ATTACHMENT 4 - Drawings 2 of 3.pdf

PDF 13 MB Posted

Attached to
Y1DZ--Medical Specialty Clinic (Minor) Construction - Mather
Solicitation number
36C77622B0012
Issued by

About this file

This document contains details for a federal contract solicitation to provide construction services for a Medical Specialty Clinic at the Mather Veterans Affairs facility in California. The contractor will be responsible for site preparation including demolition of existing structures, construction of foundations and superstructure, and installation of mechanical, electrical, plumbing and special systems. Additional requirements include landscaping and other site improvements. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center Austin. The response deadline and award date are not specified.

View the file

Other files

File Type Posted
Updated Table of Contents w-Omitted Sections.pdf PDF
36C77622B0012 0004.pdf PDF
Technical Questions Revision to Response No. 3.pdf PDF
Pole Base Detail.pdf PDF
Site Plan Construction Lay Down Area.pdf PDF
Addendum 2.pdf PDF
36C77622B0012 0003.pdf PDF
Technical Questions - FINAL - Mather 4-11-22.pdf PDF
TK101A.pdf PDF
ATTACHMENT 11 - Construction Wage Rates - Sacramento 4-1-22.pdf PDF
SMUD.pdf PDF
36C77622B0012 0002.pdf PDF
36C77622B0012 0001.pdf PDF
Site Visit Sign-in Sheet - Mather 3-15-22.pdf PDF
ATTACHMENT 8 - Contractor Core Work Hours.pdf PDF
ATTACHMENT 9 - COVID-19 Safety Protocols 12-14-21.pdf PDF
ATTACHMENT 1 - Specifications Vol 1 of 2.pdf PDF
ATTACHMENT 5 - Drawings 3 of 3.pdf PDF
ATTACHMENT 2 - Specifications Vol 2 of 2.pdf PDF
ATTACHMENT 10 - Limitations on Subcontracting - Construction.docx DOCX document
ATTACHMENT 3 - Drawings 1 of 3.pdf PDF
36C77622B0012 - 3-2-22.pdf PDF
ATTACHMENT 7 - Brand Name Justification - Mather.pdf PDF
ATTACHMENT 13 - Site Visit - Map.pdf PDF
ATTACHMENT 11 - Construction Wage Rates - Sacramento 2-25-22.pdf PDF
ATTACHMENT 6 - Geotechnical Report.pdf PDF
ATTACHMENT 12 - Contractor Safety - Environmental Form.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. ALL CORNER GUARDS TO BE 4'-0"H FROM TOP OF BASE.

2. PROVIDE BLOCKING IN WALLS FOR ALL CRASH/HANDRAILS.

3. TYPICAL HANDRAIL HEIGHT IS 3'-0" H IN CORRIDORS.

4. SEE TYPICAL DETAIL SECTIONS ON SHEET I-403.

5. HANDRAIL/CRASH RAIL TO BE HELD BACK FROM CORNER GUARDS AND

DOORFRAMES 2"

6. HANDRAIL NOT TO BE BEHIND DOORS WITH CLOSURES AND START HANDRAIL 6"

AWAY FROM START OF DOOR WHEN OPEN.

7. STANDARD WALL PROTECTION (SHEET) TO BE .040” THICKNESS FOR DRYWALL

APPLICATIONS.

8. SEE SPECIFICATION 09 06 00 SCHEDULE OF FINISHES FOR MATERIALS AND

FINISHES.

GENERAL WALL PROTECTION NOTES

ABBREVIATION LEGEND

CG: CORNER GUARD

CR: CRASH RAIL

HR: HANDRAIL

HIW: HIGH IMPACT WALLCOVERING

1. REFERENCE ROOM FINISH SCHEDULE , FINISH MATERIAL LEGEND AND

SPECIFICATION 09 06 00 SCHEDULE OF FINISHES FOR MORE INFORMATION.

2. REFERENCE REFLECTED CEILING PLAN FOR ADDITIONAL CEILING INFO.

3. PREPARE ALL FLOOR AND WALL CONSTRUCTION, NEW AND/OR EXISTING, TO

RECEIVE NEW FINISHES IN ACCORDANCE WITH MANUFACTURER’S

RECOMMENDED INSTALLATION METHODS AND MATERIALS FOR ALL FINISHES.

4. PRIOR TO INSTALLATION OF NEW FINISHES, CONTRACTOR SHALL INSPECT ALL

SUBSTRATES. IF A SUBSTRATE IS DEEMED UNACCEPTABLE, THE

CONTRACTOR SHALL TAKE THE NECESSARY STEPS TO RECTIFY THE

SITUATION OR CONTACT THE ARCHITECT WITH THE CONCERN. PROCEEDING

WITH THE INSTALLATION OF FINISHES WILL BE INDICATION THAT THE

INSTALLER / FINISHER ACCEPTS CONDITION OF SUBSTRATE.

5. USE MANUFACTURER'S RECOMMENDED INSTALLATION METHODS AND

MATERIALS FOR ALL FINISHES.

6. ALL NECESSARY TILE FLOORING UNDERLAYMENT TO BE PROVIDED AND

INSTALLED BY FLOORING CONTRACTOR.

7. ALL FLOORING TRANSITIONS SHALL COMPLY WITH ADA GUIDELINES.

TRANSITION LOCATIONS FOR DESIGNERS APPROVAL PRIOR TO INSTALLATION.

8. ALL FLOOR TRANSITIONS BETWEEN DISALIKE MATERIALS SHALL BE ANODIZED

ALUMINUM METAL TRIM AND TO BE LOCATED AT CENTERLINE OF DOOR WHEN

IN CLOSED POSITION.

9. ALL TRANSITIONS BETWEEN WALL AND FLOOR TILE SHALL BE ANODIZED COVE

ALUMINUM METAL TRIM; STRAIGHT, INSIDE, AND OUTSIDE CORNERS WHEN A

COVE BASE IS NOT PRESENT.

10. ALIGN FLOORING TRANSITIONS WITH FINISH BASE EXCEPT AT DOORS, U.N.O.

11. FLOOR FINISHES ARE TO EXTEND UNDER NEW BUILT-IN CABINETS.

12. FINISH LEVEL OF GYP. BD. WALLS AND SOFFITS TO BE LEVEL 4, U.N.O.

13. ALL PAINTED WALLS TO BE PAINTED P-1, UNLESS NOTED OTHERWISE.

14. ALL GYP. BOARD CEILINGS TO BE PAINTED P-6, U.N.O.

15. ALL PAINTED SURFACES SHALL RECEIVE A MINIMUM OF (1) ONE BASE COAT

AND (2) TWO FINISH COATS.

16. PAINTED SHEEN LEVEL TO BE SATIN/EGG-SHELL FOR ALL WALLS, U.N.O.

SEMI-GLOSS.

17. PAINT ALL EXPOSED METAL SURFACES, SUCH AS GRILLES, FIRE EXTINGUISHER

CABINETS, ETC. WITH PAINT TO MATCH ADJACENT SURFACE.

18. ALL HOLLOW METAL DOORS AND FRAMES TO BE PAINTED P-2.

GENERAL FINISH NOTES

GENERAL EQUIPMENT NOTES

ABBREVIATION LEGEND

"VV" = VA FURNISHED & VA INSTALLED

"VC" = VA FURNISHED & CONTRACTOR INSTALLED

“CC" = CONTRACTOR FURNISHED & CONTRACTOR INSTALLED

1. REFER TO G-100 FOR STANDARD MOUNTING HEIGHTS AND BLOCKING

INFORMATION. REFER TO EQUIPMENT DRAWINGS FOR LOCATIONS AND

ADDITIONAL DIMENSIONS.

2. REFER TO MECHANICAL, ELECTRICAL, PLUMBING, AND

TELECOM/TECHNOLOGY DRAWINGS FOR ADDITIONAL REQUIRED UTILITY

CONNECTIONS AND LOCATIONS.

3. REFER TO SHEETS I-431 THRU 432 FOR ENLARGED TOILET ROOMS

4. REFER TO REFLECTED CEILING PLANS A-110 AND A-110A FOR CUBICLE

CURTAIN TRACK LOCATIONS

5. SEE ENLARGED EQUIPMENT PLANS ON SHEETS I-421 THRU 424

6. SEE EQUIPMENT SCHEDULES ON SHEETS I-601 THRU 603 FOR SPECIFICS

ON EQUIPMENT BY ROOM

7. ITEM TAGS INCLUDE ACQUISITION AND INSTALLATION RESPONSIBILITIES

(ACQ.), DENOTED AS NOTED IN ABBREVIATION LEGEND

1. ITEM 01:

A. DELETE ALL WORK AND MATERIAL FOR SUPPORT STEEL FOR ROOF SCREENS. (FROM

TOP FLANGE OF ROOF STEEL UP). DELETE ALL WORK AND MATERIAL FOR

INSTALLATION OF ROOF SCREEN. DELETE ALL ROOFING WORK ASSOCIATED WITH

FLASHING IN VERTICAL SCREEN SUPPORTS. SEE STRUCTURAL AND ARCHITECTURAL

DRAWINGS.

B. REMOVE ALL WORK AND MATERIAL TO INSTALL BASIS OF DESIGN: HERMAN MILLER

COMBO CASEWORK/SINKS AT ALL LOCATIONS AND REPLACE WITH HAND SINK AND

SOLID SURFACE SPLASH PROTECTON. SEE PLUMBING AND INTERIOR DRAWINGS.

C. DELETE ALL WORK AND MATERIAL TO INSTALL GENERATOR, INCLUDING WIRING, AND

CONCRETE GENERATOR PAD. SEE CIVIL AND ELECTRICAL DRAWINGS.

2. ITEM 02:

A. INSTALL MANUAL SWING DOORS IN LIEU OF AUTOMATIC SLIDING DOORS AT VESTIBULE

100 (2 PAIRS) SEE ARCHITECTUAL DRAWINGS.

3. ITEM 03:

A. DELETE ALL WORK AND MATERIAL FOR ALL ASPHALT PAVING, ADA STALLS, PROVIDE

GRAVEL EMERGENCY ACCESS ONLY. SEE CIVIL DRAWINGS.

4. ITEM 04:

A. DELETE WORK AND MATERIAL IN DESIGNATED AREA AND REPLACE WITH UNOCCUPIED

SPACE. SEE SHEET A-101A FOR LIMITED GENERAL TRADES WORK. SPRINKLER SYSTEM

TO STILL BE INSTALLED. SEE SHEET FX101A. INSTALL RECEPTACLES, MECHANICAL

POWER, AND TEMPORARY LIGHTING AS PER SHEETS EL101A, EM101A, AND EP101A.

SEE SHEET M-101A FOR LIMITED MECHANICAL WORK. SEE SHEET PP101A FOR

PLUMBING WORK.

DEDUCT ALTERNATES

Engineers Architects

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/9

/2

:4

:2

P M

I-001

PRODUCT SCHEDULES, SYMBOLS AND

ABBREVIATIONS

1 18JK

DESIGN MEDICAL SPECIALTY

CLINIC

10535 HOSPITAL WAY, MATHER CA

95655

SEPTEMBER 10, 2021

100% CONSTRUCTION DOCUMENTS

612-12218-237-Q12

ELI

FINISH ABBREVIATIONS

AT ACOUSTICAL CEILING TILE

ADJ ADJACENT

AFF ABOVE FINISHED FLOOR

CG CORNER GUARD

CPT CARPET

CR CRASH RAIL

CWT CERAMIC WALL TILE

EP EPOXY PAINT

EX EXISTING

EXP EXPOSED

GT GROUT

GYP GYPSUM WALL BOARD

HIW HIGH IMPACT WALLCOVERING

HR HAND RAIL

LF LINEAR FEET (FOOT)

LVT LUXURY VINYL TILE

MTL METAL

MISC MISCELLANEOUS

NA NOT APPLICABLE

P PAINT

PL PLASTIC LAMINATE

PT PORCELAIN TILE

PTB PORCELAIN TILE BASE

RB RESILIENT WALL BASE

RP RESIN PANEL SYSTEM

SC SEALED CONCRETE

SDT STATIC DISAPATIVE TILE

SF SQUARE FEET (FOOT)

SS SOLID SURFACE

SST STAINLESS STEEL

TR TILE TRIM

TS TRANSITION STRIP

TYP TYPICAL

UFIN UNFINISHED

UNO UNLESS NOTED OTHERWISE

VIF VERIFY IN FIELD

WSF WELDED SHEET FLOOR

WSFB WELDED SHEET FLOOR BASE

ROOM FINISH SCHEDULE

ROOM NO. NAME FLOOR BASE

WALLS CEILING

REMARKS

EAST NORTH SOUTH WEST

FINFIN FIN FIN FIN

FIRST FLOOR

100 VESTIBULE CPT-1 RB-1 EP-1 EP-1 EP-1 EP-1 EP-2 PAINT GYP CEILING EP-2

100A LOBBY LVT-1,2 RB-1 P-1 P-1 P-5 P-5/HIW-2 P-6,7/AT-1 PAINT GYP CEILINGS P-6 & P-7, REFER TO GENERAL

FINISH NOTES ON I-001 AND REFLECTED CEILING PLAN

ON A-110A FOR ADDITIONAL INFORMATION; HIW-2

ALONG UNDERSIDE OF COUNTERTOP

100B RECEPTION LVT-1 RB-1 P-1,5 P-1,5 P-1,5 P-1 AT-2

100D WAITING LVT-1,2 RB-1 P-1 P-1 P-1 P-5 P-6,7/AT-1 PAINT GYP CEILINGS P-6 & P-7, REFER TO GENERAL

FINISH NOTES ON I-001 AND REFLECTED CEILING PLAN

ON A-110A FOR ADDITIONAL INFORMATION

101 HEIGHT AND WEIGHT LVT-1 RB-1 P-1/HIW-1 P-1/HIW-1 P-1/HIW-1 P-1/HIW-1 AT-2 HIW-1 WAINSCOT TO 3'-8" ABOVE FINISHED FLOOR

102 TOILET RM PT-1 PTB-1 PT-2/CWT-1,2 PT-2/CWT-1,2 PT-2/CWT-1,2 PT-2/CWT-1,2 EP-2 PAINT GYP CEILING EP-2

103 SOILED WSF-1 WSFB-1 EP-1/HIW-1 EP-1/HIW-1 EP-1/HIW-1 EP-1/HIW-1 EP-2 HIW-1 WAINSCOT TO 3'-8" ABOVE FINISHED FLOOR

104 HOLTER EKG LVT-1 RB-2 P-1 P-3 P-1 P-1 AT-3

105 STRESS LVT-1 RB-2 P-1 P-1 P-3 P-1 AT-3

106 EKG TECH WORK AREA LVT-1 RB-2 P-1 P-1 P-1 P-1 AT-2

107 ECHO LVT-1 RB-2 P-3 P-1 P-1 P-1 AT-3

108 ALCOVE LVT-1 RB-2 P-1/HIW-1 P-1/HIW-1 -- P-1/HIW-1 AT-2 HIW-1 WAINSCOT TO 3'-8" ABOVE FINISHED FLOOR

109 ECHO LVT-1 RB-2 P-3 P-1 P-1 P-1 AT-3

110 CHIEF OFFICE CPT-2 RB-2 P-1 P-1 P-1 P-4 AT-2

111 ECHO READING LVT-1 RB-2 P-1 P-1 P-1 P-1 AT-2

112 CHIEF OFFICE CPT-2 RB-2 P-1 P-4 P-1 P-1 AT-2

113 PAT UNI TLT PT-1 PTB-1 PT-2/CWT-1,2 PT-2/CWT-1,2 PT-2/CWT-1,2 PT-2/CWT-1,2 EP-2 PAINT GYP CEILING EP-2

115 CHIEF OFFICE CPT-2 RB-2 P-4 P-1 P-1 P-1 AT-2

116 I.T. ROOM SDT-1 RB-2 P-1 P-1 P-1 P-1 AT-2

117 NS MGR OFFICE CPT-2 RB-2 P-1 P-4 P-1 P-1 AT-2

119 CARDIOLOGY EXAM 6 LVT-1 RB-2 P-1 P-1 P-1 P-3 AT-3

120 CARDIOLOGY EXAM 1 LVT-1 RB-2 P-1 P-1 P-1 P-3 AT-3

121 CARDIOLOGY EXAM 7 LVT-1 RB-2 P-3 P-1 P-1 P-1 AT-3

122 CARDIOLOGY EXAM 2 LVT-1 RB-2 P-1 P-1 P-1 P-3 AT-3

123 CARDIOLOGY EXAM 8 LVT-1 RB-2 P-3 P-1 P-1 P-1 AT-3

124 CARDIOLOGY EXAM 3 LVT-1 RB-2 P-1 P-1 P-1 P-3 AT-3

125 NEPHR. EX. 1 LVT-1 RB-2 P-3 P-1 P-1 P-1 AT-3

126 CARDIOLOGY EXAM 4 LVT-1 RB-2 P-1 P-1 P-1 P-3 AT-3

127 NEPHROLOGY EXAM 2 LVT-1 RB-2 P-3 P-1 P-1 P-1 AT-3

128 CARDIOLOGY EXAM 5 LVT-1 RB-2 P-1 P-1 P-1 P-3 AT-3

129 PAT UNI TLT PT-1 PTB-1 PT-2/CWT-1,2 PT-2/CWT-1,2 PT-2/CWT-1,2 PT-2/CWT-1,2 EP-2 PAINT GYP CEILING EP-2

131 LAB WSF-1 WSFB-1 EP-1 EP-1 EP-1 EP-1 EP-2 PAINT GYP CEILING EP-2

132 CLEAN / MEDS WSF-1 WSFB-1 EP-1/HIW-1 EP-1/HIW-1 EP-1/HIW-1 EP-1/HIW-1 EP-2 HIW-1 WAINSCOT TO 3'-8" ABOVE FINISHED FLOOR

133 PULMINARY TESTING LAB LVT-1 RB-2 P-1 P-1 P-1 P-1 AT-3

135 HAC PT-1 -- PT-2/EP-1 PT-2/EP-1 PT-2/EP-1 PT-2/EP-1 EP-2 PT-2 WAINSCOT TO 5'-0" ABOVE FINISHED FLOOR

136 ELEC SC RB-2 P-1 P-1 P-1 P-1 --

137 MECHANICAL SC RB-2 P-1 P-1 P-1 P-1 --

138 PULMINARY TESTING LAB LVT-1 RB-2 P-1 P-1 P-1 P-1 AT-3

138A STOR. LVT-1 RB-2 P-1/HIW-1 P-1/HIW-1 P-1/HIW-1 P-1/HIW-1 AT-2 HIW-1 WAINSCOT TO 3'-8" ABOVE FINISHED FLOOR

139 NEPHRO. EXAM 3 LVT-1 RB-2 P-3 P-1 P-1 P-1 AT-3

140 PULMONARY EXAM 4 LVT-1 RB-2 P-1 P-1 P-1 P-3 AT-3

141 NEPHRO. EXAM 4 LVT-1 RB-2 P-3 P-1 P-1 P-1 AT-3

142 PULMONARY EXAM 3 LVT-1 RB-2 P-1 P-1 P-1 P-3 AT-3

143 SHARED OFFICE CPT-2 RB-2 P-4 P-1 P-1 P-1 AT-2

144 PULMONARY EXAM 2 LVT-1 RB-2 P-1 P-1 P-1 P-3 AT-3

145 SHARED OFFICE CPT-2 RB-2 P-4 P-1 P-1 P-1 AT-2

146 PULMONARY EXAM 1 LVT-1 RB-2 P-1 P-1 P-1 P-3 AT-3

147 SHARED OFFICE CPT-2 RB-2 P-4 P-1 P-1 P-1 AT-2

148 SHARED OFFICE CPT-2 RB-2 P-1 P-1 P-1 P-4 AT-2

149 CONFERENCE LVT-1 RB-2 P-1 P-1 P-1 P-4 AT-2

150 KITCHEN LVT-1 RB-2 P-1 P-1 P-1 P-1 AT-2

152 NURSE ROOM CPT-2 RB-2 P-1 P-1 P-1 P-1 AT-2

153 NURSE ROOM CPT-2 RB-2 P-1 P-1 P-1 P-1 AT-2

155 STF TLT PT-1 PTB-1 PT-2/EP-1 PT-2/EP-1 PT-2/EP-1 PT-2/EP-1 EP-2 PAINT GYP CEILING EP-2; PT-2 WAINSCOT TO 5'-6"

ABOVE FINISHED FLOOR

156 STF TLT PT-1 PTB-1 PT-2/EP-1 PT-2/EP-1 PT-2/EP-1 PT-2/EP-1 EP-2 PAINT GYP CEILING EP-2; PT-2 WAINSCOT TO 5'-6"

ABOVE FINISHED FLOOR

157 NURSE ROOM CPT-2 RB-2 P-1 P-1 P-1 P-1 AT-2

158 NURSE ROOM CPT-2 RB-2 P-1 P-1 P-1 P-1 AT-2

159 STAFF WORK AREA CPT-2 RB-2 P-1,4 P-1,4 P-1,4 P-1,4 AT-2

C114 CORRIDOR LVT-1 RB-1 P-1 P-1 P-1 P-1 AT-2

C118 CORRIDOR LVT-1 RB-1 P-1 P-1 P-1 P-1 AT-2

C130 CORRIDOR LVT-1 RB-1 P-1 P-1 P-1 P-1 AT-2

C134 CORRIDOR LVT-1 RB-1 P-1 P-1 P-1 P-1 AT-2

C151 CORRIDOR LVT-1 RB-2 P-1 P-1 P-1 P-1 AT-2

C154 CORRIDOR LVT-1 RB-2 P-1 P-1 P-1 P-1 AT-2

DEDUCT ALTERNATE - ROOM FINISH SCHEDULE

ROOM NO. NAME FLOOR BASE

WALLS CEILING

REMARKS

EAST NORTH SOUTH WEST

FINFIN FIN FIN FIN

FIRST FLOOR

100 VESTIBULE CPT-1 RB-1 EP-1 EP-1 EP-1 EP-1 GYP PAINT GYP CEILING EP-2

100A LOBBY LVT-1,2 RB-1 P-1 P-1 P-5 P-5/HIW-2 P-6,7/AT-1 PAINT GYP CEILINGS P-6 & P-7, REFER TO GENERAL

FINISH NOTES ON I-001 AND REFLECTED CEILING

PLAN ON A-110A FOR ADDITIONAL INFORMATION;

HIW-2 ALONG UNDERSIDE OF COUNTERTOP

100B RECEPTION LVT-1 RB-1 P-1,5 P-1,5 P-1,5 P-1 AT-2

100D WAITING LVT-1,2 RB-1 P-1 P-1 P-1 P-5 P-6,7/AT-1 PAINT GYP CEILINGS P-6 & P-7, REFER TO GENERAL

FINISH NOTES ON I-001 AND REFLECTED CEILING

PLAN ON A-110A FOR ADDITIONAL INFORMATION

101 HEIGHT AND WEIGHT LVT-1 RB-1 P-1/HIW-1 P-1/HIW-1 P-1/HIW-1 P-1/HIW-1 AT-2 HIW-1 WAINSCOT TO 3'-8" ABOVE FINISHED FLOOR

102 TOILET RM PT-1 PTB-1 PT-2/CWT-1,2 PT-2/CWT-1,2 PT-2/CWT-1,2 PT-2/CWT-1,2 EP-2 PAINT GYP CEILING EP-2

103 SOILED WSF-1 WSFB-1 EP-1/HIW-1 EP-1/HIW-1 EP-1/HIW-1 EP-1/HIW-1 EP-2 PAINT GYP CEILING EP-2; HIW-1 WAINSCOT TO 3'-8"

ABOVE FINISHED FLOOR

104 HOLTER EKG LVT-1 RB-2 P-1 P-3 P-1 P-1 AT-3

105 STRESS LVT-1 RB-2 P-1 P-1 P-3 P-1 AT-3

106 EKG TECH WORK AREA LVT-1 RB-2 P-1 P-1 P-1 P-1 AT-2

107 ECHO LVT-1 RB-2 P-3 P-1 P-1 P-1 AT-3

108 ALCOVE LVT-1 RB-2 P-1/HIW-1 P-1/HIW-1 -- P-1/HIW-1 AT-2 HIW-1 WAINSCOT TO 3'-8" ABOVE FINISHED FLOOR

109 ECHO LVT-1 RB-2 P-3 P-1 P-1 P-1 AT-3

110 OFFICE CPT-2 RB-2 P-1 P-1 P-1 P-4 AT-2

111 ECHO READING LVT-1 RB-2 P-1 P-1 P-1 P-1 AT-2

112 CHIEF OFFICE CPT-2 RB-2 P-1 P-4 P-1 P-1 AT-2

113 STAFF UNI TLT PT-1 PTB-1 PT-2/EP-1 PT-2/EP-1 PT-2/EP-1 PT-2/EP-1 EP-2 PAINT GYP CEILING EP-2; PT-2 WAINSCOT TO 5'-6"

ABOVE FINISHED FLOOR

115 CHIEF OFFICE CPT-2 RB-2 P-4 P-1 P-1 P-1 AT-2

116 I.T. ROOM SDT-1 RB-2 P-1 P-1 P-1 P-1 AT-2

117 NS MGR OFFICE CPT-2 RB-2 P-1 P-4 P-1 P-1 AT-2

119 CARDIOLOGY EXAM 6 LVT-1 RB-2 P-3 P-1 P-1 P-1 AT-3

120 CARDIOLOGY EXAM 1 LVT-1 RB-2 P-1 P-1 P-1 P-3 AT-3

121 CARDIOLOGY EXAM 7 LVT-1 RB-2 P-3 P-1 P-1 P-1 AT-3

122 CARDIOLOGY EXAM 2 LVT-1 RB-2 P-1 P-1 P-1 P-3 AT-3

124 CARDIOLOGY EXAM 3 LVT-1 RB-2 P-1 P-1 P-1 P-3 AT-3

126 CARDIO. EXAM 4 LVT-1 RB-2 P-1 P-1 P-1 P-3 AT-3

127 CARDIOLOGY EXAM 10 LVT-1 RB-2 P-3 P-1 P-1 P-1 AT-3

128 CARDIO. EXAM 5 LVT-1 RB-2 P-1 P-1 P-1 P-3 AT-3

129 PAT UNI TLT PT-1 PTB-1 PT-2/CWT-1,2 PT-2/CWT-1,2 PT-2/CWT-1,2 PT-2/CWT-1,2 EP-2 PAINT GYP CEILING EP-2

132 STORAGE LVT-1 RB-2 P-1/HIW-1 P-1/HIW-1 P-1/HIW-1 P-1/HIW-1 AT-2 HIW-1 WAINSCOT TO 3'-8" ABOVE FINISHED FLOOR

136 ELEC SC RB-2 P-1 P-1 P-1 P-1 --

137 MECHANICAL SC RB-2 P-1 P-1 P-1 P-1 --

149 CONFERENCE LVT-1 RB-2 P-1 P-1 P-1 P-4 AT-2

150 KITCHEN LVT-1 RB-2 P-1 P-1 P-1 P-1 AT-2

151 HAC PT-1 -- PT-2/EP-1 PT-2/EP-1 PT-2/EP-1 PT-2/EP-1 EP-2 PT-2 WAINSCOT TO 5'-0" ABOVE FINISHED FLOOR

152 NURSE ROOM CPT-2 RB-2 P-1 P-1 P-1 P-1 AT-2

153 NURSE ROOM CPT-2 RB-2 P-1 P-1 P-1 P-1 AT-2

157 NURSE ROOM CPT-2 RB-2 P-1 P-1 P-1 P-1 AT-2

158 NURSE ROOM CPT-2 RB-2 P-1 P-1 P-1 P-1 AT-2

159 STAFF WORK AREA CPT-2 RB-2 P-1,4 P-1,4 P-1,4 P-1,4 AT-2

161 CARDIOLOGY EXAM 8 LVT-1 RB-1 P-3 P-1 P-1 P-1 AT-3

162 CLEAN / MEDS WSF-1 WSFB-1 EP-1/HIW-1 EP-1/HIW-1 EP-1/HIW-1 EP-1/HIW-1 AT-3 HIW-1 WAINSCOT TO 3'-8" ABOVE FINISHED FLOOR

163 CARDIOLOGY EXAM 9 LVT-1 RB-1 P-3 P-1 P-1 P-1 AT-3

C114 CORRIDOR LVT-1 RB-1 P-1 P-1 P-1 P-1 AT-2

C118 CORRIDOR LVT-1 RB-1 P-1 P-1 P-1 P-1 AT-2

C130 CORRIDOR LVT-1 RB-1 P-1 P-1 P-1 P-1 AT-2

C151 CORRIDOR LVT-1 RB-2 P-1 P-1 P-1 P-1 AT-2

C154 CORRIDOR LVT-1 RB-2 P-1 P-1 P-1 P-1 AT-2

1 35% SCHEMATIC DESIGN DOCUMENTS 04/10/2020

2 65% DESIGN DEVELOPMENT 06/04/2020

3 65% DESIGN DEVELOPMENT - RE-SUBMISSION 06/26/2020

4 65% DESIGN DEVELOPMENT - RE-SUBMISSION 01/26/2021

5 95% CONSTRUCTION DOCUMENTS 04/06/2021

6 95% CONSTRUCTION DOCUMENTS -

RE-SUBMISSION

04/20/2021

7 95% CONSTRUCTION DOCUMENTS 07/15/2021

8 100% CONSTRUCTION DOCUMENTS 09/10/2021

DocuSign Envelope ID: A3C5497D-1410-44D4-BB2A-B22C647351DC

9/10/2021

A

1 2 3 4 6

B

C

D

I-2011

I-201

I-201 4

I-2015

I-201

I-401

I-401

I-401 56

I-402

I-401

I-201 10

I-201

I-201 11 I-20112

I-20113

I-201

I-201

I-201

I-201

I-201

I-201

I-201

I-201

I-201

I-201

I-201

I-201

I-201

I-201

I-401

I-4024 3

I-20115

I-201 6

1 1

I-4017

A.1

ECHO

READING

ECHO

ECHO

STRESS

CARDIOLOGY

EXAM 4

CARDIOLOGY

EXAM 3

CARDIOLOGY

EXAM 2

CARDIOLOGY

EXAM 1

PAT UNI

TLT

NS MGR

OFFICE

CARDIOLOGY

EXAM 6

PULMONARY

EXAM 1

CARDIOLOGY

EXAM 7

CARDIOLOGY

EXAM 8

PULMONARY

EXAM 2

PULMONARY

EXAM 3

NEPHR.

EX. 1

NEPHROLOGY

EXAM 2

PULMONARY

EXAM 4

STF TLT

NEPHRO.

EXAM 4

SHARED

OFFICE

SHARED

OFFICE

SHARED

OFFICE

CONFERENCE

CHIEF

OFFICE

112 ALCOVE

EKG

TECH

WORK

AREA

PULMINARY

TESTING

LAB

NEPHRO.

EXAM 3

SHARED

OFFICE

LAB

I.T.

ROOM

NURSE

ROOM

NURSE

ROOM

CHIEF

OFFICE

TOILET

RM

ELEC

STAFF

WORK

AREA

CORRIDOR

C114

CORRIDOR

C151

MECHANICAL

LOBBY

100A

WAITING

100D

HEIGHT

AND

WEIGHT

RECEPTION

100B

CARDIOLOGY

EXAM 5

SOILED

PAT UNI

TLT

CLEAN /

MEDS

HOLTER

EKG

STF TLT

VESTIBULE

HAC

PULMINARY

TESTING

LAB

CORRIDOR

C134

NURSE

ROOM

NURSE

ROOM

CHIEF

OFFICE

CORRIDOR

C130

CORRIDOR

C118

CORRIDOR

C154

KITCHEN

1 1 1 1

11111

1 1 1 1

1 1

I-401

I-40111

I-401

I-401

I-401

SIM

I-20117

I-201

2 2

2 2 2 2

3 1

8'-10"7'-8"

1 1

2 2

STOR.

138A

I-201

I-201

8 8 8 8

8 8 8 8 8

I-20120

I-20120I-20120I-20120

I-201

I-201 6

SIM

TYP

TYP

TYP

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

/8

/2

:2

:5

P M

I-101

FIRST FLOOR FINISH PLAN

2 18JK

DESIGN MEDICAL SPECIALTY

CLINIC

10535 HOSPITAL WAY, MATHER CA

95655

SEPTEMBER 10, 2021

100% CONSTRUCTION DOCUMENTS

612-12218-237-Q12

ELI

N

KEY PLAN

SCALE: NO SCALE

NORTH

0 4 8 16

1 PROVIDE AND INSTALL CORNER GUARD, CG-1

2 PAINT WALL P-3

3 PAINT WALL ON ALL SIDES P-4

4 P-5 TO START IN CORNER ON LOBBY SIDE AND

WRAP WALL INTO RECEPTION TERMINATING AT

FULL HEIGHT RESIN PARTITION

5 P-5 TO START IN THIS CORNER AND CONTINUE

AROUND TO LOBBY/WAITING

6 PAINT WALL P-5

7 PAINT WALL P-4

8 REFER TO ROOM 161, CARDIOLOGY EXAM

ROOM 8, FOR ADDITIONAL DEDUCT ALTERNATE

INFORMATION.

Scale: 1/8" = 1'-0"

FIRST FLOOR FINISH PLAN

1 35% SCHEMATIC DESIGN DOCUMENTS 04/10/2020

2 65% DESIGN DEVELOPMENT 06/04/2020

3 65% DESIGN DEVELOPMENT - RE-SUBMISSION 06/26/2020

4 65% DESIGN DEVELOPMENT - RE-SUBMISSION 01/26/2021

5 95% CONSTRUCTION DOCUMENTS 04/06/2021

6 95% CONSTRUCTION DOCUMENTS -

RE-SUBMISSION

04/20/2021

7 95% CONSTRUCTION DOCUMENTS 07/15/2021

8 100% CONSTRUCTION DOCUMENTS 09/10/2021

1 2 3 4 5 6

B

C

D

A.1

ECHO

READING

ECHO

ECHO

STRESS

CARDIOLOGY

EXAM 4

CARDIOLOGY

EXAM 3

CARDIOLOGY

EXAM 2

CARDIOLOGY

EXAM 1

PAT UNI

TLT

NS MGR

OFFICE

CARDIOLOGY

EXAM 6

PULMONARY

EXAM 1

CARDIOLOGY

EXAM 7

CARDIOLOGY

EXAM 8

PULMONARY

EXAM 2

PULMONARY

EXAM 3

NEPHR.

EX. 1

NEPHROLOGY

EXAM 2

PULMONARY

EXAM 4

STF TLT

NEPHRO.

EXAM 4

SHARED

OFFICE

SHARED

OFFICE

SHARED

OFFICE

CONFERENCE

CHIEF

OFFICE

ALCOVE

EKG

TECH

WORK

AREA

PULMINARY

TESTING

LAB

NEPHRO.

EXAM 3

SHARED

OFFICE

LAB

I.T.

ROOM

NURSE

ROOM

NURSE

ROOM

CHIEF

OFFICE

TOILET

RM

ELEC

STAFF

WORK

AREA

CORRIDOR

C114

CORRIDOR

C151

MECHANICAL

LOBBY

100A

WAITING

100D

HEIGHT

AND

WEIGHT

RECEPTION

100B

CARDIOLOGY

EXAM 5

SOILED

PAT UNI

TLT

CLEAN /

MEDS

HOLTER

EKG

STF TLT

VESTIBULE

HAC

PULMINARY

TESTING

LAB

CORRIDOR

C134

NURSE

ROOM

NURSE

ROOM

CHIEF

OFFICE

CORRIDOR

C130

CORRIDOR

C118

CORRIDOR

C154

KITCHEN

STOR.

138A

FINISH KEY

LVT-1 LUXURY VINYL TILE

(PATTERN TO BE 1/3 RUNNING BOND

DIRECTION AS SHOWN IN THE ROOM)

LVT-2 LUXURY VINYL TILE

(PATTERN TO BE 1/3 RUNNING BOND

DIRECTION AS SHOWN IN THE ROOM)

SDT-1 STATIC DISSIPATIVE TILE

SC SEALED CONCRETE

PT-1 PORCELAIN TILE

WSF-1 WELDED SHEET FLOOR

CPT-2 CARPET TILE STAGGER INSTALL

(DIRECTION AS SHOWN IN THE ROOM)

CPT-1 WALK-OFF CARPET TILE

Engineers Architects

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

/8

/2

:2

:0

P M

I-120

FIRST FLOOR FLOOR PATTERN PLAN

3 18JK

DESIGN MEDICAL SPECIALTY

CLINIC

10535 HOSPITAL WAY, MATHER CA

95655

SEPTEMBER 10, 2021

100% CONSTRUCTION DOCUMENTS

612-12218-237-Q12

ELI

N

KEY PLAN

SCALE: NO SCALE

Scale: 1/8" = 1'-0"

FIRST FLOOR FLOOR PATTERN PLAN

NORTH

0 4 8 16

1 35% SCHEMATIC DESIGN DOCUMENTS 04/10/2020

2 65% DESIGN DEVELOPMENT 06/04/2020

3 65% DESIGN DEVELOPMENT - RE-SUBMISSION 06/26/2020

4 65% DESIGN DEVELOPMENT - RE-SUBMISSION 01/26/2021

5 95% CONSTRUCTION DOCUMENTS 04/06/2021

6 95% CONSTRUCTION DOCUMENTS -

RE-SUBMISSION

04/20/2021

7 95% CONSTRUCTION DOCUMENTS 07/15/2021

8 100% CONSTRUCTION DOCUMENTS 09/10/2021

THE FOLLOWING NOTES ARE SPECIFIC TO CASEWORK

AND ARE IN ADDITION TO THE GENERAL FINISH NOTES.

A. FIELD VERIFY ALL CASEWORK AND SHELVING

DIMENSIONS.

B. PROVIDE WALL BRACKET SUPPORTS AT 36" O.C. MAX.

TO SUPPORT COUNTERTOP AT CONTINUING KNEE

SPACE. PROVIDE WALL BLOCKING AT ALL WALL

BRACKET SUPPORTS.

C. USE BLACK 2 1/2" DIAMETER GROMMETS WHERE

GROMMETS ARE INDICATED AT 3’-0” O.C. AT ALL KNEE

SPACES.

D. PROVIDE FINISHED END PANEL AT EXPOSED

CASEWORK ENDS AND BACKS AS NEEDED. PANEL TO

MATCH PLASTIC LAMINATE.

E. ADD FILLER PANEL AS NEEDED AT CABINETS,

WARDROBES, DRAWERS, APPLIANCES, ETC. TO

ENSURE FULL DOOR SWING AND DRAWER

OPERATION.

F. WHEN FILLER PANELS ARE REQUIRED AT BOTH ENDS

OF CASEWORK TERMINATION, BOTH FILLER PANELS

SHALL BE EQUAL WIDTH, U.N.O.

G. PROVIDE FILLER PANELS AND TRIM WHERE

EQUIPMENT IS LOCATED WITHIN CABINETS.

H. ALL BUILT IN FILING CABINETS TO HAVE RAILING TO

SUPPORT HANGING FOLDERS.

I. COUNTERTOPS TO HAVE 1/2" RADIUS AT EXPOSED

CORNERS.

J. ALL COUNTERTOPS TO BE SOLID SURFACE WITH

POST FORM PROFILE. ALL COUNTERTOPS ARE 1 1/2"

THICK WITH 4" HIGH BACK/SIDE SPLASHES UNLESS

NOTED OTHERWISE. ALL JOINTS IN COUNTERTOPS,

SPLASHES AND CURBS SHALL ALIGN AND BE

SMOOTH. PROVIDE END SPLASH AT SIDES WHEN

COUNTERTOP IS ADJACENT TO WALL.

K. ALL COUNTERTOPS TO EXTEND 1" BEYOND FRONT OF

CABINET DOOR FACE.

L. ALL WALL CABINETS TO BE 15"D OUT TO OUT, U.N.O.

M. 30"H CABINETS TO HAVE LIGHT VALANCE, U.N.O.

N. ALL WALL CABINETS TO HAVE SLOPE TOPS UNLESS A

BULKHEAD IS PRESENT.

O. ALL SHELVING SHOWN WITH DASHED LINES IN

ELEVATIONS TO BE ADJUSTABLE.

P. ALL BASE CABINETS TO BE 23" DEEP WITH 24” DEEP

COUNTERTOP INCLUDING BACKSPLASH, U.N.O.

Q. PROVIDE AN APRON AT ALL KNEE SPACES & SINKS,

U.N.O. PROVIDE 30" WIDE (MIN.) x 27" HIGH (MIN.)

CLEAR OPEN SPACE UNDER EACH ADA ACCESSIBLE

SINK.

R. PROVIDE PIPE WRAP AT EXPOSED PIPES.

S. PROVIDE SHEET METAL OR FIRE RETARDANT WOOD

BLOCKING IN WALL CAVITIES FOR ITEMS THAT ARE

REQUIRED TO BE SECURED TO THE WALLS.

REFERENCE MECHANICAL, PLUMBING, ELECTRICAL

AND TECHNOLOGY DRAWINGS. COORDINATE WITH

FURNITURE SUPPLIER WHERE APPROPRIATE.

T. SEE SHEET I-202 FOR TYPICAL CABINET SECTIONS.

CASEWORK NOTES

2'-6" 2'-6" 2'-6"

W1 W1

SB2 B1

2'-6" 2'-6" 2'-6" 2"

7'-8"

2"

W1

B2

12 12 12 123

2'-10" 3'-0" 3'-0" 3'-0" 2'-6 1/2"

14'-4 1/2"

10'-11 1/2"

2'-6" 3'-0" 3'-0" 2'-5 1/2"

12 12 12 12

2" 2'-0"2'-9"3'-6"

5"

1'-3"

W3 W7 W4

B6 B8

1'-9"

5"

3'-0" 2'-9" 2'-2"

10'-1"

5'-0"

12 11

4'-0"

2'-6"

5'-0"

2'-6" 2'-6"

10'-7 1/2"

12 11

3'-0" 3'-0" 3'-0"

I-201

5'-4" 5'-4"

2'-9" 2'-0" 1'-11"

6'-8"

5" 1'-3"

SB1

W8

B7

5'-9"

2'-6"2'-0"1'-3"

MC5

MC4

MC3

MC1

MC2

I-202 _____16

I-202

W3W3

B5

3'-6" 3'-6"

3'-6" 3'-6"

7'-0"

B5

10'-7 1/2"

12 1211

O.C. OF WATER FOUNTAINS

4'-4"

2'-3" 2'-8"

7'-3"

2'-6" 2'-9" 2'-0"

2'-6" 2'-9"

2'-1"

7'-4"

W1 W6 W5

SB1B3

CLEAN/MEDS 162 - WEST IN

DEDUCT ALTERNATE #4 PLAN(OH)

2"3'-0"3'-0"

3'-0" 3'-0" 2"

6'-2"

B4B4

W2 W2

6'-3"

4'-6"

MC1

5'-9"

1'-3"2'-0"2'-6"

" 5

MC5

MC4

MC7

MC6

I-202 _____ 16

I-202

1. LAYOUT SUBJECT TO VERIFICATON OF FIELD DIMENSIONS AND CONDITIONS

2. ALL WALLS THAT ARE TO RECEIVE WALL RAILS MUST HAVE A MINIMUM 25 GAUGE METALL STUDS 16" ON CENTER WITH

EITHER 5/8" GYPSUM WALLBOARD OR 2 LAYERS OF 1/2" GYPSUM WALLBOARD. STUDS MUST BE ANCHORED TO THE BUILDING STUCTURE AT THE FLOOR AND ABOVE THE CEILING, ALL WALLS MUST BE LEVEL AND PLUMB TO INSTALL THE

MODULAR WALL CASEWORK.

3. MODULAR CASEWORK WALL RAILS TO BE MOUNTED AT 69" AFF AND 33-1/8" AFF TO CENTER.

4. MINIMUM WALL HEIGHT FOR LOW RAIL ONLY APPLICATIONS IS 48" AFF, AND REQUIRES METAL BACKING MATERIAL 6"W, 16

G.A., APPLIED OT FACE OF STUDS AT 33-1/8" AND 22" TO CENTER OF RAIL. THE MINIMUM REQUIREMENT IS THAT THE LOWER RAIL TO BE STUD ATTACHED AS WELL AS DRY WALL ANCHORED. LOWER WALL RAIL CAN NOT EXTEND 4" BEYOND A STUD. IF SECIFICATION REQUIRES EXTENSION BEYOND 4", SPECIFY AS A VISUAL RAIL APPLICATION TO REACH THE NEXT

AVAILABLE STUD.

5. MODULAR CASEWORK WALL RAIL SHALL BE HUNG NO CLOSER THAT 3" TO THE INSIDE CORNER OF THE ARCHITECTURAL WALL. WALL RAIL MAY REQUIRE A GREATER OFFSET TO ACCOMODATE THE ROTATING WORKSURFACE.

6. ALL SINKS TO BE PROVIDED BY MODULAR CASEWORK MANUFACTURER AS PART OF THE SINK OPTION UNLESS NOTED

OTHERWISE.

7. ALL SINKS LOCATED ADJACENT TO AN ARCHITECTURAL WALL SHALL HAVE A SPECIAL CORIAN SIDE SPLASH, OPTION IF

REQUIRED OR REQUESTED.

8. FAUCETS TO BE PROVIDED BY MEP.

9. ALL SUPPLY LINES MIXING VALVES AND GRID DRAINS / TAIL PIECES MUST BE SUPPLIED AND INSTALLED BY THE MEP

CONTRACTOR

10. THE SINK DRAIN HOLE IS LOCATED 4" OFF CENTER TO THE RIGHT SIDE OF THE SINK

11. REFER TO THE MODULAR CASEWORK DETAILS FOR ALL PLUMBING AND ELECTRICAL ROUGH-IN LOCATIONS.

12. MODULAR CASEWORK MANUFACTURER DOES NOT SUPPLY THE DRAIN/ TAILPIECE ASSEMBLY FOR THE SINKS. THIS

COMPONENT MUST BE SUPPLIED BY GENERAL CONTRACTOR. THE REQUIREMENTS FOR THE DRAIN/ TAILPIECE ASSEMBLY

FOR THE SINKS. THE REQUIREMENTS FOR THE DRAIN/TAILPIECE ARE:

13. MUST BE SUITABLE FOR A SINK WITHOUT AN OVERFLOW (MUST NOT HAVE OVERFLOW HOLES IN THE BODY OF THE

DRAIN)

14. THREADED PORTION OF THE BODY MUST BE BETWEEN 1.5" AND 4" (FROM TOP OF DRAIN TO POINT WHERE TAILPIECE

TUBE THREADS INTO DRAIN BODY)

15. - NEW HEIGHT RECOMMENDATION FOR DRAIN STUB IN WALL: 24 1/4" ABOVE FINISHED FLOOR.

16. ALL UTILITY STUB OUTS AND ROUGHINS FROM THE ARCHITECTURAL WALL TO BE LOCATED 6"-8" ABOVE OR BELOW THE

MODULAR CASEWORK UTILITY RAIL CENTERLINE WHERE THE GANG BOXES ARE MOUNTED.

17. ALL EXPOSED WALL RAILS SHALL HAVE GROMMETS AT CLOSEOUTS, RAIL END CAPS, AND WALL RAIL INSERTS TO CONEAL

THE EXPOSED ANCHOR LOCATIONS.

18. THE MODULAR CASEWORK VERTICAL CHASE COVER IS DESIGNED TO BE USED WITH 64" STILES IN ROOMS WITH A CEILING

HEIGHT BETWEEN 8'-6" AND 9'-0" HIGH. FOR OTHER CHASE SIZES CONTACT OPTIONS.

19. THE ROTATING WORK SURFACE MUST BE ATTACHED TO THE FULL HEIGHT MODULAR CASEWORK WALL WITH NO

EXCEPTIONS.

20. VERTICAL CHASE COVERS TO BE PAINTED BY OTHERS TO MATCH ARCHITECTURAL WALLS.

INTEGRATED PATIENT CARE MODULAR CASEWORK

2'-1"6"

3'-0"

4 1/2" 2'-6"

1'-3"

METEL SUPPORT BRACKET

SOLID SURFACE

COUNTERTOP, SS-2

RESIN PANEL, RP-1

1 1/2"

HIW-2

P-1

P-7

BASE AS SPECIFIED

O.C. OF LAVATORY

3'-0"

O.C. OF LAVATORY

3'-0"

O.C. OF LAVATORY

3'-0"

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/8

/2

:2

:2

P M

I-201

CASEWORK ELEVATIONS

4 18JK

DESIGN MEDICAL SPECIALTY

CLINIC

10535 HOSPITAL WAY, MATHER CA

95655

SEPTEMBER 10, 2021

100% CONSTRUCTION DOCUMENTS

612-12218-237-Q12

ELI

PLASTIC LAMINATE CASEWORK SCHEDULE

Type Mark WIDTH DETAIL NO. Description

B1 2' - 6" 7/I-202 34"H x 23"D TWO DOOR, TWO DRAWER BASE STORAGE UNIT, 1 ADJ. SHELF

B2 2' - 6" 1/I-202 34"H x 23"D MICROWAVE STORAGE UNIT BASE, 1 DRAWER, 1 BUILT-IN MICROWAVE

COMPARTMENT

B3 2' - 6" 3/I-202 34"H x 23"D THREE EQUAL DRAWER BASE STORAGE UNIT

B4 3' - 0" 5/I-202 34"H x 23"D TWO DOOR, TWO DRAWER BASE STORAGE UNIT, 1 ADJ. SHELF

B5 3' - 6" 4/I-202 34"H x 23"D FILE/FILE BASE STORAGE UNIT

B6 3' - 0" 3/I-202 34"H x 23"D THREE EQUAL DRAWER BASE STORAGE UNIT

B7 1' - 9" 3/I-202 34"H x 23"D THREE EQUAL DRAWER BASE STORAGE UNIT

B8 2' - 9" 3/I-202 34"H x 23"D THREE EQUAL DRAWER BASE STORAGE UNIT

SB1 2' - 9" 2/I-202 34"H x 23"D SINK BASE, W/ REMOVABLE PANEL

SB2 2' - 6" 2/I-202 34"H x 23"D SINK BASE, W/ REMOVABLE PANEL

W1 2' - 6" 6/I-202 18"H x 15"D TWO DOOR WALL STORAGE UNIT

W2 3' - 0" 7/I-202 30"H x 15"D TWO DOOR WALL STORAGE UNIT

W3 3' - 6" 7/I-202 30"H x 15"D TWO DOOR WALL STORAGE UNIT

W4 2' - 0" 7/I-202 30"H x 15"D ONE DOOR WALL STORAGE UNIT-RH

W5 2' - 0" 7/I-202 30"H x 15"D TWO DOOR WALL STORAGE UNIT

W6 2' - 9" 6/I-202 18"H x 15"D TWO DOOR WALL STORAGE UNIT

W7 2' - 9" 7/I-202 30"H x 15"D TWO DOOR WALL STORAGE UNIT

W8 2' - 3" 7/I-202 30"H x 15"D TWO DOOR WALL STORAGE UNIT

Scale: 1/4" = 1'-0"

KITCHEN 150- WEST

Scale: 1/4" = 1'-0"

ECHO READING 111- EAST

Scale: 1/4" = 1'-0"

EKG TECH WORK AREA 105- WEST

Scale: 1/4" = 1'-0"

LAB 102- NORTH

INTEGRATED PATIENT MODULAR CASEWORK

Type Mark WIDTH Description Comments

MC1 2' - 6" Mora ADA Sink Enclosure Standard HPL 19D 24W

MC2 1' - 3" Mora Wall-Mounted Door Towers Glove Acc/3 Drws R End/L Hinge /Profile Pull HPL 15W 19D 66H

MC3 4' - 6" Mora Corian Worksurface w/Oval Sink Sink Centered Above Cab 4H Backsplash 19D Sink

MC4 4' - 6" Accessory Rail 54W

MC5 4' - 6" Mora Floating Shelf 54W

MC6 1' - 3" Mora Wall-Mounted Door Towers Glove Acc/3 Drws R End/L Hinge/Profile Pull HPL/Slope Top 15W 19D 66H

MC7 4' - 6" Mora Corian Worksurface w/Oval Sink Sink Centered Above Cab 4H Backsplash 19D Sink Centered

Scale: 1/4" = 1'-0"

CORRIDOR C130- EAST

Scale: 1/4" = 1'-0"

SOILED- SOUTH

Scale: 1/4" = 1'-0"

RECEPTION- WEST

Scale: 1/4" = 1'-0"

RECEPTION- EAST

Scale: 1/4" = 1'-0"

LAB- EAST

Scale: 1/4" = 1'-0"

TYPICAL EXAM

Scale: 1/4" = 1'-0"

STAFF WORK AREA WEST

Scale: 1/4" = 1'-0"

LOBBY- WEST

Scale: 1/4" = 1'-0"

WATING- WEST

Scale: 1/4" = 1'-0"

CLEAN/MEDS 132- WEST

Scale: 1/4" = 1'-0"

RECEPTION 100B- SOUTH

Scale: 1/4" = 1'-0"

KITCHEN 150 - SOUTH

1 FILLER PANEL

2 SLOPE TOP

3 24"D SOLID SURFACE COUNTERTOP WITH

BACK/ENDSPLASH, SS-1

4 SOLID SURFACE WALL SPLASH, SS-2

5 SUPPORT PANEL

6 FINISHED END PANEL

7 SOLID SURFACE WALL SPLASH, SS-1

8 RP-1, COUNTERTOP TO SOFFIT ABOVE

9 RP-2, FULL HEIGHT FROM FLOOR TO CEILING ABOVE

10 HIW-2

11 36'D SOLID SURFACE COUNTERTOP AND

SIDESPLASH, SS-2

12 GROMMET

Scale: 1/4" = 1'-0"

RECEPTION RESIN PANEL

Scale: 1/4" = 1'-0"

CARDIOLOGY EXAM 6 - 119

Scale: 3/4" = 1'-0"

SECTION AT RECEPTION DESK

Scale: 1/4" = 1'-0"

TYPICAL EXAM ROOM

CASEWORK - ALT DEDUCT 1

Scale: 1/4" = 1'-0"

TYPICAL SOLID SURFACE

CLADDING 104, 105, 107, 109,

133, 138

Scale: 1/4" = 1'-0"

TYPICAL SOLID SURFACE

CLADDING - 103

1 35% SCHEMATIC DESIGN DOCUMENTS 04/10/2020

2 65% DESIGN DEVELOPMENT 06/04/2020

3 65% DESIGN DEVELOPMENT - RE-SUBMISSION 06/26/2020

4 65% DESIGN DEVELOPMENT - RE-SUBMISSION 01/26/2021

5 95% CONSTRUCTION DOCUMENTS 04/06/2021

6 95% CONSTRUCTION DOCUMENTS -

RE-SUBMISSION

04/20/2021

7 95% CONSTRUCTION DOCUMENTS 07/15/2021

8 100% CONSTRUCTION DOCUMENTS 09/10/2021

BACKER SHEET (TYP)

FOR UNEXPOSED SURFACES

MOUNT OUTLET IN MILLWORK;

COORDINATE WITH ELECTRICAL

ANTIMICROBIAL SILICONE SEALANT,

COLOR TO MATCH ADJACENT WALL

WIRE PULL

COUNTERTOP CONSTRUCTED OF 1/2" SOLID

SURFACE WITH INTEGRAL BACKSPLASH.

PROVIDE BUILD-UP EDGE TO 1-1/2" WITH 1/8"

RADIUS TOP AND BOTTOM, FULLY WRAPPED.

NOTE:

ALL EXPOSED PLYWOOD

FACES & EDGES TO RECEIVE

HIGH PRESSURE LAMINATE.

BASE, SEE FINISH PLANS

BOTTOM CONSTRUCTED W/ 3/4" PLYWOOD

DOWELED INTO CABINET SIDES

2x BLOCKING

1x BLOCKING, TOP & BOTTOM

TOE KICK CONSTRUCTED OF 3/4"

PLYWOOD TOE BOARD

CAVITY

MICROWAVE. VERIFY SIZE AND

MANF. INSTALLATION PRIOR TO

FABRICATION OF MILLWORK TO

CONFIRM SHELF DEPTH REQUIRED

BY MICROWAVE.

1'-11"

2'-0"

BOTTOM CONSTRUCTED W/ 3/4" PLYWOOD

DOWELED INTO CABINET SIDES.

BASE, SEE FINISH PLANS

ANTIMICROBIAL SILICONE SEALANT, COLOR

TO MATCH ADJACENT WALL

2x BLOCKING

1x BLOCKING, TOP & BOTTOM

COUNTERTOP CONSTRUCTED OF 1/2" SOLID

SURFACE WITH INTEGRAL BACKSPLASH.

PROVIDE BUILD-UP EDGE TO 1-1/2" WITH 1/8"

RADIUS TOP AND BOTTOM, FULLY WRAPPED.

FULL OVERLAY DOOR CONSTRUCTED

W/ 3/4" PLYWOOD

FALSE FRONT CONSTRUCTED W/ 3/4"

PLYWOOD

BACK CONSTRUCTED W/ 1/2" PLYWOOD.

BACKS TO FIT INTO CABINET SIDE DADOES

NOTE:

ALL EXPOSED PLYWOOD

FACES & EDGES TO RECEIVE

HIGH PRESSURE LAMINATE.

TOE KICK CONSTRUCTED OF 3/4" PLYWOOD

TOE BOARD

REMOVABLE PANEL, ATTACH

TO CLEATS WITH NICKEL

PLATED SCREWS AND FINISH

WASHERS. MATCH REVEAL

AND EDGE TREATMENT OF

DOORS AND DRAWERS.

DROP-IN SINKS TO BE SET WITH SEALANT

ALONG ALL EDGES

2'-0"

3MM MATCHING PVC EDGE

WRAP CONT.-ALL SIDES

EUROPEAN CONCEALED HINGE

R E

F E

R T

O E

L E

V S

BLOCKING REQUIRED

WIRE PULL

ADJUSTABLE SHELF STANDARDS

BACK CONSTRUCTED W/ 1/2"

PLYWOOD. BACKS TO FIT INTO

CABINET SIDE DADOES

3/4" ADJUSTABLE S SHELVES W/ PLASTIC

LAMINATE AT ALL EXPOSED SURFACES

FULL OVERLAY DOOR

CONSTRUCTED W/ 3/4" PLYWOOD

NOTE:

ALL EXPOSED PLYWOOD

FACES & EDGES TO RECEIVE

HIGH PRESSURE LAMINATE.

1' - 3"

SLOPED TOP OR GYP. BD.

SOFFIT. REFER TO CEILING

PLANS & ELEVATIONS

1'-3"

3/4" X 2"

LIGHT VALANCE @ ALL WALL

CABINETS U.N.O. VERIFY

LOCATIONS ON ELECTRICAL

PLANS

R E

F E

R T

O E

L E

V S

BLOCKING REQUIRED

WIRE PULL

ADJUSTABLE SHELF STANDARDS

BACK CONSTRUCTED W/ 1/2"

PLYWOOD. BACKS TO FIT INTO

CABINET SIDE DADOES

(2) 3/4" ADJUSTABLE S SHELVES W/

PLASTIC LAMINATE AT ALL EXPOSED

SURFACES

FULL OVERLAY DOOR

CONSTRUCTED W/ 3/4" PLYWOOD

NOTE:

ALL EXPOSED PLYWOOD

FACES & EDGES TO RECEIVE

HIGH PRESSURE LAMINATE.

SLOPED TOP OR GYP. BD.

SOFFIT. REFER TO CEILING

PLANS & ELEVATIONS

COUNTERTOP CONSTRUCTED OF 1/2" SOLID

SURFACE WITH INTEGRAL BACKSPLASH.

PROVIDE BUILD-UP EDGE TO 1-1/2" WITH 1/8"

RADIUS TOP AND BOTTOM, FULLY WRAPPED.

(3) DRAWER UNITS CONSTRUCTED WITH

1/2" PLYWOOD SIDES. 3/4" FRONTS & BACKS

& 1/2" FULLY CAPTURED BOTTOM. DRAWER

FACES CONSTRUCTED OF 3/4" PLYWOOD.

BACK CONSTRUCTED W/ 1/2" PLYWOOD.

BACKS TO FIT INTO CABINET SIDE DADOES

BASE, SEE FINISH PLANS

BOTTOM CONSTRUCTED W/ 3/4" PLYWOOD

DOWELED INTO CABINET SIDES

E Q

E

Q

E Q

ANTIMICROBIAL SILICONE SEALANT, COLOR TO

MATCH ADJACENT WALL

2x BLOCKING

1x BLOCKING, TOP & BOTTOM

NOTE:

ALL EXPOSED PLYWOOD

FACES & EDGES TO RECEIVE

HIGH PRESSURE LAMINATE.

TOE KICK CONSTRUCTED OF 3/4"

PLYWOOD TOE BOARD

(3) WIRE PULL

1' - 11"

2' - 0"

COUNTERTOP CONSTRUCTED OF 1/2" SOLID

SURFACE WITH INTEGRAL BACKSPLASH.

PROVIDE BUILD-UP EDGE TO 1-1/2" WITH 1/8"

RADIUS TOP AND BOTTOM, FULLY WRAPPED.

(2) DRAWER UNITS CONSTRUCTED WITH 1/2"

PLYWOOD SIDES. 3/4" FRONTS & BACKS &

1/2" FULLY CAPTURED BOTTOM. DRAWER

FACES CONSTRUCTED OF 3/4" PLYWOOD.

BACK CONSTRUCTED W/ 1/2" PLYWOOD.

BACKS TO FIT INTO CABINET SIDE DADOES

BASE, SEE FINISH PLANS

BOTTOM CONSTRUCTED W/ 3/4" PLYWOOD

DOWELED INTO CABINET SIDES

E Q

E

Q

ANTIMICROBIAL SILICONE SEALANT,

COLOR TO MATCH ADJACENT WALL

2x BLOCKING

1x BLOCKING, TOP & BOTTOM

NOTE:

ALL EXPOSED PLYWOOD FACES

& EDGES TO RECEIVE HIGH

PRESSURE LAMINATE.

TOE KICK CONSTRUCTED OF

3/4" PLYWOOD TOE BOARD

WIRE PULL

1' - 11"

2' - 0"

DRAWER UNIT CONSTRUCTED WITH 1/2"

PLYWOOD SIDES. 3/4" FRONTS & BACKS &

1/2" FULLY CAPTURED BOTTOM. DRAWER

FACES CONSTRUCTED OF 3/4" PLYWOOD.

FULL OVERLAY DOOR CONSTRUCTED W/ 3/4" PLYWOOD

ADJUSTABLE SHELF CONSTRUCTED WITH 3/4"

FIRE RETARDANT TREATED PLYWOOD. EDGES

TO RECEIVE MATCHING .018 PVC BANDING

METAL ADJUSTABLE SHELF STANDARDS

BACK CONSTRUCTED W/ 1/2" PLYWOOD.

BACKS TO FIT INTO CABINET SIDE DADOES

BASE, SEE FINISH PLANS

BOTTOM CONSTRUCTED W/ 3/4" PLYWOOD

DOWELED INTO CABINET SIDES

ANTIMICROBIAL SILICONE SEALANT,

COLOR TO MATCH ADJACENT WALL

2x BLOCKING

1x BLOCKING, TOP & BOTTOM

NOTE:

ALL EXPOSED PLYWOOD FACES

& EDGES TO RECEIVE HIGH

PRESSURE LAMINATE.

TOE KICK CONSTRUCTED OF 3/4" PLYWOOD TOE BOARD

WIRE PULL

1'-11"

2'-0"

COUNTERTOP CONSTRUCTED OF 1/2" SOLID

SURFACE WITH INTEGRAL BACKSPLASH.

PROVIDE BUILD-UP EDGE TO 1-1/2" WITH 1/8"

RADIUS TOP AND BOTTOM, FULLY WRAPPED.

CUT END PIECES TO BE

EASED EDGE

CAULK-SEE SCRIBE DETAIL

1" R. ALL EXPOSED CORNERS

EXPOSED EDGE

OPEN END ELEVATION

OPEN END PLAN

/4

/4

1" 2'-0"

R 1"

COUNTERTOP-CAULK

TO SPLASH

3/4" PLYWOOD

ALL TOPS SHALL BE

SCRIBED TO WALL

PRIOR TO

INSTALLATION &

CAULKED

SPLASH END ELEVATION

SPLASH END PLAN

1" 2'-0"1 /2

/4

1/2"

/4

TRIM EDGE OF

SOLID SURFACE AT

THE INTEGRAL

BACK SPLASH

2" DIA. GROMMET

WITH COVER AND

SLEEVE

2"

GROMMET DETAIL

3/4" ANGLE BRACE

@ 36" O.C.

ANGLE CLIPS

FINISHED

CEILING LINE

COND. @

SLOPED SOFFIT

EXTENDED SOFFIT FIN.

END PANEL PASSED

CAB. FIN. END 3/8"H MIN.

1"

1"1"

PLASTIC LAMINATE

BASE AS SCHEDULE

NOTE: SEE MILLWORK

GENERAL NOTES FOR

CABINET CONSTRUCTION

REQUIRED BLOCKING

INTERIOR FINISH-

MELAMINE U.N.O.

3"

1' - 11"

SCHEDULED

BASE

SOLID SURFACE COUNTER

WITH INTEGRAL SINK AND

BACKSPLASH

SINK BASE

ACCESSORY RAIL

FLOATING SHELF

PROVIDE BLOCKING AS

REQUIRED, TYP.

TOWER WITH 3

GLOVE OPENINGS

SLOPE TOP

BLOCKING AS

REQUIRED

RB-1

Engineers Architects

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/8

/2

:2

:2

P M

I-202

CASEWORK DETAILS

5 18JK

DESIGN MEDICAL SPECIALTY

CLINIC

10535 HOSPITAL WAY, MATHER CA

95655

SEPTEMBER 10, 2021

100% CONSTRUCTION DOCUMENTS

612-12218-237-Q12

ELI

Scale: 3/4" = 1'-0"

OPEN BASE STORAGE UNIT- MICROWAVE

Scale: 3/4" = 1'-0"

BASE CABINET SINK UNIT

Scale: 3/4" = 1'-0"

CABINET DRAWER PLAN

Scale: 3/4" = 1'-0"

TYPICAL 15-24" WALL CABINET

Scale: 3/4" = 1'-0"

TYPICAL 30"H WALL CABINET

Scale: 3/4" = 1'-0"

BASE CABINET W/ 3 EQUAL DRAWERS

Scale: 3/4" = 1'-0"

BASE CABINET W/ 2 FILE DRAWERS

Scale: 3/4" = 1'-0"

BASE CABINET W/ ONE DRAWER & DOOR

Scale: 3/4" = 1'-0"

COUNTERTOP OPEN END VIEWS

Scale: 3/4" = 1'-0"

SCRIBE DETAIL

Scale: 3/4" = 1'-0"

GROMMET DETAIL

Scale: 3/4" = 1'-0"

PLASTIC LAMINATE SLOPED TOP

Scale: 3" = 1'-0"

TOE KICK DETAIL

Scale: 3/4" = 1'-0"

END PANEL DETAIL

Scale: 3/4" = 1'-0"

TYPICAL INTEGRATED PATIENT MODULAR CASEWORK

SECTION

Scale: 3/4" = 1'-0"

TYPICAL INTEGRATED PATIENT MODULAR CASEWORK

TOWER SECTION

1 35% SCHEMATIC DESIGN DOCUMENTS 04/10/2020

2 65% DESIGN DEVELOPMENT 06/04/2020

3 65% DESIGN DEVELOPMENT - RE-SUBMISSION 06/26/2020

4 65% DESIGN DEVELOPMENT - RE-SUBMISSION 01/26/2021

5 95% CONSTRUCTION DOCUMENTS 04/06/2021

6 95% CONSTRUCTION DOCUMENTS -

RE-SUBMISSION

04/20/2021

7 95% CONSTRUCTION DOCUMENTS 07/15/2021

8 100% CONSTRUCTION DOCUMENTS 09/10/2021

HR-1

CR-1

CG-1

CG-1CG-1

I-402

HR-1

CR-1

CG-1

I-402

HR-1

CR-1

I-402

HR-1

CG-1

CR-1

I-402

HR-1

CR-1

CG-1

CG-1

CG-1CG-1

CG-1CG-1

I-402

HR-1

CR-1

CG-1CG-1 CG-1CG-1CG-1

CR-1

HR-1

CR-1

HR-1

I-402

HR-1

CR-1

CG-1

I-402

HR-1

CR-1

CG-1

I-402

CR-1

HIW-1

I-402

CG-1

CG-1CG-1

CG-1 HIW-2

WP-1

I-402

Engineers Architects

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/8

/2

:2

:3

P M

I-401

INTERIOR WALL PROTECTION

ELEVATIONS

6 18JK

DESIGN MEDICAL SPECIALTY

CLINIC

10535 HOSPITAL WAY, MATHER CA

95655

SEPTEMBER 10, 2021

100% CONSTRUCTION DOCUMENTS

612-12218-237-Q12

ELI

Scale: 1/4" = 1'-0"

CORRIDOR C114 NORTH

Scale: 1/4" = 1'-0"

CORRIDOR C114 SOUTH

Scale: 1/4" = 1'-0"

CORRIDOR C130 NORTH

Scale: 1/4" = 1'-0"

CORRIDOR C130 SOUTH

Scale: 1/4" = 1'-0"

CORRIOR C130 EAST

Scale: 1/4" = 1'-0"

CORRIDOR C130 WEST

Scale: 1/4" = 1'-0"

CORRIDOR C118 NORTH

Scale: 1/4" = 1'-0"

CORRIDOR C118 SOUTH

Scale: 1/4" = 1'-0"

TYPICAL HEIGHT AND WEIGHT 101

Scale: 1/4" = 1'-0"

LOBBY 100A- WEST

Scale: 1/4" = 1'-0"

TYPICAL HIGH IMPACT WALLCOVERING -

103 SOILED, 108 ALCOVE, 132 CLEAN/MEDS,

& 138A STOR.

1 35% SCHEMATIC DESIGN DOCUMENTS 04/10/2020

2 65% DESIGN DEVELOPMENT 06/04/2020

3 65% DESIGN DEVELOPMENT - RE-SUBMISSION 06/26/2020

4 65% DESIGN DEVELOPMENT - RE-SUBMISSION 01/26/2021

5 95% CONSTRUCTION DOCUMENTS 04/06/2021

6 95% CONSTRUCTION DOCUMENTS -

RE-SUBMISSION

04/20/2021

7 95% CONSTRUCTION DOCUMENTS 07/15/2021

8 100% CONSTRUCTION DOCUMENTS 09/10/2021

HR-1

CR-1

CG-1

CG-1

CR-1

"3

I-402 _____5

I-402

HR-1

CR-1

" 3

I-402 _____6

I-402

CG-1 CG-1 CG-1

CG-1

CG-1CG-1 CG-1 CG-1

STAINLESS STEEL

CORNER GUARD

NOSE

RADIUS

STEEL STUD (BY CONTRACTOR)

G.W.B. (BY CONTRACTOR)

L E

G L

E N

G T

H

#10 X 1 1/2" PH FLAT HD

WOOD SCREW

16" [406.4mm] O.C. MAX.

A N G

LE

FINISHED FLOOR

BASE

FINISHED WALL

PETG CRASH RAIL WITH

ALUMINUM RETAINER

PETG HANDRAIL WITH STANDOFF

MOUNTING BRACKET

T.O. HANDRAIL TO BE NO

HIGHER THAN 38". 36" PREF.

BLOCKING

BLOCKING

T O

P O

F H

A N

D R

A

IL

FINISHED FLOOR

BASE

FINISHED WALL

PETG CRASH RAIL WITH

ALUMINUM RETAINER

BLOCKING

FINISHED FLOOR

VINYL BASE (4") OR

INTEGRAL COVE BASE (6")

FINISHED WALL

HIGH IMPACT

WALLCOVERING

METAL CAP BY WALL

PROTECTION MFR.

(REF ELEVATIONS FOR MATERIALS AND HEIGHTS)

V A

R

IE

S

FINISHED FLOOR

BASE

HIGH IMPACT

WALLCOVERING

S E

E E

L E

V A

T

IO

N S

V A

R

IE

S

FINISHED WALL

(REF ELEVATIONS FOR MATERIALS AND HEIGHTS)

METAL CAP BY WALL

PROTECTION MFR.

BLOCKING

PETG CRASH RAIL WITH

ALUMINUM RETAINER

STEEL STUD

(BY CONTRACTOR)

G.W.B. (BY CONTRACTOR)

#10 X 1 1/2" PH FLAT HD

WOOD SCREW

16" [406.4mm] O.C. MAX.

STAINLESS STEEL

CHANNEL GUARD

FINISHED WALL WIDTH

NOSE

RADIUS

L E

G L

E N

G T

H

A N G

LE

Engineers Architects

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/8

/2

:2

:4

P M

I-402

INTERIOR WALL PROTECTION

ELEVATIONS AND DETAILS

7 18JK

DESIGN MEDICAL SPECIALTY

CLINIC

10535 HOSPITAL WAY, MATHER CA

95655

SEPTEMBER 10, 2021

100% CONSTRUCTION DOCUMENTS

612-12218-237-Q12

ELI

Scale: 1/4" = 1'-0"

CORRIDOR 134 NORTH

Scale: 1/4" = 1'-0"

CORRIDOR C134 SOUTH

Scale: 1/4" = 1'-0"

STAFF WORK AREA 159 EAST

Scale: 1/4" = 1'-0"

STAFF WORK AREA 159 WEST

Scale: 6" = 1'-0"

CORNER GUARD DETAIL

Scale: 1" = 1'-0"

TYPICAL HANDRAIL AND CRASH RAIL

Scale: 1" = 1'-0"

TYPICAL CRASH RAIL

Scale: 1" = 1'-0"

TYPICAL WALL PROTECTION

Scale: 1" = 1'-0"

TYPICAL WALL PROTECTION WITH CRASH RAIL

Scale: 6" = 1'-0"

END WALL GUARD DETAIL

1 35% SCHEMATIC DESIGN DOCUMENTS 04/10/2020

2 65% DESIGN DEVELOPMENT 06/04/2020

3 65% DESIGN DEVELOPMENT - RE-SUBMISSION 06/26/2020

4 65% DESIGN DEVELOPMENT - RE-SUBMISSION 01/26/2021

5 95% CONSTRUCTION DOCUMENTS 04/06/2021

6 95% CONSTRUCTION DOCUMENTS -

RE-SUBMISSION

04/20/2021

7 95% CONSTRUCTION DOCUMENTS 07/15/2021

8 100% CONSTRUCTION DOCUMENTS 09/10/2021

F3200

E0903 E0906U0001U0001

E1500E1500

F3050

F3200

E0912

A1132

M4100

M4116

E1500

E0210 A5145

A5108

A5107

A1066

A5075

M1801

F2000

E0210A5145

F3200

A1132

M4116

M4100

A1132

E0912

E1500

F0465

A1066

A5075 A5080

A5107

A5108

F3200

M1802

M0512

A5210

A5080

A5075

A1066

A5107

A5108

A5077

F3200

A5075

A5080

A5108

A5107

A1066

F2010

A5080

A5075

F3200

U0005

F2010

A1012

A5077

A1132

M4100M4200

A5108

A5075

A5080

F2010

A5107

A5075

A5080

E0210

M0720

F3200

A5075 A5080

R7250

K1552

K4665

A5145 A5075

A5080

A5107

M3150

A5145

E0210

A5107

A5080A5075

A1066

A5108

F2000

M4116 A1132

E0912

E1500

A5080A5075

A5135

A5080 A5075

F3200

A6046

F2300 F3200

A5145A5145

F3200

A5077

A5107

A1012

A5077

A5080

A5075 F3200

U0005

F2010

A1132

M4100

M4200

A5108

3'-0"

A5080

A5075A5107

Engineers Architects

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/8

/2

:2

:0

P M

I-403

INTERIOR EQUIPMENT ELEVATIONS

8 18JK

DESIGN MEDICAL SPECIALTY

CLINIC

10535 HOSPITAL WAY, MATHER CA

95655

SEPTEMBER 10, 2021

100% CONSTRUCTION DOCUMENTS

612-12218-237-Q12

ELI

Scale: 1/4" = 1'-0"

CLEAN/MEDS 132- NORTH

Scale: 1/4" = 1'-0"

CLEAN/MEDS 132- EAST

Scale: 1/4" = 1'-0"

CLEAN/MEDS 132- SOUTH

Scale: 1/4" = 1'-0"

TYPICAL ECHO- NORTH

Scale: 1/4" = 1'-0"

TYPICAL ECHO- SOUTH

Scale: 1/4" = 1'-0"

TYPICAL ECHO- EAST

Scale: 1/4" = 1'-0"

TYPICAL ECHO- WEST

Scale: 1/4" = 1'-0"

STRESS 106- NORTH

Scale: 1/4" = 1'-0"

STRESS 106- SOUTH

Scale: 1/4" = 1'-0"

STRESS 106- WEST

Scale: 1/4" = 1'-0"

CONFERENCE 149- NORTH

Scale: 1/4" = 1'-0"

CONFERENCE 149- WEST

Scale: 1/4" = 1'-0"

PULMINARY TESTING LAB 133- NORTH

Scale: 1/4" = 1'-0"

PULMINARY TESTING LAB 138- NORTH

Scale: 1/4" = 1'-0"

PULMINARY TESTING LAB 138- WEST

Scale: 1/4" = 1'-0"

TYPICAL EXAM- NORTH

Scale: 1/4" = 1'-0"

TYPICAL EXAM- EAST

Scale: 1/4" = 1'-0"

TYPICAL EXAM- SOUTH

Scale: 1/4" = 1'-0"

TYPICAL EXAM- WEST

Scale: 1/4" = 1'-0"

LAB 131- SOUTH

Scale: 1/4" = 1'-0"

LAB 131- WEST

Scale: 1/4" = 1'-0"

PULMINARY TESTING LAB 133- SOUTH

Scale: 1/4" = 1'-0"

KITCHEN- WEST

Scale: 1/4" = 1'-0"

CLEAN/MEDS- WEST

Scale: 1/4" = 1'-0"

HOLTER EKG- NORTH

Scale: 1/4" = 1'-0"

HOLTER EKG- SOUTH

Scale: 1/4" = 1'-0"

HOLTER EKG- WEST

Scale: 1/4" = 1'-0"

HAC 135- WEST

Scale: 1/4" = 1'-0"

SOILED 103 - SOUTH

Scale: 1/4" = 1'-0"

WAITING 100D- SOUTH

Scale: 1/4" = 1'-0"

WAITING 100D- WEST

Scale: 1/4" = 1'-0"

TYPICAL OFFICE - WEST

Scale: 1/4" = 1'-0"

HAC 135 - EAST

Scale: 1/4" = 1'-0"

CARDIOLOGY 119 - EAST

Scale: 1/4" = 1'-0"

CARDIOLOGY 119 - NORTH

Scale: 1/4" = 1'-0"

CARDIOLOGY 119 - SOUTH

Scale: 1/4" = 1'-0"

CARDIOLOGY 119 - WEST

Scale: 1/4" = 1'-0"

TYPICAL EXAM ROOM SINK

WALL - ALT DEDUCT 1

1 35% SCHEMATIC DESIGN DOCUMENTS 04/10/2020

2 65% DESIGN DEVELOPMENT 06/04/2020

3 65% DESIGN DEVELOPMENT - RE-SUBMISSION 06/26/2020

4 65% DESIGN DEVELOPMENT - RE-SUBMISSION 01/26/2021

5 95% CONSTRUCTION DOCUMENTS 04/06/2021

6 95% CONSTRUCTION DOCUMENTS -

RE-SUBMISSION

04/20/2021

7 95% CONSTRUCTION DOCUMENTS 07/15/2021

8 100% CONSTRUCTION DOCUMENTS 09/10/2021

B

C

D

I-423

I-423

1_____ I-423

I-423

I-424

I-421

I-422

I-424

I-423

I-423

I-424

I-431

I-431

I-432

I-431

I-432

A.1

I-424

ECHO

READING

ECHO

ECHO

107 STRESS

CARDIOLOGY

EXAM 4

CARDIOLOGY

EXAM 3

CARDIOLOGY

EXAM 2

CARDIOLOGY

EXAM 1

PAT UNI

TLT

NS MGR

OFFICE

PULMONARY

EXAM 1

CARDIOLOGY

EXAM 7

CARDIOLOGY

EXAM 8

PULMONARY

EXAM 2

PULMONARY

EXAM 3

NEPHR.

EX. 1

NEPHROLOGY

EXAM 2

PULMONARY

EXAM 4

STF TLT

NEPHRO.

EXAM 4

SHARED

OFFICE

SHARED

OFFICE

SHARED

OFFICE

CONFERENCE

CHIEF

OFFICE

ALCOVE

EKG

TECH

WORK

AREA

PULMINARY

TESTING

LAB

NEPHRO.

EXAM 3

SHARED

OFFICE

LAB

I.T.

ROOM

NURSE

ROOM

NURSE

ROOM

CHIEF

OFFICE

TOILET

RM

ELEC

STAFF

WORK

AREA

CORRIDOR

C114

CORRIDOR

C151

MECHANICAL

LOBBY

100A

WAITING

100D

HEIGHT

AND

WEIGHT

RECEPTION

100B

CARDIOLOGY

EXAM 5

SOILED

PAT UNI

TLT

CLEAN /

MEDS

HOLTER

EKG

STF TLT

VESTIBULE

HAC

PULMINARY

TESTING

LAB

CORRIDOR

C134

NURSE

ROOM

152NURSE

ROOM

CHIEF

OFFICE

CORRIDOR

C130

CORRIDOR

C118

CORRIDOR

C154

KITCHEN

I-424

CARDIOLOGY

EXAM 6

STOR.

138A

Engineers Architects

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

/8

/2

:2

:2

P M

I-411

FIRST FLOOR OVERALL EQUIPMENT

PLAN

9 18JK

DESIGN MEDICAL SPECIALTY

CLINIC

10535 HOSPITAL WAY, MATHER CA

95655

SEPTEMBER 10, 2021

100% CONSTRUCTION DOCUMENTS

612-12218-237-Q12

ELI

Scale: 1/8" = 1'-0"

FIRST FLOOR OVERALL EQUIPMENT PLAN

N

KEY PLAN

SCALE: NO SCALE

NORTH

0 2 4 8

1 35% SCHEMATIC DESIGN DOCUMENTS 04/10/2020

2 65% DESIGN DEVELOPMENT 06/04/2020

3 65% DESIGN DEVELOPMENT - RE-SUBMISSION 06/26/2020

4 65% DESIGN DEVELOPMENT - RE-SUBMISSION 01/26/2021

5 95% CONSTRUCTION DOCUMENTS 04/06/2021

6 95% CONSTRUCTION DOCUMENTS -

RE-SUBMISSION

04/20/2021

7 95% CONSTRUCTION DOCUMENTS 07/15/2021

8 100% CONSTRUCTION DOCUMENTS 09/10/2021

B

F0275

M1801

U0006

F0275

M4705

M4705

M4045

M4020

F0280

F0280

M1801

F2000

A1011

M1801

M1825

X4124

U0002 U0003 U0002

F0275 F0275

F0275

F0275 F0275

F0275

U0003 U0003 U0003

U0002

F0275 F0275

F0275

U0003

F0275

U0003

F0275 F0275

U0002 U0002

U0006

U0002

U0002U0002

U0002

M1890

M1890

A1011 A1011

M1801

F0275

A1011

M1801

F2000 F2000

F2000

F0275 A1015

M1801

F0275A1015

M1801

F0275

M1801

A1015

A1015

F2000

F2000 F2000

A1015

M1801

A1015

M1801

M1801

A1015

A1015 M1801

A1015

M1801

F2000

F2000

F2000

M1801

F2000

F2000

F2000

F2000

F2000 F2000

F2000

F2000

F2000

M1801A1015M1801A1015M1801A1015

F3200

ECHO

READING

ECHO

ECHO

STRESS

CARDIOLOGY

EXAM 4

CARDIOLOGY

EXAM 3

CARDIOLOGY

EXAM 2

CARDIOLOGY

EXAM 1

PAT UNI

TLT

NS MGR

OFFICE

CHIEF

OFFICE

ALCOVE

EKG TECH

WORK AREA

I.T.

ROOM

CHIEF

OFFICE

TOILET

RM

STAFF

WORK

AREA

CORRIDOR

C114

LOBBY

100A

WAITING

100D

HEIGHT

AND

WEIGHT

RECEPTION

100B

CARDIOLOGY

EXAM 5

HOLTER

EKG

VESTIBULE

CHIEF

OFFICE

CORRIDOR

C130

E0948 E0948

E0954

A1015

M1801

A1015

M1801

A1015

M1801

Engineers Architects

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

/8

/2

:2

:3

P M

I-421

FIRST FLOOR ENLARGED EQUIPMENT

PLAN A

10 18JK

DESIGN MEDICAL SPECIALTY

CLINIC

10535 HOSPITAL WAY, MATHER CA

95655

SEPTEMBER 10, 2021

100% CONSTRUCTION DOCUMENTS

612-12218-237-Q12

ELI

Scale: 1/4" = 1'-0"

FIRST FLOOR ENLARGED EQUIPMENT PLAN A

N

KEY PLAN

SCALE: NO SCALE

NORTH

0 2 4 8

1 35% SCHEMATIC DESIGN DOCUMENTS 04/10/2020

2 65% DESIGN DEVELOPMENT 06/04/2020

3 65% DESIGN DEVELOPMENT - RE-SUBMISSION 06/26/2020

4 65% DESIGN DEVELOPMENT - RE-SUBMISSION 01/26/2021

5 95% CONSTRUCTION DOCUMENTS 04/06/2021

6 95% CONSTRUCTION DOCUMENTS -

RE-SUBMISSION

04/20/2021

7 95% CONSTRUCTION DOCUMENTS 07/15/2021

8 100% CONSTRUCTION DOCUMENTS 09/10/2021

C

D

I-403

I-40326

E0948

M1410

A5107

A5075

A5080

R6200

L1300

F0210

M4020

M0720

E0210

F0280

F3200

M1801A1011

A5080

A5075 F2010

A5107

A5108

A5180

I-403

F0280

F2010

A5080

E0210

M0720

F0210

M4020

F0275

F0275 F0275

F0275 F0275

F0275

F0275

F0275

A5080

A5075

K1552

A5080

A5075

F0275

A1015

M1801

U0004

F0275

U0004

A1015

M1801

U0004

M1801

A1015

A1015

F0275

M1801

U0004

K4665

I-40314

A1015

F2000

M1801

F0275

F0275A1015

M1801

F2000

F2000

F0275

M1801

A1015

F2000

F0275

M1801

A1015

U0002

U0003U0002

U0003

U0002

U0003 U0002

F0275

M1801

A1015

F2000 F2000

M1801

F0275

A1015

F2000

F0275

M1801

A1015

A5075

F3200

M1801

A1011

A5107

A5108

I-403

F2020 F2020 M3072 M3070

CARDIOLOGY

EXAM 6

PULMONARY

EXAM 1

CARDIOLOGY

EXAM 7

CARDIOLOGY

EXAM 8

PULMONARY

EXAM 2

PULMONARY

EXAM 3

NEPHR.

EX. 1

NEPHROLOGY

EXAM 2

PULMONARY

EXAM 4

STF TLT

NEPHRO.

EXAM 4

SHARED

OFFICE

SHARED

OFFICE

SHARED

OFFICE

CONFERENCE

PULMINARY

TESTING

LAB

NEPHRO.

EXAM 3

SHARED

OFFICE

LAB

NURSE

ROOM

NURSE

ROOM

ELEC

STAFF

WORK

AREA

CORRIDOR

C151

MECHANICAL

WAITING

100D

SOILED

PAT UNI

TLT

CLEAN /

MEDS

STF TLT

HAC

PULMINARY

TESTING

LAB

CORRIDOR

C134

NURSE

ROOM

NURSE

ROOM

CORRIDOR

C118

CORRIDOR

C154

KITCHEN

A5077

R7250

E0117

E0117

E0117

E0117

F0402F0402

E0117

F0402

E0117

E0117 E0117

F0402

F0275

F2015

A5180

M1801

M1801M1801

M1801 M1801

M1801

M1801 M1801

F2000

F2000 F2000

F2000

F2000

F2000

F2000

F2000

F2010

A5080 A5075

STOR.

138A

F2000

F2000

F2000

F2000

Engineers Architects

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .