The document is a safety requirements attachment for a Multiple Award Task Order Contract (MATOC) for Flooring Services involving the City of Fountain, Colorado, and Fort Carson Army Post. The contract seeks multiple firms to perform specialized flooring projects through task orders ranging from $1,000 to $1,000,000, with an anticipated contract relationship spanning up to 10 years or longer. The solicitation requires prime contractors to perform at least 50 percent of services with their own employees or similarly situated subcontractors, focusing on flooring specialty trade work for Fort Carson and the City of Fountain.
The safety requirements attachment provides comprehensive guidelines for contractor safety practices, including detailed accident prevention plan requirements, ergonomic design standards, and strict adherence to OSHA regulations. Contractors must submit a site-specific accident prevention plan within 10 days of contract award, including elements such as background information, safety policy, training requirements, inspection protocols, and detailed hazard analyses. The document emphasizes safety compliance, with provisions for immediate work stoppage if hazardous conditions are identified and mandatory reporting of safety violations or inspection reports from local, state, and federal regulators.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 3 MATOC Will Not Compete.docx | DOCX document | |
| Attachment 4 MATOC PPQ.docx | DOCX document | |
| Attachment 5 FLOORING MATOC SAMPLE PROJECT.pdf | ||
| FLOORING MATOC RFP.docx | DOCX document | |
| Attachment 2 MATOC Accident Prevention Plan Review Checklist.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Safety Practices and Guidelines. The Contractor shall conform to all federal OSHA standards applicable to the work performed and all safety practices and guidelines contained within this Statement of Work. Contractor shall strictly adhere to the contract clause entitled “Accident Prevention”, FAR, National Park Service Safety and Occupational Health Regulation RM 50B, 29 Code of Federal Regulations (CFR) 1926/1910, other related Department of Transportation (DOT) Regulations (49 CFR), and all local policies.
If a contractor employee is observed performing an activity in a manner inconsistent with any of the above cited regulations or is engaged in any activity that is dangerous to life, limb, or government property, the Local/Regional Safety Representative shall have the authority to notify the employee and/or the contractor’s on-site supervisor of the hazardous activity and require correction of the hazardous activity. This authority does not preclude the Safety Representative from notifying the Contracting Representative of the hazardous condition or safety violation in appropriate situations. If necessary, the Local/Regional Safety Representative shall have the authority on behalf of the City Contracting Representative to require the contractor and/or its employee to stop work until corrective action is taken to eliminate a hazardous condition or safety violation. Said action shall not be considered to be the basis of a claim and shall be at no additional cost.
Contractor and subcontractors will notify Local and Regional Safety Office immediately of Reports of Inspections and/or Notices of Violation or other enforcement actions (including warning letters) received from by local, State, and Federal Regulators in which the violation is attributed to the action of the contractor or its subcontractors while working or providing services on Fort Carson property. Contractor and subcontractors will provide Fort Carson Representative with a copy of the Inspection Reports, Notice of Violations or other enforcement action, and all supporting documentation with in 7 workings of receipt of the notice from the regulator. Contractor will provide with in 10 days after contract award all Inspections, Reports of Inspection, Notices of Violation or warnings from any federal, state or local regulator. Contractor shall provide with in 10 days after contract award their past three years of accident and injury data in the form of OSHA 300 logs as well as the year end OSHA log that is posted in the contractors work area IAW OSHA Record keeping Standard.
DESIGN (ERGONOMICS)
All parts, components, mechanisms, and assemblies furnished on the Item/Equipment, whether or not required herein, shall meet or exceed all requirements of OSHA 29 CFR 1910. Covers, guards, shielding, or other safety devices shall be provided.
Interlock switches. The Item/Equipment shall be provided with interlock switches for removing all power from the equipment when service doors that provide access to hazardous voltages are opened.
Dials. All dials used to indicate power (watts), amperage, voltage, and related electrical functions shall have independent zero adjustment and shall be permanently and legibly engraved or etched on a non-glare background with graduations that can be read from the operator's normal operating position.
Controls. All mechanical and pneumatic operating controls shall be located convenient optimum locations to the operator's workstation. Controls shall positioned to avoid operator awkward postures/positions, repetitive motions, excessive force, undue stretching, compression/contact stresses against portions of body, vibration, temperature and the operators requirement to maintain any of these recognized ergonomic risk factors for any extended period of time. Design shall incorporate these features for both operations and maintenance tasks under both normal and emergency situations.
Safety devices. Audio or Visual Safety interlocks and fail-safe features shall be incorporated into the system. Visual safety interlocks shall be positioned at optimum locations for the operator to see without obstructions during normal operations.
Maintenance. All major assemblies and installed attachments shall be optimally located for immediate accessibility for maintenance, inspection, and repair utilizing common tools under both normal and emergency situations. The inspection, adjustment, repair, and replacement of components and accessories shall be accomplished with minimum requirements and minimum disturbance to other components and accessories of the system. Contractor shall furnish all special tools with machine, if required to perform maintenance, repair, or removal and installation of any of the system components. Instructions for disassembly, repair, re-assembly, and adjustment shall be clear, concise and definitive.
Accessibility. All parts subject to wear, breakage, or distortion and all parts which require periodic lubrication or maintenance shall be readily accessible for adjustment, replacement, and lubrication as applicable. Maximum accessibility shall be provided to parts that require scheduled maintenance. The configuration of the system shall be such that removal of operational parts shall not be necessary to permit accessibility for maintenance inspection and repair and place the operator or maintenance personnel in unsafe or hazardous situations.
Construction. All parts and necessary equipment shall be functionally suitable for the purpose intended. System shall be ergonomically designed for the operator to avoid awkward postures/positions, repetitive motion, excessive force, undue stretching, compression/contact stress against portions of body, vibration, temperature and the operator’s requirement to maintaining any of these recognized ergonomic risk factors for any extended period of time.
Control station. All control elements required for system setup and run operations shall be contained in an operator's control station. This station shall be located at a position convenient for normal system operations. All keys, dials, vacuum indicators, and switches shall be functionally grouped. An emergency stop shall be readily accessible at the control station and easily identifiable as to its function.
All video display terminals, keyboards, and hardware shall be ergonomically designed when feasible and positioned at optimal locations for their intended purpose based on human capabilities and characteristics.
CONTRACTOR SAFETY PROGRAMS AND ACCIDENT PREVENTION PLANS
For each specific job or contract, a site specific accident prevention plan (or job safety plan) must be submitted. This plan is specific for the current project, and must address the particular hazards which will be inherent in the project and how they will control them. This plan must be submitted to the City Contract Representative and Fort Carson Representative not more than 10 days after contract award. Contractor must have approved plan in place prior to any work being performed on Fort Carson property. Listed below are some of the items that must be covered in the plan, the plan must also meet current standards listed above.
(1.) SIGNATURE SHEET. Title, signature, and phone number of the following:
a. Plan preparer
b. Plan approval, e.g., owner, company president, etc.
c. Plan concurrence (concurrence of other applicable corporate and project personnel (contractor) such as their safety officer, project manager, or superintendent)
(2.) BACKGROUND INFORMATION. List the following:
a. Contractor
b. Contract number
c. Project name
d. Brief description of the work to be performed and location
e. Contractor accident experience (provide information such as OSHA 200 logs, company safety trend analysis)
f. Listing of phases of work and hazardous activities requiring activity hazards analyses.
(3.) STATEMENT OF SAFETY AND HEALTH POLICY.
(4.) RESPONSIBILITIES AND LINES OF AUTHORITIES.
a. Identification and accountability of personnel responsible for safety - at both corporate and project level if applicable.
b. Lines of authority.
(5.) SUBCONTRACTORS AND SUPPLIERS.
a. Identification of subcontractors and suppliers (if known).
b. Means for controlling and coordinating subcontractors and suppliers.
c. Safety responsibilities of subcontractors and suppliers.
(6.) TRAINING.
a. List subjects to be discussed with employees in safety indoctrination.
b. List mandatory training and certifications, which are applicable to this project (e.g., explosive actuated tools, confined space entry, crane operator, vehicle operator, HAZWOPER training and certification, personal protective equipment, electrical hazards, elevated surfaces.).
c. Identify requirements for emergency response training.
d. Outline requirements (who attends, when given, who will conduct etc.) for supervisory and employee safety meetings.
(7.) SAFETY AND HEALTH INSPECTIONS. Provide details on:
a. Who will conduct safety inspections (e.g. project manager, safety professional, QC, supervisor, employees, etc.)
b. Any external inspections/certifications that may be required.
(8.) SAFETY AND HEALTH EXPECTATIONS, INCENTIVE PROGRAMS, AND COMPLIANCE.
a. The company's written safety program goals, objectives, and accident experience.
b. A brief description of the company's safety incentive programs (if any)
c. Policies and procedures for holding managers and supervisors accountable for safety.
(9.) ACCIDENT REPORTING. The contractor shall identify who shall complete the following, how, and when:
a. Exposure data (man hours worked)
b. Accident investigations, reports and logs
c. Immediate notification of accidents
(10.) PLANS (PROGRAMS, PROCEDURES) AS APPLICABLE TO THE WORK TO BE CONDUCTED. This list is not all-inclusive, nor will all topics apply to all contractors.
a. Hazard communication
b. Emergency response plans (spills, posting of emergency telephone numbers, fire prevention, etc.)
c. Layout plans
d. Respiratory protection plan
e. Health hazard control program
f. Lead abatement plan
g. Asbestos abatement plan
h. Abrasive blasting
i. Confined space
j. Hazardous energy control plan
k. Critical lift procedures
l. Contingency plan for severe weather
m. Access and haul road plan
n. Demolition plan (engineering and asbestos survey)
o. Material handling equipment licensing
p. Plan for prevention of alcohol and drug abuse
q. Fall protection
(11.) Detailed site-specific hazards and controls shall be provided in the activity hazard analysis for each phase of the operation.