ATTACHMENT 4 - Drawings 2 of 3.pdf
PDF 13 MB Posted
- Solicitation number
- 36C77622B0012
About this file
This document contains details for a federal contract solicitation to provide construction services for a Medical Specialty Clinic at the Mather Veterans Affairs facility in California. The contractor will be responsible for site preparation including demolition of existing structures, construction of foundations and superstructure, and installation of mechanical, electrical, plumbing and special systems. Additional requirements include landscaping and other site improvements. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center Austin. The response deadline and award date are not specified.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. ALL CORNER GUARDS TO BE 4'-0"H FROM TOP OF BASE.
2. PROVIDE BLOCKING IN WALLS FOR ALL CRASH/HANDRAILS.
3. TYPICAL HANDRAIL HEIGHT IS 3'-0" H IN CORRIDORS.
4. SEE TYPICAL DETAIL SECTIONS ON SHEET I-403.
5. HANDRAIL/CRASH RAIL TO BE HELD BACK FROM CORNER GUARDS AND
DOORFRAMES 2"
6. HANDRAIL NOT TO BE BEHIND DOORS WITH CLOSURES AND START HANDRAIL 6"
AWAY FROM START OF DOOR WHEN OPEN.
7. STANDARD WALL PROTECTION (SHEET) TO BE .040” THICKNESS FOR DRYWALL
APPLICATIONS.
8. SEE SPECIFICATION 09 06 00 SCHEDULE OF FINISHES FOR MATERIALS AND
FINISHES.
GENERAL WALL PROTECTION NOTES
ABBREVIATION LEGEND
CG: CORNER GUARD
CR: CRASH RAIL
HR: HANDRAIL
HIW: HIGH IMPACT WALLCOVERING
1. REFERENCE ROOM FINISH SCHEDULE , FINISH MATERIAL LEGEND AND
SPECIFICATION 09 06 00 SCHEDULE OF FINISHES FOR MORE INFORMATION.
2. REFERENCE REFLECTED CEILING PLAN FOR ADDITIONAL CEILING INFO.
3. PREPARE ALL FLOOR AND WALL CONSTRUCTION, NEW AND/OR EXISTING, TO
RECEIVE NEW FINISHES IN ACCORDANCE WITH MANUFACTURER’S
RECOMMENDED INSTALLATION METHODS AND MATERIALS FOR ALL FINISHES.
4. PRIOR TO INSTALLATION OF NEW FINISHES, CONTRACTOR SHALL INSPECT ALL
SUBSTRATES. IF A SUBSTRATE IS DEEMED UNACCEPTABLE, THE
CONTRACTOR SHALL TAKE THE NECESSARY STEPS TO RECTIFY THE
SITUATION OR CONTACT THE ARCHITECT WITH THE CONCERN. PROCEEDING
WITH THE INSTALLATION OF FINISHES WILL BE INDICATION THAT THE
INSTALLER / FINISHER ACCEPTS CONDITION OF SUBSTRATE.
5. USE MANUFACTURER'S RECOMMENDED INSTALLATION METHODS AND
MATERIALS FOR ALL FINISHES.
6. ALL NECESSARY TILE FLOORING UNDERLAYMENT TO BE PROVIDED AND
INSTALLED BY FLOORING CONTRACTOR.
7. ALL FLOORING TRANSITIONS SHALL COMPLY WITH ADA GUIDELINES.
TRANSITION LOCATIONS FOR DESIGNERS APPROVAL PRIOR TO INSTALLATION.
8. ALL FLOOR TRANSITIONS BETWEEN DISALIKE MATERIALS SHALL BE ANODIZED
ALUMINUM METAL TRIM AND TO BE LOCATED AT CENTERLINE OF DOOR WHEN
IN CLOSED POSITION.
9. ALL TRANSITIONS BETWEEN WALL AND FLOOR TILE SHALL BE ANODIZED COVE
ALUMINUM METAL TRIM; STRAIGHT, INSIDE, AND OUTSIDE CORNERS WHEN A
COVE BASE IS NOT PRESENT.
10. ALIGN FLOORING TRANSITIONS WITH FINISH BASE EXCEPT AT DOORS, U.N.O.
11. FLOOR FINISHES ARE TO EXTEND UNDER NEW BUILT-IN CABINETS.
12. FINISH LEVEL OF GYP. BD. WALLS AND SOFFITS TO BE LEVEL 4, U.N.O.
13. ALL PAINTED WALLS TO BE PAINTED P-1, UNLESS NOTED OTHERWISE.
14. ALL GYP. BOARD CEILINGS TO BE PAINTED P-6, U.N.O.
15. ALL PAINTED SURFACES SHALL RECEIVE A MINIMUM OF (1) ONE BASE COAT
AND (2) TWO FINISH COATS.
16. PAINTED SHEEN LEVEL TO BE SATIN/EGG-SHELL FOR ALL WALLS, U.N.O.
SEMI-GLOSS.
17. PAINT ALL EXPOSED METAL SURFACES, SUCH AS GRILLES, FIRE EXTINGUISHER
CABINETS, ETC. WITH PAINT TO MATCH ADJACENT SURFACE.
18. ALL HOLLOW METAL DOORS AND FRAMES TO BE PAINTED P-2.
GENERAL FINISH NOTES
GENERAL EQUIPMENT NOTES
ABBREVIATION LEGEND
"VV" = VA FURNISHED & VA INSTALLED
"VC" = VA FURNISHED & CONTRACTOR INSTALLED
“CC" = CONTRACTOR FURNISHED & CONTRACTOR INSTALLED
1. REFER TO G-100 FOR STANDARD MOUNTING HEIGHTS AND BLOCKING
INFORMATION. REFER TO EQUIPMENT DRAWINGS FOR LOCATIONS AND
ADDITIONAL DIMENSIONS.
2. REFER TO MECHANICAL, ELECTRICAL, PLUMBING, AND
TELECOM/TECHNOLOGY DRAWINGS FOR ADDITIONAL REQUIRED UTILITY
CONNECTIONS AND LOCATIONS.
3. REFER TO SHEETS I-431 THRU 432 FOR ENLARGED TOILET ROOMS
4. REFER TO REFLECTED CEILING PLANS A-110 AND A-110A FOR CUBICLE
CURTAIN TRACK LOCATIONS
5. SEE ENLARGED EQUIPMENT PLANS ON SHEETS I-421 THRU 424
6. SEE EQUIPMENT SCHEDULES ON SHEETS I-601 THRU 603 FOR SPECIFICS
ON EQUIPMENT BY ROOM
7. ITEM TAGS INCLUDE ACQUISITION AND INSTALLATION RESPONSIBILITIES
(ACQ.), DENOTED AS NOTED IN ABBREVIATION LEGEND
1. ITEM 01:
A. DELETE ALL WORK AND MATERIAL FOR SUPPORT STEEL FOR ROOF SCREENS. (FROM
TOP FLANGE OF ROOF STEEL UP). DELETE ALL WORK AND MATERIAL FOR
INSTALLATION OF ROOF SCREEN. DELETE ALL ROOFING WORK ASSOCIATED WITH
FLASHING IN VERTICAL SCREEN SUPPORTS. SEE STRUCTURAL AND ARCHITECTURAL
DRAWINGS.
B. REMOVE ALL WORK AND MATERIAL TO INSTALL BASIS OF DESIGN: HERMAN MILLER
COMBO CASEWORK/SINKS AT ALL LOCATIONS AND REPLACE WITH HAND SINK AND
SOLID SURFACE SPLASH PROTECTON. SEE PLUMBING AND INTERIOR DRAWINGS.
C. DELETE ALL WORK AND MATERIAL TO INSTALL GENERATOR, INCLUDING WIRING, AND
CONCRETE GENERATOR PAD. SEE CIVIL AND ELECTRICAL DRAWINGS.
2. ITEM 02:
A. INSTALL MANUAL SWING DOORS IN LIEU OF AUTOMATIC SLIDING DOORS AT VESTIBULE
100 (2 PAIRS) SEE ARCHITECTUAL DRAWINGS.
3. ITEM 03:
A. DELETE ALL WORK AND MATERIAL FOR ALL ASPHALT PAVING, ADA STALLS, PROVIDE
GRAVEL EMERGENCY ACCESS ONLY. SEE CIVIL DRAWINGS.
4. ITEM 04:
A. DELETE WORK AND MATERIAL IN DESIGNATED AREA AND REPLACE WITH UNOCCUPIED
SPACE. SEE SHEET A-101A FOR LIMITED GENERAL TRADES WORK. SPRINKLER SYSTEM
TO STILL BE INSTALLED. SEE SHEET FX101A. INSTALL RECEPTACLES, MECHANICAL
POWER, AND TEMPORARY LIGHTING AS PER SHEETS EL101A, EM101A, AND EP101A.
SEE SHEET M-101A FOR LIMITED MECHANICAL WORK. SEE SHEET PP101A FOR
PLUMBING WORK.
DEDUCT ALTERNATES
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/9
/2
:4
:2
P M
I-001
PRODUCT SCHEDULES, SYMBOLS AND
ABBREVIATIONS
1 18JK
DESIGN MEDICAL SPECIALTY
CLINIC
10535 HOSPITAL WAY, MATHER CA
95655
SEPTEMBER 10, 2021
100% CONSTRUCTION DOCUMENTS
612-12218-237-Q12
ELI
FINISH ABBREVIATIONS
AT ACOUSTICAL CEILING TILE
ADJ ADJACENT
AFF ABOVE FINISHED FLOOR
CG CORNER GUARD
CPT CARPET
CR CRASH RAIL
CWT CERAMIC WALL TILE
EP EPOXY PAINT
EX EXISTING
EXP EXPOSED
GT GROUT
GYP GYPSUM WALL BOARD
HIW HIGH IMPACT WALLCOVERING
HR HAND RAIL
LF LINEAR FEET (FOOT)
LVT LUXURY VINYL TILE
MTL METAL
MISC MISCELLANEOUS
NA NOT APPLICABLE
P PAINT
PL PLASTIC LAMINATE
PT PORCELAIN TILE
PTB PORCELAIN TILE BASE
RB RESILIENT WALL BASE
RP RESIN PANEL SYSTEM
SC SEALED CONCRETE
SDT STATIC DISAPATIVE TILE
SF SQUARE FEET (FOOT)
SS SOLID SURFACE
SST STAINLESS STEEL
TR TILE TRIM
TS TRANSITION STRIP
TYP TYPICAL
UFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
VIF VERIFY IN FIELD
WSF WELDED SHEET FLOOR
WSFB WELDED SHEET FLOOR BASE
ROOM FINISH SCHEDULE
ROOM NO. NAME FLOOR BASE
WALLS CEILING
REMARKS
EAST NORTH SOUTH WEST
FINFIN FIN FIN FIN
FIRST FLOOR
100 VESTIBULE CPT-1 RB-1 EP-1 EP-1 EP-1 EP-1 EP-2 PAINT GYP CEILING EP-2
100A LOBBY LVT-1,2 RB-1 P-1 P-1 P-5 P-5/HIW-2 P-6,7/AT-1 PAINT GYP CEILINGS P-6 & P-7, REFER TO GENERAL
FINISH NOTES ON I-001 AND REFLECTED CEILING PLAN
ON A-110A FOR ADDITIONAL INFORMATION; HIW-2
ALONG UNDERSIDE OF COUNTERTOP
100B RECEPTION LVT-1 RB-1 P-1,5 P-1,5 P-1,5 P-1 AT-2
100D WAITING LVT-1,2 RB-1 P-1 P-1 P-1 P-5 P-6,7/AT-1 PAINT GYP CEILINGS P-6 & P-7, REFER TO GENERAL
FINISH NOTES ON I-001 AND REFLECTED CEILING PLAN
ON A-110A FOR ADDITIONAL INFORMATION
101 HEIGHT AND WEIGHT LVT-1 RB-1 P-1/HIW-1 P-1/HIW-1 P-1/HIW-1 P-1/HIW-1 AT-2 HIW-1 WAINSCOT TO 3'-8" ABOVE FINISHED FLOOR
102 TOILET RM PT-1 PTB-1 PT-2/CWT-1,2 PT-2/CWT-1,2 PT-2/CWT-1,2 PT-2/CWT-1,2 EP-2 PAINT GYP CEILING EP-2
103 SOILED WSF-1 WSFB-1 EP-1/HIW-1 EP-1/HIW-1 EP-1/HIW-1 EP-1/HIW-1 EP-2 HIW-1 WAINSCOT TO 3'-8" ABOVE FINISHED FLOOR
104 HOLTER EKG LVT-1 RB-2 P-1 P-3 P-1 P-1 AT-3
105 STRESS LVT-1 RB-2 P-1 P-1 P-3 P-1 AT-3
106 EKG TECH WORK AREA LVT-1 RB-2 P-1 P-1 P-1 P-1 AT-2
107 ECHO LVT-1 RB-2 P-3 P-1 P-1 P-1 AT-3
108 ALCOVE LVT-1 RB-2 P-1/HIW-1 P-1/HIW-1 -- P-1/HIW-1 AT-2 HIW-1 WAINSCOT TO 3'-8" ABOVE FINISHED FLOOR
109 ECHO LVT-1 RB-2 P-3 P-1 P-1 P-1 AT-3
110 CHIEF OFFICE CPT-2 RB-2 P-1 P-1 P-1 P-4 AT-2
111 ECHO READING LVT-1 RB-2 P-1 P-1 P-1 P-1 AT-2
112 CHIEF OFFICE CPT-2 RB-2 P-1 P-4 P-1 P-1 AT-2
113 PAT UNI TLT PT-1 PTB-1 PT-2/CWT-1,2 PT-2/CWT-1,2 PT-2/CWT-1,2 PT-2/CWT-1,2 EP-2 PAINT GYP CEILING EP-2
115 CHIEF OFFICE CPT-2 RB-2 P-4 P-1 P-1 P-1 AT-2
116 I.T. ROOM SDT-1 RB-2 P-1 P-1 P-1 P-1 AT-2
117 NS MGR OFFICE CPT-2 RB-2 P-1 P-4 P-1 P-1 AT-2
119 CARDIOLOGY EXAM 6 LVT-1 RB-2 P-1 P-1 P-1 P-3 AT-3
120 CARDIOLOGY EXAM 1 LVT-1 RB-2 P-1 P-1 P-1 P-3 AT-3
121 CARDIOLOGY EXAM 7 LVT-1 RB-2 P-3 P-1 P-1 P-1 AT-3
122 CARDIOLOGY EXAM 2 LVT-1 RB-2 P-1 P-1 P-1 P-3 AT-3
123 CARDIOLOGY EXAM 8 LVT-1 RB-2 P-3 P-1 P-1 P-1 AT-3
124 CARDIOLOGY EXAM 3 LVT-1 RB-2 P-1 P-1 P-1 P-3 AT-3
125 NEPHR. EX. 1 LVT-1 RB-2 P-3 P-1 P-1 P-1 AT-3
126 CARDIOLOGY EXAM 4 LVT-1 RB-2 P-1 P-1 P-1 P-3 AT-3
127 NEPHROLOGY EXAM 2 LVT-1 RB-2 P-3 P-1 P-1 P-1 AT-3
128 CARDIOLOGY EXAM 5 LVT-1 RB-2 P-1 P-1 P-1 P-3 AT-3
129 PAT UNI TLT PT-1 PTB-1 PT-2/CWT-1,2 PT-2/CWT-1,2 PT-2/CWT-1,2 PT-2/CWT-1,2 EP-2 PAINT GYP CEILING EP-2
131 LAB WSF-1 WSFB-1 EP-1 EP-1 EP-1 EP-1 EP-2 PAINT GYP CEILING EP-2
132 CLEAN / MEDS WSF-1 WSFB-1 EP-1/HIW-1 EP-1/HIW-1 EP-1/HIW-1 EP-1/HIW-1 EP-2 HIW-1 WAINSCOT TO 3'-8" ABOVE FINISHED FLOOR
133 PULMINARY TESTING LAB LVT-1 RB-2 P-1 P-1 P-1 P-1 AT-3
135 HAC PT-1 -- PT-2/EP-1 PT-2/EP-1 PT-2/EP-1 PT-2/EP-1 EP-2 PT-2 WAINSCOT TO 5'-0" ABOVE FINISHED FLOOR
136 ELEC SC RB-2 P-1 P-1 P-1 P-1 --
137 MECHANICAL SC RB-2 P-1 P-1 P-1 P-1 --
138 PULMINARY TESTING LAB LVT-1 RB-2 P-1 P-1 P-1 P-1 AT-3
138A STOR. LVT-1 RB-2 P-1/HIW-1 P-1/HIW-1 P-1/HIW-1 P-1/HIW-1 AT-2 HIW-1 WAINSCOT TO 3'-8" ABOVE FINISHED FLOOR
139 NEPHRO. EXAM 3 LVT-1 RB-2 P-3 P-1 P-1 P-1 AT-3
140 PULMONARY EXAM 4 LVT-1 RB-2 P-1 P-1 P-1 P-3 AT-3
141 NEPHRO. EXAM 4 LVT-1 RB-2 P-3 P-1 P-1 P-1 AT-3
142 PULMONARY EXAM 3 LVT-1 RB-2 P-1 P-1 P-1 P-3 AT-3
143 SHARED OFFICE CPT-2 RB-2 P-4 P-1 P-1 P-1 AT-2
144 PULMONARY EXAM 2 LVT-1 RB-2 P-1 P-1 P-1 P-3 AT-3
145 SHARED OFFICE CPT-2 RB-2 P-4 P-1 P-1 P-1 AT-2
146 PULMONARY EXAM 1 LVT-1 RB-2 P-1 P-1 P-1 P-3 AT-3
147 SHARED OFFICE CPT-2 RB-2 P-4 P-1 P-1 P-1 AT-2
148 SHARED OFFICE CPT-2 RB-2 P-1 P-1 P-1 P-4 AT-2
149 CONFERENCE LVT-1 RB-2 P-1 P-1 P-1 P-4 AT-2
150 KITCHEN LVT-1 RB-2 P-1 P-1 P-1 P-1 AT-2
152 NURSE ROOM CPT-2 RB-2 P-1 P-1 P-1 P-1 AT-2
153 NURSE ROOM CPT-2 RB-2 P-1 P-1 P-1 P-1 AT-2
155 STF TLT PT-1 PTB-1 PT-2/EP-1 PT-2/EP-1 PT-2/EP-1 PT-2/EP-1 EP-2 PAINT GYP CEILING EP-2; PT-2 WAINSCOT TO 5'-6"
ABOVE FINISHED FLOOR
156 STF TLT PT-1 PTB-1 PT-2/EP-1 PT-2/EP-1 PT-2/EP-1 PT-2/EP-1 EP-2 PAINT GYP CEILING EP-2; PT-2 WAINSCOT TO 5'-6"
ABOVE FINISHED FLOOR
157 NURSE ROOM CPT-2 RB-2 P-1 P-1 P-1 P-1 AT-2
158 NURSE ROOM CPT-2 RB-2 P-1 P-1 P-1 P-1 AT-2
159 STAFF WORK AREA CPT-2 RB-2 P-1,4 P-1,4 P-1,4 P-1,4 AT-2
C114 CORRIDOR LVT-1 RB-1 P-1 P-1 P-1 P-1 AT-2
C118 CORRIDOR LVT-1 RB-1 P-1 P-1 P-1 P-1 AT-2
C130 CORRIDOR LVT-1 RB-1 P-1 P-1 P-1 P-1 AT-2
C134 CORRIDOR LVT-1 RB-1 P-1 P-1 P-1 P-1 AT-2
C151 CORRIDOR LVT-1 RB-2 P-1 P-1 P-1 P-1 AT-2
C154 CORRIDOR LVT-1 RB-2 P-1 P-1 P-1 P-1 AT-2
DEDUCT ALTERNATE - ROOM FINISH SCHEDULE
ROOM NO. NAME FLOOR BASE
WALLS CEILING
REMARKS
EAST NORTH SOUTH WEST
FINFIN FIN FIN FIN
FIRST FLOOR
100 VESTIBULE CPT-1 RB-1 EP-1 EP-1 EP-1 EP-1 GYP PAINT GYP CEILING EP-2
100A LOBBY LVT-1,2 RB-1 P-1 P-1 P-5 P-5/HIW-2 P-6,7/AT-1 PAINT GYP CEILINGS P-6 & P-7, REFER TO GENERAL
FINISH NOTES ON I-001 AND REFLECTED CEILING
PLAN ON A-110A FOR ADDITIONAL INFORMATION;
HIW-2 ALONG UNDERSIDE OF COUNTERTOP
100B RECEPTION LVT-1 RB-1 P-1,5 P-1,5 P-1,5 P-1 AT-2
100D WAITING LVT-1,2 RB-1 P-1 P-1 P-1 P-5 P-6,7/AT-1 PAINT GYP CEILINGS P-6 & P-7, REFER TO GENERAL
FINISH NOTES ON I-001 AND REFLECTED CEILING
PLAN ON A-110A FOR ADDITIONAL INFORMATION
101 HEIGHT AND WEIGHT LVT-1 RB-1 P-1/HIW-1 P-1/HIW-1 P-1/HIW-1 P-1/HIW-1 AT-2 HIW-1 WAINSCOT TO 3'-8" ABOVE FINISHED FLOOR
102 TOILET RM PT-1 PTB-1 PT-2/CWT-1,2 PT-2/CWT-1,2 PT-2/CWT-1,2 PT-2/CWT-1,2 EP-2 PAINT GYP CEILING EP-2
103 SOILED WSF-1 WSFB-1 EP-1/HIW-1 EP-1/HIW-1 EP-1/HIW-1 EP-1/HIW-1 EP-2 PAINT GYP CEILING EP-2; HIW-1 WAINSCOT TO 3'-8"
ABOVE FINISHED FLOOR
104 HOLTER EKG LVT-1 RB-2 P-1 P-3 P-1 P-1 AT-3
105 STRESS LVT-1 RB-2 P-1 P-1 P-3 P-1 AT-3
106 EKG TECH WORK AREA LVT-1 RB-2 P-1 P-1 P-1 P-1 AT-2
107 ECHO LVT-1 RB-2 P-3 P-1 P-1 P-1 AT-3
108 ALCOVE LVT-1 RB-2 P-1/HIW-1 P-1/HIW-1 -- P-1/HIW-1 AT-2 HIW-1 WAINSCOT TO 3'-8" ABOVE FINISHED FLOOR
109 ECHO LVT-1 RB-2 P-3 P-1 P-1 P-1 AT-3
110 OFFICE CPT-2 RB-2 P-1 P-1 P-1 P-4 AT-2
111 ECHO READING LVT-1 RB-2 P-1 P-1 P-1 P-1 AT-2
112 CHIEF OFFICE CPT-2 RB-2 P-1 P-4 P-1 P-1 AT-2
113 STAFF UNI TLT PT-1 PTB-1 PT-2/EP-1 PT-2/EP-1 PT-2/EP-1 PT-2/EP-1 EP-2 PAINT GYP CEILING EP-2; PT-2 WAINSCOT TO 5'-6"
ABOVE FINISHED FLOOR
115 CHIEF OFFICE CPT-2 RB-2 P-4 P-1 P-1 P-1 AT-2
116 I.T. ROOM SDT-1 RB-2 P-1 P-1 P-1 P-1 AT-2
117 NS MGR OFFICE CPT-2 RB-2 P-1 P-4 P-1 P-1 AT-2
119 CARDIOLOGY EXAM 6 LVT-1 RB-2 P-3 P-1 P-1 P-1 AT-3
120 CARDIOLOGY EXAM 1 LVT-1 RB-2 P-1 P-1 P-1 P-3 AT-3
121 CARDIOLOGY EXAM 7 LVT-1 RB-2 P-3 P-1 P-1 P-1 AT-3
122 CARDIOLOGY EXAM 2 LVT-1 RB-2 P-1 P-1 P-1 P-3 AT-3
124 CARDIOLOGY EXAM 3 LVT-1 RB-2 P-1 P-1 P-1 P-3 AT-3
126 CARDIO. EXAM 4 LVT-1 RB-2 P-1 P-1 P-1 P-3 AT-3
127 CARDIOLOGY EXAM 10 LVT-1 RB-2 P-3 P-1 P-1 P-1 AT-3
128 CARDIO. EXAM 5 LVT-1 RB-2 P-1 P-1 P-1 P-3 AT-3
129 PAT UNI TLT PT-1 PTB-1 PT-2/CWT-1,2 PT-2/CWT-1,2 PT-2/CWT-1,2 PT-2/CWT-1,2 EP-2 PAINT GYP CEILING EP-2
132 STORAGE LVT-1 RB-2 P-1/HIW-1 P-1/HIW-1 P-1/HIW-1 P-1/HIW-1 AT-2 HIW-1 WAINSCOT TO 3'-8" ABOVE FINISHED FLOOR
136 ELEC SC RB-2 P-1 P-1 P-1 P-1 --
137 MECHANICAL SC RB-2 P-1 P-1 P-1 P-1 --
149 CONFERENCE LVT-1 RB-2 P-1 P-1 P-1 P-4 AT-2
150 KITCHEN LVT-1 RB-2 P-1 P-1 P-1 P-1 AT-2
151 HAC PT-1 -- PT-2/EP-1 PT-2/EP-1 PT-2/EP-1 PT-2/EP-1 EP-2 PT-2 WAINSCOT TO 5'-0" ABOVE FINISHED FLOOR
152 NURSE ROOM CPT-2 RB-2 P-1 P-1 P-1 P-1 AT-2
153 NURSE ROOM CPT-2 RB-2 P-1 P-1 P-1 P-1 AT-2
157 NURSE ROOM CPT-2 RB-2 P-1 P-1 P-1 P-1 AT-2
158 NURSE ROOM CPT-2 RB-2 P-1 P-1 P-1 P-1 AT-2
159 STAFF WORK AREA CPT-2 RB-2 P-1,4 P-1,4 P-1,4 P-1,4 AT-2
161 CARDIOLOGY EXAM 8 LVT-1 RB-1 P-3 P-1 P-1 P-1 AT-3
162 CLEAN / MEDS WSF-1 WSFB-1 EP-1/HIW-1 EP-1/HIW-1 EP-1/HIW-1 EP-1/HIW-1 AT-3 HIW-1 WAINSCOT TO 3'-8" ABOVE FINISHED FLOOR
163 CARDIOLOGY EXAM 9 LVT-1 RB-1 P-3 P-1 P-1 P-1 AT-3
C114 CORRIDOR LVT-1 RB-1 P-1 P-1 P-1 P-1 AT-2
C118 CORRIDOR LVT-1 RB-1 P-1 P-1 P-1 P-1 AT-2
C130 CORRIDOR LVT-1 RB-1 P-1 P-1 P-1 P-1 AT-2
C151 CORRIDOR LVT-1 RB-2 P-1 P-1 P-1 P-1 AT-2
C154 CORRIDOR LVT-1 RB-2 P-1 P-1 P-1 P-1 AT-2
1 35% SCHEMATIC DESIGN DOCUMENTS 04/10/2020
2 65% DESIGN DEVELOPMENT 06/04/2020
3 65% DESIGN DEVELOPMENT - RE-SUBMISSION 06/26/2020
4 65% DESIGN DEVELOPMENT - RE-SUBMISSION 01/26/2021
5 95% CONSTRUCTION DOCUMENTS 04/06/2021
6 95% CONSTRUCTION DOCUMENTS -
RE-SUBMISSION
04/20/2021
7 95% CONSTRUCTION DOCUMENTS 07/15/2021
8 100% CONSTRUCTION DOCUMENTS 09/10/2021
DocuSign Envelope ID: A3C5497D-1410-44D4-BB2A-B22C647351DC
9/10/2021
A
1 2 3 4 6
B
C
D
I-2011
I-201
I-201 4
I-2015
I-201
I-401
I-401
I-401 56
I-402
I-401
I-201 10
I-201
I-201 11 I-20112
I-20113
I-201
I-201
I-201
I-201
I-201
I-201
I-201
I-201
I-201
I-201
I-201
I-201
I-201
I-201
I-401
I-4024 3
I-20115
I-201 6
1 1
I-4017
A.1
ECHO
READING
ECHO
ECHO
STRESS
CARDIOLOGY
EXAM 4
CARDIOLOGY
EXAM 3
CARDIOLOGY
EXAM 2
CARDIOLOGY
EXAM 1
PAT UNI
TLT
NS MGR
OFFICE
CARDIOLOGY
EXAM 6
PULMONARY
EXAM 1
CARDIOLOGY
EXAM 7
CARDIOLOGY
EXAM 8
PULMONARY
EXAM 2
PULMONARY
EXAM 3
NEPHR.
EX. 1
NEPHROLOGY
EXAM 2
PULMONARY
EXAM 4
STF TLT
NEPHRO.
EXAM 4
SHARED
OFFICE
SHARED
OFFICE
SHARED
OFFICE
CONFERENCE
CHIEF
OFFICE
112 ALCOVE
EKG
TECH
WORK
AREA
PULMINARY
TESTING
LAB
NEPHRO.
EXAM 3
SHARED
OFFICE
LAB
I.T.
ROOM
NURSE
ROOM
NURSE
ROOM
CHIEF
OFFICE
TOILET
RM
ELEC
STAFF
WORK
AREA
CORRIDOR
C114
CORRIDOR
C151
MECHANICAL
LOBBY
100A
WAITING
100D
HEIGHT
AND
WEIGHT
RECEPTION
100B
CARDIOLOGY
EXAM 5
SOILED
PAT UNI
TLT
CLEAN /
MEDS
HOLTER
EKG
STF TLT
VESTIBULE
HAC
PULMINARY
TESTING
LAB
CORRIDOR
C134
NURSE
ROOM
NURSE
ROOM
CHIEF
OFFICE
CORRIDOR
C130
CORRIDOR
C118
CORRIDOR
C154
KITCHEN
1 1 1 1
11111
1 1 1 1
1 1
I-401
I-40111
I-401
I-401
I-401
SIM
I-20117
I-201
2 2
2 2 2 2
3 1
8'-10"7'-8"
1 1
2 2
STOR.
138A
I-201
I-201
8 8 8 8
8 8 8 8 8
I-20120
I-20120I-20120I-20120
I-201
I-201 6
SIM
TYP
TYP
TYP
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/8
/2
:2
:5
P M
I-101
FIRST FLOOR FINISH PLAN
2 18JK
DESIGN MEDICAL SPECIALTY
CLINIC
10535 HOSPITAL WAY, MATHER CA
95655
SEPTEMBER 10, 2021
100% CONSTRUCTION DOCUMENTS
612-12218-237-Q12
ELI
N
KEY PLAN
SCALE: NO SCALE
NORTH
0 4 8 16
1 PROVIDE AND INSTALL CORNER GUARD, CG-1
2 PAINT WALL P-3
3 PAINT WALL ON ALL SIDES P-4
4 P-5 TO START IN CORNER ON LOBBY SIDE AND
WRAP WALL INTO RECEPTION TERMINATING AT
FULL HEIGHT RESIN PARTITION
5 P-5 TO START IN THIS CORNER AND CONTINUE
AROUND TO LOBBY/WAITING
6 PAINT WALL P-5
7 PAINT WALL P-4
8 REFER TO ROOM 161, CARDIOLOGY EXAM
ROOM 8, FOR ADDITIONAL DEDUCT ALTERNATE
INFORMATION.
Scale: 1/8" = 1'-0"
FIRST FLOOR FINISH PLAN
1 35% SCHEMATIC DESIGN DOCUMENTS 04/10/2020
2 65% DESIGN DEVELOPMENT 06/04/2020
3 65% DESIGN DEVELOPMENT - RE-SUBMISSION 06/26/2020
4 65% DESIGN DEVELOPMENT - RE-SUBMISSION 01/26/2021
5 95% CONSTRUCTION DOCUMENTS 04/06/2021
6 95% CONSTRUCTION DOCUMENTS -
RE-SUBMISSION
04/20/2021
7 95% CONSTRUCTION DOCUMENTS 07/15/2021
8 100% CONSTRUCTION DOCUMENTS 09/10/2021
1 2 3 4 5 6
B
C
D
A.1
ECHO
READING
ECHO
ECHO
STRESS
CARDIOLOGY
EXAM 4
CARDIOLOGY
EXAM 3
CARDIOLOGY
EXAM 2
CARDIOLOGY
EXAM 1
PAT UNI
TLT
NS MGR
OFFICE
CARDIOLOGY
EXAM 6
PULMONARY
EXAM 1
CARDIOLOGY
EXAM 7
CARDIOLOGY
EXAM 8
PULMONARY
EXAM 2
PULMONARY
EXAM 3
NEPHR.
EX. 1
NEPHROLOGY
EXAM 2
PULMONARY
EXAM 4
STF TLT
NEPHRO.
EXAM 4
SHARED
OFFICE
SHARED
OFFICE
SHARED
OFFICE
CONFERENCE
CHIEF
OFFICE
ALCOVE
EKG
TECH
WORK
AREA
PULMINARY
TESTING
LAB
NEPHRO.
EXAM 3
SHARED
OFFICE
LAB
I.T.
ROOM
NURSE
ROOM
NURSE
ROOM
CHIEF
OFFICE
TOILET
RM
ELEC
STAFF
WORK
AREA
CORRIDOR
C114
CORRIDOR
C151
MECHANICAL
LOBBY
100A
WAITING
100D
HEIGHT
AND
WEIGHT
RECEPTION
100B
CARDIOLOGY
EXAM 5
SOILED
PAT UNI
TLT
CLEAN /
MEDS
HOLTER
EKG
STF TLT
VESTIBULE
HAC
PULMINARY
TESTING
LAB
CORRIDOR
C134
NURSE
ROOM
NURSE
ROOM
CHIEF
OFFICE
CORRIDOR
C130
CORRIDOR
C118
CORRIDOR
C154
KITCHEN
STOR.
138A
FINISH KEY
LVT-1 LUXURY VINYL TILE
(PATTERN TO BE 1/3 RUNNING BOND
DIRECTION AS SHOWN IN THE ROOM)
LVT-2 LUXURY VINYL TILE
(PATTERN TO BE 1/3 RUNNING BOND
DIRECTION AS SHOWN IN THE ROOM)
SDT-1 STATIC DISSIPATIVE TILE
SC SEALED CONCRETE
PT-1 PORCELAIN TILE
WSF-1 WELDED SHEET FLOOR
CPT-2 CARPET TILE STAGGER INSTALL
(DIRECTION AS SHOWN IN THE ROOM)
CPT-1 WALK-OFF CARPET TILE
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/8
/2
:2
:0
P M
I-120
FIRST FLOOR FLOOR PATTERN PLAN
3 18JK
DESIGN MEDICAL SPECIALTY
CLINIC
10535 HOSPITAL WAY, MATHER CA
95655
SEPTEMBER 10, 2021
100% CONSTRUCTION DOCUMENTS
612-12218-237-Q12
ELI
N
KEY PLAN
SCALE: NO SCALE
Scale: 1/8" = 1'-0"
FIRST FLOOR FLOOR PATTERN PLAN
NORTH
0 4 8 16
1 35% SCHEMATIC DESIGN DOCUMENTS 04/10/2020
2 65% DESIGN DEVELOPMENT 06/04/2020
3 65% DESIGN DEVELOPMENT - RE-SUBMISSION 06/26/2020
4 65% DESIGN DEVELOPMENT - RE-SUBMISSION 01/26/2021
5 95% CONSTRUCTION DOCUMENTS 04/06/2021
6 95% CONSTRUCTION DOCUMENTS -
RE-SUBMISSION
04/20/2021
7 95% CONSTRUCTION DOCUMENTS 07/15/2021
8 100% CONSTRUCTION DOCUMENTS 09/10/2021
THE FOLLOWING NOTES ARE SPECIFIC TO CASEWORK
AND ARE IN ADDITION TO THE GENERAL FINISH NOTES.
A. FIELD VERIFY ALL CASEWORK AND SHELVING
DIMENSIONS.
B. PROVIDE WALL BRACKET SUPPORTS AT 36" O.C. MAX.
TO SUPPORT COUNTERTOP AT CONTINUING KNEE
SPACE. PROVIDE WALL BLOCKING AT ALL WALL
BRACKET SUPPORTS.
C. USE BLACK 2 1/2" DIAMETER GROMMETS WHERE
GROMMETS ARE INDICATED AT 3’-0” O.C. AT ALL KNEE
SPACES.
D. PROVIDE FINISHED END PANEL AT EXPOSED
CASEWORK ENDS AND BACKS AS NEEDED. PANEL TO
MATCH PLASTIC LAMINATE.
E. ADD FILLER PANEL AS NEEDED AT CABINETS,
WARDROBES, DRAWERS, APPLIANCES, ETC. TO
ENSURE FULL DOOR SWING AND DRAWER
OPERATION.
F. WHEN FILLER PANELS ARE REQUIRED AT BOTH ENDS
OF CASEWORK TERMINATION, BOTH FILLER PANELS
SHALL BE EQUAL WIDTH, U.N.O.
G. PROVIDE FILLER PANELS AND TRIM WHERE
EQUIPMENT IS LOCATED WITHIN CABINETS.
H. ALL BUILT IN FILING CABINETS TO HAVE RAILING TO
SUPPORT HANGING FOLDERS.
I. COUNTERTOPS TO HAVE 1/2" RADIUS AT EXPOSED
CORNERS.
J. ALL COUNTERTOPS TO BE SOLID SURFACE WITH
POST FORM PROFILE. ALL COUNTERTOPS ARE 1 1/2"
THICK WITH 4" HIGH BACK/SIDE SPLASHES UNLESS
NOTED OTHERWISE. ALL JOINTS IN COUNTERTOPS,
SPLASHES AND CURBS SHALL ALIGN AND BE
SMOOTH. PROVIDE END SPLASH AT SIDES WHEN
COUNTERTOP IS ADJACENT TO WALL.
K. ALL COUNTERTOPS TO EXTEND 1" BEYOND FRONT OF
CABINET DOOR FACE.
L. ALL WALL CABINETS TO BE 15"D OUT TO OUT, U.N.O.
M. 30"H CABINETS TO HAVE LIGHT VALANCE, U.N.O.
N. ALL WALL CABINETS TO HAVE SLOPE TOPS UNLESS A
BULKHEAD IS PRESENT.
O. ALL SHELVING SHOWN WITH DASHED LINES IN
ELEVATIONS TO BE ADJUSTABLE.
P. ALL BASE CABINETS TO BE 23" DEEP WITH 24” DEEP
COUNTERTOP INCLUDING BACKSPLASH, U.N.O.
Q. PROVIDE AN APRON AT ALL KNEE SPACES & SINKS,
U.N.O. PROVIDE 30" WIDE (MIN.) x 27" HIGH (MIN.)
CLEAR OPEN SPACE UNDER EACH ADA ACCESSIBLE
SINK.
R. PROVIDE PIPE WRAP AT EXPOSED PIPES.
S. PROVIDE SHEET METAL OR FIRE RETARDANT WOOD
BLOCKING IN WALL CAVITIES FOR ITEMS THAT ARE
REQUIRED TO BE SECURED TO THE WALLS.
REFERENCE MECHANICAL, PLUMBING, ELECTRICAL
AND TECHNOLOGY DRAWINGS. COORDINATE WITH
FURNITURE SUPPLIER WHERE APPROPRIATE.
T. SEE SHEET I-202 FOR TYPICAL CABINET SECTIONS.
CASEWORK NOTES
2'-6" 2'-6" 2'-6"
W1 W1
SB2 B1
2'-6" 2'-6" 2'-6" 2"
7'-8"
2"
W1
B2
12 12 12 123
2'-10" 3'-0" 3'-0" 3'-0" 2'-6 1/2"
14'-4 1/2"
10'-11 1/2"
2'-6" 3'-0" 3'-0" 2'-5 1/2"
12 12 12 12
2" 2'-0"2'-9"3'-6"
5"
1'-3"
W3 W7 W4
B6 B8
1'-9"
5"
3'-0" 2'-9" 2'-2"
10'-1"
5'-0"
12 11
4'-0"
2'-6"
5'-0"
2'-6" 2'-6"
10'-7 1/2"
12 11
3'-0" 3'-0" 3'-0"
I-201
5'-4" 5'-4"
2'-9" 2'-0" 1'-11"
6'-8"
5" 1'-3"
SB1
W8
B7
5'-9"
2'-6"2'-0"1'-3"
MC5
MC4
MC3
MC1
MC2
I-202 _____16
I-202
W3W3
B5
3'-6" 3'-6"
3'-6" 3'-6"
7'-0"
B5
10'-7 1/2"
12 1211
O.C. OF WATER FOUNTAINS
4'-4"
2'-3" 2'-8"
7'-3"
2'-6" 2'-9" 2'-0"
2'-6" 2'-9"
2'-1"
7'-4"
W1 W6 W5
SB1B3
CLEAN/MEDS 162 - WEST IN
DEDUCT ALTERNATE #4 PLAN(OH)
2"3'-0"3'-0"
3'-0" 3'-0" 2"
6'-2"
B4B4
W2 W2
6'-3"
4'-6"
MC1
5'-9"
1'-3"2'-0"2'-6"
" 5
MC5
MC4
MC7
MC6
I-202 _____ 16
I-202
1. LAYOUT SUBJECT TO VERIFICATON OF FIELD DIMENSIONS AND CONDITIONS
2. ALL WALLS THAT ARE TO RECEIVE WALL RAILS MUST HAVE A MINIMUM 25 GAUGE METALL STUDS 16" ON CENTER WITH
EITHER 5/8" GYPSUM WALLBOARD OR 2 LAYERS OF 1/2" GYPSUM WALLBOARD. STUDS MUST BE ANCHORED TO THE BUILDING STUCTURE AT THE FLOOR AND ABOVE THE CEILING, ALL WALLS MUST BE LEVEL AND PLUMB TO INSTALL THE
MODULAR WALL CASEWORK.
3. MODULAR CASEWORK WALL RAILS TO BE MOUNTED AT 69" AFF AND 33-1/8" AFF TO CENTER.
4. MINIMUM WALL HEIGHT FOR LOW RAIL ONLY APPLICATIONS IS 48" AFF, AND REQUIRES METAL BACKING MATERIAL 6"W, 16
G.A., APPLIED OT FACE OF STUDS AT 33-1/8" AND 22" TO CENTER OF RAIL. THE MINIMUM REQUIREMENT IS THAT THE LOWER RAIL TO BE STUD ATTACHED AS WELL AS DRY WALL ANCHORED. LOWER WALL RAIL CAN NOT EXTEND 4" BEYOND A STUD. IF SECIFICATION REQUIRES EXTENSION BEYOND 4", SPECIFY AS A VISUAL RAIL APPLICATION TO REACH THE NEXT
AVAILABLE STUD.
5. MODULAR CASEWORK WALL RAIL SHALL BE HUNG NO CLOSER THAT 3" TO THE INSIDE CORNER OF THE ARCHITECTURAL WALL. WALL RAIL MAY REQUIRE A GREATER OFFSET TO ACCOMODATE THE ROTATING WORKSURFACE.
6. ALL SINKS TO BE PROVIDED BY MODULAR CASEWORK MANUFACTURER AS PART OF THE SINK OPTION UNLESS NOTED
OTHERWISE.
7. ALL SINKS LOCATED ADJACENT TO AN ARCHITECTURAL WALL SHALL HAVE A SPECIAL CORIAN SIDE SPLASH, OPTION IF
REQUIRED OR REQUESTED.
8. FAUCETS TO BE PROVIDED BY MEP.
9. ALL SUPPLY LINES MIXING VALVES AND GRID DRAINS / TAIL PIECES MUST BE SUPPLIED AND INSTALLED BY THE MEP
CONTRACTOR
10. THE SINK DRAIN HOLE IS LOCATED 4" OFF CENTER TO THE RIGHT SIDE OF THE SINK
11. REFER TO THE MODULAR CASEWORK DETAILS FOR ALL PLUMBING AND ELECTRICAL ROUGH-IN LOCATIONS.
12. MODULAR CASEWORK MANUFACTURER DOES NOT SUPPLY THE DRAIN/ TAILPIECE ASSEMBLY FOR THE SINKS. THIS
COMPONENT MUST BE SUPPLIED BY GENERAL CONTRACTOR. THE REQUIREMENTS FOR THE DRAIN/ TAILPIECE ASSEMBLY
FOR THE SINKS. THE REQUIREMENTS FOR THE DRAIN/TAILPIECE ARE:
13. MUST BE SUITABLE FOR A SINK WITHOUT AN OVERFLOW (MUST NOT HAVE OVERFLOW HOLES IN THE BODY OF THE
DRAIN)
14. THREADED PORTION OF THE BODY MUST BE BETWEEN 1.5" AND 4" (FROM TOP OF DRAIN TO POINT WHERE TAILPIECE
TUBE THREADS INTO DRAIN BODY)
15. - NEW HEIGHT RECOMMENDATION FOR DRAIN STUB IN WALL: 24 1/4" ABOVE FINISHED FLOOR.
16. ALL UTILITY STUB OUTS AND ROUGHINS FROM THE ARCHITECTURAL WALL TO BE LOCATED 6"-8" ABOVE OR BELOW THE
MODULAR CASEWORK UTILITY RAIL CENTERLINE WHERE THE GANG BOXES ARE MOUNTED.
17. ALL EXPOSED WALL RAILS SHALL HAVE GROMMETS AT CLOSEOUTS, RAIL END CAPS, AND WALL RAIL INSERTS TO CONEAL
THE EXPOSED ANCHOR LOCATIONS.
18. THE MODULAR CASEWORK VERTICAL CHASE COVER IS DESIGNED TO BE USED WITH 64" STILES IN ROOMS WITH A CEILING
HEIGHT BETWEEN 8'-6" AND 9'-0" HIGH. FOR OTHER CHASE SIZES CONTACT OPTIONS.
19. THE ROTATING WORK SURFACE MUST BE ATTACHED TO THE FULL HEIGHT MODULAR CASEWORK WALL WITH NO
EXCEPTIONS.
20. VERTICAL CHASE COVERS TO BE PAINTED BY OTHERS TO MATCH ARCHITECTURAL WALLS.
INTEGRATED PATIENT CARE MODULAR CASEWORK
2'-1"6"
3'-0"
4 1/2" 2'-6"
1'-3"
METEL SUPPORT BRACKET
SOLID SURFACE
COUNTERTOP, SS-2
RESIN PANEL, RP-1
1 1/2"
HIW-2
P-1
P-7
BASE AS SPECIFIED
O.C. OF LAVATORY
3'-0"
O.C. OF LAVATORY
3'-0"
O.C. OF LAVATORY
3'-0"
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/8
/2
:2
:2
P M
I-201
CASEWORK ELEVATIONS
4 18JK
DESIGN MEDICAL SPECIALTY
CLINIC
10535 HOSPITAL WAY, MATHER CA
95655
SEPTEMBER 10, 2021
100% CONSTRUCTION DOCUMENTS
612-12218-237-Q12
ELI
PLASTIC LAMINATE CASEWORK SCHEDULE
Type Mark WIDTH DETAIL NO. Description
B1 2' - 6" 7/I-202 34"H x 23"D TWO DOOR, TWO DRAWER BASE STORAGE UNIT, 1 ADJ. SHELF
B2 2' - 6" 1/I-202 34"H x 23"D MICROWAVE STORAGE UNIT BASE, 1 DRAWER, 1 BUILT-IN MICROWAVE
COMPARTMENT
B3 2' - 6" 3/I-202 34"H x 23"D THREE EQUAL DRAWER BASE STORAGE UNIT
B4 3' - 0" 5/I-202 34"H x 23"D TWO DOOR, TWO DRAWER BASE STORAGE UNIT, 1 ADJ. SHELF
B5 3' - 6" 4/I-202 34"H x 23"D FILE/FILE BASE STORAGE UNIT
B6 3' - 0" 3/I-202 34"H x 23"D THREE EQUAL DRAWER BASE STORAGE UNIT
B7 1' - 9" 3/I-202 34"H x 23"D THREE EQUAL DRAWER BASE STORAGE UNIT
B8 2' - 9" 3/I-202 34"H x 23"D THREE EQUAL DRAWER BASE STORAGE UNIT
SB1 2' - 9" 2/I-202 34"H x 23"D SINK BASE, W/ REMOVABLE PANEL
SB2 2' - 6" 2/I-202 34"H x 23"D SINK BASE, W/ REMOVABLE PANEL
W1 2' - 6" 6/I-202 18"H x 15"D TWO DOOR WALL STORAGE UNIT
W2 3' - 0" 7/I-202 30"H x 15"D TWO DOOR WALL STORAGE UNIT
W3 3' - 6" 7/I-202 30"H x 15"D TWO DOOR WALL STORAGE UNIT
W4 2' - 0" 7/I-202 30"H x 15"D ONE DOOR WALL STORAGE UNIT-RH
W5 2' - 0" 7/I-202 30"H x 15"D TWO DOOR WALL STORAGE UNIT
W6 2' - 9" 6/I-202 18"H x 15"D TWO DOOR WALL STORAGE UNIT
W7 2' - 9" 7/I-202 30"H x 15"D TWO DOOR WALL STORAGE UNIT
W8 2' - 3" 7/I-202 30"H x 15"D TWO DOOR WALL STORAGE UNIT
Scale: 1/4" = 1'-0"
KITCHEN 150- WEST
Scale: 1/4" = 1'-0"
ECHO READING 111- EAST
Scale: 1/4" = 1'-0"
EKG TECH WORK AREA 105- WEST
Scale: 1/4" = 1'-0"
LAB 102- NORTH
INTEGRATED PATIENT MODULAR CASEWORK
Type Mark WIDTH Description Comments
MC1 2' - 6" Mora ADA Sink Enclosure Standard HPL 19D 24W
MC2 1' - 3" Mora Wall-Mounted Door Towers Glove Acc/3 Drws R End/L Hinge /Profile Pull HPL 15W 19D 66H
MC3 4' - 6" Mora Corian Worksurface w/Oval Sink Sink Centered Above Cab 4H Backsplash 19D Sink
MC4 4' - 6" Accessory Rail 54W
MC5 4' - 6" Mora Floating Shelf 54W
MC6 1' - 3" Mora Wall-Mounted Door Towers Glove Acc/3 Drws R End/L Hinge/Profile Pull HPL/Slope Top 15W 19D 66H
MC7 4' - 6" Mora Corian Worksurface w/Oval Sink Sink Centered Above Cab 4H Backsplash 19D Sink Centered
Scale: 1/4" = 1'-0"
CORRIDOR C130- EAST
Scale: 1/4" = 1'-0"
SOILED- SOUTH
Scale: 1/4" = 1'-0"
RECEPTION- WEST
Scale: 1/4" = 1'-0"
RECEPTION- EAST
Scale: 1/4" = 1'-0"
LAB- EAST
Scale: 1/4" = 1'-0"
TYPICAL EXAM
Scale: 1/4" = 1'-0"
STAFF WORK AREA WEST
Scale: 1/4" = 1'-0"
LOBBY- WEST
Scale: 1/4" = 1'-0"
WATING- WEST
Scale: 1/4" = 1'-0"
CLEAN/MEDS 132- WEST
Scale: 1/4" = 1'-0"
RECEPTION 100B- SOUTH
Scale: 1/4" = 1'-0"
KITCHEN 150 - SOUTH
1 FILLER PANEL
2 SLOPE TOP
3 24"D SOLID SURFACE COUNTERTOP WITH
BACK/ENDSPLASH, SS-1
4 SOLID SURFACE WALL SPLASH, SS-2
5 SUPPORT PANEL
6 FINISHED END PANEL
7 SOLID SURFACE WALL SPLASH, SS-1
8 RP-1, COUNTERTOP TO SOFFIT ABOVE
9 RP-2, FULL HEIGHT FROM FLOOR TO CEILING ABOVE
10 HIW-2
11 36'D SOLID SURFACE COUNTERTOP AND
SIDESPLASH, SS-2
12 GROMMET
Scale: 1/4" = 1'-0"
RECEPTION RESIN PANEL
Scale: 1/4" = 1'-0"
CARDIOLOGY EXAM 6 - 119
Scale: 3/4" = 1'-0"
SECTION AT RECEPTION DESK
Scale: 1/4" = 1'-0"
TYPICAL EXAM ROOM
CASEWORK - ALT DEDUCT 1
Scale: 1/4" = 1'-0"
TYPICAL SOLID SURFACE
CLADDING 104, 105, 107, 109,
133, 138
Scale: 1/4" = 1'-0"
TYPICAL SOLID SURFACE
CLADDING - 103
1 35% SCHEMATIC DESIGN DOCUMENTS 04/10/2020
2 65% DESIGN DEVELOPMENT 06/04/2020
3 65% DESIGN DEVELOPMENT - RE-SUBMISSION 06/26/2020
4 65% DESIGN DEVELOPMENT - RE-SUBMISSION 01/26/2021
5 95% CONSTRUCTION DOCUMENTS 04/06/2021
6 95% CONSTRUCTION DOCUMENTS -
RE-SUBMISSION
04/20/2021
7 95% CONSTRUCTION DOCUMENTS 07/15/2021
8 100% CONSTRUCTION DOCUMENTS 09/10/2021
BACKER SHEET (TYP)
FOR UNEXPOSED SURFACES
MOUNT OUTLET IN MILLWORK;
COORDINATE WITH ELECTRICAL
ANTIMICROBIAL SILICONE SEALANT,
COLOR TO MATCH ADJACENT WALL
WIRE PULL
COUNTERTOP CONSTRUCTED OF 1/2" SOLID
SURFACE WITH INTEGRAL BACKSPLASH.
PROVIDE BUILD-UP EDGE TO 1-1/2" WITH 1/8"
RADIUS TOP AND BOTTOM, FULLY WRAPPED.
NOTE:
ALL EXPOSED PLYWOOD
FACES & EDGES TO RECEIVE
HIGH PRESSURE LAMINATE.
BASE, SEE FINISH PLANS
BOTTOM CONSTRUCTED W/ 3/4" PLYWOOD
DOWELED INTO CABINET SIDES
2x BLOCKING
1x BLOCKING, TOP & BOTTOM
TOE KICK CONSTRUCTED OF 3/4"
PLYWOOD TOE BOARD
CAVITY
MICROWAVE. VERIFY SIZE AND
MANF. INSTALLATION PRIOR TO
FABRICATION OF MILLWORK TO
CONFIRM SHELF DEPTH REQUIRED
BY MICROWAVE.
1'-11"
2'-0"
BOTTOM CONSTRUCTED W/ 3/4" PLYWOOD
DOWELED INTO CABINET SIDES.
BASE, SEE FINISH PLANS
ANTIMICROBIAL SILICONE SEALANT, COLOR
TO MATCH ADJACENT WALL
2x BLOCKING
1x BLOCKING, TOP & BOTTOM
COUNTERTOP CONSTRUCTED OF 1/2" SOLID
SURFACE WITH INTEGRAL BACKSPLASH.
PROVIDE BUILD-UP EDGE TO 1-1/2" WITH 1/8"
RADIUS TOP AND BOTTOM, FULLY WRAPPED.
FULL OVERLAY DOOR CONSTRUCTED
W/ 3/4" PLYWOOD
FALSE FRONT CONSTRUCTED W/ 3/4"
PLYWOOD
BACK CONSTRUCTED W/ 1/2" PLYWOOD.
BACKS TO FIT INTO CABINET SIDE DADOES
NOTE:
ALL EXPOSED PLYWOOD
FACES & EDGES TO RECEIVE
HIGH PRESSURE LAMINATE.
TOE KICK CONSTRUCTED OF 3/4" PLYWOOD
TOE BOARD
REMOVABLE PANEL, ATTACH
TO CLEATS WITH NICKEL
PLATED SCREWS AND FINISH
WASHERS. MATCH REVEAL
AND EDGE TREATMENT OF
DOORS AND DRAWERS.
DROP-IN SINKS TO BE SET WITH SEALANT
ALONG ALL EDGES
2'-0"
3MM MATCHING PVC EDGE
WRAP CONT.-ALL SIDES
EUROPEAN CONCEALED HINGE
R E
F E
R T
O E
L E
V S
BLOCKING REQUIRED
WIRE PULL
ADJUSTABLE SHELF STANDARDS
BACK CONSTRUCTED W/ 1/2"
PLYWOOD. BACKS TO FIT INTO
CABINET SIDE DADOES
3/4" ADJUSTABLE S SHELVES W/ PLASTIC
LAMINATE AT ALL EXPOSED SURFACES
FULL OVERLAY DOOR
CONSTRUCTED W/ 3/4" PLYWOOD
NOTE:
ALL EXPOSED PLYWOOD
FACES & EDGES TO RECEIVE
HIGH PRESSURE LAMINATE.
1' - 3"
SLOPED TOP OR GYP. BD.
SOFFIT. REFER TO CEILING
PLANS & ELEVATIONS
1'-3"
3/4" X 2"
LIGHT VALANCE @ ALL WALL
CABINETS U.N.O. VERIFY
LOCATIONS ON ELECTRICAL
PLANS
R E
F E
R T
O E
L E
V S
BLOCKING REQUIRED
WIRE PULL
ADJUSTABLE SHELF STANDARDS
BACK CONSTRUCTED W/ 1/2"
PLYWOOD. BACKS TO FIT INTO
CABINET SIDE DADOES
(2) 3/4" ADJUSTABLE S SHELVES W/
PLASTIC LAMINATE AT ALL EXPOSED
SURFACES
FULL OVERLAY DOOR
CONSTRUCTED W/ 3/4" PLYWOOD
NOTE:
ALL EXPOSED PLYWOOD
FACES & EDGES TO RECEIVE
HIGH PRESSURE LAMINATE.
SLOPED TOP OR GYP. BD.
SOFFIT. REFER TO CEILING
PLANS & ELEVATIONS
COUNTERTOP CONSTRUCTED OF 1/2" SOLID
SURFACE WITH INTEGRAL BACKSPLASH.
PROVIDE BUILD-UP EDGE TO 1-1/2" WITH 1/8"
RADIUS TOP AND BOTTOM, FULLY WRAPPED.
(3) DRAWER UNITS CONSTRUCTED WITH
1/2" PLYWOOD SIDES. 3/4" FRONTS & BACKS
& 1/2" FULLY CAPTURED BOTTOM. DRAWER
FACES CONSTRUCTED OF 3/4" PLYWOOD.
BACK CONSTRUCTED W/ 1/2" PLYWOOD.
BACKS TO FIT INTO CABINET SIDE DADOES
BASE, SEE FINISH PLANS
BOTTOM CONSTRUCTED W/ 3/4" PLYWOOD
DOWELED INTO CABINET SIDES
E Q
E
Q
E Q
ANTIMICROBIAL SILICONE SEALANT, COLOR TO
MATCH ADJACENT WALL
2x BLOCKING
1x BLOCKING, TOP & BOTTOM
NOTE:
ALL EXPOSED PLYWOOD
FACES & EDGES TO RECEIVE
HIGH PRESSURE LAMINATE.
TOE KICK CONSTRUCTED OF 3/4"
PLYWOOD TOE BOARD
(3) WIRE PULL
1' - 11"
2' - 0"
COUNTERTOP CONSTRUCTED OF 1/2" SOLID
SURFACE WITH INTEGRAL BACKSPLASH.
PROVIDE BUILD-UP EDGE TO 1-1/2" WITH 1/8"
RADIUS TOP AND BOTTOM, FULLY WRAPPED.
(2) DRAWER UNITS CONSTRUCTED WITH 1/2"
PLYWOOD SIDES. 3/4" FRONTS & BACKS &
1/2" FULLY CAPTURED BOTTOM. DRAWER
FACES CONSTRUCTED OF 3/4" PLYWOOD.
BACK CONSTRUCTED W/ 1/2" PLYWOOD.
BACKS TO FIT INTO CABINET SIDE DADOES
BASE, SEE FINISH PLANS
BOTTOM CONSTRUCTED W/ 3/4" PLYWOOD
DOWELED INTO CABINET SIDES
E Q
E
Q
ANTIMICROBIAL SILICONE SEALANT,
COLOR TO MATCH ADJACENT WALL
2x BLOCKING
1x BLOCKING, TOP & BOTTOM
NOTE:
ALL EXPOSED PLYWOOD FACES
& EDGES TO RECEIVE HIGH
PRESSURE LAMINATE.
TOE KICK CONSTRUCTED OF
3/4" PLYWOOD TOE BOARD
WIRE PULL
1' - 11"
2' - 0"
DRAWER UNIT CONSTRUCTED WITH 1/2"
PLYWOOD SIDES. 3/4" FRONTS & BACKS &
1/2" FULLY CAPTURED BOTTOM. DRAWER
FACES CONSTRUCTED OF 3/4" PLYWOOD.
FULL OVERLAY DOOR CONSTRUCTED W/ 3/4" PLYWOOD
ADJUSTABLE SHELF CONSTRUCTED WITH 3/4"
FIRE RETARDANT TREATED PLYWOOD. EDGES
TO RECEIVE MATCHING .018 PVC BANDING
METAL ADJUSTABLE SHELF STANDARDS
BACK CONSTRUCTED W/ 1/2" PLYWOOD.
BACKS TO FIT INTO CABINET SIDE DADOES
BASE, SEE FINISH PLANS
BOTTOM CONSTRUCTED W/ 3/4" PLYWOOD
DOWELED INTO CABINET SIDES
ANTIMICROBIAL SILICONE SEALANT,
COLOR TO MATCH ADJACENT WALL
2x BLOCKING
1x BLOCKING, TOP & BOTTOM
NOTE:
ALL EXPOSED PLYWOOD FACES
& EDGES TO RECEIVE HIGH
PRESSURE LAMINATE.
TOE KICK CONSTRUCTED OF 3/4" PLYWOOD TOE BOARD
WIRE PULL
1'-11"
2'-0"
COUNTERTOP CONSTRUCTED OF 1/2" SOLID
SURFACE WITH INTEGRAL BACKSPLASH.
PROVIDE BUILD-UP EDGE TO 1-1/2" WITH 1/8"
RADIUS TOP AND BOTTOM, FULLY WRAPPED.
CUT END PIECES TO BE
EASED EDGE
CAULK-SEE SCRIBE DETAIL
1" R. ALL EXPOSED CORNERS
EXPOSED EDGE
OPEN END ELEVATION
OPEN END PLAN
/4
/4
1" 2'-0"
R 1"
COUNTERTOP-CAULK
TO SPLASH
3/4" PLYWOOD
ALL TOPS SHALL BE
SCRIBED TO WALL
PRIOR TO
INSTALLATION &
CAULKED
SPLASH END ELEVATION
SPLASH END PLAN
1" 2'-0"1 /2
/4
1/2"
/4
TRIM EDGE OF
SOLID SURFACE AT
THE INTEGRAL
BACK SPLASH
2" DIA. GROMMET
WITH COVER AND
SLEEVE
2"
GROMMET DETAIL
3/4" ANGLE BRACE
@ 36" O.C.
ANGLE CLIPS
FINISHED
CEILING LINE
COND. @
SLOPED SOFFIT
EXTENDED SOFFIT FIN.
END PANEL PASSED
CAB. FIN. END 3/8"H MIN.
1"
1"1"
PLASTIC LAMINATE
BASE AS SCHEDULE
NOTE: SEE MILLWORK
GENERAL NOTES FOR
CABINET CONSTRUCTION
REQUIRED BLOCKING
INTERIOR FINISH-
MELAMINE U.N.O.
3"
1' - 11"
SCHEDULED
BASE
SOLID SURFACE COUNTER
WITH INTEGRAL SINK AND
BACKSPLASH
SINK BASE
ACCESSORY RAIL
FLOATING SHELF
PROVIDE BLOCKING AS
REQUIRED, TYP.
TOWER WITH 3
GLOVE OPENINGS
SLOPE TOP
BLOCKING AS
REQUIRED
RB-1
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/8
/2
:2
:2
P M
I-202
CASEWORK DETAILS
5 18JK
DESIGN MEDICAL SPECIALTY
CLINIC
10535 HOSPITAL WAY, MATHER CA
95655
SEPTEMBER 10, 2021
100% CONSTRUCTION DOCUMENTS
612-12218-237-Q12
ELI
Scale: 3/4" = 1'-0"
OPEN BASE STORAGE UNIT- MICROWAVE
Scale: 3/4" = 1'-0"
BASE CABINET SINK UNIT
Scale: 3/4" = 1'-0"
CABINET DRAWER PLAN
Scale: 3/4" = 1'-0"
TYPICAL 15-24" WALL CABINET
Scale: 3/4" = 1'-0"
TYPICAL 30"H WALL CABINET
Scale: 3/4" = 1'-0"
BASE CABINET W/ 3 EQUAL DRAWERS
Scale: 3/4" = 1'-0"
BASE CABINET W/ 2 FILE DRAWERS
Scale: 3/4" = 1'-0"
BASE CABINET W/ ONE DRAWER & DOOR
Scale: 3/4" = 1'-0"
COUNTERTOP OPEN END VIEWS
Scale: 3/4" = 1'-0"
SCRIBE DETAIL
Scale: 3/4" = 1'-0"
GROMMET DETAIL
Scale: 3/4" = 1'-0"
PLASTIC LAMINATE SLOPED TOP
Scale: 3" = 1'-0"
TOE KICK DETAIL
Scale: 3/4" = 1'-0"
END PANEL DETAIL
Scale: 3/4" = 1'-0"
TYPICAL INTEGRATED PATIENT MODULAR CASEWORK
SECTION
Scale: 3/4" = 1'-0"
TYPICAL INTEGRATED PATIENT MODULAR CASEWORK
TOWER SECTION
1 35% SCHEMATIC DESIGN DOCUMENTS 04/10/2020
2 65% DESIGN DEVELOPMENT 06/04/2020
3 65% DESIGN DEVELOPMENT - RE-SUBMISSION 06/26/2020
4 65% DESIGN DEVELOPMENT - RE-SUBMISSION 01/26/2021
5 95% CONSTRUCTION DOCUMENTS 04/06/2021
6 95% CONSTRUCTION DOCUMENTS -
RE-SUBMISSION
04/20/2021
7 95% CONSTRUCTION DOCUMENTS 07/15/2021
8 100% CONSTRUCTION DOCUMENTS 09/10/2021
HR-1
CR-1
CG-1
CG-1CG-1
I-402
HR-1
CR-1
CG-1
I-402
HR-1
CR-1
I-402
HR-1
CG-1
CR-1
I-402
HR-1
CR-1
CG-1
CG-1
CG-1CG-1
CG-1CG-1
I-402
HR-1
CR-1
CG-1CG-1 CG-1CG-1CG-1
CR-1
HR-1
CR-1
HR-1
I-402
HR-1
CR-1
CG-1
I-402
HR-1
CR-1
CG-1
I-402
CR-1
HIW-1
I-402
CG-1
CG-1CG-1
CG-1 HIW-2
WP-1
I-402
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/8
/2
:2
:3
P M
I-401
INTERIOR WALL PROTECTION
ELEVATIONS
6 18JK
DESIGN MEDICAL SPECIALTY
CLINIC
10535 HOSPITAL WAY, MATHER CA
95655
SEPTEMBER 10, 2021
100% CONSTRUCTION DOCUMENTS
612-12218-237-Q12
ELI
Scale: 1/4" = 1'-0"
CORRIDOR C114 NORTH
Scale: 1/4" = 1'-0"
CORRIDOR C114 SOUTH
Scale: 1/4" = 1'-0"
CORRIDOR C130 NORTH
Scale: 1/4" = 1'-0"
CORRIDOR C130 SOUTH
Scale: 1/4" = 1'-0"
CORRIOR C130 EAST
Scale: 1/4" = 1'-0"
CORRIDOR C130 WEST
Scale: 1/4" = 1'-0"
CORRIDOR C118 NORTH
Scale: 1/4" = 1'-0"
CORRIDOR C118 SOUTH
Scale: 1/4" = 1'-0"
TYPICAL HEIGHT AND WEIGHT 101
Scale: 1/4" = 1'-0"
LOBBY 100A- WEST
Scale: 1/4" = 1'-0"
TYPICAL HIGH IMPACT WALLCOVERING -
103 SOILED, 108 ALCOVE, 132 CLEAN/MEDS,
& 138A STOR.
1 35% SCHEMATIC DESIGN DOCUMENTS 04/10/2020
2 65% DESIGN DEVELOPMENT 06/04/2020
3 65% DESIGN DEVELOPMENT - RE-SUBMISSION 06/26/2020
4 65% DESIGN DEVELOPMENT - RE-SUBMISSION 01/26/2021
5 95% CONSTRUCTION DOCUMENTS 04/06/2021
6 95% CONSTRUCTION DOCUMENTS -
RE-SUBMISSION
04/20/2021
7 95% CONSTRUCTION DOCUMENTS 07/15/2021
8 100% CONSTRUCTION DOCUMENTS 09/10/2021
HR-1
CR-1
CG-1
CG-1
CR-1
"3
I-402 _____5
I-402
HR-1
CR-1
" 3
I-402 _____6
I-402
CG-1 CG-1 CG-1
CG-1
CG-1CG-1 CG-1 CG-1
STAINLESS STEEL
CORNER GUARD
NOSE
RADIUS
STEEL STUD (BY CONTRACTOR)
G.W.B. (BY CONTRACTOR)
L E
G L
E N
G T
H
#10 X 1 1/2" PH FLAT HD
WOOD SCREW
16" [406.4mm] O.C. MAX.
A N G
LE
FINISHED FLOOR
BASE
FINISHED WALL
PETG CRASH RAIL WITH
ALUMINUM RETAINER
PETG HANDRAIL WITH STANDOFF
MOUNTING BRACKET
T.O. HANDRAIL TO BE NO
HIGHER THAN 38". 36" PREF.
BLOCKING
BLOCKING
T O
P O
F H
A N
D R
A
IL
FINISHED FLOOR
BASE
FINISHED WALL
PETG CRASH RAIL WITH
ALUMINUM RETAINER
BLOCKING
FINISHED FLOOR
VINYL BASE (4") OR
INTEGRAL COVE BASE (6")
FINISHED WALL
HIGH IMPACT
WALLCOVERING
METAL CAP BY WALL
PROTECTION MFR.
(REF ELEVATIONS FOR MATERIALS AND HEIGHTS)
V A
R
IE
S
FINISHED FLOOR
BASE
HIGH IMPACT
WALLCOVERING
S E
E E
L E
V A
T
IO
N S
V A
R
IE
S
FINISHED WALL
(REF ELEVATIONS FOR MATERIALS AND HEIGHTS)
METAL CAP BY WALL
PROTECTION MFR.
BLOCKING
PETG CRASH RAIL WITH
ALUMINUM RETAINER
STEEL STUD
(BY CONTRACTOR)
G.W.B. (BY CONTRACTOR)
#10 X 1 1/2" PH FLAT HD
WOOD SCREW
16" [406.4mm] O.C. MAX.
STAINLESS STEEL
CHANNEL GUARD
FINISHED WALL WIDTH
NOSE
RADIUS
L E
G L
E N
G T
H
A N G
LE
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/8
/2
:2
:4
P M
I-402
INTERIOR WALL PROTECTION
ELEVATIONS AND DETAILS
7 18JK
DESIGN MEDICAL SPECIALTY
CLINIC
10535 HOSPITAL WAY, MATHER CA
95655
SEPTEMBER 10, 2021
100% CONSTRUCTION DOCUMENTS
612-12218-237-Q12
ELI
Scale: 1/4" = 1'-0"
CORRIDOR 134 NORTH
Scale: 1/4" = 1'-0"
CORRIDOR C134 SOUTH
Scale: 1/4" = 1'-0"
STAFF WORK AREA 159 EAST
Scale: 1/4" = 1'-0"
STAFF WORK AREA 159 WEST
Scale: 6" = 1'-0"
CORNER GUARD DETAIL
Scale: 1" = 1'-0"
TYPICAL HANDRAIL AND CRASH RAIL
Scale: 1" = 1'-0"
TYPICAL CRASH RAIL
Scale: 1" = 1'-0"
TYPICAL WALL PROTECTION
Scale: 1" = 1'-0"
TYPICAL WALL PROTECTION WITH CRASH RAIL
Scale: 6" = 1'-0"
END WALL GUARD DETAIL
1 35% SCHEMATIC DESIGN DOCUMENTS 04/10/2020
2 65% DESIGN DEVELOPMENT 06/04/2020
3 65% DESIGN DEVELOPMENT - RE-SUBMISSION 06/26/2020
4 65% DESIGN DEVELOPMENT - RE-SUBMISSION 01/26/2021
5 95% CONSTRUCTION DOCUMENTS 04/06/2021
6 95% CONSTRUCTION DOCUMENTS -
RE-SUBMISSION
04/20/2021
7 95% CONSTRUCTION DOCUMENTS 07/15/2021
8 100% CONSTRUCTION DOCUMENTS 09/10/2021
F3200
E0903 E0906U0001U0001
E1500E1500
F3050
F3200
E0912
A1132
M4100
M4116
E1500
E0210 A5145
A5108
A5107
A1066
A5075
M1801
F2000
E0210A5145
F3200
A1132
M4116
M4100
A1132
E0912
E1500
F0465
A1066
A5075 A5080
A5107
A5108
F3200
M1802
M0512
A5210
A5080
A5075
A1066
A5107
A5108
A5077
F3200
A5075
A5080
A5108
A5107
A1066
F2010
A5080
A5075
F3200
U0005
F2010
A1012
A5077
A1132
M4100M4200
A5108
A5075
A5080
F2010
A5107
A5075
A5080
E0210
M0720
F3200
A5075 A5080
R7250
K1552
K4665
A5145 A5075
A5080
A5107
M3150
A5145
E0210
A5107
A5080A5075
A1066
A5108
F2000
M4116 A1132
E0912
E1500
A5080A5075
A5135
A5080 A5075
F3200
A6046
F2300 F3200
A5145A5145
F3200
A5077
A5107
A1012
A5077
A5080
A5075 F3200
U0005
F2010
A1132
M4100
M4200
A5108
3'-0"
A5080
A5075A5107
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/8
/2
:2
:0
P M
I-403
INTERIOR EQUIPMENT ELEVATIONS
8 18JK
DESIGN MEDICAL SPECIALTY
CLINIC
10535 HOSPITAL WAY, MATHER CA
95655
SEPTEMBER 10, 2021
100% CONSTRUCTION DOCUMENTS
612-12218-237-Q12
ELI
Scale: 1/4" = 1'-0"
CLEAN/MEDS 132- NORTH
Scale: 1/4" = 1'-0"
CLEAN/MEDS 132- EAST
Scale: 1/4" = 1'-0"
CLEAN/MEDS 132- SOUTH
Scale: 1/4" = 1'-0"
TYPICAL ECHO- NORTH
Scale: 1/4" = 1'-0"
TYPICAL ECHO- SOUTH
Scale: 1/4" = 1'-0"
TYPICAL ECHO- EAST
Scale: 1/4" = 1'-0"
TYPICAL ECHO- WEST
Scale: 1/4" = 1'-0"
STRESS 106- NORTH
Scale: 1/4" = 1'-0"
STRESS 106- SOUTH
Scale: 1/4" = 1'-0"
STRESS 106- WEST
Scale: 1/4" = 1'-0"
CONFERENCE 149- NORTH
Scale: 1/4" = 1'-0"
CONFERENCE 149- WEST
Scale: 1/4" = 1'-0"
PULMINARY TESTING LAB 133- NORTH
Scale: 1/4" = 1'-0"
PULMINARY TESTING LAB 138- NORTH
Scale: 1/4" = 1'-0"
PULMINARY TESTING LAB 138- WEST
Scale: 1/4" = 1'-0"
TYPICAL EXAM- NORTH
Scale: 1/4" = 1'-0"
TYPICAL EXAM- EAST
Scale: 1/4" = 1'-0"
TYPICAL EXAM- SOUTH
Scale: 1/4" = 1'-0"
TYPICAL EXAM- WEST
Scale: 1/4" = 1'-0"
LAB 131- SOUTH
Scale: 1/4" = 1'-0"
LAB 131- WEST
Scale: 1/4" = 1'-0"
PULMINARY TESTING LAB 133- SOUTH
Scale: 1/4" = 1'-0"
KITCHEN- WEST
Scale: 1/4" = 1'-0"
CLEAN/MEDS- WEST
Scale: 1/4" = 1'-0"
HOLTER EKG- NORTH
Scale: 1/4" = 1'-0"
HOLTER EKG- SOUTH
Scale: 1/4" = 1'-0"
HOLTER EKG- WEST
Scale: 1/4" = 1'-0"
HAC 135- WEST
Scale: 1/4" = 1'-0"
SOILED 103 - SOUTH
Scale: 1/4" = 1'-0"
WAITING 100D- SOUTH
Scale: 1/4" = 1'-0"
WAITING 100D- WEST
Scale: 1/4" = 1'-0"
TYPICAL OFFICE - WEST
Scale: 1/4" = 1'-0"
HAC 135 - EAST
Scale: 1/4" = 1'-0"
CARDIOLOGY 119 - EAST
Scale: 1/4" = 1'-0"
CARDIOLOGY 119 - NORTH
Scale: 1/4" = 1'-0"
CARDIOLOGY 119 - SOUTH
Scale: 1/4" = 1'-0"
CARDIOLOGY 119 - WEST
Scale: 1/4" = 1'-0"
TYPICAL EXAM ROOM SINK
WALL - ALT DEDUCT 1
1 35% SCHEMATIC DESIGN DOCUMENTS 04/10/2020
2 65% DESIGN DEVELOPMENT 06/04/2020
3 65% DESIGN DEVELOPMENT - RE-SUBMISSION 06/26/2020
4 65% DESIGN DEVELOPMENT - RE-SUBMISSION 01/26/2021
5 95% CONSTRUCTION DOCUMENTS 04/06/2021
6 95% CONSTRUCTION DOCUMENTS -
RE-SUBMISSION
04/20/2021
7 95% CONSTRUCTION DOCUMENTS 07/15/2021
8 100% CONSTRUCTION DOCUMENTS 09/10/2021
B
C
D
I-423
I-423
1_____ I-423
I-423
I-424
I-421
I-422
I-424
I-423
I-423
I-424
I-431
I-431
I-432
I-431
I-432
A.1
I-424
ECHO
READING
ECHO
ECHO
107 STRESS
CARDIOLOGY
EXAM 4
CARDIOLOGY
EXAM 3
CARDIOLOGY
EXAM 2
CARDIOLOGY
EXAM 1
PAT UNI
TLT
NS MGR
OFFICE
PULMONARY
EXAM 1
CARDIOLOGY
EXAM 7
CARDIOLOGY
EXAM 8
PULMONARY
EXAM 2
PULMONARY
EXAM 3
NEPHR.
EX. 1
NEPHROLOGY
EXAM 2
PULMONARY
EXAM 4
STF TLT
NEPHRO.
EXAM 4
SHARED
OFFICE
SHARED
OFFICE
SHARED
OFFICE
CONFERENCE
CHIEF
OFFICE
ALCOVE
EKG
TECH
WORK
AREA
PULMINARY
TESTING
LAB
NEPHRO.
EXAM 3
SHARED
OFFICE
LAB
I.T.
ROOM
NURSE
ROOM
NURSE
ROOM
CHIEF
OFFICE
TOILET
RM
ELEC
STAFF
WORK
AREA
CORRIDOR
C114
CORRIDOR
C151
MECHANICAL
LOBBY
100A
WAITING
100D
HEIGHT
AND
WEIGHT
RECEPTION
100B
CARDIOLOGY
EXAM 5
SOILED
PAT UNI
TLT
CLEAN /
MEDS
HOLTER
EKG
STF TLT
VESTIBULE
HAC
PULMINARY
TESTING
LAB
CORRIDOR
C134
NURSE
ROOM
152NURSE
ROOM
CHIEF
OFFICE
CORRIDOR
C130
CORRIDOR
C118
CORRIDOR
C154
KITCHEN
I-424
CARDIOLOGY
EXAM 6
STOR.
138A
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/8
/2
:2
:2
P M
I-411
FIRST FLOOR OVERALL EQUIPMENT
PLAN
9 18JK
DESIGN MEDICAL SPECIALTY
CLINIC
10535 HOSPITAL WAY, MATHER CA
95655
SEPTEMBER 10, 2021
100% CONSTRUCTION DOCUMENTS
612-12218-237-Q12
ELI
Scale: 1/8" = 1'-0"
FIRST FLOOR OVERALL EQUIPMENT PLAN
N
KEY PLAN
SCALE: NO SCALE
NORTH
0 2 4 8
1 35% SCHEMATIC DESIGN DOCUMENTS 04/10/2020
2 65% DESIGN DEVELOPMENT 06/04/2020
3 65% DESIGN DEVELOPMENT - RE-SUBMISSION 06/26/2020
4 65% DESIGN DEVELOPMENT - RE-SUBMISSION 01/26/2021
5 95% CONSTRUCTION DOCUMENTS 04/06/2021
6 95% CONSTRUCTION DOCUMENTS -
RE-SUBMISSION
04/20/2021
7 95% CONSTRUCTION DOCUMENTS 07/15/2021
8 100% CONSTRUCTION DOCUMENTS 09/10/2021
B
F0275
M1801
U0006
F0275
M4705
M4705
M4045
M4020
F0280
F0280
M1801
F2000
A1011
M1801
M1825
X4124
U0002 U0003 U0002
F0275 F0275
F0275
F0275 F0275
F0275
U0003 U0003 U0003
U0002
F0275 F0275
F0275
U0003
F0275
U0003
F0275 F0275
U0002 U0002
U0006
U0002
U0002U0002
U0002
M1890
M1890
A1011 A1011
M1801
F0275
A1011
M1801
F2000 F2000
F2000
F0275 A1015
M1801
F0275A1015
M1801
F0275
M1801
A1015
A1015
F2000
F2000 F2000
A1015
M1801
A1015
M1801
M1801
A1015
A1015 M1801
A1015
M1801
F2000
F2000
F2000
M1801
F2000
F2000
F2000
F2000
F2000 F2000
F2000
F2000
F2000
M1801A1015M1801A1015M1801A1015
F3200
ECHO
READING
ECHO
ECHO
STRESS
CARDIOLOGY
EXAM 4
CARDIOLOGY
EXAM 3
CARDIOLOGY
EXAM 2
CARDIOLOGY
EXAM 1
PAT UNI
TLT
NS MGR
OFFICE
CHIEF
OFFICE
ALCOVE
EKG TECH
WORK AREA
I.T.
ROOM
CHIEF
OFFICE
TOILET
RM
STAFF
WORK
AREA
CORRIDOR
C114
LOBBY
100A
WAITING
100D
HEIGHT
AND
WEIGHT
RECEPTION
100B
CARDIOLOGY
EXAM 5
HOLTER
EKG
VESTIBULE
CHIEF
OFFICE
CORRIDOR
C130
E0948 E0948
E0954
A1015
M1801
A1015
M1801
A1015
M1801
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/8
/2
:2
:3
P M
I-421
FIRST FLOOR ENLARGED EQUIPMENT
PLAN A
10 18JK
DESIGN MEDICAL SPECIALTY
CLINIC
10535 HOSPITAL WAY, MATHER CA
95655
SEPTEMBER 10, 2021
100% CONSTRUCTION DOCUMENTS
612-12218-237-Q12
ELI
Scale: 1/4" = 1'-0"
FIRST FLOOR ENLARGED EQUIPMENT PLAN A
N
KEY PLAN
SCALE: NO SCALE
NORTH
0 2 4 8
1 35% SCHEMATIC DESIGN DOCUMENTS 04/10/2020
2 65% DESIGN DEVELOPMENT 06/04/2020
3 65% DESIGN DEVELOPMENT - RE-SUBMISSION 06/26/2020
4 65% DESIGN DEVELOPMENT - RE-SUBMISSION 01/26/2021
5 95% CONSTRUCTION DOCUMENTS 04/06/2021
6 95% CONSTRUCTION DOCUMENTS -
RE-SUBMISSION
04/20/2021
7 95% CONSTRUCTION DOCUMENTS 07/15/2021
8 100% CONSTRUCTION DOCUMENTS 09/10/2021
C
D
I-403
I-40326
E0948
M1410
A5107
A5075
A5080
R6200
L1300
F0210
M4020
M0720
E0210
F0280
F3200
M1801A1011
A5080
A5075 F2010
A5107
A5108
A5180
I-403
F0280
F2010
A5080
E0210
M0720
F0210
M4020
F0275
F0275 F0275
F0275 F0275
F0275
F0275
F0275
A5080
A5075
K1552
A5080
A5075
F0275
A1015
M1801
U0004
F0275
U0004
A1015
M1801
U0004
M1801
A1015
A1015
F0275
M1801
U0004
K4665
I-40314
A1015
F2000
M1801
F0275
F0275A1015
M1801
F2000
F2000
F0275
M1801
A1015
F2000
F0275
M1801
A1015
U0002
U0003U0002
U0003
U0002
U0003 U0002
F0275
M1801
A1015
F2000 F2000
M1801
F0275
A1015
F2000
F0275
M1801
A1015
A5075
F3200
M1801
A1011
A5107
A5108
I-403
F2020 F2020 M3072 M3070
CARDIOLOGY
EXAM 6
PULMONARY
EXAM 1
CARDIOLOGY
EXAM 7
CARDIOLOGY
EXAM 8
PULMONARY
EXAM 2
PULMONARY
EXAM 3
NEPHR.
EX. 1
NEPHROLOGY
EXAM 2
PULMONARY
EXAM 4
STF TLT
NEPHRO.
EXAM 4
SHARED
OFFICE
SHARED
OFFICE
SHARED
OFFICE
CONFERENCE
PULMINARY
TESTING
LAB
NEPHRO.
EXAM 3
SHARED
OFFICE
LAB
NURSE
ROOM
NURSE
ROOM
ELEC
STAFF
WORK
AREA
CORRIDOR
C151
MECHANICAL
WAITING
100D
SOILED
PAT UNI
TLT
CLEAN /
MEDS
STF TLT
HAC
PULMINARY
TESTING
LAB
CORRIDOR
C134
NURSE
ROOM
NURSE
ROOM
CORRIDOR
C118
CORRIDOR
C154
KITCHEN
A5077
R7250
E0117
E0117
E0117
E0117
F0402F0402
E0117
F0402
E0117
E0117 E0117
F0402
F0275
F2015
A5180
M1801
M1801M1801
M1801 M1801
M1801
M1801 M1801
F2000
F2000 F2000
F2000
F2000
F2000
F2000
F2000
F2010
A5080 A5075
STOR.
138A
F2000
F2000
F2000
F2000
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S.
This is the start of the file's text. The full file is on GovTribe.