This document package includes a first floor technology plan drawing and details for a proposed medical specialty clinic construction project, along with the associated federal contract solicitation.

The technology plan drawing shows the proposed layout and installation details for various IT, communications, security and A/V systems throughout the first floor of the building. These include data drops and wireless access points for both clinical and patient networks, a fiber optic patch panel for the BAS, IP cameras connected to the IT room, and empty conduits run for future card readers, TVs and other devices. The solicitation is for construction services to build the proposed 612-122 Medical Specialties clinic located north of existing VA buildings 730 and 731 in Mather, California. The awarded firm will be responsible for site preparation, demolition, building the superstructure, and installing all mechanical, electrical and plumbing systems, landscaping and other site work as detailed in the contract drawings and specifications.

View the file

Other files

File Type Posted
Updated Table of Contents w-Omitted Sections.pdf PDF
36C77622B0012 0004.pdf PDF
Technical Questions Revision to Response No. 3.pdf PDF
Pole Base Detail.pdf PDF
Site Plan Construction Lay Down Area.pdf PDF
Addendum 2.pdf PDF
36C77622B0012 0003.pdf PDF
Technical Questions - FINAL - Mather 4-11-22.pdf PDF
ATTACHMENT 11 - Construction Wage Rates - Sacramento 4-1-22.pdf PDF
SMUD.pdf PDF
36C77622B0012 0002.pdf PDF
36C77622B0012 0001.pdf PDF
Site Visit Sign-in Sheet - Mather 3-15-22.pdf PDF
ATTACHMENT 8 - Contractor Core Work Hours.pdf PDF
ATTACHMENT 9 - COVID-19 Safety Protocols 12-14-21.pdf PDF
ATTACHMENT 1 - Specifications Vol 1 of 2.pdf PDF
ATTACHMENT 5 - Drawings 3 of 3.pdf PDF
ATTACHMENT 2 - Specifications Vol 2 of 2.pdf PDF
ATTACHMENT 10 - Limitations on Subcontracting - Construction.docx DOCX document
ATTACHMENT 3 - Drawings 1 of 3.pdf PDF
ATTACHMENT 4 - Drawings 2 of 3.pdf PDF
36C77622B0012 - 3-2-22.pdf PDF
ATTACHMENT 7 - Brand Name Justification - Mather.pdf PDF
ATTACHMENT 13 - Site Visit - Map.pdf PDF
ATTACHMENT 11 - Construction Wage Rates - Sacramento 2-25-22.pdf PDF
ATTACHMENT 6 - Geotechnical Report.pdf PDF
ATTACHMENT 12 - Contractor Safety - Environmental Form.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

84" 84"

AC

AC

E

42"

E 42"

AC

AC

N

N1

AC

AC

J

J

J

J

48"

AC

AC

48"

48"

48"

48"

48"

48"

48"

48"

48"

48"

A

LOBBY

100A

CORRIDOR

C114

HOLTER EKG

EKG TECH WORK AREA

ALCOVE

CHIEF OFFICE

CHIEF OFFICE

STAFF UNI TLT

I.T. ROOM

ECHO READING

CARDIOLOGY EXAM 1

NS MGR OFFICE

ECHO

ECHO

STRESS

CARDIO. EXAM 5

CARDIO. EXAM 4

CARDIOLOGY EXAM 3

CARDIOLOGY EXAM 2

CARDIOLOGY EXAM 10

CARDIOLOGY EXAM 7

CARDIOLOGY EXAM 6

WAITING

100D

ELEC

MECHANICAL

CONFERENCE

CORRIDOR

C151

PANEL 'FACP'

TK101

OFFICE

NURSE ROOM

NURSE ROOM

NURSE ROOM

NURSE ROOM

15cd

KITCHEN

1/2 W

LOBBY

100A

HEIGHT AND WEIGHT

TOILET RM

SOILED

MOUNT FA PULL

STATION BELOW

SPEAKER STROBE.

CORRIDOR

C130

STORAGE

PAT UNI TLT

CLEAN / MEDS

HAC

CARDIOLOGY EXAM 9

CARDIOLOGY EXAM 8

CORRIDOR

C118

CORRIDOR

C118

STAFF WORK AREA

CORRIDOR

C154

STAFF WORK AREA

CORRIDOR

C130

VESTIBULE

35cd 1/2 W

7 8

2 3 4 5 6

B

C

D

UNOCCUPIED SPACE

120" AFF

120" AFF

PANEL

'815GZ-ELP03'

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

/8

/2

:1

:4

P M

TK101A

FIRST FLOOR TECHNOLOGY PLAN -

DEDUCT ALTERNATE #4

4 7EFJ

DESIGN MEDICAL SPECIALTY

CLINIC

10535 HOSPITAL WAY, MATHER CA

95655

SEPTEMBER 10, 2021

100% CONSTRUCTION DOCUMENTS

612-12218-237-Q12

JVE

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

DEDUCT ALTERNATIVE

NORTH

0 4 8 16

Scale: 1/8" = 1'-0"

FIRST FLOOR TECHNOLOGY PLAN - DEDUCT ALTERNATE #4

1 COORDINATE LOCATION WITH FINAL KIOSK

PLACEMENT.

2 PROVIDE EMPTY DATA CONDUIT TO DOOR

LOCATION FOR FUTURE INSTALLATION OF

CARD READER AT EXTERIOR OF BUILDING,

PUSH BUTTON AT INTERIOR OF BUILDING,

ELECTRONIC LOCKING MECHANISM, DOOR

CONTACT, AND REQUEST FOR EXIT FOR

FUTURE DOOR HARDWARE. ALL EMPTY

CONDUIT TO BE RUN OVER CEILING.

3 PROVIDE EMPTY DATA CONDUIT TO WALL

LOCATION AND OUTLET DATA BOX WITH

FACE COVERING FOR FUTURE INSTALLATION

OF DATA JACK FOR TV. ALL EMPTY CONDUIT

TO BE RUN OVER CEILING.

4 PROVIDE CONDUIT UNDER SLAB FOR

OUTLETS SHOWN TO BE INSTALLED ON HALF

WALL.

5 ALL DATA DROPS SHALL BE ROUTED FROM

THEIR LOCATIONS VIA 2” EMT CONDUIT TO

NEAREST CABLE TRAY. STRAIGHT INLINE

PULL BOX SHALL BE INSTALLED IN CONDUIT

RUNS WHERE CONDUIT EXCEEDS 180

DEGREES.

6 COORDINATE LOCATION OF CODE SIZE

JUNCTION BOX FOR CONNECTION TO

SYSTEM FURNITURE WITH VA. PROVIDE

FLEXIBLE CONDUIT FROM BOX TO

FURNITURE MAKE ALL CONNECTIONS AND

WIRE AS REQUIRED.

7 PROVIDE 24” X 4” WIRE MESH CABLE TRAY.

8 PROVIDE 12” X 4” WIRE MESH CABLE TRAY.

9 PROVIDE HIGH-CAPACITY FLOOR BOX FOR

POWER AND DATA ¾” CONDUIT FOR POWER

AND 1-1/2” CONDUIT FOR DATA.

10 ROVIDE WALL MOUNTED FIBER OPTIC PATCH

PANEL AND DATA OUTLET FOR BAS

COORDINATE WITH MECHANICAL. SEE RISER

DIAGRAM ON SHEET TK601.

11 PLAN AND ASSOCIATED NOTES TO BE

ACCEPTED AS MAIN DESIGN IF BID

ALTERNATE ITEM 4 IS TAKEN.

12 CAMERAS TO BE POE, CAT 6A TO BE RUN

FROM CAMERA TO SPARE PORT IN PATCH

PANEL LOCATED IN I.T. ROOM 116.

13 PROVIDE WALL MOUNTED FIBER PATCH

PANEL AND DATA OUTLET FOR FACP. SEE

RISER DIAGRAM ON SHEET TK601.

A. REFERENCE SPECIFICATIONS FOR WIRELESS

ACCESS POINTS REQUIREMENTS.

CONTRACTOR SHALL PROVIDE FOR THE

SERVICES OF A WIRELESS ANTENNA

PENETRATION SURVEY SUB-CONTRACTOR TO

ANALYZE THE PROPER SPACING AND

PLACEMENT REQUIREMENTS FOR TWO

DISTINCT WIRELESS ACCESS SYSTEMS -

CLINICAL AND PATIENT. UPON SATISFACTORY

REVIEW OF SURVEY, THE CONTRACTOR SHALL

PROVIDE THE NUMBER OF DATA OUTLETS AND

CABLING FOR EACH SYSTEM TO CORRESPOND

WITH THE SURVEY RECOMMENDATIONS.

B. UPON COMPLETION CONTRACTOR SHALL TEST

AND INSPECT ALL SYSTEMS FOR REQUIRED

FUNCTIONS AND DEMONSTRATE TO THE COR

AND VA SPECIFICATIONS.

C. COORDIANTE WITH ARCHITECTURAL

ELEVATIONS FOR EXACT LOCATION AND

ELEVATION OF DEVICES.

D. SEE SHEET TK001 FOR ALTERNATE NOTES AND

ARCHITECTURAL DEDUCT ALTERNATE PLAN

FOR ADDITIONAL INFORMATION.

E. WIRELESS ACCESS POINTS ARE GENERAL

LOCATIONS TO BE CONFIRMED. IT TO INSTALL

WAPS, CONTRACTOR TO RUN CABLE TO

GENERAL LOCATIONS WITH 20 EXTRA FEET

COILING UP ABOVE CEILING

1 35% SCHEMATIC DESIGN DOCUMENTS 04/10/2020

2 65% DESIGN DEVELOPMENT 06/04/2020

3 65% DESIGN DEVELOPMENT - RE-SUBMISSION 06/26/2020

4 65% DESIGN DEVELOPMENT - RE-SUBMISSION 01/26/2021

5 95% CONSTRUCTION DOCUMENTS 04/06/2021

6 95% CONSTRUCTION DOCUMENTS -

RE-SUBMISSION

04/20/2021

7 95% CONSTRUCTION DOCUMENTS 07/15/2021

8 100% CONSTRCUTION DOCUMENTS 09/10/2021

DocuSign Envelope ID: 9E23B62B-308B-446D-AECD-CF0E77C522A7

9/9/2021 9/10/2021 ejorgensen Snapshot ejorgensen Callout FOR DEDUCT ALTERNATE #4 THE BATHROOM DESIGNATION CHANGES FROM A PATIENT TO A STAFF BATHROOM. STANDALONE

RESTROOM CALL WITH PULLCORD AND

DOME LIGHT WITH BUZZER WILL NOT BE REQUIRED FOR THE BATHROOM IF DEDUCT ALTERNATE #4 IS APPLIED.

ejorgensen Snapshot ejorgensen Snapshot ejorgensen Text Box ejorgensen Highlight ejorgensen Highlight ejorgensen Image ejorgensen Callout

DEVICES TO BE OMITTED FROM CONSTRUCTION FOR DEDUCT ALTERNATE #4

ejorgensen Arrow ejorgensen Arrow ejorgensen Text Box

REVIEW KEYNOTE #3

ejorgensen Text Box

TK101, FIRST FLOOR TECHNOLOGY PLAN FOR CONFERENCE RM149

File details come from the government source that posted it. Updated .