Attachment 2 - SOI Sam Owen Campground.xlsx
XLSX spreadsheet 28 KB Posted
- Solicitation number
- 1240LT26Q0071
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Schedule of Items (SOI) pricing template for the Sam Owen Campground Improvements project on the Idaho Panhandle National Forests under solicitation 1240LT26Q0071. The document outlines all required line items with quantities and unit measurements for contractors to input unit prices and extended amounts.
The base scope (Items 0001-0002) encompasses campground demolition and reconstruction work, including mobilization, surveying, testing, erosion control, clearing and grubbing of 17 trees and 14 stumps, removal of existing infrastructure (culverts, gates, kiosks, holding tank components, wood fencing), roadway and spur excavation (3,900 cubic yards), roadway obliteration (900 cubic yards), aggregate base and surface course installation (430-2,750 cubic yards), asphalt concrete placement (1,820 tons across two depth specifications), and fog seal application (7,000 square yards). Additional base items include concrete work for spigots and dumpster pads (15 cubic yards), 52 linear feet of culvert pipe, 90 wheelstops, water system relocation with frost-free spigots and HOST hydrant assembly, sewer system installation with 1,000-gallon holding tank and dump connection, six gates, seeding and mulching, signage system components (86 site markers, informational kiosks, directional signs), electrical systems for five RV pedestals, timber crib steps, 90 picnic tables, 86 fire rings, seven barrier boulders, and vault toilet relocation. Three optional items are available: Option A includes utility survey, additional gates, post-and-rail fencing, dump station gates, and a prefabricated shed structure; Option B includes contractor-designed retaining walls and four bear-proof storage boxes; Option C includes four additional HOST water hydrant assemblies and four sewer dump connections. Contractors must submit unit prices for all items, with payment calculated by extending unit prices by specified quantities. The government reserves the right to award for quantities less than stated and will make a single award from this small business set-aside solicitation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sam Owen SOI
| Sam Owen Campground Improvements |
| Idaho Panhandle National Forests |
| 1240LT26Q0071 |
| SCHEDULE OF ITEMS |
| SCHEDULE OF ITEMS - BASE ITEM 0001 |
| ITEM NUMBER | SPEC NUMBER | ITEM DESCRIPTION | METHOD | UNIT | QTY | UNIT PRICE | AMOUNT |
| 0001AA | 15101 | MOBILIZATION | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0001AB | 15201 | CONSTRUCTION SURVEY AND STAKING, METHOD 2,TOLERANCE CLASS A | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0001AC | 15401 | CONTRACTOR TESTING | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0001AD | 15713 | SOIL EROSION & POLLUTION CONTROL | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0001AE | 15802 | WATERING FOR DUST CONTROL | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0001AF | 20101 | CLEARING AND GRUBBING, DISPOSAL METHOD (a) | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0001AG | 20106 | REMOVAL OF INDIVIDUAL TREES, DISPOSAL METHOD (a) | AQ | EA | 17 | $ - 0 | $ - 0 |
| 0001AH | 20208 | STUMP REMOVAL, DISPOSAL METHOD (a) | AQ | EA | 14 | $ - 0 | $ - 0 |
| 0001AI | 20301A | REMOVAL OF CONCRETE BOLLARDS, DISPOSAL METHOD (a) | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0001AJ | 20301B | REMOVAL OF SITE MARKERS, DISPOSAL METHOD (a) | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0001AK | 20301C | REMOVAL OF PICNIC TABLE, DISPOSAL METHOD (a) | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0001AL | 20301D | REMOVAL OF FIRE RING, DISPOSAL METHOD (a) | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0001AM | 20301E | REMOVAL OF WHEELSTOPS, DISPOSAL METHOD (a) | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0001AN | 20302A | REMOVAL OF CULVERT, DISPOSAL METHOD (a) | AQ | EA | 1 | $ - 0 | $ - 0 |
| 0001AO | 20302B | REMOVAL OF GATES, DISPOSAL METHOD (a) | AQ | EA | 6 | $ - 0 | $ - 0 |
| 0001AP | 20302C | REMOVAL OF SIGN, DISPOSAL METHOD (a) | AQ | EA | 1 | $ - 0 | $ - 0 |
| 0001AQ | 20302D | REMOVAL OF EXISTING KIOSK/FEE SIGNAGE, SALVAGE | AQ | EA | 2 | $ - 0 | $ - 0 |
| 0001AR | 20302E | REMOVAL OF EXISTING HOLDING TANK INLET AND INFRASTRUCTURE, DISPOSAL METHOD (A) | AQ | EA | 1 | $ - 0 | $ - 0 |
| 0001AS | 20302F | REMOVAL OF WOOD FENCE, DISPOSAL METHOD (a) | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0001AT | 20407 | ROADWAY/SPUR EXCAVATION, PLACEMENT METHOD 2, TOLERANCE CLASS 1 | CQ | CY | 3,900 | $ - 0 | $ - 0 |
| 0001AU | 21103 | ROADWAY OBLITERATION, METHOD (2) | CQ | CY | 900 | $ - 0 | $ - 0 |
| 0001AV | 30112 | AGGREGATE SURFACE COURSE, GRADING CRUSHER FINES (4" DEPTH), METHOD (b) | CQ | CY | 430 | $ - 0 | $ - 0 |
| 0001AW | 30201 | AGGREGATE BASE, METHOD (b) (6" DEPTH) | CQ | CY | 2,750 | $ - 0 | $ - 0 |
| 0001AX | 30207 | AGGREGATE SURFACE COURSE, METHOD (b) (4" DEPTH) | CQ | CY | 240 | $ - 0 | $ - 0 |
| 0001AY | 40301 | ASPHALT CONCRETE, IDAHO DOT, TYPE II (3" DEPTH) | AQ | TON | 95 | $ - 0 | $ - 0 |
| 0001AZ | 40304 | ASPHALT CONCRETE, IDAHO DOT, TYPE II (4" DEPTH) | AQ | TON | 1,725 | $ - 0 | $ - 0 |
| 0001BA | 40603 | FOG SEAL, R4 PMRE SPRAY SEAL | CQ | SY | 7,000 | $ - 0 | $ - 0 |
| BASE 0001 TOTAL | $ - 0 |
SCHEDULE OF ITEMS - BASE ITEM 0002
| ITEM NUMBER | SPEC NUMBER | ITEM DESCRIPTION | METHOD | UNIT | QTY | UNIT PRICE | AMOUNT |
| 0002AA | 60101 | CONCRETE, FROST FREE SPIGOT PAD, HOST DUMP COLLAR, & DUMPSTER PADS | CQ | CY | 15 | $ - 0 | $ - 0 |
| 0002AB | 60201 | 12" PIPE CULVERT, CMP, GAGE 16, COMPACTION METHOD (a) | CQ | LF | 52 | $ - 0 | $ - 0 |
| 0002AC | 60910 | WHEELSTOP, PIN DOWN | AQ | EA | 90 | $ - 0 | $ - 0 |
| 0002AD | 61101A | WATER SYSTEM (RELOCATE WATER VALVE, FROST FREE WATER SPIGOT, 1" HDPE, COUPLINGS) | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0002AE | 61101B | WATER SYSTEM (HOST SITE WATER HYDRANT ASSEMBLY) | AQ | EA | 1 | $ - 0 | $ - 0 |
| 0002AF | 61201A | SEWER SYSTEM (HOST SITE HOLDING TANK, 1000 GALLON, WITH HIGH LEVEL ALARM) | AQ | EA | 1 | $ - 0 | $ - 0 |
| 0002AG | 61201B | SEWER SYSTEM (HOST SITE SEWER DUMP CONNECTION) | AQ | EA | 1 | $ - 0 | $ - 0 |
| 0002AH | 61902A | GATE, CAMPGROUND LOOP ENTRY/EXIT, SINGLE GATE | AQ | EA | 4 | $ - 0 | $ - 0 |
| 0002AI | 61902B | GATE, CAMPGROUND LOOP ENTRY/EXIT, DOUBLE GATE | AQ | EA | 2 | $ - 0 | $ - 0 |
| 0002AJ | 62552 | SEEDING AND MULCHING, DRY METHOD | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0002AK | 63301A | SIGN SYSTEM, REMOVE AND RESET METAL FEE TUBES | AQ | EA | 2 | $ - 0 | $ - 0 |
| 0002AL | 63301B | SIGN SYSTEM (CAMPGROUND SITE MARKER) | AQ | EA | 86 | $ - 0 | $ - 0 |
| 0002AM | 63302A | SIGN SYSTEM ("WALK-IN SITES 61-67") | AQ | EA | 1 | $ - 0 | $ - 0 |
| 0002AN | 63302C | SIGN SYSTEM ("FEE AREA") | AQ | EA | 2 | $ - 0 | $ - 0 |
| 0002AO | 63302D | SIGN SYSTEM ("ENTER") | AQ | EA | 1 | $ - 0 | $ - 0 |
| 0002AP | 63304 | SIGN, 3 PANEL, INFORMATIONAL KIOSK | AQ | EA | 2 | $ - 0 | $ - 0 |
| 0002AQ | 63307 | REMOVING AND RESETTING PERMANENT SIGNAGE | AQ | EA | 4 | $ - 0 | $ - 0 |
| 0002AR | 63309 | REMOVE AND RESET, BOULDER | AQ | EA | 7 | $ - 0 | $ - 0 |
| 0002AS | 63501 | TEMPORARY TRAFFIC CONTROL | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0002AT | 63601A | ELECTRICAL SYSTEM (RV PEDESETAL) | AQ | EA | 5 | $ - 0 | $ - 0 |
| 0002AU | 63601B | ELECTRICAL SYSTEM (SERVICE CONNECTION, HOLDING TANK ALARM CONTROL PANEL & NEW RV PEDESTAL) | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0002AV | 64001A | TIMBER CRIB STEPS | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0002AW | 64001B | PICNIC TABLE | AQ | EA | 90 | $ - 0 | $ - 0 |
| 0002AX | 64001C | FIRE RING | AQ | EA | 86 | $ - 0 | $ - 0 |
| 0002AY | 64001D | BARRIER BOULDER | AQ | EA | 7 | $ - 0 | $ - 0 |
| 0002AZ | 64601 | REMOVE AND RELOCATE, EXISTING VAULT TOILET | AQ | EA | 1 | $ - 0 | $ - 0 |
| BASE 0002 TOTAL | $ - 0 | ||||||
| BASE 0001 AND BASE 0002 - TOTAL | $ - 0 |
SCHEDULE OF ITEMS - OPTION A ITEM 0003
| ITEM NUMBER | SPEC NUMBER | ITEM DESCRIPTION | METHOD | UNIT | QTY | UNIT PRICE | AMOUNT |
| 0003AA | 15210 | MISCELLANEOUS SURVEY AND STAKING, EXISTING UTILITIES (AS-BUILT DATA) | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0003AB | 20302 | REMOVAL OF GATES, DISPOSAL METHOD (a) | AQ | EA | 2 | $ - 0 | $ - 0 |
| 0003AC | 61901 | FENCE, POST AND RAIL, INSTALLED | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0003AD | 61902 | GATE, DUMP STATION LOOP | AQ | EA | 2 | $ - 0 | $ - 0 |
| 0003AE | 64001 | CXT SHED STRUCTURE ("SCHWEITZER" 10' - 6" X 12' - 0") | AQ | EA | 1 | $ - 0 | $ - 0 |
| OPTION A 0003 TOTAL | $ - 0 |
SCHEDULE OF ITEMS - OPTION B ITEM 0004
| ITEM NUMBER | SPEC NUMBER | ITEM DESCRIPTION | METHOD | UNIT | QTY | UNIT PRICE | AMOUNT |
| 0004AA | 25701 | CONTRACTOR DESIGNED RETAINING WALL, SPLIT FACE | LSQ | LS | 4 | $ - 0 | $ - 0 |
| 0004AB | 64001 | BEAR PROOF STORAGE BOXES, BEAR GUARDIAN (S124) | AQ | EA | 4 | $ - 0 | $ - 0 |
| OPTION B 0004 TOTAL | $ - 0 |
SCHEDULE OF ITEMS - OPTION C ITEM 0005
| ITEM NUMBER | SPEC NUMBER | ITEM DESCRIPTION | METHOD | UNIT | QTY | UNIT PRICE | AMOUNT |
| 0005AA | 61101 | WATER SYSTEM (HOST SITE WATER HYDRANT ASSEMBLY) | AQ | EA | 4 | $ - 0 | $ - 0 |
| 0005AB | 61201 | SEWER SYSTEM (HOST SITE SEWER DUMP CONNECTION) | AQ | EA | 4 | $ - 0 | $ - 0 |
| OPTION C 0005 TOTAL | $ - 0 | ||||||
| OPTION A,B,C - TOTAL | $ - 0 |
BASE + OPTIONS - GRAND TOTAL $ - 0
| Designated Method of Measurement: |
| LSQ - lump sum quantities, AQ - Actual Quantities, CQ - Contract Quantities |
| NOTE 1: Contractor input Unit Prices |
| NOTE 2: Auto Calculated Values |
| NOTE 3: One award will be made from this solicitation. Contractor's must submit pricing for all items. In the event of an error in extending the proposed prices, unit prices will govern, unless otherwise determined by the Contracting Officer, in accordance with applicable regulations. The Government reserves the right to make award for quantities less than those stated on the Schedule of Items. |
| NOTE 4: Submission of the SOI represents the Contractors commitment to the data herein. It is the responsibility of the Contractor to verify that all values presented in the SOI, including auto-calculated cells, accurately represent the Contractor's intended price elements. The Government shall not be held liable for any errors in calculation or pricing data. |
| NOTE 5: Payment for bond premiums in accordance with AGAR Clause 452.232-71, Progress Payments for Commercial Construction Contracts, shall not be in addition to the contract price, but may be included under Mobilization. |
QUOTER NAME:
SAM UEI #:
DATE:
File details come from the government source that posted it. Updated .