Amend 02 Attachment 3 - FSSS Section 646.docx

DOCX document 27 KB Posted

Attached to
GAOA Sam Owen Campground Improvements, Idaho Panhandle National Forest
Solicitation number
1240LT26Q0071
Issued by

About this file

This is a specification section for construction work on a federal solicitation for campground improvements. Section 646 describes the relocation of an existing vault toilet building at the Sam Owen Campground on the Idaho Panhandle National Forest. The Contractor must remove the existing vault toilet building and reinstalling it at Scotchman Peak Trailhead (latitude 48.1643070, longitude -116.0986980), approximately 8 miles northeast of Clark Fork, Idaho. The work includes pumping the vault of all sewage and debris prior to removal, transporting the building safely to avoid damage, and installing the toilet following manufacturer specifications for the CXT Cascadian model precast concrete vault toilet building. The Contractor is responsible for all aspects of the relocation including excavation, bedding, backfilling, compaction, finish grading, site restoration at the original location, securing required permits for transport, and repairing any damage incurred during relocation operations, up to and including replacement of damaged components. The original site must be restored to match surrounding terrain with removal of all foundation materials and debris, proper backfilling and compaction, finish grading to blend with adjacent contours, and restoration of drainage patterns. Payment is based on the contract price per unit of measurement as listed in the schedule of items, with payment constituting full compensation for all prescribed work. This specification is part of Solicitation Number 1240LT26Q0071, a Request for Quotation set-aside for small business concerns under NAICS code 237990, with the quote due date extended to July 16, 2026.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

646 – Relocate Existing Vault Toilet Building

Description

646.01 This work consists of removing an existing vault toilet building and reinstalling it at a new location.

Material

646.02 Conform to the following Subsections:

Surface Course Crusher Fines703.05(d)
Precast Concrete Vault Toilet713.23

Construction Requirements

646.03 Removal. Remove building and vault so as to minimize damage to components. Vault shall be pumped of all sewage and debris prior to removal and transport.

Upon completion of removal of the existing vault toilet, the Contractor shall restore the original site to match the surrounding terrain and site conditions. Restoration shall include removal of all foundation materials, debris, and construction waste; backfilling all excavations and depressions with suitable material; placement and compaction of fill as necessary to eliminate settlement; finish grading to blend with adjacent contours; and restoration of drainage patterns. The completed site shall be free of hazards, ruts, mounds, and depressions, and shall present a neat, stable, and natural appearance consistent with the surrounding area.

646.04 Transport. Transport vault and building to ensure safety and avoid damage to the toilet components. Contractor will be responsible for securing any permits or other required documentation prior to transport.

646.05 Installation. Install toilet in location identified and staked by CO at Scotchman Peak Trailhead (lat. 48.1643070, long. -116.0986980), approximately 8 miles northeast of Clark Fork, Idaho. Contractor shall follow manufacturer’s directions for installation of the CXT Cascadian model toilet building (including but not limited to excavation, bedding, backfilling, compaction, and finish grading). See CXT Cascadian website here for specifications and drawings:

https://lbfoster.com/infrastructure/precast-concrete-buildings/vault-restrooms/cascadian Contractor is responsible for removal, loading, transport, bedding, placement, backfilling, and all other work required for a complete and finished installation at new location. Contractor shall repair any damage to vault and/or building during relocation operations, up to and including replacement.

646.06 Acceptance. Relocation of existing vault toilet building will be evaluated under Subsections 106.02.

Measurement

646.07 Measure the Section 646 pay items listed in the schedule of items according to Section 109.02.

Payment

646.08 The accepted quantities will be paid at the contract price per unit of measurement for the Section 646 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.