Attachment 2 - SOI Sam Owen Campground.xlsx
XLSX spreadsheet 28 KB Posted
- Solicitation number
- 1240LT26Q0071
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Schedule of Items (SOI) pricing template for commercial construction services related to campground improvements at Sam Owen Campground on the Idaho Panhandle National Forest under solicitation number 1240LT26Q0071.
The document outlines a comprehensive base scope of work divided into two sections: Base Item 0001 encompasses site preparation and roadway work, including mobilization, survey and staking, clearing and grubbing, removal of existing site features (trees, stumps, bollards, picnic tables, fire rings, gates, signs, kiosks, holding tank infrastructure, and fencing), roadway and spur excavation, roadway obliteration, aggregate base and surface courses, and asphalt concrete paving with fog seal application. Base Item 0002 covers utility and facility installations, including concrete pads for frost-free spigots and dumpsters, culvert pipe installation, wheelstops, water system relocation and HOST site hydrant assembly, sewer system installation with 1,000-gallon holding tank and dump connection, four single-entry gates and two double-entry gates, seeding and mulching, signage systems (fee tubes, site markers, informational kiosks, and permanent signage), temporary traffic control, electrical systems for RV pedestals, timber crib steps, picnic tables (90 units), fire rings (86 units), barrier boulders, and vault toilet relocation. Three optional items are available: Option A includes survey of existing utilities, fence installation, dump station loop gates, and a CXT shed structure; Option B provides contractor-designed retaining walls and bear-proof storage boxes; and Option C adds four additional HOST site water hydrant assemblies and sewer dump connections. Contractors must submit unit prices for all line items, with payment governed by actual or contract quantities depending on the measurement method designated for each item. The solicitation is set-aside for small business concerns under NAICS code 237990 with a $45 million size standard.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Engineer Est.
| Sam Owen Campground Improvements |
| Idaho Panhandle National Forests |
| 1240LT26Q0071 |
| SCHEDULE OF ITEMS |
| SCHEDULE OF ITEMS - BASE ITEM 0001 |
| ITEM NUMBER | SPEC NUMBER | ITEM DESCRIPTION | METHOD | UNIT | QTY | UNIT PRICE | AMOUNT |
| 0001AA | 15101 | MOBILIZATION | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0001AB | 15201 | CONSTRUCTION SURVEY AND STAKING, METHOD 2,TOLERANCE CLASS A | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0001AC | 15401 | CONTRACTOR TESTING | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0001AD | 15713 | SOIL EROSION & POLLUTION CONTROL | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0001AE | 15802 | WATERING FOR DUST CONTROL | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0001AF | 20101 | CLEARING AND GRUBBING, DISPOSAL METHOD (a) | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0001AG | 20106 | REMOVAL OF INDIVIDUAL TREES, DISPOSAL METHOD (a) | AQ | EA | 17 | $ - 0 | $ - 0 |
| 0001AH | 20208 | STUMP REMOVAL, DISPOSAL METHOD (a) | AQ | EA | 14 | $ - 0 | $ - 0 |
| 0001AI | 20301A | REMOVAL OF CONCRETE BOLLARDS, DISPOSAL METHOD (a) | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0001AJ | 20301B | REMOVAL OF SITE MARKERS, DISPOSAL METHOD (a) | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0001AK | 20301C | REMOVAL OF PICNIC TABLE, DISPOSAL METHOD (a) | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0001AL | 20301D | REMOVAL OF FIRE RING, DISPOSAL METHOD (a) | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0001AM | 20301E | REMOVAL OF WHEELSTOPS, DISPOSAL METHOD (a) | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0001AN | 20302A | REMOVAL OF CULVERT, DISPOSAL METHOD (a) | AQ | EA | 1 | $ - 0 | $ - 0 |
| 0001AO | 20302B | REMOVAL OF GATES, DISPOSAL METHOD (a) | AQ | EA | 6 | $ - 0 | $ - 0 |
| 0001AP | 20302C | REMOVAL OF SIGN, DISPOSAL METHOD (a) | AQ | EA | 1 | $ - 0 | $ - 0 |
| 0001AQ | 20302D | REMOVAL OF EXISTING KIOSK/FEE SIGNAGE, SALVAGE | AQ | EA | 2 | $ - 0 | $ - 0 |
| 0001AR | 20302E | REMOVAL OF EXISTING HOLDING TANK INLET AND INFRASTRUCTURE, DISPOSAL METHOD (A) | AQ | EA | 1 | $ - 0 | $ - 0 |
| 0001AS | 20302F | REMOVAL OF WOOD FENCE, DISPOSAL METHOD (a) | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0001AT | 20407 | ROADWAY/SPUR EXCAVATION, PLACEMENT METHOD 2, TOLERANCE CLASS 1 | CQ | CY | 3,900 | $ - 0 | $ - 0 |
| 0001AU | 21103 | ROADWAY OBLITERATION, METHOD (2) | CQ | CY | 900 | $ - 0 | $ - 0 |
| 0001AV | 30112 | AGGREGATE SURFACE COURSE, GRADING CRUSHER FINES (4" DEPTH), METHOD (b) | CQ | CY | 430 | $ - 0 | $ - 0 |
| 0001AW | 30201 | AGGREGATE BASE, METHOD (b) (6" DEPTH) | CQ | CY | 2,750 | $ - 0 | $ - 0 |
| 0001AX | 30207 | AGGREGATE SURFACE COURSE, METHOD (b) (4" DEPTH) | CQ | CY | 240 | $ - 0 | $ - 0 |
| 0001AY | 40301 | ASPHALT CONCRETE, IDAHO DOT, TYPE II (3" DEPTH) | AQ | TON | 95 | $ - 0 | $ - 0 |
| 0001AZ | 40304 | ASPHALT CONCRETE, IDAHO DOT, TYPE II (4" DEPTH) | AQ | TON | 1,725 | $ - 0 | $ - 0 |
| 0001BA | 40603 | FOG SEAL, R4 PMRE SPRAY SEAL | CQ | SY | 7,000 | $ - 0 | $ - 0 |
| BASE 0001 TOTAL | $ - 0 |
SCHEDULE OF ITEMS - BASE ITEM 0002
| ITEM NUMBER | SPEC NUMBER | ITEM DESCRIPTION | METHOD | UNIT | QTY | UNIT PRICE | AMOUNT |
| 0002AA | 60101 | CONCRETE, FROST FREE SPIGOT PAD, HOST DUMP COLLAR, & DUMPSTER PADS | CQ | CY | 15 | $ - 0 | $ - 0 |
| 0002AB | 60201 | 12" PIPE CULVERT, CMP, GAGE 16, COMPACTION METHOD (a) | CQ | LF | 52 | $ - 0 | $ - 0 |
| 0002AC | 60910 | WHEELSTOP, PIN DOWN | AQ | EA | 90 | $ - 0 | $ - 0 |
| 0002AD | 61101A | WATER SYSTEM (RELOCATE WATER VALVE, FROST FREE WATER SPIGOT, 1" HDPE, COUPLINGS) | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0002AE | 61101B | WATER SYSTEM (HOST SITE WATER HYDRANT ASSEMBLY) | AQ | EA | 1 | $ - 0 | $ - 0 |
| 0002AF | 61201A | SEWER SYSTEM (HOST SITE HOLDING TANK, 1000 GALLON, WITH HIGH LEVEL ALARM) | AQ | EA | 1 | $ - 0 | $ - 0 |
| 0002AG | 61201B | SEWER SYSTEM (HOST SITE SEWER DUMP CONNECTION) | AQ | EA | 1 | $ - 0 | $ - 0 |
| 0002AH | 61902A | GATE, CAMPGROUND LOOP ENTRY/EXIT, SINGLE GATE | AQ | EA | 4 | $ - 0 | $ - 0 |
| 0002AI | 61902B | GATE, CAMPGROUND LOOP ENTRY/EXIT, DOUBLE GATE | AQ | EA | 2 | $ - 0 | $ - 0 |
| 0002AJ | 62552 | SEEDING AND MULCHING, DRY METHOD | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0002AK | 63301A | SIGN SYSTEM, REMOVE AND RESET METAL FEE TUBES | AQ | EA | 2 | $ - 0 | $ - 0 |
| 0002AL | 63301B | SIGN SYSTEM (CAMPGROUND SITE MARKER) | AQ | EA | 86 | $ - 0 | $ - 0 |
| 0002AM | 63302A | SIGN SYSTEM ("WALK-IN SITES 61-67") | AQ | EA | 1 | $ - 0 | $ - 0 |
| 0002AN | 63302C | SIGN SYSTEM ("FEE AREA") | AQ | EA | 2 | $ - 0 | $ - 0 |
| 0002AO | 63302D | SIGN SYSTEM ("ENTER") | AQ | EA | 1 | $ - 0 | $ - 0 |
| 0002AP | 63304 | SIGN, 3 PANEL, INFORMATIONAL KIOSK | AQ | EA | 2 | $ - 0 | $ - 0 |
| 0002AQ | 63307 | REMOVING AND RESETTING PERMANENT SIGNAGE | AQ | EA | 4 | $ - 0 | $ - 0 |
| 0002AR | 63309 | REMOVE AND RESET, BOULDER | AQ | EA | 7 | $ - 0 | $ - 0 |
| 0002AS | 63501 | TEMPORARY TRAFFIC CONTROL | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0002AT | 63601A | ELECTRICAL SYSTEM (RV PEDESETAL) | AQ | EA | 5 | $ - 0 | $ - 0 |
| 0002AU | 63601B | ELECTRICAL SYSTEM (SERVICE CONNECTION, HOLDING TANK ALARM CONTROL PANEL & NEW RV PEDESTAL) | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0002AV | 64001A | TIMBER CRIB STEPS | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0002AW | 64001B | PICNIC TABLE | AQ | EA | 90 | $ - 0 | $ - 0 |
| 0002AX | 64001C | FIRE RING | AQ | EA | 86 | $ - 0 | $ - 0 |
| 0002AY | 64001D | BARRIER BOULDER | AQ | EA | 7 | $ - 0 | $ - 0 |
| 0002AZ | 64601 | REMOVE AND RELOCATE, EXISTING VAULT TOILET | AQ | EA | 1 | $ - 0 | $ - 0 |
| BASE 0002 TOTAL | $ - 0 | ||||||
| BASE 0001 AND BASE 0002 - TOTAL | $ - 0 |
SCHEDULE OF ITEMS - OPTION A ITEM 0003
| ITEM NUMBER | SPEC NUMBER | ITEM DESCRIPTION | METHOD | UNIT | QTY | UNIT PRICE | AMOUNT |
| 0003AA | 15210 | MISCELLANEOUS SURVEY AND STAKING, EXISTING UTILITIES (AS-BUILT DATA) | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0003AB | 20302 | REMOVAL OF GATES, DISPOSAL METHOD (a) | AQ | EA | 2 | $ - 0 | $ - 0 |
| 0003AC | 61901 | FENCE, POST AND RAIL, INSTALLED | LSQ | LS | 1 | $ - 0 | $ - 0 |
| 0003AD | 61902 | GATE, DUMP STATION LOOP | AQ | EA | 2 | $ - 0 | $ - 0 |
| 0003AE | 64001 | CXT SHED STRUCTURE ("SCHWEITZER" 10' - 6" X 12' - 0") | AQ | EA | 1 | $ - 0 | $ - 0 |
| OPTION A 0003 TOTAL | $ - 0 |
SCHEDULE OF ITEMS - OPTION B ITEM 0004
| ITEM NUMBER | SPEC NUMBER | ITEM DESCRIPTION | METHOD | UNIT | QTY | UNIT PRICE | AMOUNT |
| 0004AA | 25701 | CONTRACTOR DESIGNED RETAINING WALL, SPLIT FACE | LSQ | LS | 4 | $ - 0 | $ - 0 |
| 0004AB | 64001 | BEAR PROOF STORAGE BOXES, BEAR GUARDIAN (S124) | AQ | EA | 4 | $ - 0 | $ - 0 |
| OPTION B 0004 TOTAL | $ - 0 |
SCHEDULE OF ITEMS - OPTION C ITEM 0005
| ITEM NUMBER | SPEC NUMBER | ITEM DESCRIPTION | METHOD | UNIT | QTY | UNIT PRICE | AMOUNT |
| 0005AA | 61101 | WATER SYSTEM (HOST SITE WATER HYDRANT ASSEMBLY) | AQ | EA | 4 | $ - 0 | $ - 0 |
| 0005AB | 61201 | SEWER SYSTEM (HOST SITE SEWER DUMP CONNECTION) | AQ | EA | 4 | $ - 0 | $ - 0 |
| OPTION C 0005 TOTAL | $ - 0 | ||||||
| OPTION A,B,C - TOTAL | $ - 0 |
BASE + OPTIONS - GRAND TOTAL $ - 0
| Designated Method of Measurement: |
| LSQ - lump sum quantities, AQ - Actual Quantities, CQ - Contract Quantities |
| NOTE 1: Contractor input Unit Prices |
| NOTE 2: Auto Calculated Values |
| NOTE 3: One award will be made from this solicitation. Contractor's must submit pricing for all items. In the event of an error in extending the proposed prices, unit prices will govern, unless otherwise determined by the Contracting Officer, in accordance with applicable regulations. The Government reserves the right to make award for quantities less than those stated on the Schedule of Items. |
| NOTE 4: Submission of the SOI represents the Contractors commitment to the data herein. It is the responsibility of the Contractor to verify that all values presented in the SOI, including auto-calculated cells, accurately represent the Contractor's intended price elements. The Government shall not be held liable for any errors in calculation or pricing data. |
| NOTE 5: Payment for bond premiums in accordance with AGAR Clause 452.232-71, Progress Payments for Commercial Construction Contracts, shall not be in addition to the contract price, but may be included under Mobilization. |
QUOTER NAME:
SAM UEI #:
DATE:
File details come from the government source that posted it. Updated .