Attachment 5 - DBA WD ID20260040 Bonner Co 051826.pdf
PDF 2 MB Posted
- Solicitation number
- 1240LT26Q0071
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a General Decision wage determination document for heavy construction work in Idaho Counties of Bonner, issued under General Decision Number ID20260040 effective May 18, 2026.
The document establishes prevailing wage rates and fringe benefits for various construction trade classifications applicable to Davis-Bacon Act contracts in the specified geographic area. Classifications include carpenters, electricians, power equipment operators (cranes, backhoes, front-end loaders, bulldozers, rollers), ironworkers, laborers, cement masons/concrete finishers, plumbers, truck drivers, and equipment operators. Wage rates range from $17.67 to $49.55 per hour for base compensation, with fringe benefits between 0.00% and 30.27%. The determination includes multiple power equipment operator groups with detailed specifications for equipment type, size, and capacity, along with zone-based pay differentials and boom pay provisions. The document incorporates Executive Order 13706 paid sick leave requirements for covered federal contractors and Executive Order 13658 minimum wage requirements of $13.65 per hour (or applicable higher rate). Union rate identifiers (denoted by prefixes such as ◊SU◊, ◊UAVG◊, ◊SA◊, and ◊SC◊) indicate whether rates are union prevailing, weighted union average, state-adopted, or survey rates. The wage determination became effective on January 2, 2026, with Modification 1 published May 18, 2026. Appeals and reconsideration requests regarding wage determinations should be directed to the appropriate Department of Labor division based on the matter type.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend 02 Attachment 4 - Revised Plans.pdf | ||
| Amendment 02 Sam Owen CG.pdf | ||
| Amend 02 Attachment 3 - FSSS Section 646.docx | DOCX document | |
| Amend 02 Attachment 2 - SOI Sam Owen CG.xlsx | XLSX spreadsheet | |
| Amendment 01 Sam Owen CG.pdf | ||
| Attachment 2 - SOI Sam Owen Campground.xlsx | XLSX spreadsheet | |
| Attachment 2 - SOI Sam Owen Campground.xlsx | XLSX spreadsheet | |
| Attachment 1 - Solicitation Sam Owen CG Improvements.pdf | ||
| Attachment 4 - Signed Plans Sam Owen Campground.pdf | ||
| Attachment 3 - FSSS Sam Owen Campground.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .