Amend 02 Attachment 2 - SOI Sam Owen CG.xlsx
XLSX spreadsheet 29 KB Posted
- Solicitation number
- 1240LT26Q0071
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Schedule of Items (SOI) Amendment 02 for the Sam Owen Campground Improvements project on the Idaho Panhandle National Forest (Solicitation 1240LT26Q0071). The document presents a detailed pricing template for commercial construction services organized into base items and optional items, with all unit prices currently set to zero pending contractor input.
The base work (Items 0001 and 0002) encompasses comprehensive campground improvements including mobilization, site preparation, removal of existing infrastructure, and installation of new facilities. Base Item 0001 covers clearing and grubbing, tree and stump removal, removal of existing site elements (bollards, markers, picnic tables, fire rings, wheelstops, culverts, gates, signs, kiosks, and holding tank infrastructure), roadway and spur excavation, roadway obliteration, aggregate base and surface courses, and asphalt concrete work with fog seal application. Base Item 0002 includes concrete pads, pipe culverts, wheelstops, water system relocation and installation, sewer system components (1000-gallon holding tank and dump connection), gates, seeding and mulching, sign systems (86 site markers), pavement markings, electrical systems (5 RV pedestals), timber crib steps, 90 picnic tables, 86 fire rings, barrier boulders, and vault toilet relocation. Three optional items are available: Option A (miscellaneous survey, additional gates, post and rail fence, dump station gates, and CXT shed structure); Option B (contractor-designed retaining walls and bear-proof storage boxes); and Option C (additional water hydrant assemblies and sewer dump connections for four additional host sites). The solicitation is set-aside for small business concerns with a size standard of $45 Million under NAICS code 237990, with quotes due by 7/16/26 per Amendment 02.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sam Owen SOI
| AMENDMENT 02 |
| Sam Owen Campground Improvements |
| Idaho Panhandle National Forests |
| 1240LT26Q0071 |
| SCHEDULE OF ITEMS |
| SCHEDULE OF ITEMS - BASE ITEM 0001 |
| ITEM NUMBER | SPEC NUMBER | ITEM DESCRIPTION | METHOD | UNIT | QTY | UNIT PRICE | AMOUNT |
| 0001AA | 15101 | MOBILIZATION | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0001AB | 15201 | CONSTRUCTION SURVEY AND STAKING, METHOD 2,TOLERANCE CLASS A | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0001AC | 15401 | CONTRACTOR TESTING | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0001AD | 15713 | SOIL EROSION & POLLUTION CONTROL | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0001AE | 15802 | WATERING FOR DUST CONTROL | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0001AF | 20101 | CLEARING AND GRUBBING, DISPOSAL METHOD (a) | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0001AG | 20106 | REMOVAL OF INDIVIDUAL TREES, DISPOSAL METHOD (a) | AQ | EA | 17 | $ - 0 | $ - 0 |
| 0001AH | 20208 | STUMP REMOVAL, DISPOSAL METHOD (a) | AQ | EA | 14 | $ - 0 | $ - 0 |
| 0001AI | 20301A | REMOVAL OF CONCRETE BOLLARDS, DISPOSAL METHOD (a) | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0001AJ | 20301B | REMOVAL OF SITE MARKERS, DISPOSAL METHOD (a) | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0001AK | 20301C | REMOVAL OF PICNIC TABLE, DISPOSAL METHOD (a) | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0001AL | 20301D | REMOVAL OF FIRE RING, DISPOSAL METHOD (a) | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0001AM | 20301E | REMOVAL OF WHEELSTOPS, DISPOSAL METHOD (a) | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0001AN | 20302A | REMOVAL OF CULVERT, DISPOSAL METHOD (a) | AQ | EA | 1 | $ - 0 | $ - 0 |
| 0001AO | 20302B | REMOVAL OF GATES, DISPOSAL METHOD (a) | AQ | EA | 6 | $ - 0 | $ - 0 |
| 0001AP | 20302C | REMOVAL OF SIGN, DISPOSAL METHOD (a) | AQ | EA | 1 | $ - 0 | $ - 0 |
| 0001AQ | 20302D | REMOVAL OF EXISTING KIOSK/FEE SIGNAGE, SALVAGE | AQ | EA | 2 | $ - 0 | $ - 0 |
| 0001AR | 20302E | REMOVAL OF EXISTING HOLDING TANK INLET AND INFRASTRUCTURE, DISPOSAL METHOD (A) | AQ | EA | 1 | $ - 0 | $ - 0 |
| 0001AS | 20302F | REMOVAL OF WOOD FENCE, DISPOSAL METHOD (a) | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0001AT | 20407 | ROADWAY/SPUR EXCAVATION, PLACEMENT METHOD 2, TOLERANCE CLASS 1 | CQ | CY | 3,900 | $ - 0 | $ - 0 |
| 0001AU | 21103 | ROADWAY OBLITERATION, METHOD (2) | CQ | CY | 900 | $ - 0 | $ - 0 |
| 0001AV | 30112 | AGGREGATE SURFACE COURSE, GRADING CRUSHER FINES (4" DEPTH), METHOD (b) | CQ | CY | 430 | $ - 0 | $ - 0 |
| 0001AW | 30107 | AGGREGATE SURFACE COURSE, GRADING (T), METHOD (b) (4" DEPTH) | CQ | CY | 240 | $ - 0 | $ - 0 |
| 0001AX | 30201 | AGGREGATE BASE, METHOD (b) (6" DEPTH) | CQ | CY | 2,750 | $ - 0 | $ - 0 |
| 0001AY | 40301 | ASPHALT CONCRETE, IDAHO DOT, TYPE II (3" DEPTH) | AQ | TON | 95 | $ - 0 | $ - 0 |
| 0001AZ | 40304 | ASPHALT CONCRETE, IDAHO DOT, TYPE II (4" DEPTH) | AQ | TON | 1,725 | $ - 0 | $ - 0 |
| 0001BA | 40603 | FOG SEAL, R4 PMRE SPRAY SEAL | CQ | SY | 7,000 | $ - 0 | $ - 0 |
| BASE 0001 TOTAL | $ - 0 |
SCHEDULE OF ITEMS - BASE ITEM 0002
| ITEM NUMBER | SPEC NUMBER | ITEM DESCRIPTION | METHOD | UNIT | QTY | UNIT PRICE | AMOUNT |
| 0002AA | 60101 | CONCRETE, POST HYDRANT PAD, HOST DUMP COLLAR, SIGN POSTS, & DUMPSTER PADS | CQ | CY | 16 | $ - 0 | $ - 0 |
| 0002AB | 60201 | 12" PIPE CULVERT, CMP, GAGE 16, COMPACTION METHOD (a) | CQ | LF | 52 | $ - 0 | $ - 0 |
| 0002AC | 60910 | WHEELSTOP, PIN DOWN | AQ | EA | 90 | $ - 0 | $ - 0 |
| 0002AD | 61101A | WATER SYSTEM (RELOCATE WATER VALVE, POST HYDRANT, 1" HDPE, COUPLINGS) (SALVAGE AND REUSE FAUCET) | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0002AE | 61101B | WATER SYSTEM (HOST SITE WATER HYDRANT ASSEMBLY)(GOV'T FURNISHED) | AQ | EA | 1 | $ - 0 | $ - 0 |
| 0002AF | 61201A | SEWER SYSTEM (HOST SITE HOLDING TANK, 1000 GALLON, WITH HIGH LEVEL ALARM) | AQ | EA | 1 | $ - 0 | $ - 0 |
| 0002AG | 61201B | SEWER SYSTEM (HOST SITE SEWER DUMP CONNECTION) | AQ | EA | 1 | $ - 0 | $ - 0 |
| 0002AH | 61902A | GATE, CAMPGROUND LOOP ENTRY/EXIT, SINGLE GATE | AQ | EA | 4 | $ - 0 | $ - 0 |
| 0002AI | 61902B | GATE, CAMPGROUND LOOP ENTRY/EXIT, DOUBLE GATE | AQ | EA | 2 | $ - 0 | $ - 0 |
| 0002AJ | 62552 | SEEDING AND MULCHING, DRY METHOD | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0002AK | 63301A | SIGN SYSTEM, REMOVE AND RESET METAL FEE TUBES | AQ | EA | 2 | $ - 0 | $ - 0 |
| 0002AL | 63301B | SIGN SYSTEM (CAMPGROUND SITE MARKER) | AQ | EA | 86 | $ - 0 | $ - 0 |
| 0002AM | 63302A | SIGN SYSTEM ("WALK-IN SITES 61-67") | AQ | EA | 1 | $ - 0 | $ - 0 |
| 0002AN | 63302C | SIGN SYSTEM ("ACCESSIBLE PARKING") | AQ | EA | 1 | $ - 0 | $ - 0 |
| 0002AO | 63302D | SIGN SYSTEM ("ENTER") | AQ | EA | 1 | $ - 0 | $ - 0 |
| 0002AP | 63304 | SIGN, 3 PANEL, INFORMATIONAL KIOSK | AQ | EA | 2 | $ - 0 | $ - 0 |
| 0002AQ | 63307 | REMOVING AND RESETTING PERMANENT SIGNAGE | AQ | EA | 4 | $ - 0 | $ - 0 |
| 0002AR | 63309 | REMOVE AND RESET, BOULDER | AQ | EA | 7 | $ - 0 | $ - 0 |
| 0002AS | 63401 | PAVEMENT MARKINGS, TYPE D | CQ | LF | 290 | $ - 0 | $ - 0 |
| 0002AT | 63501 | TEMPORARY TRAFFIC CONTROL | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0002AU | 63601A | ELECTRICAL SYSTEM (RV PEDESETAL) | AQ | EA | 5 | $ - 0 | $ - 0 |
| 0002AV | 63601B | ELECTRICAL SYSTEM (SERVICE CONNECTION, HOLDING TANK ALARM CONTROL PANEL & NEW RV PEDESTAL) | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0002AW | 64001A | TIMBER CRIB STEPS | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0002AX | 64001B | PICNIC TABLE | AQ | EA | 90 | $ - 0 | $ - 0 |
| 0002AY | 64001C | FIRE RING | AQ | EA | 86 | $ - 0 | $ - 0 |
| 0002AZ | 64001D | BARRIER BOULDER | AQ | EA | 7 | $ - 0 | $ - 0 |
| 0002BA | 64601 | REMOVE AND RELOCATE, EXISTING VAULT TOILET | AQ | EA | 1 | $ - 0 | $ - 0 |
| BASE 0002 TOTAL | $ - 0 | ||||||
| BASE 0001 AND BASE 0002 - TOTAL | $ - 0 |
SCHEDULE OF ITEMS - OPTION A ITEM 0003
| ITEM NUMBER | SPEC NUMBER | ITEM DESCRIPTION | METHOD | UNIT | QTY | UNIT PRICE | AMOUNT |
| 0003AA | 15210 | MISCELLANEOUS SURVEY AND STAKING, EXISTING UTILITIES (AS-BUILT DATA) | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0003AB | 20302 | REMOVAL OF GATES, DISPOSAL METHOD (a) | AQ | EA | 2 | $ - 0 | $ - 0 |
| 0003AC | 61901 | FENCE, POST AND RAIL, INSTALLED | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0003AD | 61902 | GATE, DUMP STATION LOOP | AQ | EA | 2 | $ - 0 | $ - 0 |
| 0003AE | 64001 | CXT SHED STRUCTURE ("SCHWEITZER" 10' - 6" X 12' - 0") | AQ | EA | 1 | $ - 0 | $ - 0 |
| OPTION A 0003 TOTAL | $ - 0 |
SCHEDULE OF ITEMS - OPTION B ITEM 0004
| ITEM NUMBER | SPEC NUMBER | ITEM DESCRIPTION | METHOD | UNIT | QTY | UNIT PRICE | AMOUNT |
| 0004AA | 25701 | CONTRACTOR DESIGNED RETAINING WALL, SPLIT FACE | AQ | EA | 4 | $ - 0 | $ - 0 |
| 0004AB | 64001 | BEAR PROOF STORAGE BOXES, BEAR GUARDIAN (S124), INCLUDES CONCRETE SLAB | AQ | EA | 4 | $ - 0 | $ - 0 |
| OPTION B 0004 TOTAL | $ - 0 |
SCHEDULE OF ITEMS - OPTION C ITEM 0005
| ITEM NUMBER | SPEC NUMBER | ITEM DESCRIPTION | METHOD | UNIT | QTY | UNIT PRICE | AMOUNT |
| 0005AA | 61101 | WATER SYSTEM (HOST SITE WATER HYDRANT ASSEMBLY)(GOV'T FURNISHED) | AQ | EA | 4 | $ - 0 | $ - 0 |
| 0005AB | 61201 | SEWER SYSTEM (HOST SITE SEWER DUMP CONNECTION) | AQ | EA | 4 | $ - 0 | $ - 0 |
| OPTION C 0005 TOTAL | $ - 0 | ||||||
| OPTION A,B,C - TOTAL | $ - 0 |
BASE + OPTIONS - GRAND TOTAL $ - 0
| Designated Method of Measurement: |
| LSQ - lump sum quantities, AQ - Actual Quantities, CQ - Contract Quantities |
| NOTE 1: Contractor input Unit Prices |
| NOTE 2: Auto Calculated Values |
| NOTE 3: One award will be made from this solicitation. Contractor's must submit pricing for all items. In the event of an error in extending the proposed prices, unit prices will govern, unless otherwise determined by the Contracting Officer, in accordance with applicable regulations. The Government reserves the right to make award for quantities less than those stated on the Schedule of Items. |
| NOTE 4: Submission of the SOI represents the Contractors commitment to the data herein. It is the responsibility of the Contractor to verify that all values presented in the SOI, including auto-calculated cells, accurately represent the Contractor's intended price elements. The Government shall not be held liable for any errors in calculation or pricing data. |
| NOTE 5: Payment for bond premiums in accordance with AGAR Clause 452.232-71, Progress Payments for Commercial Construction Contracts, shall not be in addition to the contract price, but may be included under Mobilization. |
QUOTER NAME:
SAM UEI #:
DATE:
File details come from the government source that posted it. Updated .