EMIT
THE DIG PERMIT COORDINATOR AT BLDG 8010, FORT CARSON, CO, (719) 302-0157.
THE CONTRACTOR SHALL COORDINATE ALL OUTAGES AND OBTAIN ALL REQUIRED SIGNATURES ON THE OUTAGE REQUEST. FORMS SHALL BE TURNED IN TO
OUTAGES NO LATER THAN (14) DAYS PRIOR TO THE CLOSURE. THE FORM SHALL BE SUBMITTED IN ACCORDANCE WITH FORT CARSON REGULATION 420-19.
3. THE CONTRACTOR SHALL DEVELOP AND SUBMIT A FORT CARSON UTILITY OUTAGE/CONNECTION REQUEST, FC FORM 420-E, FOR ANY CLOSURES OR UTILITY
REPAIR. FORMS SHALL BE TURNED IN TO THE DIG PERMIT COORDINATOR AT BLDG. 8010, FORT CARSON, CO, (719) 302-0157.
FOUNTAIN'S EXPENSE. THE CONTRACTOR SHALL CONTACT THE IGSA-M AND THE IGSA-TR TO REPORT ANY DAMAGE AND IDENTIFY THE CONTRACTOR'S
DAMAGE ANY SUCH UTILITY LINE OR STRUCTURE, THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROMPT REPAIR OF THAT DAMAGE, AT THE CITY OF
INDICATED UTILITY LINES AND STRUCTURES ON THE DIG PERMIT AND TAKE NECESSARY PRECAUTIONS TO PROTECT THEM. SHOULD THE CONTRACTOR
CONTRACTOR SHALL OBTAIN ALL REQUIRED SIGNATURES ON THE OUTAGE REQUEST. THE CONTRACTOR SHALL VERIFY THE EXACT LOCATION OF ALL
PERMIT REQUEST, FC FORM 86-E, FOR EACH REQUIREMENT THAT REQUIRES A DIG PERMIT IN ACCORDANCE WITH FORT CARSON REGULATION 420-20. THE
UTILITIES AND THE DEPICTED LOCATIONS MAY NOT BE ACCURATE. THE CONTRACTOR SHALL OBTAIN AND PROCESS A FORT CARSON FACILITIES ENGINEER DIG
2. EXISTING UTILITIES SHOWN ON DRAWINGS ARE COMPILED FROM THE BEST AVAILABLE INFORMATION. HOWEVER, THE SITE PLAN MAY NOT BE INCLUSIVE OF ALL
WORK AND NOTIFY THE IGSA-M IMMEDIATELY OF ANY DISCREPANCIES FOUND.
1. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO COMMENCING
GENERAL:
E
S
IG
N E
D B
Y
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
S C
A L
E
F
E B
A B
A M
B A
A B
A M
B A
J S
O S
A
D A
T E
IN
IT
IA
L
S R
E V
IS
IO
N D
E S
C R
IP
T
IO
N
G - 1.2
G E
N E
R A
L N
O T
E S
D P
W
-0
R P
R F
L O
O R
IN
G
B
F O
R T
C A
R S
O N
C
O L
O R
A D
O
D
IR
E C
T O
R A
T E
O F
P U
B L
IC
W
O R
K S
FOR REFERENCE ONLY
CARPET TILES ROLL CARPETSROLL CARPETS
NOT TO SCALE
E
S
IG
N E
D B
Y
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
S C
A L
E
F E
B
A B
A M
B A
A B
A M
B A
J S
O S
A
D A
T E
IN
IT
IA
L
S R
E V
IS
IO
N D
E S
C R
IP
T
IO
N
A 1.0
G E
N E
R A
L N
O T
E S
D P
W
-0
R P
R F
L O
O R
IN
G
B
F O
R T
C A
R S
O N
C
O L
O R
A D
O
D
IR
E C
T O
R A
T E
O F
P U
B L
IC
W
O R
K S
FLOORPLAN (NOT TO SCALE)
en ....I
I-z-w
Cl z I-a.
a:::
en w
Cl z en w
1220• RU.248 1220-Rt,1221
1220•RU24�
1220-RU23S '122O-RM224
1220-RM249 1220·Ni1220 N
1220·RM244 1220-RM2241
N
[Il [Il cJi [Il � � w <( <( 0 u..
[Il [Il en 0
J <( <( -, N
122O-HALL2O511
1220·RM2�1 1220•RM243
1220-FAX/'CCPIER RM
D O•#IIM'l,2060 1220-A5UP20M
12:ZO· RU:23.!
20-RM232
122O·RM227
1220•RM219
[Il [Il
Cl � Cl w w [Il > z z 0 u..i (!)
I a::: w ....I en a.
w a.
Cl Cl <( Cl en l220•HALL2025 122O-HALL2Dl5
1220•HM.L204-11220·HALL20
en
1220·Rtil2ft3 1220•1E0120
122O-RM209
1220 • COF'IE Fl
1220•F"OYR2O23 tz20•Rlil201 1220-RM202 122� 1220-Rt,1204 1220·AM20e l220-Rlol207 1220-IW:208 122O-Rlil.217 a::: 0 0 Cl
::::i 0
....I [Il 0 a.
u.. z
1220-RM2M 00
1220·RM259
w en a:::
1220•1111255 1220·RM2M
tr: I-w u..
a:::
Cl
122O•RW211
1220-Flt,a� 1220·R11213
D
N � N� en Ill
" LC) w
(!) co z9 0 -""" z C::: N ....I
0� � 0 a.
....I Cl w u.. z a::: w
a. (!)
a:::
FLOORPLAN (NOT TO SCALE) SHEET NUMBER:
A 1.1
REQUIRED SUBMITTAL SUSPENSE FORMAT REMARKS Received Date Approved
Dissaproved Date
Approved By
SUBSEQUENT SUBMITTALS
ENGINEERING DIVISION - IGSA/PUMP
SUBMITTAL REGISTER
Page 1 of 1 Version 1.0
GFC IGSA MATERIAL APPROVAL SUBMITTAL
(See Instructions on Reverse)
Public reporting burden for this collection of information is estimated to average 20 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project 0MB No 9000-0062, Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send your completed form to:
Fort Carson GFC IGSA Manager / TR / CR
DATE (DDMMMYYYY)
Submittal
TO: (IGSA Manager / TR / CR)
GFC IGSA Number
Previous Submission Number
TO BE COMPLETED BY CITY OF FOUNTAIN DELEGATE FOR GOVERNMENT USE ONLY
ITEM SPECIFICATION SECTION/ DESCRIPTION OF MATERIAL AP- DISAP- SEE INITIAL
NO. PARA NO./DRAWING NO. (Include Type, Model Number, Catalog Number, Mfg., etc) PROVED PROVED REVERSE
BY COMPLETING THIS FORM, THE UNDERSIGNED CITY OF FOUNTAIN DELEGATE CERTIFIES THAT THE MATERIAL
SUBITTAL(S) COMPLY WITH ALL SPECIFICATIONS OF SUBJECT TASK ORDER IAW THE GFC IGSA.
RECOMMEND:
DATE (DDMMMYYYY)
DATE (YYYYMMDD)
CoF's Quality Control Delegate certifies: "I hereby certify that the equipment/material/article shown and marked in this submittal is that proposed to be incorporated with the task order number stated above, is in compliance with the task order drawings and specifications, can be installed in the allocated spaces, and is submitted for Government approval."
DATE (DDMMMYYYY) TYPE OR PRINT NAME AND TITLE (CoF QC Delegate)
FOR GOVERNMENT USE ONLY
TYPE OR PRINT NAME AND TITLE (IGSA Manager / TR / CR) SIGNATURE
AF IMT 3000, 20030901, Vl (as amended for GFC IGSA)
For Evaluation and Action
APPROVAL I DISAPPROVAL AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE REVERSE TYPE OR PRINT NAME AND TITLE (IGSA Manager / TR / COR) SIGNATURE
FROM: City of Fountain Delegate (CoF)
Submission Number
Task Order Number
SIGNATURE
NEW RESUBITTAL
APPROVED DISAPPROVED AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE REVERSE SIDE
RESUBMITTAL ON DISAPPROVED ITEMS WITHIN ____ DAYS OF DATE SHOWN BELOW.
-1
-2
-3
-4
-5
-6
-7
-8
-9
-10
IGSA-A60RD-21-DPW-002
COMMENTS
(Number to correspond with applicable Item Number on reverse)
INSTRUCTIONS TO COF DELEGATES
1. The term "material" is defined as articles, supplies, raw materials, equipment, parts, components, and end items that are to be incorporated into the work required by the contract.
2. This form is to be used by CoF Delegate for submitting Shop Drawings, Equipment Data, Manufacturer's Literature and Certificates and samples of Materials to the Government for approval in accordance with the provisions of this Task Order. Unless otherwise specified, it is to be prepared, signed, and provided with the appropriate attachments by CoF Delegate.
3. ltem(s) to be approved will be clearly tabbed or identified. Data pertaining to item(s) to be approved will be clearly identified or tabbed, particularly where documents are voluminous, in order to properly evaluate the materials or articles to be incorporated in the work. Each attachment will be numbered to correspond with the item number shown on the face of this form AND in the title of the attachment referenced. (I.E. Submittal No. then Item No., then Title of attachment - MS#01-1- Project Schedule;
MS#01-2 - Door Specs; MS#01-3 - Window Schedule and so on with each successive Submittal in series).
4. Requests submitted shall be numbered consecutively, by task order, in the space entitled "Submission No.". This number, in addition to the Task Order No., will be used to identify each Material Approval Submittal. Resubmissions will be indicated in the appropriate block and the insertion of previous submission number and data in addition to a new submission number. A single submission should be used for all work of a section of the specifications, but in NO instance should the submission include work for more than one (1) Task Order.
5. This Material Approval Submittal is not valid unless it is signed by the IGSA Manager / TR / CR. This approval is required as called for by the IGSA Manager under the terms of this Task Order IAW the GFC IGSA.
AF IMT 3000, 20030901, Vl (as amended for GFC IGSA)
Request for Information (RFI) Project Number, Title: Contract Number: Date:
Contractor: RFI Type:
Pre-Award Post-Award
RFI Number:
Request for Information:
Name and Title (Requester): Signature Date:
RFI Response Response:
IGSA Manager / IGSA TR / IGSA COR (Responder): Signature Date:
Name Confirming Receipt of Response (Requester): Signature Date:
RFI, 9 Feb 2016
Request for Information (Cont.):
Response (Cont.):
US Army - Fort Carson Intergovernmental Support Agreement (IGSA)
TO General Requirements IGSA Number W0VNAA‐IGSA‐A60RD‐21‐0003, General Facility Construction Project # and Title
General Requirements
SAFETY:
Project Specific safety requirements are included on the General Sheets of the Task Order specific Drawings.
SURETY BONDS:
No bonds are required for this specific Task Order.
COMPETITION:
All resulting subcontracts shall be awarded on a competitive basis, in accordance with 10 U.S.C. § 2679: [Installation-support services: intergovernmental supports agreements], paragraph (a)(4): Any contract for the provision of installation support services awarded by the Federal Government or a State or local government pursuant to an intergovernmental support agreement shall be awarded on a competitive basis.
WARRANTY:
The CITY OF FOUNTAIN must guarantee all materials and workmanship for a period of one year from the date of final acceptance as annotated on the Task Order Notice to Proceed Acceptance date. Any item that requires repair and/or replacement prior to expiration of the one-year warranty period shall be guaranteed for a period of one-year after the date of said correction or repair.
GOVERNMENT FURNISHED PROPETY:
There is no government furnished property provided as part of this specific Task Order.
INSTALLATION SECURITY AND ACCESS REQUIREMENTS:
The CITY OF FOUNTAIN shall not permit employees who are not citizens or lawful immigrants to perform services under this IGSA. Employees who have been convicted of felonies, sex crimes, drug offenses or violent crimes, shall not perform services under this IGSA without the specific approval of the IGSA-M. The CITY OF FOUNTAIN shall not permit any employee to perform work on this IGSA if such person is identified by the IGSA-TR as a potential threat the health, safety, security, general well-being or operational mission of the United States. The IGSA-TR may deny the continued entry of any employee upon receipt of information that indicates that the individual’s continued entry to the installation is not in the best interests of national security.
All CITY OF FOUNTAIN vehicles will be identifiable and include the CITY OF FOUNTAIN’s name.
INSURANCE:
The CITY OF FOUNTAIN shall at its own expense provide and maintain during the entire period of this IGSA the following insurance:
which clearly identifies that they are CITY OF FOUNTAIN employees. At the conclusion of the IGSA or whenever an employee no longer performs IGSA services, the CITY OF FOUNTAIN will provide the IGSA-TR all identification or other credentials furnished by the government.
| DPW24-065 TOPR |
| combined |
| A1.2 |
| A1 |
| Fort Carson General Forms |
| FC Form 2036-E Flattened |
| FC REG 420-19 |
| Page 1 |
| Page 2 |
| Page 3 |
| Page 4 |
| Page 5 |
| Page 6 |
| Page 7 |
| FC REG 420-20 |
| img20140421_07115624 |
| FC REG 420-20 |
| DEPARTMENT OF THE ARMY *FC REG 420-20 |
| Appendix A |
| Guide for DPW Government Representatives |
| FC Form 86-E Dig Permit Request Flattened |
| Clearance Matrix Utilities |
| Sheet1 |
| Project # TO General Reqts |
| IGSA RFI.pdf |
| Blank Page |
| IGSA Submittal Register Template.pdf |
| Sheet1 |
| which clearly identifies that they are CITY OF FOUNTAIN employees At the conclusion of the IGSA or whenever an employee no longer performs IGSA services the CITY OF FOUNTAIN will provide the IGSATR all identification or other credentials furnished by the government: |
| Text1: FLOORING MATOC SAMPLE PROJECT |
| Date3_af_date: |
| Check Box5: Off |
| Check Box6: Off |
| Text7: |
| Text8: |
| Text9: |
| Text11: |
| Text12: |
| Check Box13: Off |
| Check Box14: Off |
| Check Box15: Off |
| Check Box16: Off |
| Check Box17: Off |
| Check Box18: Off |
| Check Box19: Off |
| Check Box20: Off |
| Check Box21: Off |
| Check Box22: Off |
| Check Box23: Off |
| Check Box24: Off |
| Check Box25: Off |
| Check Box26: Off |
| Check Box27: Off |
| Check Box28: Off |
| Check Box29: Off |
| Check Box30: Off |
| Check Box31: Off |
| Check Box32: Off |
| Check Box33: Off |
| Check Box34: Off |
| Check Box35: Off |
| Check Box36: Off |
| Check Box37: Off |
| Check Box38: Off |
| Check Box39: Off |
| Check Box40: Off |
| Check Box41: Off |
| Check Box42: Off |
| Text43: |
| Text44: |
| Text45: |
| Text46: |
| Text47: |
| Text48: |
| Text49: |
| Text50: |
| Text51: |
| Text52: |
| Date56_af_date: |
| Text57: |
| Check Box59: Off |
| Check Box60: Off |
| Date61_af_date: |
| Text62: |
| Check Box64: Off |
| Check Box65: Off |
| Text66: |
| Date67_af_date: |
| Text68: |
| Text5: |
| Text6: |
| Text10: |
| Text13: |
| Text14: |
| Text15: |
| Text16: |
| Text17: |
| Text18: |
| Text19: |
| Text20: |
| Text21: |
| Text22: |
| Text23: |
| Text25: |
| Text26: |
| Text27: |
| Text28: |
| Text70: |
| Project Number Title: |
| Contract Number: |
| Date: |
| RFI Number: |
| Check Box1: Off |
| Check Box2: Off |
| Contractor: |
| Request for Information: |
| Type or Print Name and Title Requestor: |
| Date_2: |
| Response: |
| Type or Print Name and Title Responder: |
| Date_3: |
| Type or Print Name and Title Contracting Officer: |
| Date_4: |
| Request For Information (Cont: |
| ): |
| Response (Cont: |
| ): |
| REQUIRED SUBMITTALRow1: 1. Work Schedule |
| SUSPENSERow1: 10 days after award |
| FORMATRow1: Electronic |
| REMARKSRow1: |
| Received DateRow1: |
| Approved Dissaproved DateRow1: |
| Approved ByRow1: |
| REQUIRED SUBMITTALRow2: 2. Flooring types |
| SUSPENSERow2: 10 days after award |
| FORMATRow2: Physical |
| REMARKSRow2: Provide physical samples |
| Received DateRow2: |
| Approved Dissaproved DateRow2: |
| Approved ByRow2: |
| REQUIRED SUBMITTALRow3: 3. Cove base |
| SUSPENSERow3: 10 days after award |
| FORMATRow3: Physical |
| REMARKSRow3: Provide physical samples |
| Received DateRow3: |
| Approved Dissaproved DateRow3: |
| Approved ByRow3: |
| REQUIRED SUBMITTALRow4: 4. Cove base adhesives |
| SUSPENSERow4: 10 days after award |
| FORMATRow4: Electronic |
| REMARKSRow4: |
| Received DateRow4: |
| Approved Dissaproved DateRow4: |
| Approved ByRow4: |
| REQUIRED SUBMITTALRow5: 5. Weekly progress reports |
| SUSPENSERow5: Weekly |
| FORMATRow5: Electronic |
| REMARKSRow5: |
| Received DateRow5: |
| Approved Dissaproved DateRow5: |
| Approved ByRow5: |
| REQUIRED SUBMITTALRow6: 6. Testing results (if any) |
| SUSPENSERow6: 5days after testing |
| FORMATRow6: Electronic |
| REMARKSRow6: |
| Received DateRow6: |
| Approved Dissaproved DateRow6: |
| Approved ByRow6: |
| REQUIRED SUBMITTALRow7: 7. Warranty letter |
| SUSPENSERow7: No later than 5 days after final inspection |
| FORMATRow7: Electronic |
| REMARKSRow7: |
| Received DateRow7: |
| Approved Dissaproved DateRow7: |
| Approved ByRow7: |
| REQUIRED SUBMITTALRow8: |
| SUSPENSERow8: |
| FORMATRow8: |
| REMARKSRow8: |
| Received DateRow8: |
| Approved Dissaproved DateRow8: |
| Approved ByRow8: |
| SUBSEQUENT SUBMITTALSRow1: |
| SUSPENSERow10: |
| FORMATRow10: |
| REMARKSRow10: |
| Received DateRow10: |
| Approved Dissaproved DateRow10: |
| Approved ByRow10: |
| SUBSEQUENT SUBMITTALSRow2: |
| SUSPENSERow11: |
| FORMATRow11: |
| REMARKSRow11: |
| Received DateRow11: |
| Approved Dissaproved DateRow11: |
| Approved ByRow11: |
| SUBSEQUENT SUBMITTALSRow3: |
| SUSPENSERow12: |
| FORMATRow12: |
| REMARKSRow12: |
| Received DateRow12: |
| Approved Dissaproved DateRow12: |
| Approved ByRow12: |
| SUBSEQUENT SUBMITTALSRow4: |
| SUSPENSERow13: |
| FORMATRow13: |
| REMARKSRow13: |
| Received DateRow13: |
| Approved Dissaproved DateRow13: |
| Approved ByRow13: |
| SUBSEQUENT SUBMITTALSRow5: |
| SUSPENSERow14: |
| FORMATRow14: |
| REMARKSRow14: |
| Received DateRow14: |
| Approved Dissaproved DateRow14: |
| Approved ByRow14: |
| SUBSEQUENT SUBMITTALSRow6: |
| SUSPENSERow15: |
| FORMATRow15: |
| REMARKSRow15: |
| Received DateRow15: |
| Approved Dissaproved DateRow15: |
| Approved ByRow15: |
| SUBSEQUENT SUBMITTALSRow7: |
| SUSPENSERow16: |
| FORMATRow16: |
| REMARKSRow16: |
| Received DateRow16: |
| Approved Dissaproved DateRow16: |
| Approved ByRow16: |
| SUBSEQUENT SUBMITTALSRow8: |
| SUSPENSERow17: |
| FORMATRow17: |
| REMARKSRow17: |
| Received DateRow17: |
| Approved Dissaproved DateRow17: |
| Approved ByRow17: |
| SUBSEQUENT SUBMITTALSRow9: |
| SUSPENSERow18: |
| FORMATRow18: |
| REMARKSRow18: |
| Received DateRow18: |
| Approved Dissaproved DateRow18: |
| Approved ByRow18: |
| SUBSEQUENT SUBMITTALSRow10: |
| SUSPENSERow19: |
| FORMATRow19: |
| REMARKSRow19: |
| Received DateRow19: |
| Approved Dissaproved DateRow19: |
| Approved ByRow19: |
| SUBSEQUENT SUBMITTALSRow11: |
| SUSPENSERow20: |
| FORMATRow20: |
| REMARKSRow20: |
| Received DateRow20: |
| Approved Dissaproved DateRow20: |
| Approved ByRow20: |
| SUBSEQUENT SUBMITTALSRow12: |
| SUSPENSERow21: |
| FORMATRow21: |
| REMARKSRow21: |
| Received DateRow21: |
| Approved Dissaproved DateRow21: |
| Approved ByRow21: |
| SUBSEQUENT SUBMITTALSRow13: |
| SUSPENSERow22: |
| FORMATRow22: |
| REMARKSRow22: |
| Received DateRow22: |
| Approved Dissaproved DateRow22: |
| Approved ByRow22: |
| Text2: |
File details come from the government source that posted it. Updated .