Attachment 5- Revised DRCG Brevard Sewer SOI.pdf

PDF 149 KB Posted

Attached to
Davidson River Campground Brevard Sewer Project Federal contract opportunity
Solicitation number
12445226Q0005
Issued by
Department of Agriculture Forest Service

About this file

This is a Bid Form (Schedule A) for the Davidson River Campground Sewer System Improvements project for the US Forest Service. The bid form is structured in two divisions, each representing distinct work scopes with separate subtotals.

Division I covers the New Sycamore Flats Lift Station project and includes: contractor mobilization/demobilization; clearing and grubbing; gravity sewer lines in open cut configuration using 8" PVC (SDR 35 and C900) at various depths (6'-16' deep) totaling 1,590 linear feet; gravity sewer bore and jack work with 24" steel encasement pipe and 8" DIP (400 LF); sewer forcemain work in open cut (6-inch DIP and 7-inch HDPE) and horizontal directional drill (1,600 LF of 7-inch HDPE); multiple 4-foot diameter manholes at varying depths (1-5 each); 5-foot diameter inside drop manhole; 4-foot diameter outside drop manhole; watertight frames and covers (10 each); manhole vents; modifications to existing manholes; new and relocated sewer services including 50 LF of 4" PVC service line; lift station components (pumps, rails, floats, piping, valves, concrete structures, electrical controls with canopy, emergency generator, concrete pads, crushed stone paving at 205 tons, yard hydrant, water service, landscaping, and cattle gate); tree removal (10 each); pavement replacement on state highway and driveway/parking areas (990 LF total); sediment and erosion control facilities; sewer system testing (mandrel/deflection, air/infiltration, and manhole vacuum tests); and 1,000 cubic yards of classified excavation.

Division II covers the New Ranger Station Lift Station project with similar components but smaller quantities: gravity sewer lines (1,840 LF of 8" PVC SDR 35); 2-inch PVC and HDPE sewer forcemain lines (120 LF open cut, 805 LF HDD standard, 465 LF HDD rock bore); 2-inch gate valve and box; air/vacuum valve; 6 total 4-foot diameter manholes; watertight frames and covers (5 each); manhole vents; new/relocated services (4 new services, 1,270 LF of 4" service line, 13 additional cleanouts); lift station construction components; tree removal (9 each); pavement repair (170 LF); sediment and erosion control; sewer system testing; and 200 cubic yards of classified excavation. Both divisions require contractors to provide unit prices and calculate totals for each line item, with division subtotals to be calculated for final bid determination.

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE A

BID FORM

Davidson River Campground Sewer System Improvements -For The-

US Forest Service

Item No.

A.

1. 1 LS $ $

2. 1 LS $ $

3.

a. 8" PVC, SDR 35

1) 6'-8' Deep 300 LF $ $

2) 8'-10' Deep 340 LF $ $

b. 8" PVC, C900

1) 12'-14' Depth 850 LF $ $

2) 14'-16' Depth 300 LF $ $

4.

a. 24" Stl. Encasement Pipe w/ 8" DIP 400 LF $ $

5.

a. 6-inch DIP, Cl. 350 140 LF $ $

b. 7-inch HDPE, DR11 30 LF $ $

6. Sewer Forcemain - Horizontal Directional Drill

a. 7-inch HDPE, DR11 1,600 LF $ $

7. 1 EA $ $

8.

a. 6'-8' Depth 1 EA $ $

b. 8'-10' Depth 2 EA $ $

c. 14'-16' Depth 5 EA $ $

9. 1 EA $ $

10. 1 EA $ $

11. 10 EA $ $

12.

a. Offset Vent 3 EA $ $

13.

a. Re-Build/Raise Invert 1 EA $ $

b. Raise Manhole Cone 1 EA $ $

14. 2 EA $ $

15. 2 EA $ $

16.

a. New Service (Lateral, Connection, & Cleanout) 1 EA $ $

b. New 4" PVC Service Line - Open Cut 50 LF $ $

17.

a. Clearing & Grubbing 1 LS $ $

b. Earthwork 760 CY $ $

Sewer Forcemain - Open Cut

Gravity Sewer - Bore & Jack

New/Relocated Sewer Services:

Air and Vacuum Valve in 4' Diameter Manhole

Description Quantity Unit Total

DIVISION I

New Sycamore Flats Lift Station

Unit Price

Contractor Mobilization / Demobilization:

Manholes - 4' Diameter

Clearing and Grubbing (R/W Clearing) Up to 10"

BASE BID:

Gravity Sewer Lines - Open Cut

Connection to Ex. Manhole

5' Diameter Inside Drop Manhole

Modification of Ex. Manhole

4' Diameter Outside Drop Manhole

Watertight Frame & Cover

Manhole Vents

Cut and Plug Ex. Gravity Sewer

Schedule A - Page1 of 2

Davidson River Campground Sewer System Improvements -For The-

US Forest Service

c. Pumps, Rails, Floats, Piping, and Valves 1 LS $ $

d. Conc. Structures (Wet Well and Valve Vault) 1 LS $ $

e. Electrical and Pump Controls w/ Canopy 1 LS $ $

f. Emergency Generator 1 EA $ $

g. Concrete Pads 1 LS $ $

h. Crushed Stone Paving 205 Tons $ $

i. Non-Freeze Yard Hydrant 1 EA $ $

j. New 3/4" Water Service 1 LS $ $

k. Landscaping 1 LS $ $

l. Cattle Gate 1 EA $ $

18. 2 EA $ $

19. 9 EA $ $

20.

a. Asph. Pave. Repair (State Hwy.) 10 LF $ $

b. Asph. Pave. Repair (Driveway, Parking, etc.) 980 LF $ $

21.

a. Outlet Protection 1 EA $ $

b. Silt Fence 1,460 LF $ $

c. Mud Mat/Construction Entrance 1 EA $ $

d. Wattles 6 EA $ $

e. Grassing 0.5 AC $ $

22.

a. Mandrel / Deflection Testing 1,790 LF $ $

b. Air / Infiltration Testing 1,790 LF $ $

c. Manhole Vacuum Tests 11 EA $ $

23. 10 EA $ $

24. 1,000 CY $ $

Sewer System Testing

Classified Excavation

Pavement Replacement:

Compaction Tests

Sediment & Erosion Control Facilities

DIVISION I SUB-TOTAL

Tree Removal

Abandonment of Ex. Lift Station

Schedule A - Page2 of 2

Davidson River Campground Sewer System Improvements -For The-

US Forest Service

Item No.

A.

1. 1 LS $ $

2. 1 LS $ $

3.

a. 8" PVC, SDR 35

1) 6'-8' Deep 1,840 LF $ $

4.

a. 2-inch PVC, Cl. 200 120 LF $ $

5.

a. 2-inch HDPE, DR 11 805 LF $ $

b. 2-inch HDPE (Rock Bore) 465 LF $ $

6.

a. 2" G.V. & Box 2 EA $ $

7. 1 EA $ $

8.

a. 0'-6' Depth 1 EA $ $

b. 6'-8' Depth 5 EA $ $

9. 5 EA $ $

10.

a. Standard Vent 3 EA $ $

11. 1 EA $ $

12. 4 EA $ $

13.

a. New Service (Lateral, Connection, & Cleanout) 4 EA $ $

b. New 4" PVC Service Line - Open Cut 1,270 LF $ $

c. Additional Clean Outs 13 EA $ $

14.

a. Clearing & Grubbing 1 LS $ $

b. Earthwork 410 CY $ $

c. Pumps, Rails, Floats, Piping, and Valves 1 LS $ $

d. Conc. Structures (Wet Well and Valve Vault) 1 LS $ $

e. Electrical and Pump Controls w/ Canopy 1 LS $ $

f. Emergency Generator 1 EA $ $

g. Concrete Pads 1 LS $ $

h. Crushed Stone Paving 145 Tons $ $

i. Non-Freeze Yard Hydrant 1 EA $ $

Sewer Forcemain - Open Cut

Manholes - 4' Diameter

Connection to Ex. Manhole

Cut and Plug Ex. Sewer Service

Watertight Frame & Cover

Manhole Vents

New/Relocated Sewer Services:

Sewer Forcemain - Horizontal Directional Drill

Forcemain Line Valves

New Ranger Station Lift Station

DIVISION II

Description Quantity Unit

BASE BID:

Contractor Mobilization / Demobilization:

Clearing and Grubbing (R/W Clearing)

Gravity Sewer Lines - Open Cut

Air and Vacuum Valve in 4' Diameter Manhole

Unit Price Total

Schedule A - Page1 of 2

Davidson River Campground Sewer System Improvements -For The-

US Forest Service

j. New 3/4" Water Service 1 LS $ $

k. Landscaping 1 LS $ $

15. 9 EA $ $

16.

a. Asph. Pave. Repair (Driveway, Parking, etc.) 170 LF $ $

17.

a. Inlet Protection 1 EA $ $

b. Silt Fence 1,970 LF $ $

c. Mud Mat/Construction Entrance 1 EA $ $

d. Wattles 12 EA $ $

e. Grassing 0.8 AC $ $

18.

a. Mandrel / Deflection Testing 1,840 LF $ $

b. Air / Infiltration Testing 1,840 LF $ $

c. Manhole Vacuum Tests 6 EA $ $

19. 5 EA $ $

20. 200 CY $ $

Tree Removal

Pavement Replacement:

Sediment & Erosion Control Facilities

Sewer System Testing

DIVISION II SUB-TOTAL

Compaction Tests

Classified Excavation

Schedule A - Page2 of 2

24040 Schedule A - Bid Form Div I Revised 2-13-26
Schedule A Base Bid
24040 Schedule A - Bid Form Revised Div II 2-13-26
Schedule A Base Bid

File details come from the government source that posted it. Updated .