Attachment 5-DRCG Brevard Sewer SOI.pdf
PDF 145 KB Posted
- Attached to
- Davidson River Campground Brevard Sewer Project Federal contract opportunity
- Solicitation number
- 12445226Q0005
- Issued by
- Department of Agriculture Forest Service
About this file
This is a Bid Form (Schedule A) for the Davidson River Campground Sewer System Improvements project for the US Forest Service. The form is structured in two divisions covering distinct project areas with separate subtotals for each.
Division I addresses the Sycamore Flats Lift Station area and includes 24 line items encompassing contractor mobilization/demobilization, clearing and grubbing, gravity sewer lines (8" PVC in various depths and specifications), sewer forcemain installation via open cut and horizontal directional drill methods, bore and jack operations, manholes (4' and 5' diameter), manhole vents and modifications, new sewer services, pavement replacement, sediment and erosion control facilities, sewer system testing (mandrel/deflection testing, air/infiltration testing, and manhole vacuum tests), compaction tests, tree removal, and classified excavation. Item 24 specifies 80 cubic yards of classified excavation at a fixed unit price of $175.00 per cubic yard, totaling $14,000.00.
Division II addresses the Ranger Station Lift Station area with 20 line items covering similar work categories: contractor mobilization/demobilization, clearing and grubbing, gravity sewer lines (8" PVC), sewer forcemain in open cut and via horizontal directional drill (2" HDPE), forcemain line valves, 4' diameter manholes at various depths, watertight frames and covers, manhole vents, connections to existing manholes, new/relocated sewer services (including 1,270 linear feet of 4" PVC service line), the new Ranger Station Lift Station with associated components (pumps, concrete structures, electrical controls, emergency generator, concrete pads, crushed stone paving, yard hydrant, water service, and landscaping), tree removal, pavement replacement, sediment and erosion control facilities, and sewer system testing. Contractors must provide unit prices and calculate total costs for all line items, with subtotals required for each division.
View the file
Other files for this federal contract opportunity
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE A
BID FORM
Davidson River Campground Sewer System Improvements -For The-
US Forest Service
Item No.
A.
1. 1 LS $ $
2. 1 LS $ $
3.
a. 8" PVC, SDR 35
1) 6'-8' Deep 300 LF $ $
2) 8'-10' Deep 340 LF $ $
b. 8" PVC, C900
1) 12'-14' Depth 850 LF $ $
2) 14'-16' Depth 300 LF $ $
4.
a. 16" Stl. Encasement Pipe w/ 8" DIP 400 LF $ $
5.
a. 6-inch DIP, Cl. 350 140 LF $ $
b. 7-inch HDPE, DR11 30 LF $ $
6. Sewer Forcemain - Horizontal Directional Drill
a. 7-inch HDPE, DR11 1,600 LF $ $
7. 1 EA
8.
a. 6'-8' Depth 1 EA $ $
b. 8'-10' Depth 2 EA $ $
c. 14'-16' Depth 5 EA $ $
9. 1 EA $ $
10. 1 EA $ $
11. 10 EA $ $
12.
a. Offset Vent 3 EA $ $
13.
a. Re-Build/Raise Invert 1 EA $ $
b. Raise Manhole Cone 1 EA $ $
14. 2 EA $ $
15. 2 EA $ $
16.
a. New Service (Lateral, Connection, & Cleanout) 1 EA $ $
b. New 4" PVC Service Line - Open Cut 50 LF $ $
17.
a. Clearing & Grubbing 1 LS $ $
b. Earthwork 760 CY $ $
4' Diameter Outside Drop Manhole
Watertight Frame & Cover
Manhole Vents
Cut and Plug Ex. Gravity Sewer
Connection to Ex. Manhole
5' Diameter Inside Drop Manhole
Modification of Ex. Manhole
New Sycamore Flats Lift Station
Unit Price
Contractor Mobilization / Demobilization:
Manholes - 4' Diameter
Clearing and Grubbing (R/W Clearing) Up to 10"
BASE BID:
Gravity Sewer Lines - Open Cut
Description Quantity Unit Total
DIVISION I
Sewer Forcemain - Open Cut
Gravity Sewer - Bore & Jack
New/Relocated Sewer Services:
Air and Vacuum Valve in 4' Diameter Manhole
Schedule A - Page1 of 4
Davidson River Campground Sewer System Improvements -For The-
US Forest Service
c. Pumps, Rails, Floats, Piping, and Valves 1 LS $ $
d. Conc. Structures (Wet Well and Valve Vault) 1 LS $ $
e. Electrical and Pump Controls w/ Canopy 1 LS $ $
f. Emergency Generator 1 EA $ $
g. Concrete Pads 1 LS $ $
h. Crushed Stone Paving 205 Tons $ $
i. Non-Freeze Yard Hydrant 1 EA $ $
j. New 3/4" Water Service 1 LS $ $
k. Landscaping 1 LS $ $
l. Cattle Gate 1 EA $ $
18. 2 EA $ $
19. 9 EA $ $
20.
a. Asph. Pave. Repair (State Hwy.) 10 LF $ $
b. Asph. Pave. Repair (Driveway, Parking, etc.) 980 LF $ $
21.
a. Outlet Protection 1 EA $ $
b. Silt Fence 1,460 LF $ $
c. Mud Mat/Construction Entrance 1 EA $ $
d. Wattles 6 EA $ $
e. Grassing 0.5 AC $
22.
a. Mandrel / Deflection Testing 1,790 LF $ $
b. Air / Infiltration Testing 1,790 LF $ $
c. Manhole Vacuum Tests 11 EA $ $
23. 10 EA $ $
24. 80 CY 175.00$ 14,000.00$
Tree Removal
Abandonment of Ex. Lift Station
Pavement Replacement:
Compaction Tests
Sediment & Erosion Control Facilities
DIVISION I SUB-TOTAL
Classified Excavation
Sewer System Testing
Schedule A - Page2 of 4
Davidson River Campground Sewer System Improvements -For The-
US Forest Service
Item No.
A.
1. 1 LS $ $
2. 1 LS $ $
3.
a. 8" PVC, SDR 35
1) 0'-6' Deep 1,700 LF $ $
2) 6'-8' Deep 140 LF $ $
4.
a. 2-inch PVC, Cl. 200 120 LF $ $
5.
a. 2-inch HDPE, DR 11 1,270 LF $ $
6.
a. 2" G.V. & Box 2 EA $ $
7. 1 EA $ $
8.
a. 0'-6' Depth 4 EA $ $
b. 6'-8' Depth 2 EA $ $
9. 5 EA $ $
10.
a. Standard Vent 3 EA $ $
11. 1 EA $ $
12. 4 EA $ $
13.
a. New Service (Lateral, Connection, & Cleanout) 4 EA $ $
b. New 4" PVC Service Line - Open Cut 1,270 LF $ $
c. Additional Clean Outs 13 EA $ $
14.
a. Clearing & Grubbing 1 LS $ $
b. Earthwork 410 CY $ $
c. Pumps, Rails, Floats, Piping, and Valves 1 LS $ $
d. Conc. Structures (Wet Well and Valve Vault) 1 LS $ $
e. Electrical and Pump Controls w/ Canopy 1 LS $ $
f. Emergency Generator 1 EA $ $
g. Concrete Pads 1 LS $ $
h. Crushed Stone Paving 145 Tons $ $
i. Non-Freeze Yard Hydrant 1 EA $ $
Sewer Forcemain - Open Cut
Manholes - 4' Diameter
Connection to Ex. Manhole
Cut and Plug Ex. Sewer Service
Watertight Frame & Cover
Manhole Vents
New/Relocated Sewer Services:
Sewer Forcemain - Horizontal Directional Drill
Forcemain Line Valves
New Ranger Station Lift Station
DIVISION II
Description Quantity Unit
BASE BID:
Contractor Mobilization / Demobilization:
Clearing and Grubbing (R/W Clearing)
Gravity Sewer Lines - Open Cut
Air and Vacuum Valve in 4' Diameter Manhole
Unit Price Total
Schedule A - Page3 of 4
Davidson River Campground Sewer System Improvements -For The-
US Forest Service
j. New 3/4" Water Service 1 LS $ $
k. Landscaping 1 LS $ $
15. 9 EA $ $
16.
a. Asph. Pave. Repair (Driveway, Parking, etc.) 170 LF $ $
17.
a. Inlet Protection 1 EA $ $
b. Silt Fence 1,970 LF $ $
c. Mud Mat/Construction Entrance 1 EA $ $
d. Wattles 12 EA $ $
e. Grassing 0.8 AC $ $
18.
a. Mandrel / Deflection Testing 1,840 LF $ $
b. Air / Infiltration Testing 1,840 LF $ $
c. Manhole Vacuum Tests 6 EA $ $
19. 5 EA $ $
20. 80 CY $ $
Tree Removal
Pavement Replacement:
Sediment & Erosion Control Facilities
Sewer System Testing
DIVISION II SUB-TOTAL
Compaction Tests
Classified Excavation
Schedule A - Page4 of 4
Schedule A Base Bid