ATTACHMENT 5 - Drawings 3 of 3.pdf

PDF 12 MB Posted

Attached to
Y1DZ--Medical Specialty Clinic (Minor) Construction - Mather
Solicitation number
36C77622B0012
Issued by

About this file

This document contains a federal contract opportunity for construction services. The Department of Veterans Affairs Technology Acquisition Center Austin is soliciting bids for a Minor Construction - Medical Specialty Clinic project at the Mather VA Medical Center in California. The contractor will be responsible for site preparation including demolition and removal of existing structures, and construction of a new 6,12-122 Medical Specialties building. The project scope includes foundations, superstructure, mechanical, electrical, plumbing and special systems, landscaping, and other required site improvements. The response deadline and anticipated award date are not specified.

View the file

Other files

File Type Posted
Updated Table of Contents w-Omitted Sections.pdf PDF
36C77622B0012 0004.pdf PDF
Technical Questions Revision to Response No. 3.pdf PDF
Pole Base Detail.pdf PDF
Site Plan Construction Lay Down Area.pdf PDF
Addendum 2.pdf PDF
36C77622B0012 0003.pdf PDF
Technical Questions - FINAL - Mather 4-11-22.pdf PDF
TK101A.pdf PDF
ATTACHMENT 11 - Construction Wage Rates - Sacramento 4-1-22.pdf PDF
SMUD.pdf PDF
36C77622B0012 0002.pdf PDF
36C77622B0012 0001.pdf PDF
Site Visit Sign-in Sheet - Mather 3-15-22.pdf PDF
ATTACHMENT 8 - Contractor Core Work Hours.pdf PDF
ATTACHMENT 9 - COVID-19 Safety Protocols 12-14-21.pdf PDF
ATTACHMENT 1 - Specifications Vol 1 of 2.pdf PDF
ATTACHMENT 2 - Specifications Vol 2 of 2.pdf PDF
ATTACHMENT 10 - Limitations on Subcontracting - Construction.docx DOCX document
ATTACHMENT 3 - Drawings 1 of 3.pdf PDF
ATTACHMENT 4 - Drawings 2 of 3.pdf PDF
36C77622B0012 - 3-2-22.pdf PDF
ATTACHMENT 7 - Brand Name Justification - Mather.pdf PDF
ATTACHMENT 13 - Site Visit - Map.pdf PDF
ATTACHMENT 11 - Construction Wage Rates - Sacramento 2-25-22.pdf PDF
ATTACHMENT 6 - Geotechnical Report.pdf PDF
ATTACHMENT 12 - Contractor Safety - Environmental Form.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

L L

ELECTRICAL ABBREVIATIONS LIST

SR SURFACE RACEWAY

SS STAINLESS STEEL

SSW SELECTOR SWITCH

STD STANDARD

SURF SURFACE MOUNTED

SW SWITCH

SWBD SWITCHBOARD

SYM SYMMETRICAL

SYS SYSTEM

TC TIMECLOCK

TEL TELEPHONE

TEL/DATA TELEPHONE/DATA

TERM TERMINAL

TP TWISTED PAIR

TPS TWISTED PAIR SHIELDED

TR TAMPER RESISTANT

T-STAT THERMOSTAT

TTB TELEPHONE TERMINAL BOARD

TTC TELEPHONE TERMINAL

CABINET

TV TELEVISION

TYP TYPICAL

UC UNDER COUNTER

UE UNDERGROUND ELECTRICAL

UG UNDERGROUND

UH UNIT HEATER

UL UNDERWRITER'S LABORATORY

UT UNDERGROUND TELEPHONE

UTP UNSHIELDED TWISTED PAIR

UTIL UTILITY

UV UNIT VENTILATOR OR

ULTRAVIOLET

V VOLT

VA VOLT-AMPERES

VERT VERTICAL

VFD VARIABLE FREQUENCY DRIVE

VOL VOLUME

W WATT

W/ WITH

WH WATER HEATER

W/O WITHOUT

WP WEATHERPROOF

XFMR TRANSFORMER

XFR TRANSFER

ANGLE

@ AT

DELTA

' FEET

" INCHES

# NUMBER

Φ PHASE

C CENTER LINE

P PLATE

MTR MOTOR, MOTORIZED

MTS MANUAL TRANSFER SWITCH

NA NOT APPLICABLE

NC NORMALLY CLOSED

NEC NATIONAL ELECTRICAL CODE

NEMA NATIONAL ELECTRICAL

MANUFACTURER'S ASSOCIATION

NFDS NON-FUSED SAFETY DISCONNECT

SWITCH

NIC NOT IN CONTRACT

NL NIGHT LIGHT

NO NORMALLY OPEN

NTS NOT TO SCALE

OC ON CENTER

OD OUTSIDE DIAMETER

OH OVERHEAD

OL OVERLOAD

PA PUBLIC ADDRESS

PB PULL BOX OR PUSHBUTTON

PBPU PREFABRICATED BEDSIDE PATIENT

UNIT

PCB POLYCHLORINATED BYPHENYL

PC PHOTOELECTRIC CELL

PED PEDESTAL

PEND PENDANT

PF POWER FACTOR

PH PHASE

PIV POST INDICATING VALVE

PNL PANEL

POE POWER-OVER-ETHERNET

PR PAIR

PRI PRIMARY

PROJ PROJECTION

PRV POWER ROOF VENTILATOR

PT POTENTIAL TRANSFORMER

PVC POLYVINYL CHLORIDE (CONDUIT)

PWR POWER

QTY QUANTITY

RCP REFLECTED CEILING PLAN

RCPT RECEPTACLE

REQD REQUIRED

RGS RIGID GALVANIZED STEEL

RM ROOM

RMS ROOT MEAN SQUARE

RTU ROOF TOP UNIT

SC SURFACE CONDUIT

SEC SECONDARY

SF SQUARE FEET/FOOT

SHT SHEET

SI INTERNATIONAL SYSTEM OF UNITS

SIM SIMILAR

S/N SOLID NEUTRAL

SPEC SPECIFICATION

SPKR SPEAKER

SP SPARE

1P 1 POLE (2P, 3P, 4P, ETC.)

1PH 1 PHASE

2/C TWO-CONDUCTOR (3/C, 4/C, ETC.)

W2 TWO-WIRE (3W, 4W, ETC.)

3PH 3 PHASE

A AMPERE

AAP ALARM ANNUNCIATOR PANEL

AC ABOVE COUNTER

AIR CONDITIONER

ALTERNATING CURRENT

ACC ACCESSIBLE

ACLG ABOVE CEILING

ADO AUTOMATIC DOOR OPENER

A/E ARCHITECT/ENGINEER

AF AMP FRAME

AFC AVAILABLE FAULT CURRENT (KILOAMPS)

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AFI ARC FAULT CIRCUIT INTERRUPTER

AHJ AUTHORITY HAVING JURISDICTION

AHU AIR HANDLING UNIT

AIC AMPERE INTERRUPTING CAPACITY

AL ALUMINUM

ALT ALTERNATE

AMP AMPERE

APPROX APPROXIMATELY

ARCH ARCHITECT, ARCHITECTURAL

AT AMP TRIP

ATS AUTOMATIC TRANSFER SWITCH

AUTO AUTOMATIC

AUX AUXILIARY

AV AUDIO VISUAL

AWG AMERICAN WIRE GAUGE

BAS BUILDING AUTOMATION SYSTEM

BATT BATTERY

BC BARE COPPER

BD BOARD

BFF BELOW FINISHED FLOOR

BFG BELOW FINISHED GRADE

BLDG BUILDING

BMS BUILDING MANAGEMENT SYSTEM

BYP BYPASS

C CONDUIT

CAB CABINET

CALC CALCULATED

CAP CAPACITY

CAT CATALOG, CATEGORY

CATV COMMUNITY ANTENNA TELEVISION

CB CIRCUIT BREAKER

CCR CONTROL CONTACTOR

CCTV CLOSED CIRCUIT TELEVISION

cd CANDELA

CD CONSTRUCTION DOCUMENTS

CF CONTRACTOR-FURNISHED

CKT CIRCUIT

CLG CEILING

CO CONTRACTING OFFICER

COAX COAXIAL CABLE

COMM COMMUNICATION

CONN CONNECTION

CONST CONSTRUCTION

CONT CONTINUATION OR CONTINUOUS

CONTR CONTRACTOR

COORD COORDINATE

COR CONTRACTING OFFICER'S

REPRESENTATIVE

CPT CONTROL POWER TRANSFORMER

CRI COLOR RENDERING INDEX

CT CURRENT TRANSFORMER

CTV CABLE TELEVISION

CTR CENTER

CU COPPER

CU FT CUBIC FEET

dB DECIBEL

DB DIRECT BURIAL

DC DIRECT CURRENT

DEG C DEGREES CELSIUS

DEG F DEGREES FAHRENHEIT

DEMO DEMOLISH/DEMOLITION

DEPT DEPARTMENT

DIA DIAMETER

DISC DISCONNECT

DIST DISTRIBUTION

DN DOWN

DS SAFETY DISCONNECT SWITCH

DT DOUBLE THROW

DWG DRAWING

EC ELECTRICAL CONTRACTOR

EG EQUIPMENT GROUND

ELEC ELECTRIC, ELECTRICAL

ELEV ELEVATOR

EM EMERGENCY

EMI ELECTROMAGNETIC INTERFERENCE

EMS ENERGY MANAGEMENT SYSTEM

EMT ELECTRICAL METALLIC TUBING

EPO EMERGENCY POWER OFF

EQUIP EQUIPMENT

ESMT EASEMENT

ETR EXISTING TO REMAIN

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WALL HEATER

ELECTRIC WATER HEATER

EX EXISTING

EXP EXPLOSION PROOF

FA FIRE ALARM

FAAP FIRE ALARM ANNUNCIATOR PANEL

FACP FIRE ALARM CONTROL PANEL

FC FOOTCANDLE

FCU FAN COIL UNIT

FIXT FIXTURE

FLR FLOOR

FLUOR FLUORESCENT

FU FUSE

FUDS FUSED SAFETY DISCONNECT SWITCH

FVR FULL VOLTAGE REVERSING

FVNR FULL VOLTAGE NON-REVERSING

GAL GALLON

GALV GALVANIZED

GC GENERAL CONTRACTOR

GEC GROUNDING ELECTRODE CONDUCTOR

GEN GENERATOR

GFI GROUND FAULT CIRCUIT INTERRUPTER

GND GROUND

GRS GALVANIZED RIGID STEEL (CONDUIT)

GYP BD GYPSUM BOARD

HID HIGH-INTENSITY DISCHARGE

HOA HAND-OFF-AUTOMATIC

HP HORSEPOWER

HT HEIGHT

HTR HEATER

HV HIGH VOLTAGE

HVAC HEATING, VENTILATING AND AIR

CONDITIONING

IES ILLUMINATION ENGINEERING SOCIETY

IG ISOLATED GROUND

IMC INTERMEDIATE METAL CONDUIT

IR INFRARED

I/W INTERLOCK WITH

IWH INSTANTANEOUS WATER HEATER

J-BOX JUNCTION BOX

KV KILOVOLT

KVA KILOVOLT-AMPERE

KVAR KILOVOLT-AMPERE REACTIVE

KW KILOWATT

KWH KILOWATT HOUR

LED LIGHT-EMITTING DIODE

LF LINEAR FEET/FOOT

LM LUMEN

LRA LOCKED ROTOR AMPS

LT LIGHT

LTG LIGHTING

LTNG LIGHTNING

LV LOW VOLTAGE

MATV MASTER ANTENNA TELEVISION SYSTEM

MAX MAXIMUM

MC MECHANICAL CONTRACTOR

METAL-CLAD (CONDUIT)

MBJ MAIN BONDING JUMPER

MCA MINIMUM CIRCUIT AMPACITY

MCB MAIN CIRCUIT BREAKER

MCC MOTOR CONTROL CENTER

MDP MAIN DISTRIBUTION PANEL

MECH MECHANICAL

MFR MANUFACTURER

MFS MAIN FUSED DISCONNECT SWITCH

MH MANHOLE

MIC MICROPHONE

MIN MINIMUM

MISC MISCELLANEOUS

MLO MAIN LUGS ONLY

MOA MULTIOUTLET ASSEMBLY

MSBD MAIN SWITCHBOARD

MT MOUNT

A1 b

E1 c d

T1

'LPN'

ELECTRICAL SYMBOL NOTES

THE LIGHTING FIXTURE TYPE IS INDICATED BY AN UPPER CASE LETTER OR AN UPPER

CASE LETTER AND NUMBER.

THE SWITCH DESIGNATION (IF NEEDED) IS INDICATED BY A LOWER CASE LETTER.

EXAMPLE: LIGHTING FIXTURE TYPE 'A1' IS CONTROLLED BY SWITCH 'b'.

EXIT SIGNS: STEM INDICATES WALL MOUNTING. NO STEM INDICATES CEILING

MOUNTING. SHADED AREA INDICATES ILLUMINATED FACE(S). ARROW INDICATES

DIRECTIONAL ARROW ON ILLUMINATED FACE(S).

DEVICES: THE SWITCH DESIGNATION IS INDICATED BY A LOWER CASE LETTER.

THE CONTROL DEVICE DESIGNATION IS INDICATED BY A LOWER CASE LETTER.

TRANSFORMERS: THE TRANSFORMER TYPE IS INDICATED BY A NUMBER

FOLLOWING THE UPPER CASE LETTER 'T'. SEE THE TRANSFORMER SCHEDULE OR

THE SINGLE LINE DIAGRAM FOR THE TRANSFORMER DESCRIPTION AND

REQUIREMENTS.

PANELBOARDS: PANELBOARD DOORS MAY BE SHOWN TO INDICATE OPENING

SIDE OF RECESSED PANELBOARDS. SEE PANELBOARD IDENTIFICATION FOR

DESIGNATION CODES.

SHEET KEY NOTE: SEE THE SHEET KEY NOTES ON THAT SHEET FOR THE NOTE

NUMBER INDICATED IN THE HEXAGON.

HOME RUN TO BRANCH CIRCUIT PANEL: THE PANEL DESIGNATION AND CIRCUIT

DESIGNATION ARE SHOWN ADJACENT TO THE HOME RUN ARROW.

CIRCUIT BREAKER SIZES (AMPS/NUMBER OF POLES) ARE SHOWN IN THE PANEL

SCHEDULE WITH THE CORRESPONDING PANEL AND CIRCUIT DESIGNATION.

SYMBOL NOTATIONS: UPPER CASE LETTERS ADJACENT TO SYMBOLS INDICATE

A UNIT TYPE. SEE APPROPRIATE SCHEDULE OR SPECIFICATIONS.

EXAMPLE 1: WALL MOUNTED EXIT SIGN TYPE 'E1' WITH SINGLE FACE

AND DIRECTIONAL ARROW.

EXAMPLE 2: CEILING MOUNTED EXIT SIGN TYPE 'E2' WITH DOUBLE

FACE AND DIRECTIONAL ARROWS.

E2

EXAMPLE: SPLIT DUPLEX RECEPTACLE; ONE RECEPTACLE OUTLET IS

CONTROLLED BY SWITCH 'c'.

EXAMPLE: SINGLE POLE SWITCH 'd' TO CONTROL LIGHTING FIXTURES INDICATED BY 'd'.

EXAMPLE: TRANSFORMER TYPE 'T1'.

EXAMPLE: HOME RUN TO PANELBOARD 'LPN'; CIRCUITS 1, 3, 5.

# DEMOLITION KEY NOTE: SEE THE SHEET KEY NOTES ON THAT SHEET FOR THE

NOTE NUMBER INDICATED IN THE SQUARE.

'LPN'-1,3,5

GENERAL ELECTRICAL NOTES

1. ALL ELECTRICAL DEVICES, FIXTURES, EQUIPMENT AND FEEDERS SHALL BE INSTALLED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS, THE MANUFACTURER'S RECOMMENDED PROCEDURES, ALL APPLICABLE LOCAL AND STATE CODES, AMERICANS WITH DISABILITIES ACT AND WITH THE LATEST EDITION OF THE NATIONAL

ELECTRICAL CODE AND VA STANDARDS.

2. PROVIDE ADDITIONAL SUPPORT FOR DEVICES, FIXTURES, EQUIPMENT AND FEEDERS WHERE THE BUILDING

CONSTRUCTION IS NOT SUITABLE FOR DIRECT MOUNTING.

3. FIRESTOP, DRAFTSTOP, SMOKESTOP AND/OR PROTECT THE ANNULAR SPACE AROUND ALL PENETRATIONS THROUGH WALLS, PARTITIONS, FLOORS, CEILING, AND ROOFS IN ACCORDANCE WITH THE REQUIREMENTS OF THE NATIONAL ELECTRICAL CODE, UL LISTING REQUIREMENT AND THE APPLICABLE BUILDING CODES.

4. VERIFY CEILING SYSTEMS AND PROVIDE MOUNTING ACCESSORIES, TRIMS AND ALL REQUIRED MOUNTING

HARDWARE TO SUIT THE PARTICULAR INSTALLATION.

5. PROTECT EXISTING UNDERGROUND AND BUILDING INTERIOR UTILITIES DURING CONSTRUCTION.

6. BRANCH CIRCUIT CONDUCTORS SHALL BE 12 AWG COPPER MINIMUM.

7. COORDINATE ANY AND ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION SO AS TO AVOID CONFLICT

DURING CONSTRUCTION.

8. ALL PANELS SHALL HAVE TYPED, COMPLETED DIRECTORIES INDICATING EQUIPMENT SERVED AND ROOM NUMBER (AS INDICATED ON FINAL BUILDING ROOM SIGNAGE) OF EQUIPMENT LOCATION, OR SPARE, OR SPACE.

9. MANUFACTURER'S NAME AND MODEL NUMBER ARE GIVEN FOR DESCRIPTIVE PURPOSES, TO INDICATE A QUALITY STANDARD, AND ARE NOT INTENDED TO LIMIT PRODUCTS TO A PARTICULAR MANUFACTURER.

PRODUCTS DEEMED EQUAL AND APPROVED BY THE DESIGNER WILL BE ACCEPTED. ALL PRODUCTS MUST

COMPLY WITH "BUY AMERICAN ACT".

10. ALL FEEDERS AND CIRCUITRY SHALL BE TORQUED PER THE PANEL, BREAKER, AND/OR PARTICULAR EQUIPMENT

MANUFACTURER'S SPECIFICATIONS.

11. CIRCUITRY TO SWITCHES, RECEPTACLES, AND ALL OTHER DEVICES SHALL BE TERMINATED ON THE DEVICE'S

SCREW TERMINALS.

12. MOUNTING HEIGHTS INDICATED ARE TO CENTER OF DEVICE, OUTLET, FIXTURE, OR EQUIPMENT UNLESS NOTED

OTHERWISE.

13. ALL WIRE TERMINATIONS SHALL BE RATED FOR 75 DEGREES C.

14. ALL CONDUCTORS SHALL HAVE THHN/THWN INSULATION, UNLESS OTHERWISE NOTED.

15. ALL CONDUIT SHALL BE RGS OR EMT UNLESS OTHERWISE NOTED. FMC CONDUIT SHALL BE USED ON VIBRATING EQUIPMENT (MAXIMUM LENGTH OF 6 FEET). PVC SHALL BE USED FOR UNDERGROUND CONDUIT OR WHERE CONCRETE-ENCASED. WHERE VIBRATING EQUIPMENT IS LOCATED OUTSIDE, LFMC CONDUIT SHALL BE USED

(MAXIMUM SIX FEET) FOR FINAL CONNECTIONS.

16. ALL ELECTRICAL MATERIALS, DEVICES, APPLIANCES AND EQUIPMENT SHALL BE LABEL LISTED BY AN APPROVED

THIRD PARTY TESTING AGENCY.

17. FOR ALL LED FIXTURES, THE FIXTURE MUST BE CAPABLE OF SELF-RESETTING TO THE SWITCHED/CONTROLLED STATE DURING ANY FLUCTUATION IN POWER SUPPLY WHERE AUTOMATIC PROTECTIVE MEASURES DISABLE THE LED LAMPS. PROVIDE A LETTER OR STATEMENT FROM THE MANUFACTURER, OR OTHER ACCEPTABLE PROOF, THAT ALL LED FIXTURES, WITH OR WITHOUT BROWNOUT PROTECTION, WILL RETURN TO THE SWITCHED/CONTROLLED STATE AUTOMATICALLY. PROVIDE STATEMENT WITH THE FIXTURE SUBMITTALS.

18. IN CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT DRAWINGS, THE BETTER QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER QUANTITY OF WORK , AS DETERMINED BY THE

GOVERNMENT, SHALL BE PROVIDED.

19. COMPRESSION COUPLINGS SHALL BE USED. NO SET SCREW FITTINGS ARE ALLOWED.

20. MINIMUM CONDUIT SIZE TO BE USED IS 3/4".

ELECTRICAL SYMBOL LEGEND

120V DUPLEX RECEPTACLE

RECEPTACLE MODIFIERS:

AC: 3" ABOVE COUNTERTOP/BACKSPLASH

GFI: GROUND FAULT CURRENT INTERRUPTER

WP: WEATHERPROOF ENCLOSURE

DED: DEDICATED CIRCUIT

120V DUPLEX RECEPTACLE EMERGENCY OUTLET

AND COVER PLATE SHALL BE RED IN COLOR

120V QUADRUPLEX RECEPTACLE

120V QUADRUPLEX RECEPTACLE EMERGENCY

OUTLET AND COVER PLATE SHALL BE RED IN COLOR

JUNCTION BOX, WALL MOUNTED, PURPOSE AS NOTED

DISCONNECT SWITCH NON-FUSED

DISCONNECT SWITCH FUSED

SINGLE POLE WALL SWITCH: 48" AFF STANDARD UNO

SYMBOL HEIGHT DESCRIPTION

18"

18"

18"

18"

AS

NOTED

72" TOP

72" TOP

SWITCH MODIFIERS:

M: MOTOR-RATED

48"

ALL HEIGHTS ARE TO CENTER OF DEVICE UNLESS NOTED OTHERWISE.

TOP: HEIGHT TO TOP OF DEVICE

ANY HEIGHTS INDICATED IN PLANS SHALL SUPERCEDE THOSE LISTED HERE.

SPECIAL RECEPTACLE

EQUIPMENT CONNECTION

AS

NOTED

E

208V DUPLEX RECEPTACLE18"

18"

120V DUPLEX RECEPTACLE FLOOR BOX

120V DUPLEX RECEPTACLE EMERGENCY FLOOR BOX

OUTLET AND COVER PLATE SHALL BE RED IN COLOR

120V QUADUPLEX RECEPTACLE FLOOR BOX

120V QUADUPLEX RECEPTACLE EMERGENCY

FLOOR BOX OUTLET AND COVER PLATE SHALL BE

RED IN COLOR

CLNG

J

J

J

JUNCTION BOX, CEILING MOUNTED, PURPOSE AS

NOTED

JUNCTION BOX, FLOOR MOUNTED, PURPOSE AS

NOTED

LIGHTING SYMBOL LEGEND

2' X 2' RECESSED DIRECT/INDIRECT TROFFER

2' X 4' RECESSED DIRECT/INDIRECT TROFFER

SYMBOL

HEIGHT

AFF * DESCRIPTION

--- 4' INDUSTRIAL STRIP

POLE MOUNTED LIGHTPOLE MNTD

6" DIAMETER RECESSED DOWNLIGHT---

EXIT SIGN - WALL MOUNTED

EXIT SIGN - CEILING MOUNTED---

7'-5"

BOTTOM

SINGLE POLE WALL SWITCH

SWITCH MODIFIERS:

OS: OCCUPANCY SENSOR, DUAL TECHNOLOGY

VS: VACANCY SENSOR, DUAL TECHNOLOGY

VSD: VACANCY SENSOR DIMMER, LINE VOLTAGE

DUAL TECHNOLOGY

LV: LOW VOLTAGE

LVD: LOW VOLTAGE DIMMER

D: LINE VOLTAGE DIMMER

T: DIGITAL TIMER

3: 3 WAY

4: 4 WAY

48"

CENTER

OCCUPANCY SENSOR, DUAL

TECHNOLOGY - CEILING MOUNTED

--- LOW VOLTAGE LIGHTING CONTROL DEVICE

OCCUPANCY SENSOR, DUAL

TECHNOLOGY - WALL/CORNER MOUNTED

2' LINEAR - WALL MOUNTED

7'-0"

CENTER

EMERGENCY LIGHT BATTERY

OPERATED - WALL MOUNTED

7'-6"

CENTER

RC

* - ANY HEIGHTS INDICATED IN PLANS SHALL SUPERCEDE THOSE

LISTED HERE.

LIGHT LEVEL SENSOR, SINGLE ZONE

DIMMING CLOSED LOOP - CEILING MOUNTED

--- LOW VOLTAGE LIGHTING CONTROL

DEVICE WITH 0-10V DIMMING

RCD

4' LINEAR - WALL MOUNTED

7'-0"

CENTER

OS

OS

LS

EXTERIOR WALL MOUNTED LIGHT

10'-0"

CENTER

1. ITEM 01:

A. DELETE ALL WORK AND MATERIAL FOR SUPPORT STEEL FOR ROOF SCREENS. (FROM TOP FLANGE OF ROOF STEEL UP). DELETE ALL WORK AND MATERIAL FOR

INSTALLATION OF ROOF SCREEN. DELETE ALL ROOFING WORK ASSOCIATED WITH FLASHING IN VERTICAL SCREEN SUPPORTS. SEE STRUCTURAL AND ARCHITECTURAL

DRAWINGS.

B. REMOVE ALL WORK AND MATERIAL TO INSTALL BASIS OF DESIGN: HERMAN MILLER COMBO CASEWORK/SINKS AT ALL LOCATIONS AND REPLACE WITH HAND SINK AND

SOLID SURFACE SPLASH PROTECTON. SEE PLUMBING AND INTERIOR DRAWINGS.

C. DELETE ALL WORK AND MATERIAL TO INSTALL GENERATOR, INCLUDING WIRING, AND CONCRETE GENERATOR PAD. SEE CIVIL AND ELECTRICAL DRAWINGS.

2. ITEM 02:

A. INSTALL MANUAL SWING DOORS IN LIEU OF AUTOMATIC SLIDING DOORS AT VESTIBULE 100 (2 PAIRS) SEE ARCHITECTUAL DRAWINGS.

3. ITEM 03:

A. DELETE ALL WORK AND MATERIAL FOR ALL ASPHALT PAVING, ADA STALLS, PROVIDE GRAVEL EMERGENCY ACCESS ONLY. SEE CIVIL DRAWINGS.

4. ITEM 04:

A. DELETE WORK AND MATERIAL IN DESIGNATED AREA AND REPLACE WITH UNOCCUPIED SPACE. SEE SHEET A-101A FOR LIMITED GENERAL TRADES WORK. SPRINKLER

SYSTEM TO STILL BE INSTALLED. SEE SHEET FX101A. INSTALL RECEPTACLES, MECHANICAL POWER, AND TEMPORARY LIGHTING AS PER SHEETS EL101A, EM101A, AND EP101A. SEE SHEET M-101A FOR LIMITED MECHANICAL WORK. SEE SHEET PP101A FOR PLUMBING WORK.

DEDUCT ALTERNATES

SEISMIC DESIGN CRITERIA

LOCATION MATHER, CA

RISK CATEGORY II

MAPPED SHORT PERIOD SPECTRAL RESPONSE (ss) 0.460

MAPPED 1-SECOND SPECTRAL RESPONSE (SI) 0.225

SITE CLASSIFICATION C

SITE COEFFICIENT (Fa) 1.3

SITE COEFFICIENT (Fv) 1.5

MAXIMUM SHORT PERIOD SPECTRAL RESPONSE (SMS)

MAXIMUM 1-SECOND SPECTRAL RESPONSE (SM1)

MAPPED SHORT PERIOD SPECTRAL RESPONSE (SDS)

MAPPED 1-SECOND SPECTRAL RESPONSE (SD1)

SEISMIC DESIGN CATEGORY D

SEISMIC IMPORTANCE FACTOR 1

(FOR FINAL VALUES REFER STRUCTURAL DRAWINGS)

NOTES:

ELECTRICAL GENERATORS, SWITCHGEAR, TRANSFER SWITCHES, UPS, TRANSFORMERS,

MOTOR CONTROL CENTERS, PANELBOARDS, FIRE ALARM CONTROL PANEL, BUSWAYS, IT

SERVERS, AND CONTROL PANELS MUST BE SEISMICALLY RATED PER THE FOLLOWING

CRITERIA AND IN ACCORDANCE WITH ASCE 7.

0.599

0.440

0.399

0.293

Engineers Architects

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/9

/2

:2

:5

P M

E-001

ELECTRICAL GENERAL NOTES,

SYMBOL LEGENDS, AND

ABBREVIATIONS

1 14EFJ

DESIGN MEDICAL SPECIALTY

CLINIC

10535 HOSPITAL WAY, MATHER CA

95655

SEPTEMBER 10, 2021

100% CONSTRUCTION DOCUMENTS

612-12218-237-Q12

JAV

1 35% SCHEMATIC DESIGN DOCUMENTS 04/10/2020

2 65% DESIGN DEVELOPMENT 06/04/2020

3 65% DESIGN DEVELOPMENT - RE-SUBMISSION 06/26/2020

4 65% DESIGN DEVELOPMENT - RE-SUBMISSION 01/26/2021

5 95% CONSTRUCTION DOCUMENTS 04/06/2021

6 95% CONSTRUCTION DOCUMENTS -

RE-SUBMISSION

04/20/2021

7 95% CONSTRUCTION DOCUMENTS 07/15/2021

8 100% CONSTRCUTION DOCUMENTS 09/10/2021

DocuSign Envelope ID: 9E23B62B-308B-446D-AECD-CF0E77C522A7

9/9/2021 9/10/2021

H

D P

E

H

D P

E

12" HDPE

12" HDPE

H

D P

E

4" PVC

" P

V C

X

X

X

X

X

IT RM

ELEC

ROOM

J4

OHOH

5 TYP.

J 6

GENERATOR

TRANSFORMER

SWITCHGEAR

ATS, CONNECTION

CABINET, MAIN

'PLP'- 1, 3

Engineers Architects

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/8

/2

:1

:1

P M

ES101

ELECTRICAL SITE PLAN

2 14EFJ

DESIGN MEDICAL SPECIALTY

CLINIC

10535 HOSPITAL WAY, MATHER CA

95655

SEPTEMBER 10, 2021

100% CONSTRUCTION DOCUMENTS

612-12218-237-Q12

JAV

Scale: 1" = 20'-0"

ELECTRICAL SITE PLAN

NORTH

0 2010 40

1 IF BID ALTERNATE ONE (GENERATOR) IS

ACCEPTED AS A DEDUCT THE FOLLOWING

SHALL GOVERN: DELETE GENERATOR,

SWITCHGEAR, AND ASSOCIATE

ACCESSORIES.

2 COORDINATE INSTALLATION OF

TRANSFORMER WITH SMUD. VERIFY PAD

PLACEMENT AND STUBOUTS. SEE

SINGLE-LINE FOR SIZING OF FEEDERS

BETWEEN EQUIPMENT. FIELD ROUTE. SEE

CIVIL AND LANDSCAPE PLANS FOR PAD &

SCREENING.

3 PROPOSED PARKING LOT LIGHTING.

CONNECT NEW WIRING TO ONE OF THE

EXISTING PULL BOXES PROVIDED UNDER

THE PARKING LOT IMPROVEMENT PROJECT.

4 CONNECT NEW PARKING LOT LIGHTING TO

EXISTING JUNCTION BOX, AND TIE INTO

EXISTING CIRCUIT. VERIFY PANEL AND

CIRCUIT TIE IN. COORDINATE TIE WITH COR

SO VA OPERATIONS ARE UNDISTURBED.

5 PROVIDE 2 – 2” PVC SCHEDULE 40

UNDERGROUND CONDUIT AND MATCH

CONDUCTORS FROM PARKING LOT

IMPROVEMENT PROJECT.

6 PROVIDE UNDERGROUND PULL BOX. MATCH

SIZE TO PARKING LOT IMPROVEMENT

PROJECT.

7 COORDINATE WITH ELECTRICAL UTILITY

SMUD FOR THE INSTALLATION

REQUIREMENTS OF UTILITY TRANSFORMER

AND FEED.

8 PROVIDE 3-4” CONDUITS FOR PRIMARY FEED

TO SWITCHGEAR. COORDINATE

INSTALLATION REQUIREMENTS WITH

MANUFACTURER.

9 PROVIDE 3-4” CONDUITS TO MAIN

DISTRIBUTION BOARD. COORDINATE

INSTALLATION REQUIREMENTS WITH

MANUFACTURER.

10 PROVIDE 3-4” CONDUITS TO MAIN

DISTRIBUTION BOARD IN THE CASE THAT BID

ALTERNATE ONE IS ACCEPTED, AND THE

GENERATOR AND SWITCHGEAR IS NOT.

COORDINATE INSTALLATION REQUIREMENTS

WITH MANUFACTURER.

11 PROTECTIVE AND SECURED FENCING

AROUND ELECTRICAL EQUIPMENT. SEE CIVIL

DRAWINGS FOR MORE INFORMATION.

12 PROVIDE NEW GROUND ROD. SEE SHEET

E-502.

13 PROVIDE NEW 250 KCMIL BARE COPPER

GROUND RING AT MINIMUM 3’ BFG.

14 CONNECT #3/0 BARE COPPER GEC FROM

GENERATOR TO GROUND RING.

OH OVERHEAD UTILITY LINES

## KEY NOTES:

1 35% SCHEMATIC DESIGN DOCUMENTS 04/10/2020

2 65% DESIGN DEVELOPMENT 06/04/2020

3 65% DESIGN DEVELOPMENT - RE-SUBMISSION 06/26/2020

4 65% DESIGN DEVELOPMENT - RE-SUBMISSION 01/26/2021

5 95% CONSTRUCTION DOCUMENTS 04/06/2021

6 95% CONSTRUCTION DOCUMENTS -

RE-SUBMISSION

04/20/2021

7 95% CONSTRUCTION DOCUMENTS 07/15/2021

8 100% CONSTRCUTION DOCUMENTS 09/10/2021

9/10/2021

GFI

AC

GFI

AC

GFI

48"

DED

62"

GFI

DED

AC

AC

GFI

48"

AC

GFI

AC

GFI

AC

GFI

AC

AC

DED

GFI

ACAC

AC

GFI

AC

GFI

GFI

DED

48"

GFIDED

J

J

AC

GFI

AC

GFI

48"

GFI

GFI 48"DED

AC

GFI

AC

AC

GFI

DEDAC

AC

GFI

GFI

DED

AC

GFI

AC

GFI

GFI

DED

DED

AC

AC

AC

AC

GFI

AC

GFI

DED

48"

AC

GFI

48"

48" 48"

48"48"48"

48"

48" 48" 48"

48" 48" 48" 48"

AC

GFI

AC

GFI

AC

GFI

AC

GFI

AC

GFI

AC

GFI

AC

GFI

AC

GFI

AC

GFI

GFI

AC

GFI

AC

GFI

48"

GFI

AC

GFI

AC

GFI

AC

GFI

GFI

DED48"

GFI

GFI

12"

62"

J

J

DED

A

EP101

PANEL

'815GZ-ELP01'

PANEL

'815GZ-ELL01'

PULMINARY TESTING LAB

PULMINARY TESTING LAB

SHARED OFFICE

SHARED OFFICE

SHARED OFFICE

SHARED OFFICE

NEPHRO. EXAM 4

NEPHRO. EXAM 3

CORRIDOR

C134

CLEAN / MEDS

PAT UNI TLT

129NEPHROLOGY EXAM 2

NEPHR. EX. 1

PULMONARY EXAM 3

PULMONARY EXAM 2

PULMONARY EXAM 1

CARDIOLOGY EXAM 7

CARDIOLOGY EXAM 8

CARDIOLOGY EXAM 1

CARDIOLOGY EXAM 2

CARDIOLOGY EXAM 3

CARDIOLOGY EXAM 4

CARDIOLOGY EXAM 5

CARDIOLOGY EXAM 6

STF TLT

STF TLT

NURSE ROOM

NURSE ROOM

NURSE ROOM

NURSE ROOM

CORRIDOR

C114

PAT UNI TLT

CHIEF OFFICE

CHIEF OFFICE

CHIEF OFFICE

ALCOVE

EKG TECH WORK AREA

HOLTER EKG

CORRIDOR

C130

CORRIDOR

C114

HEIGHT AND WEIGHT

RECEPTION

100B

TOILET RM

LAB

SOILED

WAITING

100D

LOBBY

100A

MECHANICAL

HAC

135 ELEC

CONFERENCE

KITCHEN

CORRIDOR

C130

CORRIDOR

C118

CORRIDOR

C134

CORRIDOR

C151

CORRIDOR

C154

STAFF WORK AREA

STAFF WORK AREA

STRESS

ECHO

ECHO

ECHO READING

I.T. ROOM

PULMONARY EXAM 4

PANEL

'815GZ-ELM01'

PANEL

'815GZ-ELP02'

PANEL

'815GZ-ELP03'

STOR.

138A

NS MGR OFFICE

'815GZ-ELP01'- 71

'815GZ-ELP01'- 76

'815GZ-ELP01'- 75

'815GZ-ELP01'- 74

'815GZ-ELP01'- 80

'815GZ-ELP01'- 72

'815GZ-ELP01'- 73

'815GZ-ELP01'- 79

'815GZ-ELP01'- 65

'815GZ-ELP01'- 64

'815GZ-ELP01'- 61

'815GZ-ELP01'- 62

'815GZ-ELP01'- 60

'815GZ-ELP01'- 59

EP101

815GZ-ELP03 - 11

815GZ-ELP03 - 9

815GZ-ELP03 - 12

815GZ-ELP03 - 13

815GZ-ELP03 - 14

815GZ-ELP03 - 15

815GZ-ELP03 - 17

815GZ-ELP03 - 16

815GZ-ELP03 - 18

815GZ-ELP03 - 19

815GZ-ELP03 - 21

815GZ-ELP03 - 20

'815GZ-ELP01'- 1

'815GZ-ELP01'- 2

'815GZ-ELP01'- 3

'815GZ-ELP01'- 5

'815GZ-ELP01'- 4

'815GZ-ELP01'- 6

'815GZ-ELP01'- 7

'815GZ-ELP01'- 8 '815GZ-ELP01'- 9

'815GZ-ELP01'- 10

'815GZ-ELP01'- 11

'815GZ-ELP01'- 13

'815GZ-ELP01'- 12

'815GZ-ELP01'- 32

'815GZ-ELP01'- 34

'815GZ-ELP01'- 31

'815GZ-ELP01'- 28

'815GZ-ELP01'- 67

'815GZ-ELP01'- 27

'815GZ-ELP01'- 26

'815GZ-ELP01'- 19 '815GZ-ELP01'- 20

'815GZ-ELP01'- 30

'815GZ-ELP01'- 33

'815GZ-ELP01'- 35

'815GZ-ELP01'- 18'815GZ-ELP01'- 17'815GZ-ELP01'- 16'815GZ-ELP01'- 15

'815GZ-ELP01'- 22

'815GZ-ELP01'- 23 '815GZ-ELP01'- 24 '815GZ-ELP01'- 25

'815GZ-ELP01'- 55

'815GZ-ELP01'- 49 '815GZ-ELP01'- 56

'815GZ-ELP01'- 54 '815GZ-ELP01'- 53 '815GZ-ELP01'- 52 '815GZ-ELP01'- 50 '815GZ-ELP01'- 51

'815GZ-ELP01'- 58

'815GZ-ELP01'- 83

'815GZ-ELP01'- 70

'815GZ-ELP01'- 57

'815GZ-ELP01'- 68'815GZ-ELP01'- 69

'815GZ-ELP01'- 78

'815GZ-ELP01'- 77

2 3 4

5 6

A.1

B

C

D

'815GZ-ELP01'- 41

'815GZ-ELP01'- 14

'815GZ-ELP01'- 14

'815GZ-ELP01'- 82

'815GZ-ELP01'- 81

'815GZ-ELP01'- 48

'815GZ-ELP01'- 66

'815GZ-ELP01'- 63

PANEL 'Panel

ELP02B'

PANEL

'815GZ-ELM01'

PANEL

'815GZ-ELP01'

PANEL

'815GZ-ELL01'

PANEL

'815GZ-ELP03'

'815GZ-ELP03'- 7

'815GZ-ELP03'- 6

'815GZ-ELP03'- 5

'815GZ-ELP03'- 1,3 '815GZ-ELP03'- 2,4

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

/8

/2

:1

:0

P M

EP101

FIRST FLOOR POWER PLAN

3 14EFJ

DESIGN MEDICAL SPECIALTY

CLINIC

10535 HOSPITAL WAY, MATHER CA

95655

SEPTEMBER 10, 2021

100% CONSTRUCTION DOCUMENTS

612-12218-237-Q12

JAV

Scale: 1/8" = 1'-0"

FIRST FLOOR POWER PLAN

1 COORDINATE LOCATION WITH FINAL KIOSK

PLACEMENT.

2 DEDICATED CIRCUIT FOR FIRE ALARM

CONTROL PANEL (FACP).

3 PROVIDE CONDUIT UNDER SLAB FOR

OUTLETS SHOWN TO BE INSTALLED ON HALF

WALL.

4 JUNCTION BOX IN WALL COORDINATE EXACT

LOCATION AND CONNECTION WITH

FURNITURE PROVIDE BY VA.

N

KEY PLAN

SCALE: NO SCALE

NORTH

0 4 8 16

Scale: 1/4" = 1'-0"

ELEC ROOM ENLARGEMENT - POWER

A. CONTRACTOR TO PROVIDE AND INSTALL

ALL DEVICES SHOWN ON THIS PLAN.

B. PANEL NAMING CONVENTION CHANGES

WITH DEDUCT ALTERNATES ITEM ONE.

PANELS CHANGE FROM EMERGENCY TO

NORMAL POWER UPDATE EQUIPMENT

NAMING TAGS TO SHOW THAT EQUIPMENT

IS ATTACHED TO NORMAL BRANCH.

C. PRIOR TO INSTALLING BRANCH CIRCUIT

WIRES AND WIRING DEVICES TO LOCATIONS

OF OWNER FURNISHED EQUIPMENT,

CONTRACTOR TO REVIEW ALL OWNER

FURNISHED EQUIPMENT CUT SHEETS.

NOTIFY COR IF DISCREPANCIES EXIST

BETWEEN WIRING DEVICES SHOWN AND

EQUIPMENT FURNISHED.

Scale: 1/4" = 1'-0"

IT ROOM ENLARGEMENT - POWER

NORTH

0 2 4 8

NORTH

0 2 4 8

1 35% SCHEMATIC DESIGN DOCUMENTS 04/10/2020

2 65% DESIGN DEVELOPMENT 06/04/2020

3 65% DESIGN DEVELOPMENT - RE-SUBMISSION 06/26/2020

4 65% DESIGN DEVELOPMENT - RE-SUBMISSION 01/26/2021

5 95% CONSTRUCTION DOCUMENTS 04/06/2021

6 95% CONSTRUCTION DOCUMENTS -

RE-SUBMISSION

04/20/2021

7 95% CONSTRUCTION DOCUMENTS 07/15/2021

8 100% CONSTRCUTION DOCUMENTS 09/10/2021

AC

GFI

AC

GFI

DED

62"

GFI

DED

AC

AC

GFI

48"

AC

GFI

AC

GFI

AC

AC

DED

GFI

ACAC

AC

GFI

AC

GFI

GFI

DED

48"

GFI

J

J

AC

GFI

48"

GFI

GFI 48"DED

AC

GFI

AC

AC

GFI

DEDAC

AC

GFI

DED

AC

AC

AC

48"

AC

GFI

48"

48"

48" 48" 48"

48" 48" 48" 48"

AC

GFI

AC

GFI

AC

GFI

AC

GFI

AC

GFI

AC

GFI

AC

GFI

AC

GFI

AC

GFI

GFI

AC

GFI

DED

48"

GFI

DED48"

GFI

12"

62"

J

J

A

2 3 4

5 6

A.1

B

C

D

VESTIBULE

LOBBY

100A

CORRIDOR

C114

HEIGHT AND WEIGHT

HOLTER EKG

EKG TECH WORK AREA

ALCOVE

108CHIEF OFFICE

CHIEF OFFICE

STAFF WORK AREA

STRESS

105ECHO

ECHO

ECHO READING

STAFF UNI TLT

I.T. ROOM

NS MGR OFFICE

CARDIOLOGY EXAM 1

CARDIOLOGY EXAM 2

CARDIOLOGY EXAM 3

CARDIO. EXAM 4

CARDIO. EXAM 5

CARDIOLOGY EXAM 6

CARDIOLOGY EXAM 7

CARDIOLOGY EXAM 10

CORRIDOR

C151

MECHANICAL

ELEC

WAITING

100D

TOILET RM

NURSE ROOM

NURSE ROOM

NURSE ROOM

NURSE ROOM

SOILED

OFFICE

EP101

CONFERENCE

KITCHEN

PANEL

'815GZ-ELP01'

PANEL

'815GZ-ELL01'

PANEL

'815GZ-ELM01'

PANEL

'815GZ-ELP02'

PANEL

'815GZ-ELP03'

'815GZ-ELP01'- 71

'815GZ-ELP01'- 76 '815GZ-ELP01'- 75

'815GZ-ELP01'- 74

'815GZ-ELP01'- 80

'815GZ-ELP01'- 72

'815GZ-ELP01'- 73

'815GZ-ELP01'- 79

<unnamed>

<unnamed>

'815GZ-ELP01'- 65

'815GZ-ELP01'- 64

'815GZ-ELP01'- 61

'815GZ-ELP01'- 62

'815GZ-ELP01'- 60

'815GZ-ELP01'- 59

EP101

815GZ-ELP03 - 11

815GZ-ELP03 - 9

815GZ-ELP03 - 12

815GZ-ELP03 - 13

815GZ-ELP03 - 14

815GZ-ELP03 - 15

815GZ-ELP03 - 17

815GZ-ELP03 - 16

815GZ-ELP03 - 18

815GZ-ELP03 - 19

815GZ-ELP03 - 21

815GZ-ELP03 - 20

'815GZ-ELP01'- 1

'815GZ-ELP01'- 2

'815GZ-ELP01'- 3

'815GZ-ELP01'- 5

'815GZ-ELP01'- 4

'815GZ-ELP01'- 6

'815GZ-ELP01'- 7

'815GZ-ELP01'- 67

'815GZ-ELP01'- 27

'815GZ-ELP01'- 26

'815GZ-ELP01'- 35

'815GZ-ELP01'- 22

'815GZ-ELP01'- 23 '815GZ-ELP01'- 24 '815GZ-ELP01'- 25

'815GZ-ELP01'- 55

'815GZ-ELP01'- 49 '815GZ-ELP01'- 56

'815GZ-ELP01'- 54 '815GZ-ELP01'- 53 '815GZ-ELP01'- 52 '815GZ-ELP01'- 50 '815GZ-ELP01'- 51

'815GZ-ELP01'- 58

'815GZ-ELP01'- 83

'815GZ-ELP01'- 70

'815GZ-ELP01'- 57

'815GZ-ELP01'- 68'815GZ-ELP01'- 69

'815GZ-ELP01'- 78

'815GZ-ELP01'- 77

'815GZ-ELP01'- 82

'815GZ-ELP01'- 81

UNOCCUPIED SPACE

CARDIOLOGY EXAM 9

CARDIOLOGY EXAM 8

STORAGE

PAT UNI TLT

CLEAN / MEDS

RECEPTION

100B

CORRIDOR

C118

CORRIDOR

C130

HAC

NS MGR OFFICE

'815GZ-ELP01'- 48

'815GZ-ELP01'- 38

'815GZ-ELP01'- 8

'815GZ-ELP01'- 14

'815GZ-ELP01'- 40

'815GZ-ELP01'- 36

'815GZ-ELP01'- 39

'815GZ-ELP01'- 30

'815GZ-ELP01'- 38

'815GZ-ELP03'- 7

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

/8

/2

:1

:1

P M

EP101A

FIRST FLOOR POWER PLAN - DEDUCT

ALTERNATE #4

4 14EFJ

DESIGN MEDICAL SPECIALTY

CLINIC

10535 HOSPITAL WAY, MATHER CA

95655

SEPTEMBER 10, 2021

100% CONSTRUCTION DOCUMENTS

612-12218-237-Q12

JAV

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

DEDUCT ALTERNATIVE

NORTH

0 4 8 16

A. CONTRACTOR TO PROVIDE AND INSTALL

ALL DEVICES SHOWN ON THIS PLAN.

B. PANEL NAMING CONVENTION CHANGES

WITH DEDUCT ALTERNATES ITEM ONE.

PANELS CHANGE FROM EMERGENCY TO

NORMAL POWER UPDATE EQUIPMENT

NAMING TAGS TO SHOW THAT EQUIPMENT

IS ATTACHED TO NORMAL BRANCH.

C. PRIOR TO INSTALLING BRANCH CIRCUIT

WIRES AND WIRING DEVICES TO LOCATIONS

OF OWNER FURNISHED EQUIPMENT,

CONTRACTOR TO REVIEW ALL OWNER

FURNISHED EQUIPMENT CUT SHEETS.

NOTIFY COR IF DISCREPANCIES EXIST

BETWEEN WIRING DEVICES SHOWN AND

EQUIPMENT FURNISHED.

1 COORDINATE LOCATION WITH FINAL KIOSK

PLACEMENT.

2 DEDICATED CIRCUIT FOR FIRE ALARM

CONTROL PANEL (FACP).

3 PROVIDE CONDUIT UNDER SLAB FOR

OUTLETS SHOWN TO BE INSTALLED ON HALF

WALL.

4 JUNCTION BOX IN WALL COORDINATE EXACT

LOCATION AND CONNECTION WITH

FURNITURE PROVIDE BY VA.

5 PLAN AND ASSOCIATED NOTES TO BE

ACCEPTED AS MAIN DESIGN IF BID

ALTERNATE ITEM FOUR IS TAKEN.

Scale: 1/8" = 1'-0"

FIRST FLOOR POWER PLAN FIRST FLOOR POWER PLAN - DEDUCT ALTERNATE #4

1 35% SCHEMATIC DESIGN DOCUMENTS 04/10/2020

2 65% DESIGN DEVELOPMENT 06/04/2020

3 65% DESIGN DEVELOPMENT - RE-SUBMISSION 06/26/2020

4 65% DESIGN DEVELOPMENT - RE-SUBMISSION 01/26/2021

5 95% CONSTRUCTION DOCUMENTS 04/06/2021

6 95% CONSTRUCTION DOCUMENTS -

RE-SUBMISSION

04/20/2021

7 95% CONSTRUCTION DOCUMENTS 07/15/2021

8 100% CONSTRCUTION DOCUMENTS 09/10/2021

WP

GFI

WP

GFI

WP

GFI

WP

M

A

815-RTU-5

815-RTU-3 815-RTU-4815-RTU-2815-RTU-1

FDS RHU-1 FDS RHU-2 FDS RHU-5 FDS RHU-3 FDS RHU-4

PANEL

'815PZ-ELP01'

815-CU-1

815-EF-1

815-EF-2

2 3 4

5 6

A.1

B

C

D

'815PZ-ELP01'-

8,10,12

'815PZ-ELP01'- 1,3,5

'815PZ-ELP01'- 2,4,6

'815PZ-ELP01'- 7,9,11'815PZ-ELP01'-

13,15,17

'815GZ-ELP03'- 8,10

'815PZ-ELP01'- 16

'815PZ-ELP01'- 18

'815PZ-ELP01'- 14

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/8

/2

:1

:1

P M

EP102

ROOF POWER PLAN

5 14EFJ

DESIGN MEDICAL SPECIALTY

CLINIC

10535 HOSPITAL WAY, MATHER CA

95655

SEPTEMBER 10, 2021

100% CONSTRUCTION DOCUMENTS

612-12218-237-Q12

JAV

N

KEY PLAN

SCALE: NO SCALE

Scale: 1/8" = 1'-0"

ROOF MECHANICAL POWER PLAN

A. CONTRACTOR TO PROVIDE AND INSTALL

ALL DEVICES SHOWN ON THIS PLAN.

B. PANEL NAMING CONVENTION CHANGES

WITH DEDUCT ALTERNATES ITEM 1. PANELS

CHANGE FROM EMERGENCY TO NORMAL

POWER UPDATE EQUIPMENT NAMING TAGS

TO SHOW THAT EQUIPMENT IS ATTACHED

TO NORMAL BRANCH.

C. PRIOR TO INSTALLING BRANCH CIRCUIT

WIRES AND WIRING DEVICES TO LOCATIONS

OF OWNER FURNISHED EQUIPMENT,

CONTRACTOR TO REVIEW ALL OWNER

FURNISHED EQUIPMENT CUT SHEETS.

NOTIFY COR IF DISCREPANCIES EXIST

BETWEEN WIRING DEVICES SHOWN AND

EQUIPMENT FURNISHED.

NORTH

0 4 8 16

1 35% SCHEMATIC DESIGN DOCUMENTS 04/10/2020

2 65% DESIGN DEVELOPMENT 06/04/2020

3 65% DESIGN DEVELOPMENT - RE-SUBMISSION 06/26/2020

4 65% DESIGN DEVELOPMENT - RE-SUBMISSION 01/26/2021

5 95% CONSTRUCTION DOCUMENTS 04/06/2021

6 95% CONSTRUCTION DOCUMENTS -

RE-SUBMISSION

04/20/2021

7 95% CONSTRUCTION DOCUMENTS 07/15/2021

8 100% CONSTRCUTION DOCUMENTS 09/10/2021

VAV-1

VAV-2

VAV-3

VAV-5

VAV-4

815-FCU-1

815-DH-1

815-DH-2

815-DH-3 815-DH-4

815-DH-6

815-DH-5

815-DH-7

815-IWH-121 815-IWH-123

815-IWH-125

815-IWH-127

815-IWH-140815-IWH-142815-IWH-144815-IWH-146

815-IWH-119

815-IWH-120 815-IWH-122 815-IWH-124 815-IWH-126 815-IWH-128

815-IWH-104

815-IWH-105815-IWH-107815-IWH-109

815-IWH-131A

815-IWH-102

815-IWH-131B

815-IWH-103

815-IWH-133

815-IWH-135A

815-IWH-135B

815-IWH-138

815-IWH-156

815-IWH-155

815-IWH-113

815-IWH-141 815-IWH-139

'815GZ-ELP02'- 13,15

'815GZ-ELP02'- 18,20

'815GZ-ELP02'- 17,19'815GZ-ELP02'- 22,24

'815GZ-ELP02'- 61,63

'815GZ-ELP02'- 30,32

'815GZ-ELP02'- 25,27 '815GZ-ELP02'- 26,28 '815GZ-ELP02'- 21,23

'815GZ-ELP02'- 29,31

'815GZ-ELP02'- 45,47

'815GZ-ELP02'- 46,48

'815GZ-ELP02'- 41,43

'815GZ-ELP02'- 42,44

'815GZ-ELP02'- 34,36

'815GZ-ELP02'- 33,35'815GZ-ELP02'- 38,40

'815GZ-ELP02'- 37,39

'815GZ-ELP02'- 50,52

'815GZ-ELP02'- 54,56

'815GZ-ELP02'- 49,51

'815GZ-ELP02'- 62,64

'815GZ-ELP02'- 57,59

'815GZ-ELP02'- 58,60

'815GZ-ELP02'- 53,55

'815GZ-ELP02'- 5,7

'815GZ-ELP02'- 6,8

'815GZ-ELP02'- 2,4

'815GZ-ELP02'- 1,3

'815GZ-ELP02'- 10,12

'815GZ-ELP02'- 9,11

'815GZ-ELP02'- 14,16

'815GZ-ELP02'-

65,67,69

'815GZ-ELP02'-

70,72,74

'815GZ-ELP02'-

71,73,75

'815GZ-ELP02'-

77,79,81

'815GZ-ELP01'-

42,44,46

'815GZ-ELP01'-

43,45,47

'815GZ-ELP02'-

76,78,80

'815GZ-ELP03'- 26,28

'815GZ-ELP03'- 22,24

'815GZ-ELP03'- 23,25

'815GZ-ELP03'- 27,29

'815GZ-ELP03'- 30,32

'815GZ-ELP03'-

31,33,35

815-EUH-1

PANEL

'815GZ-ELP02'

PANEL

'815GZ-ELP03'

PANEL

'815GZ-ELP01'

815-IWH-162

'815GZ-ELP02'- 66,68

812-IWH-150

'815GZ-ELP02'- 82,84

815-IWH-129

'815GZ-ELL01'- 11

'815GZ-ELL01'- 11

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

/8

/2

:1

:5

P M

EM101

FIRST FLOOR MECHANICAL POWER

PLAN

6 14EFJ

DESIGN MEDICAL SPECIALTY

CLINIC

10535 HOSPITAL WAY, MATHER CA

95655

SEPTEMBER 10, 2021

100% CONSTRUCTION DOCUMENTS

612-12218-237-Q12

JAV

N

KEY PLAN

SCALE: NO SCALE

Scale: 1/8" = 1'-0"

FIRST FLOOR MECHANICAL POWER PLAN

A. PROVIDE MECHANICAL CONNECTIONS PER

MECHANICAL EQUIPMENT CONDUCTOR

SCHEDULE. SEE SHEET E-603.

NORTH

0 4 8 16

1 FCU POWERED THROUGH MANUFACTURER

SUPPLIED CABLING FROM CONDENSER

COORDINATE WITH MECHANICAL

CONTRACTOR FOR CONNECTION.

2 PROVIDE EMERGENCY CIRCUIT TO

STANDALONE NURSE CALL DEVICES.

1 35% SCHEMATIC DESIGN DOCUMENTS 04/10/2020

2 65% DESIGN DEVELOPMENT 06/04/2020

3 65% DESIGN DEVELOPMENT - RE-SUBMISSION 06/26/2020

4 65% DESIGN DEVELOPMENT - RE-SUBMISSION 01/26/2021

5 95% CONSTRUCTION DOCUMENTS 04/06/2021

6 95% CONSTRUCTION DOCUMENTS -

RE-SUBMISSION

04/20/2021

7 95% CONSTRUCTION DOCUMENTS 07/15/2021

8 100% CONSTRCUTION DOCUMENTS 09/10/2021

VAV-1

VAV-2

VAV-3

VAV-5

VAV-4

815-FCU-1

815-DH-1

815-DH-2

815-DH-3 815-DH-4

815-DH-6

815-DH-5

815-DH-7

815-IWH-121 815-IWH-127815-IWH-119

815-IWH-120 815-IWH-122 815-IWH-124 815-IWH-126 815-IWH-128

815-IWH-104

815-IWH-105815-IWH-107815-IWH-109

815-IWH-102

815-IWH-103

815-IWH-135A

815-IWH-135B

815-IWH-113

'815GZ-ELP02'- 13,15

'815GZ-ELP02'- 18,20

'815GZ-ELP02'- 17,19'815GZ-ELP02'- 22,24

'815GZ-ELP02'- 61,63

'815GZ-ELP02'- 30,32

'815GZ-ELP02'- 25,27 '815GZ-ELP02'- 26,28 '815GZ-ELP02'- 21,23

'815GZ-ELP02'- 29,31

'815GZ-ELP02'- 34,36

'815GZ-ELP02'- 33,35'815GZ-ELP02'- 38,40

'815GZ-ELP02'- 37,39

'815GZ-ELP02'- 50,52

'815GZ-ELP02'- 62,64

'815GZ-ELP02'- 5,7

'815GZ-ELP02'- 2,4

'815GZ-ELP02'- 1,3

'815GZ-ELP02'- 10,12

'815GZ-ELP02'- 9,11

'815GZ-ELP02'- 14,16

'815GZ-ELP02'-

65,67,69

'815GZ-ELP02'-

70,72,74

'815GZ-ELP02'-

71,73,75

'815GZ-ELP02'-

77,79,81

'815GZ-ELP01'-

42,44,46

'815GZ-ELP01'-

43,45,47

'815GZ-ELP02'-

76,78,80

'815GZ-ELP03'- 26,28

'815GZ-ELP03'- 22,24

'815GZ-ELP03'- 23,25

'815GZ-ELP03'- 27,29

'815GZ-ELP03'- 30,32

'815GZ-ELP03'-

31,33,35

815-EUH-1

PANEL

'815GZ-ELP02'

PANEL

'815GZ-ELP03'

PANEL

'815GZ-ELP01'

815-IWH-162

'815GZ-ELP02'- 66,68

812-IWH-150

'815GZ-ELP02'- 82,84

UNOCCUPIED SPACE

'815GZ-ELL01'- 11

'815GZ-ELL01'- 11

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

/8

/2

:1

:0

P M

EM101A

FIRST FLOOR MECHANICAL POWER

PLAN - DEDUCT ALTERNATE #4

7 14EFJ

DESIGN MEDICAL SPECIALTY

CLINIC

10535 HOSPITAL WAY, MATHER CA

95655

SEPTEMBER 10, 2021

100% CONSTRUCTION DOCUMENTS

612-12218-237-Q12

JAV

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

DEDUCT ALTERNATIVE

A. PROVIDE MECHANICAL CONNECTIONS PER

MECHANICAL EQUIPMENT CONDUCTOR

SCHEDULE. SEE SHEET E-603.

1 PLAN AND ASSOCIATED NOTES TO BE

ACCEPTED AS MAIN DESIGN IF BID

ALTERNATE ITEM FOUR IS TAKEN.

2 FCU POWERED THROUGH MANUFACTURER

SUPPLIED CABLING FROM CONDENSER

COORDINATE WITH MECHANICAL

CONTRACTOR FOR CONNECTION.

Scale: 1/8" = 1'-0"

FIRST FLOOR MECHANICAL POWER PLAN - DEDUCT ALTERNATE #4

NORTH

0 4 8 16

1 35% SCHEMATIC DESIGN DOCUMENTS 04/10/2020

2 65% DESIGN DEVELOPMENT 06/04/2020

3 65% DESIGN DEVELOPMENT - RE-SUBMISSION 06/26/2020

4 65% DESIGN DEVELOPMENT - RE-SUBMISSION 01/26/2021

5 95% CONSTRUCTION DOCUMENTS 04/06/2021

6 95% CONSTRUCTION DOCUMENTS -

RE-SUBMISSION

04/20/2021

7 95% CONSTRUCTION DOCUMENTS 07/15/2021

8 100% CONSTRCUTION DOCUMENTS 09/10/2021

OS

VSD

VSD

LVD

O S

LVD

VSD

VSD LVD

LVDLVD LVD

LVD

LVD

LVD

OS

OS

OS

OS

LVD

OS

OS

OS

OS

OS

OS

OSOS

OS

OS

OS

OS

LS

LS

LVD

4LV

LVD

OS

LVD

OS

VSD VSD

LVD

OS

OS

LVD

OS

OS OS OS OS

LVD LVD LVD LVD

LVD LVD LVD LVD

OS OS OS OS

VSD

VSD VSD

OS OS OS OS

LVD LVD LVD

OS OS

LVDLVDLVDVSDVSD

LV

OS

OS

OS

OS

LV

D

LV

D

OS

OS

OS

OS OS OS

OS

OS OS OS OS

OS

OS

OS

OS

OS OS OS

VSD

OS

OS

OS

OS

OS

LV

D

LV

D

LV

D

LS

OS

OS

OS

LS

A

A2 A2 A2

A2 A2 A2

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1 A1 A1 A1 A1 A1

A1

A1A1A1A1A1

A1 A1

A1A1A1A1A1

A1

A1 A3

A3

A1

A1

A1A2

A2 A1

A1

A1

A1F A1F

A1 A1

B B

B

B

B

A3

A3

A3 A3

D

D

D

D

E1

E1

E2

E1

E2 E1 E1

E1

E1

A2

A2

B

B

RCD2

RCD

RCD

RCDRCD RCD

RCD2

RCD2

RCD

RCD

E1

E1

RCD

E1

E1

H

D

H

H

A3F

A3F

A3F

A3F

A3F

A2 A2

F F RCD3

RCD3

D D

D

D

D

D

D

D

DCARDIOLOGY EXAM 6

CARDIOLOGY EXAM 7

CARDIOLOGY EXAM 8

NEPHR. EX. 1

NEPHROLOGY EXAM 2

PULMONARY EXAM 3

PULMONARY EXAM 4

PULMONARY EXAM 2

PULMONARY EXAM 1

STF TLT

STF TLT

CORRIDOR

C134

CORRIDOR

C151

NURSE ROOM

NURSE ROOM

NURSE ROOM

NURSE ROOM

KITCHEN

CONFERENCE

SHARED OFFICE

SHARED OFFICE

SHARED OFFICE

SHARED OFFICE

NEPHRO. EXAM 4

NEPHRO. EXAM 3

139 PULMINARY TESTING LAB

MECHANICAL

ELEC

HAC

SOILED

LAB

WAITING

100D

WAITING

100D

LOBBY

100A

LOBBY

100A

CORRIDOR

C130

CORRIDOR

C114

CORRIDOR

C114

CORRIDOR

C118

CORRIDOR

C118

NS MGR OFFICE

I.T. ROOM

PAT UNI TLT

CARDIOLOGY EXAM 1

CARDIOLOGY EXAM 2

CARDIOLOGY EXAM 3

CARDIOLOGY EXAM 4

CARDIOLOGY EXAM 5

CORRIDOR

C130

PAT UNI TLT

CORRIDOR

C134

CORRIDOR

C134

CORRIDOR

C154

STAFF WORK AREA

ECHO READING

ECHO

ECHO

STRESS

TOILET RM

HEIGHT AND WEIGHT

RECEPTION

100B

HOLTER EKG

ALCOVE

CHIEF OFFICE

CHIEF OFFICE

CHIEF OFFICE

EKG TECH WORK AREA

VESTIBULE

PULMINARY TESTING LAB

CLEAN / MEDS

B

B

RCD

RCD

A1 A1

A1A1

A1

A1

A1

A1

A1 A1

A1A1

E1

E1

A2

A2

A2

A2

A2

A2

RCD

A2

A2 A2

D

H

RCD

A1 A1

A1 A1 A1 A1

A1A1

RCD

A1

A1

RCD

A1A1A1A1

A1 A1

RCD

A1A1

A1 A1

RCD

A1

A1

A1

A1

RCD RCD

A1 A1

A1A1 A1

A1 A1

A1 A1

A1

RCDRCD

A1

A1

A1 A1

A1A1

RCD

A1

RCDA1

A1

A1

RCD

A1 A1

A1 A1A1

A1

A1 A1

RCD

RCD

A1

A1

A1 A1

A1 A1A1 A1 A1 A1 A1 A1

A1A1A1A1A1

A2 A2

A2A2

A2 A2

A1

A1 A2

A2 A2

A2

A1

A1

A1

A1

A1

A1

A1 A1

A1

A1 A1

A1

A1

A1

A1

A1

A3

STOR.

138A

A1F

A1F

PANEL

'815GZ-ELL01'

Z

Z

Z

2 3 4

5 6

A.1

B

C

D

'815GZ-ELL01'- 4

'815GZ-ELL01'- 8

A1

C

C

C

C

C C

C C

C C a b c c c c c c c a b c a,b,c c

'815GZ-ELL01'- 5

H

D

'815GZ-ELL01'- 3

RCD

'815GZ-ELL01'- 1

'815GZ-ELL01'- 4

'815GZ-ELL01'- 6

A1

'815GZ-ELL01'- 7

'815GZ-ELL01'- 8

EB1

A3 d,e,f g d d f f f f e d e e e e e f f f f f f f f f f f f f f e e e e g g g d f f f f c a c ca,b a,b a,b a g

RCD

W W

'815GZ-ELL01'- 9

Engineers Architects

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

/8

/2

:1

:4

P M

EL101

FIRST FLOOR LIGHTING PLAN

8 14EFJ

DESIGN MEDICAL SPECIALTY

CLINIC

10535 HOSPITAL WAY, MATHER CA

95655

SEPTEMBER 10, 2021

100% CONSTRUCTION DOCUMENTS

612-12218-237-Q12

JAV

NORTH

0 4 8 16

A. CONTRACTOR TO PROVIDE AND INSTALL

ALL DEVICES SHOWN ON THIS PLAN.

B. EXIT SIGN LIGHTING FIXTURES TO BE

CIRCUITED TO PANEL ‘815GZ-ELL01’-10.

C. EXTERIOR WALL PACK LIGHTING FIXTURES

TO BE CIRCUITED TO PANEL ‘815GZ-ELL01’-2.

N

KEY PLAN

SCALE: NO SCALE

Scale: 1/8" = 1'-0"

FIRST FLOOR LIGHTING PLAN

1 35% SCHEMATIC DESIGN DOCUMENTS 04/10/2020

2 65% DESIGN DEVELOPMENT 06/04/2020

3 65% DESIGN DEVELOPMENT - RE-SUBMISSION 06/26/2020

4 65% DESIGN DEVELOPMENT - RE-SUBMISSION 01/26/2021

5 95% CONSTRUCTION DOCUMENTS 04/06/2021

6 95% CONSTRUCTION DOCUMENTS -

RE-SUBMISSION

04/20/2021

7 95% CONSTRUCTION DOCUMENTS 07/15/2021

8 100% CONSTRCUTION DOCUMENTS 09/10/2021

OS

VSD

O S

LVD

VSD

VSD LVD

LVDLVD LVD

LVD

OS

OS

LVD

OS

OS

OS

OSOS

OS

OS

OS

OS

LS

LS

LVD

4LV

LVD

OS

LVD

OS

T

T

VSD VSD

LVDOS

LVD

OS

OS OS OS OS

LVD LVD LVD LVD

LVD LVD LVD LVD

OS OS OS OS

VSD

VSD VSD

LV

OS

OS

OS

OS

LV

D

LV

D

OS

OS

OS

OS OS OS

OS

OS

OS

OS

OS OS OS

OS

OS

OS

OS

OS

OS

LV

D

LV

D

LV

D

LS

OS

OS

OS

LS

A

A2

A2 A2

A2

A2 A2

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1 A1 A1 A1 A1 A1

ELEC

MECHANICAL

CONFERENCE

CORRIDOR

C151

NURSE ROOM

NURSE ROOM

NURSE ROOM

NURSE ROOM

CARDIOLOGY EXAM 7

CARDIOLOGY EXAM 10

CARDIO. EXAM 5

CARDIO. EXAM 4

CARDIOLOGY EXAM 3

CARDIOLOGY EXAM 2

CARDIOLOGY EXAM 1

NS MGR OFFICE

I.T. ROOM

STAFF UNI TLT

ECHO READING

ECHO

ECHO

STRESS

LOBBY

100A

VESTIBULE

HOLTER EKG

CORRIDOR

C114

ALCOVE

EKG TECH WORK AREA

OFFICE

CHIEF OFFICE

CHIEF OFFICE

A1

A1A1A1A1A1

A1

A1A2

A2

A1

A1A1

A1F A1F

A1 A1

B B

B

B

B

A3

A3 A3

D

D

D

D

E1

E1

E2

E1

E2 E1 E1

E1

E1

A2

A2

B

B

RCD2

RCD

RCDRCD RCD

RCD2

RCD

CARDIOLOGY EXAM 6

EM

EM

EMEM

EM

EM EM

EM

EM

EM

E1

E1

H

H

CORRIDOR

C118

CORRIDOR

C130

A3F

A3F

A3F

A2 A2

F F RCD3 EM

RCD3

HEIGHT AND WEIGHT

TOILET RM

SOILED

D D

D

D

D

D

D

D

D

HAC

WAITING

100D

CARDIOLOGY EXAM 9

CARDIOLOGY EXAM 8

PAT UNI TLT

STORAGE

CLEAN / MEDS

KITCHEN

STAFF WORK AREA

CORRIDOR

C130

B

B

A1 A1

A1

A1

A1 A1

A1

A1

E1

E1

B B

B

B B B

B

BBB

B

B

B B B

EM EM

EM

E1

RCD

A2

A2 A2

A2

H

D

RCD

A2

A2

RCD

RCD RCD

RCD RCD

RCD

A1

A1

A1 A1A1

A1

A1

A1A1A1

A1

A1A1

A1

A1 A1

RCD

RCD RCD RCD

A1 A1

A1 A1

A1

A1 A1

A1 A1

A1

A1

A1

A1 A1

A1A1

A2

A2

A2

EM

EM

EM

A2 A2

A2 A2

A2A2

A1

A1

A1

A1

A1

A1

A1

A1

A1 A1

A1

A1 A1

A1

A1

A1

A1

A1

B

A1F

A1F

Z

Z

Z

PANEL

'815GZ-ELL01'

RECEPTION

100B

2 3 4

5 6

A.1

B

C

D

UNOCCUPIED

SPACE

B

'815GZ-ELL01'- 12

'815GZ-ELL01'- 8

'815GZ-ELL01'- 6

A1

A1

'815GZ-ELL01'- 3

A3

'815GZ-ELL01'- 4

'815GZ-ELL01'- 1

RCD

C C

A1

C

C C C

C

C a,b,c d,e,f g

EB1

g g g d e f d d d f ff f f f f f f f f f f f f f f f f f f e e e e e e e e e a b a,b a,b a,b a c c a b c c c c c c c c c a c

EM

W W

RCD

'815GZ-ELL01'- 9

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

/8

/2

:1

:5

P M

EL101A

FIRST FLOOR LIGHTING PLAN -

DEDUCT ALTERNATE #4

9 14EFJ

DESIGN MEDICAL SPECIALTY

CLINIC

10535 HOSPITAL WAY, MATHER CA

95655

SEPTEMBER 10, 2021

100% CONSTRUCTION DOCUMENTS

612-12218-237-Q12

JAV

Scale: 1/8" = 1'-0"

FIRST FLOOR LIGHTING PLAN - DEDUCT ALTERNATE #4

NORTH

0 4 8 16

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

DEDUCT ALTERNATIVE

1 PLAN AND ASSOCIATED NOTES TO BE

ACCEPTED AS MAIN DESIGN IF BID

ALTERNATE ITEM FOUR IS TAKEN.

A. CONTRACTOR TO PROVIDE AND INSTALL

ALL DEVICES SHOWN ON THIS PLAN.

B. LIGHTING FIXTURES DESIGNATED WITH THE

EM TAG TO HAVE BATTERY BACKUP.

INCLUDING EXIT LIGHTS. THIS IS APPLICABLE

ONLY FOR ALTERNATE DEDUCT 1 ON THE

REMOVAL OF THE GENERATOR FROM THE

PROJECT. CONNECT TO SEPARATE

CIRCUITS.

C. EXIT SIGN LIGHTING FIXTURES TO BE

CIRCUITED TO PANEL ‘815GZ-ELL01’-10. EXIT

SIGNS TO ALSO INCLUDE SELF-TESTING

BATTERY OPERATION. DEVICE MODEL

NUMBER: LEDRBB-ST

D. EXTERIOR WALL PACK LIGHTING FIXTURES

TO BE CIRCUITED TO PANEL ‘815GZ-ELL01’-2.

1 35% SCHEMATIC DESIGN DOCUMENTS 04/10/2020

2 65% DESIGN DEVELOPMENT 06/04/2020

3 65% DESIGN DEVELOPMENT - RE-SUBMISSION 06/26/2020

4 65% DESIGN DEVELOPMENT - RE-SUBMISSION 01/26/2021

5 95% CONSTRUCTION DOCUMENTS 04/06/2021

6 95% CONSTRUCTION DOCUMENTS -

RE-SUBMISSION

04/20/2021

7 95% CONSTRUCTION DOCUMENTS 07/15/2021

8 100% CONSTRCUTION DOCUMENTS 09/10/2021

FINISH GRADE/FLOOR

PVC OR RIGID METAL CONDUIT AS

SPECIFIED-SEE SPECIFICATIONS

AND/OR DRAWINGS

INSYLATING BUSHING-PROVIDE GROUNDING BUSHING AT

PAD MOUNT TRANSFORMER, AND WHEN TERMINATING IN

SERVICE ENTRANCE EQUIPMENT

BEND AND CONDUIT RISE TO

ABOVE GRADE/FLOOR SHALL BE

RIGID METAL CONDUIT-COAT WITH

ASPHALTUM AS SPECIFIED TO 6"

ABOVE GRADE OR FLUSH AT

FLOOR

RISE MIN. 6" ABOVE

GRADE/FLOOR UNO

LUMINAIRE MANUFACTURER'S

EARTHQUAKE CLIP, (4) PER

FIXTURE AT CORNERS. ATTACH

WITH SHEET METAL SCREW

FIXTURE WHIP

FROM JUNCTION

BOX

(6FT. LONG MAX.)

LUMINAIR. REFER TO

SCHEDULE

LUMINAIRE. REFER TO

SCHEDULE

DRYWALL BORDER

CEILING CROSS

BEAM

GYPSUM BOARD

CEILING MAIN BEAM

CEILING CROSS BEAM

GYPSUM BOARD

(TYP)

3 TWIST

MINIMUM (TYP)

LUMINAIRE

SUSPENSION WIRES

(#10 MIN)

ATTACHED TO

STRUCTURE

(TYP EA. CORNER)

LUMINAIRE MANUFACTURER'S

EARTHQUAKE CLIP, (4) PER

FIXTURE AT CORNERES. ATTACH

WITH SHEET METAL SCREW

FIXTURE WHIP

FROM JUNCTION

BOX

(6FT. LONG MAX.)

LUMINAIRE. REFER TO

SCHEDULE

ARCHITECTURAL

CEILING GRID

LUMINAIRE. REFER

TO SCHEDULE

ACOUSTICAL CEILING

TILE (TYP)

3 TWIST

MINIMUM (TYP)

LUMINAIRE

SUSPENSION WIRES

(#10 MIN)

ATTACHED TO

STRUCTURE

(TYP EA. CORNER)

CEILING

MAIN BEAM RECESSED CAN

LUMINAIRE

CEILING BEAM

GYPSUM BOARD (TYP)

LUMINAIRE

BAR HANGERSRECESSED CAN

LUMINAIRE

CEILING

CROSS BEAM

WIRE TIE OR SCREW

BAR HANGER TO

CROSS BEAM TYP.

CEILING HANGER

WIRE, TYP.

GENERAL NOTE:

1. INSTALL IN ACCORDANCE WITH MANUFACTURER'S MOUNTING

INSTRUCTIONS AND USING THE RECOMMENDED MOUNTING

HARDWARE.

FIXTURE WHIP FROM

JUNCTION BOX (6'

[1829MM] LONG MAX

LUMINAIRE SUSPENSION

WIRE REFER TO

SPECIFICATION SECTION 26

51 00

CEILING HANGER

WIRE, TYP.

WIRE TIE OR

SCREW BAR

HANGER TO

ARCHITECTURAL

CEILING GRID TYP.

ARCHITECTURAL

CEILING GRID RECESSED CAN

LUMINAIRE

RECESSED CAN

LUMINAIRE

ARCHITECTURAL CEILING GRID

ACOUSTICAL

CEILING TILE

(TYP)

LUMINAIRE

BAR HANGERS

LUMINAIRE SUSPENSION

WIRE REFER TO

SPECIFICATION SECTION 26

51 00

GENERAL NOTE:

1. INSTALL IN ACCORDANCE WITH MANUFACTURER'S MOUNTING

INSTRUCTIONS AND USING THE RECOMMENDED MOUNTING

HARDWARE.

FIXTURE WHIP FROM

JUNCTION BOX (6'

[1829MM] LONG MAX

CEILING HANGER WIRE

DRYWALL

CEILING CROSS

TEE, TYP.

INTEGRAL GALVANIZED LIPPED

STEEL MOUNTING CHANNEL

HANGER WIRE AND MOUNTING

CHANNEL ATTACHED TO

STRUCTURE REFER TO

SPECIFICATION SECTION 26 51 00

WIRE TIE THROUGH

MOUNTING CHANNEL

& CROSS BEAM, TYP.

CEILING MAIN

BEAM

GYPSUM

BOARD

DRYWALL

CEILING CROSS

TEE, TYP. 1/4" SCREW

JUNCTION BOX

LOCKING

SQUARE

WASHER & NUT

GENERAL NOTE:

1. INSTALL IN ACCORDANCE WITH MANUFACTURER'S MOUNTING

INSTRUCTIONS AND USING THE RECOMMENDED MOUNTING

HARDWARE.

FIXTURE WHIP FROM JUNCTION

BOX (6' [1829MM] LONG MAX.)

OFF

PROVIDE SWITCH ABOVE

CEILING FOR BATTERY TESTING

CEILING HANGER WIRE

ARCHITECTURAL

CEILING GRID

HANGER WIRE AND MOUNTING

CHANNEL ATTACHED TO

STRUCTURE. REFER TO

SPECIFICATION SECTION 26 51 00

INTEGRAL GALVANIZED LIPPED

STEEL MOUNTING CHANNEL

WIRE TIE THROUGH

MOUNTING CHANNEL

& CROSS BEAM, TYP.

ARCHITECTURAL

CEILING GRID

ACOUSTICAL CEILING

TILE, TYP.

ARCHITECTURAL

CEILING GRID

1/4" SCREW

JUNCTION BOX

LOCKING SQUARE

WASHER & NUT

FIXTURE WHIP FROM JUNCTION

BOX (6' [1829MM] LONG MAX)

GENERAL NOTE:

1. INSTALL IN ACCORDANCE WITH MANUFACTURER'S MOUNTING

INSTRUCTIONS AND USING THE RECOMMENDED MOUNTING

HARDWARE.

OFF

PROVIDE SWITCH ABOVE

CEILING FOR BATTERY TESTING

1. WALL ASSEMBLY - THE 1, 2, 3 OR 4 HR FIRE-RATED GYPSUM WALLBOARD/STUD WALL ASSEMBLY SHALL BE CONSTRUCTED OF THE MATERIALS AND IN THE MANNER DESCRIBED IN THE INDIVIDUAL U300 OR U400 SERIES WALL OR PARTITION DESIGNS IN THE UL FIRE RESISTANCE DIRECTORY AND SHALL INCLUDE THE FOLLOWING CONSTRUCTION FEATURES:

A. STUDS - WALL FRAMING MAY CONSIST OF EITHER WOOD STUDS (MAX 2 HR FIRE RATED ASSEMBLIES) OR STEEL CHANNEL STUDS. WOOD STUDS TO CONSIST OF NOM 2 BY 4 IN. (51 BY 102 MM) LUMBER SPACED 16 IN. (406 MM) OC WITH NOM 2 BY 4 IN. (51 BY 102 MM) LUMBER END PLATES AND CROSS BRACES. STEEL STUDS TO BE MIN 3-5/8 IN. (92 MM)

WIDE BY 1-3/8 IN. (35 MM) DEEP CHANNELS SPACED MAX 24 IN. (610 MM) OC.

B. GYPSUM BOARD* - NOM 1/2 OR 5/8 IN. (13 OR 16 MM) THICK, 4 FT. (122 CM) WIDE WITH SQUARE OR TAPERED EDGES. THE GYPSUM WALLBOARD TYPE, THICKNESS, NUMBER OF LAYERS, FASTENER TYPE AND SHEET ORIENTATION SHALL BE AS SPECIFIED IN THE INDIVIDUAL U300 OR U400 SERIES DESIGN IN THE UL FIRE RESISTANCE DIRECTORY. MAX DIAM OF

OPENING IS 26 IN. (660 MM).

2. THROUGH PENETRANT - ONE METALLIC PIPE, CONDUIT OR TUBING INSTALLED EITHER CONCENTRICALLY OR ECCENTRICALLY WITHIN THE FIRESTOP SYSTEM. THE ANNULAR SPACE BETWEEN PIPE, CONDUIT OR TUBING AND PERIPHERY OF OPENING SHALL BE MIN OF 0 IN. (0 MM) (POINT CONTACT) TO MAX 2 IN. (51 MM). PIPE, CONDUIT OR TUBING TO BE RIGIDLY SUPPORTED ON BOTH SIDES OF WALL ASSEMBLY. THE FOLLOWING TYPES AND SIZES OF METALLIC PIPES, CONDUITS OR TUBING MAY BE USED:

A. STEEL PIPE - NOM 24 IN. (610 MM) DIAM (OR SMALLER) SCHEDULE 10 (OR HEAVIER) STEEL PIPE.

B. IRON PIPE - NOM 24 IN. (610 MM) DIAM (OR SMALLER) SERVICE WEIGHT (OR HEAVIER) CAST IRON SOIL PIPE, NOM 12 IN.

(305 MM) DIAM (OR SMALLER) OR CLASS 50 (OR HEAVIER) DUCTILE IRON PRESSURE PIPE.

C. CONDUIT - NOM 6 IN. (152 MM) DIAM (OR SMALLER) STEEL CONDUIT OR NOM 4 IN. (102 MM) DIAM (OR SMALLER) STEEL

ELECTRICAL METALLIC TUBING

D. COPPER TUBING - NOM 6 IN. (152 MM) DIAM (OR SMALLER) TYPE L (OR HEAVIER) COPPER TUBING E. COPPER PIPE - NOM 6 IN. (152 MM) DIAM (OR SMALLER) REGULAR (OR HEAVIER) COPPER PIPE.

F. THROUGH PENETRATING PRODUCT* - FLEXIBLE METAL PIPING - THE FOLLOWING TYPES OF STEEL FLEXIBLE METAL GAS

PIPING MAY BE USED:

1. NOM 2 IN. (51 MM) DIAM (OR SMALLER) STEEL FLEXIBLE METAL GAS PIPING. PLASTIC COVERING ON PIPING MAY OR MAY

NOT BE REMOVED ON BOTH SIDES OF FLOOR OR WALL ASSEMBLY.

OMEGA FLEX INC

2. NOM 1 IN. (25 MM) DIAM (OR SMALLER) STEEL FLEXIBLE METAL GAS PIPING. PLASTIC COVERING ON PIPING MAY OR MAY

NOT BE REMOVED ON BOTH SIDES OF FLOOR OR WALL ASSEMBLY.

TITEFLEX CORP

A BUNDY CO

3. NOM 1 IN. (25 MM) DIAM (OR SMALLER) STEEL FLEXIBLE METAL GAS PIPING. PLASTIC COVERING ON PIPING MAY OR MAY

NOT BE REMOVED ON BOTH SIDES OF FLOOR OR WALL ASSEMBLY.

WARD MFG INC

3. FILL,VOID OR CAVITY MATERIAL* - CAULK OR SEALANT - MIN 5/8. 1-1/4,1-7/8 AND 2-1/2 IN. (16, 32, 48 AND 64 MM) THICKNESS OF CAULK FOR 1, 2, 3 AND 4 HR RATED ASSEMBLIES, RESPECTIVELY, APPLIED WITHIN ANNULUS, FLUSH WITH BOTH SURFACES OF WALL. MIN 1/4 IN. (6 MM) DIAM BEAD OF CAULK APPLIED TO GYPSUM BOARD/PENETRANT INTERFACE AT POINT CONTACT

LOCATION ON BOTH SIDES OF WALL.

THE HOURLY F RATING OF THE FIRESTOP SYSTEM IS DEPENDENT UPON THE HOURLY FIRE RATING OF THE WALL ASSEMBLY IN

WHICH IT IS INSTALLED, AS SHOWN IN THE FOLLOWING TABLE.

THE HOURLY T RATING OF THE FIRESTOP SYSTEM IS DEPENDENT UPON THE TYPE OR SIZE OF THE PIPE OR CONDUIT AND THE HOURLY FIRE RATING OF THE WALL ASSEMBLY IN WHICH IT IS INSTALLED, AS TABULATED BELOW:

+WHEN COPPER PIPE IS USED, T RATING IS 0 HR.

3M COMPANY - CP 25WB+ CAULK OR FB-3000 WT SEALANT,

*BEARING THE UL CLASSIFICATION MARKING

SYSTEM NO.W-L-1001

JUNE 15, 2005

F RATINGS - 1, 2, 3 AND 4 HR (SEE ITEMS 2 AND 3)

T RATINGS - 0, 1, 2, 3, AND 4 HR (SEE ITEM 3)

L RATING AT AMBIENT - LESS THAN 1 CFM/SQ FT

L RATING AT 400 F - LESS THAN 1 CFM/SQ FT

MAX PIPE OR

CONDUIT DIAM

IN. (mm)

1 (25)

1 (25)

4 (102)

6 (152)

12 (305)

F RATING

HR

1 OR 2

3 OR 4

1 OR 2

3 OR 4

1 OR 2

T RATING

HR

0+, 1 OR 2

3 OR 4

SECTION A-A

1B

1A

3A

A

LIGHTING

ZONE (a)

RCD

(AS NEEDED)

SEQUENCE OF OPERATION:

•…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .