Attachment 5 -Appendix A.xlsx
XLSX spreadsheet 26 KB Posted
- Attached to
- Hawaii Security System Upgrade Federal contract opportunity
- Solicitation number
- HC102823R0059
- Issued by
- Defense Information Systems Agency
About this file
This document contains an attachment to a solicitation for a security system upgrade at a Defense Information Systems Agency facility in Hawaii. The attachment includes a door schedule listing over 200 doors with existing and required new access control equipment. It also contains a CCTV camera schedule listing over 30 existing cameras to be replaced with new 360-degree, 180-degree, 270-degree and PTZ cameras both inside and outside the facility, including at multiple entry points. The related solicitation is for the Hawaii Security System Upgrade opportunity issued by the Defense Information Systems Agency. Responses are due based on the standard solicitation response timeline. The awarded contractor will be responsible for upgrading the existing access control and CCTV systems at the Hawaii facility to the new equipment specified in the attachment schedules.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Responses R.1.docx | DOCX document | |
| Questions and Responses R.0.docx | DOCX document | |
| Solicitation HC102823R0059 AMD01.pdf | ||
| Attachment 4 - Site Visit Request Instructions Rev.1.doc | DOC document | |
| JA 832366447 HAW Security System Upgrade _Redacted.pdf | ||
| Attachment 1 - PWS 832366447.docx | DOCX document | |
| Attachment 6 - Appendix B.pdf | ||
| Solicitation HC102823R0059 Security System Upgrade.pdf | ||
| Attachment 2 - CLIN Pricing Sheet and Equipment List.xlsx | XLSX spreadsheet | |
| Attachment 3 - QASP 832366447.docx | DOCX document | |
| Attachment 4 - Site Visit Request Instructions.doc | DOC document | |
| Attachment 7 - Appendix C NDA.docx | DOCX document |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACS Door Schedule
| DISA PAC - CDC Hawaii Security System Upgrade Project | ||||||||||
| Building 77 | Existing Equipment | New Equipment | ||||||||
| Room Number | Door Number | Interior | Exterior | Interior | Exterior | Notes | Group | Drawing | Legend | |
| 73 | D-73-1 | K | PB M | CRK | AIR CONDITIONING CHILLER ROOM | CDC | T-101 | CR - Card Reader | ||
| 73 | D-73-2 | K | PB M | CRK | AIR CONDITIONING CHILLER ROOM | CDC | T-101 | CRK - Card Reader w/ Key Pad | ||
| 73 | D-73-3 | K | PB M | CRK | AIR CONDITIONING CHILLER ROOM | CDC | T-101 | P - Pin Pad | ||
| 74 | D-74-1 | CR | PB MS | CRK | DISA PAC Large Storage (Upper Storage). Exterior Card Reader w/ Key Pad needs protected from weather | PAC | T-101 | DC - Door Contact | ||
| 74 | D-74-2 | CR | PB MS | CRK | DISA PAC Large Storage (Upper Storage) | PAC | T-101 | DR - Door Relay | ||
| 75 | D-75-1 | K, CR,P | PB MS | CRK | DISA PAC Quality Assurance (PC5). Exterior Card Reader w/ Key Pad needs protected from weather | PAC | T-101 | M - Mag Lock | ||
| 75 | D-75-2 | CY | PB MS | CRK | DISA PAC Quality Assurance (PC5). Exterior Card Reader w/ Key Pad needs protected from weather | PAC | T-101 | E - Egress/EPBit Button | ||
| 76 | D-76 | PB MS | CRK | DISA PAC STORAGE ROOM (Lower Storage). Exterior Card Reader w/ Key Pad needs protected from weather | PAC | T-101 | PB - Push Bar Egress | |||
| 81 | D-81 | Pad Lock | PB | CRK | DISA PAC Electrical Room (Facilities PC12). Exterior Card Reader w/ Key Pad needs protected from weather | PAC | T-104 | LKM(X10) - High Security Lock | ||
| 89 (GEN Yard) | D-89-1 | CRK | PB | CRK | CDC | T-103 | X09 - High Security Lock | |||
| 89 (GEN Yard) | D-89-2 | CDC | T-103 | ACS - Access Control Panel | ||||||
| 89 (GEN Yard) | D-89-3 | CRK | PB | CRK | CDC | T-103 | K - Key Lock | |||
| 90 (UPS Rm) | D-90-1 | PB | CRK | CDC | T-103 | CY - Cipher | ||||
| 90 (UPS Rm) | D-90-2 | PB | CDC | T-103 | S - Electronic Striker | |||||
| 91 | D-91-1 | K | K | SWGR Room | CDC | T-103 | MS - Motion Sensor | |||
| 91 | D-91-2 | PB | CRK | CDC | T-103 | DLK - Door Lever Kit w/ Electronic Striker | ||||
| 92 | D-92-1 | PB | CRK | CDC | T-103 | ENR - Enrollment Reader | ||||
| 92 | D-92-2 | CDC | T-103 | |||||||
| 92 | D-92-3 | K | K | PB | CRK | CDC | T-103 | |||
| 93 | D-93-1 | K | PB | CRK | CDC | T-103 | ||||
| 93 | D-93-2 | K | PB | CRK | CDC | T-103 | ||||
| 94A | D-94A | K | CRK | DISA PAC Electrical Room (Facilities PC12). Exterior Card Reader w/ Key Pad needs protected from weather | PAC | T-102 | ||||
| 97 | D-97 | CY | PB | CRK | DISA PAC Administrative Offices (PC4). Exterior Card Reader w/ Key Pad needs to be protected from weather | PAC | T-102 | |||
| 100 | D-100-1 | PB | CRK M | DISA PAC Hallway (PC4). | PAC | T-102 | ||||
| 100 | D-100-2 | M PB S | CR | PB | CRK M | DISA PAC Hallway (PC4). Exterior Card Reader w/ Key Pad needs to be protected from weather | PAC | T-102 | ||
| 101 | D-101 | CY | DLK | CRK | DISA PAC CYBERSECURITY Office. (PC13) | PAC | T-102 | |||
| 102 | D-102-2 | CY | DLK | CRK | DISA PAC System & Cyber Assurance Office (PC13) | PAC | T-102 | |||
| 102 | D-102-1 | CR K | DLK | CRK | DISA PAC System & Cyber Assurance Office (PC13) | PAC | T-102 | |||
| 103 | D-103 | CRK | Existing LENEL | N/A | N/A | DISA PAC System and Cyber Assurance Office. This is on a separate LENEL system and not in this scope of work | PAC | T-102 | ||
| 106 | D-106-1 | K | DLK | CRK | DISA PAC Chief of Infrastructure Services Division (PC4) | PAC | T-102 | |||
| 106 | D-106-2 | N/A | N/A | No requirement for this door | N/A | T-102 | ||||
| 107 | D-107 | K | DLK | CRK | DISA PAC Deputy Chief of Infrastructure Services Division (PC4) | PAC | T-102 | |||
| 108 | D-108 | K | DLK | CRK | DISA PAC Video Services (PC4) | PAC | T-103 | |||
| 109 | D-109 | CY | CR | CRK | DISA PAC Security Management Office (PC12) | PAC | T-103 | |||
| 110 (Elevator Equip Rm) | D-110 | K | N/A | N/A | DISA PAC Passenger Elevator Machine Room (Facilities/PC12) No requirement for this door | PAC | T-103 | |||
| 110 (Passenger Elevator 1st Flr) | Passenger Elevator | CR | CRK | DISA PAC Passenger Elevator (This was not identified and needs to be added) | PAC | T-100 | ||||
| 111 | D-111 | K | CRK | DISA PAC Storage (Honor Guard) | PAC | T-102 | ||||
| 112 | D-112-1 | K | CRK | DISA PAC Stairwell (This was previously identified as 111 and is actually labeled 112) | ||||||
| PAC | T-102 | |||||||||
| 112 | D-112-2 | K | CRK | DISA PAC Stairwell Roof Access | ||||||
| PAC | T-102 | |||||||||
| 115 | D-115-1 | PB | M PB | DISA PAC Enterprise Services Branch (PC41). | ||||||
| No Exterior Card Reader needed. Upgrade egress hardware | PAC | T-103 | ||||||||
| 115 | D-115-2 | N/A | N/A | DISA PAC Enterprise Services Branch (PC41). | ||||||
| No requirement for this door | PAC | T-103 | ||||||||
| 139 | D-139 | K | DLK | CRK | DISA PAC Infrastructure Services Division (PC4). | PAC | T-104 | |||
| 140 | D-140-1 | M, PB | CR | PB | CRK | DISA PAC Infrastructure Services Division (PC4). | PAC | T-100 | ||
| 140 | D-140-2 | N/A | N/A | N/A | N/A | DISA PAC Infrastructure Services Division (PC4). No requirement for this door | N/A | T-103 | ||
| 140 | D-140-3 | M PB S | CR | M PB S | CRK | DISA PAC Infrastructure Services Division (PC4). | PAC | T-104 | ||
| 140 | D-140-4 | CR | PB | CRK | DISA PAC Infrastructure Services Division (PC4). | PAC | T-101 | |||
| 141 | D-141 | N/A | K | N/A | CRK | UPS Room | CDC | T-103 | ||
| 141 | D-141 | K | CRK | DISA PAC Storage | PAC | T-100 | ||||
| 142 | D-142 | K | CRK | DISA PAC Storage | PAC | T-100 | ||||
| 143 | D-143 | K | CRK | DISA PAC Storage | PAC | T-100 | ||||
| 144 | D-144 | X09 LENEL CRK | N/A | N/A | DISA PAC System and Cyber Assurance Office. This is on a separate LENEL system and not in this scope of work | PAC | T-101 | |||
| 145 | D-145 | K | CRK | DISA PAC Storage | PAC | T-100 | ||||
| 152A | K | PB | CRK | DISA PAC Auditorium | PAC | T-100 | ||||
| 152B | D-152B-1 | PB | CRK | DISA PAC Auditorium | PAC | T-100 | ||||
| 152B | D-152B-2 | CRK | PB | CRK | DISA PAC Auditorium Same requirements as Door 152B-1 | PAC | T-101 | |||
| 153 | D-153 | PB | CR | PB MS | CRK | DISA PAC Entrance 1 (Main Entrance), Glass Doors. Exterior Card Reader w/ Key Pad needs protect from weather | PAC | T-100 | ||
| 155 | D-155 | K | PB | CRK | DISA PAC Storage | PAC | T-100 | |||
| 159 | D-159 | K | DLK | CRK | DISA PAC Electrical Room | PAC | T-100 | |||
| 160 | D-160 | K | N/A | N/A | DISA PAC Janitor Closet. | |||||
| No requirement for this door | N/A | T-100 | ||||||||
| 164 | D-164 | CRK | X10, CR | PB | CRK | CDC | T-101 | |||
| 165 | D-165 | DLK | CRK | DISA PAC Telephone Communication Room | PAC | T-101 | ||||
| 166 (Freight Elevator 1st Flr) | Freight Elevator | CR | CRK | DISA PAC Freight Elevator (This was not identified and needs to be added) | PAC | T-101 | ||||
| 167 | D-167 | CR | PB MS | CRK | Loading Dock Entrance. Exterior Card Reader w/ Key Pad needs protected from weather | PAC | T-101 | |||
| 180 | D-180-1 | PB | CRK | CDC | T-100 | |||||
| 180 | D-180-2 | PB | CR | PB | CRK | Door is removed. | CDC | T-100 | ||
| 180 | D-180-3 | CY | PB | CRK | CDC | T-100 | ||||
| 180A | D-180A | K | DLK | CRK | CDC | T-100 | ||||
| 180B | D-180B | K | DLK | CRK | CDC | T-100 | ||||
| 180C | D-180C | K | DLK | CRK | CDC | T-100 | ||||
| 180D | D-180D-1 | K | DLK | CRK | CDC | T-100 | ||||
| D-180D-2 | N/A | N/A | CDC | T-100 | ||||||
| 180E | D-180E | CDC | T-100 | |||||||
| 180F | D-180F | DLK | CRK | CDC | T-100 | |||||
| 182 | D-182 | X09 | N/A | N/A | DISA PAC System and Cyber Assurance Office. This is on a separate LENEL system and not in this scope of work | PAC | T-101 | |||
| 183 | D-183-1 | CR | PB | CRK | DISA PAC Facilities and Logistics Office (PC12) | PAC | T-101 | |||
| 183 | D-183-2 | E | CRK | PAC | T-101 | |||||
| 184 | D-184 | CY | PB | CRK | DISA PAC 93 CPT Office | PAC | T-101 | |||
| 187 | D-187-1 | PB | PB MS | CRK | DISA PAC Stairwell at Ground elevation. Exterior Card Reader w/ Key Pad needs protected from weather | PAC | T-101 | |||
| 187 | D-187-2 | PB | CRK | PB MS | CRK | DISA PAC Stairwell at Roof. Exterior Card Reader w/ Key Pad needs protected from weather | PAC | Door not shown | ||
| 189 | D-189-1 | CR | CRK LKM | N/A | N/A | new CR to be integrated with system | CDC | T-100 | ||
| 189 | D-189-2 | PB | Emergency Exit Only | CDC | T-100 | |||||
| 190 | D-190 | K CR | PB | CRK | CDC | T-100 | ||||
| 191 | D-191 | K CR | N/A | N/A | DISA PAC System and Cyber Assurance Office. This is on a separate LENEL system and not in this scope of work | PAC | T-100 | |||
| 195 | D-195-1 | PB | CRK | CDC | T-100 | |||||
| 195 | D-195-2 | CDC | T-100 | |||||||
| 195 | D-195-3 | PB | DISA PAC Stairwell at Ground elevation. | |||||||
| Upgrade egress hardware | PAC | T-100 | ||||||||
| 196 | D-196 | E | CRK | PB | CRK | CDC Main Entrance to Lobby | CDC | T-100 | ||
| 201 | D-201-1 | CRK | CRK | DISA PAC Command Deck Hallway | PAC | T-107 | ||||
| 201 | D-201-2 | N/A | N/A | DISA PAC Command Deck Hallway | ||||||
| No requirement for this door | PAC | T-107 | ||||||||
| 201 | D-201-3 | E | CRK | DISA PAC Command Deck Entrance. Exterior Card Reader w/ Key Pad needs protected from weather | PAC | T-107 | ||||
| 202 | D-202 | N/A | N/A | DISA PAC Command Deck Kitchen | ||||||
| No requirement for this door | PAC | T-107 | ||||||||
| 203 | D-203 | DLKS | CRK | DISA PAC Command Conference Room | ||||||
| PAC | T-107 | |||||||||
| 204 | D-204 | DLKS | CRK | DISA PAC Chief Command Support Branch Office (PC12) | PAC | T-107 | ||||
| 205 | D-205 | DLKS | CRK | DISA PAC Chief Financial and Human Resources Branch Office (PC11) | PAC | T-107 | ||||
| 206 | D-206-1 | DLKS | CRK | DISA PAC Chief Business Management Division Office (PC1) | PAC | T-107 | ||||
| 206 | D-206-2 | CRK | DISA PAC Chief Business Management Division Office (PC1) | PAC | T-107 | |||||
| 207 | D-207 | DLK | CRK | DISA PAC Command Admin Office (PC) | PAC | T-107 | ||||
| 208 | D-208-1 | DLK | CRK | DISA PAC Commander Office (PC) | PAC | T-107 | ||||
| 208 | D-208-2 | CRK | DISA PAC Commander Office (PC) | PAC | T-107 | |||||
| 209 | D-209 | CY | DLK | CRK | DISA PAC Distinguished Visitor Office (PC) | PAC | T-107 | |||
| 210 | D-210 | N/A | N/A | DISA PAC Budget Office (PC11) | ||||||
| No requirement for this vault door. | PAC | T-107 | ||||||||
| 211 | D-211-1 | DLK | CRK | DISA PAC Budget Office (PC11) | PAC | T-107 | ||||
| 211 | D-211-2 | DLK | CRK | DISA PAC Budget Office (PC11) | PAC | T-107 | ||||
| 214 | D-214 | N/A | K | CRK | DISA PAC Deputy Commander Office (PC) | PAC | T-107 | |||
| 215 | D-215 | N/A | K | DLK | CRK | DISA PAC Senior Enlisted Leader (SEL) Office (PC) | PAC | T-107 | ||
| 217 | D-217-1 | K | DLK | CRK | DISA PAC Theater Conference Room (PC) | PAC | T-107 | |||
| 217 | D-217-2 | K | DLK | CRK | DISA PAC Theater Conference Room (PC) | PAC | T-107 | |||
| 218 | D-218 | LKM (New Lenel) | N/A | N/A | DISA PAC System and Cyber Assurance Office. This is on a separate LENEL system and not in this scope of work | PAC | T-107 | |||
| 220 | D-220 | PB | CRK | DISA PAC Plans and Programs Division (PC5) | PAC | T-105 | ||||
| 221 | D-221 | K | DLK | CRK | DISA PAC Chief of Plans and Programs Division (PC5) | PAC | T-105 | |||
| 222 | D-222 | K | CRK | DISA PAC Chief of Operations Division (PC3) | PAC | T-105 | ||||
| 226 | D-226 | K | CRK | DISA PAC Deputy Chief of Plans and Programs Division (PC5) | PAC | T-105 | ||||
| 227 | D-227 | PB | CRK | DISA PAC Stairwell entrance to PC3 Breakroom | PAC | T-105 | ||||
| 228 | D-228 | N/A | N/A | DISA PAC Video Communications Room (PC4) No requirement for this door | PAC | T-105 | ||||
| 229 | D-229-1 | PB | CR | PB | CRK | DISA PAC Operations Division (PC3) | PAC | T-105 | ||
| 229 | D-229-2 | K | CRK | PB | CRK | DISA PAC Operations Division (PC3) | PAC | T-106 | ||
| 230 | D-230 | N/A | N/A | DISA PAC Operations Division. This is on a separate LENEL system and not in this scope of work | PAC | T-106 | ||||
| 230-C1 | D-230-C1 | K | DLK | CRK | DISA PAC Operations Division (PC3) | PAC | T-106 | |||
| 230-C2 | D-230-C2 | K | DLK | CRK | DISA PAC Operations Division (PC3) | PAC | T-106 | |||
| 230-C3 | D-230-C3 | K | DLK | CRK | DISA PAC Operations Division (PC3) | PAC | T-106 | |||
| 231 | D-231 | N/A | N/A | DISA PAC Operations Division. This is on a separate LENEL system and not in this scope of work | PAC | T-105 | ||||
| 232 | D-232-1 | N/A | N/A | DISA PAC Operations Division. This is on a separate LENEL system and not in this scope of work | PAC | T-105 | ||||
| 233 | D-233 | X10 | N/A | N/A | DISA PAC Operations Division. This is on a separate LENEL system and not in this scope of work | PAC | T-106 | |||
| 237 | D-237 | K | N/A | N/A | DISA PAC Video Communications Room (PC4) No requirement for this door | PAC | T-106 | |||
| 238 | D-238 | K | N/A | N/A | DISA PAC Freight Elevator Machine Room (Facilities/PC12) No requirement for this door | PAC | T-106 | |||
| 239 | D-239-1 | N/A | N/A | DISA PAC West Bridge | ||||||
| No requirement for this door. | JIOC | T-106 | ||||||||
| 239 | D-239-2 | CRK | DISA PAC | PAC | T-106 |
CCTV Camera Schedule
| DISA PAC - CDC Hawaii (Building 77) Security System Upgrade Project | |||||||||
| Camera # (Existing) | Existing | New Camera Number | New | Notes | Group | Drawing Location | Legend | ||
| C-1 | F | C-1 | 360° Camera | Replaced w/ New C-1 (360°), Corridor 118 | DISA PAC-1 | T-104 | F- Fixed Camera | ||
| C-2 | F | C-2 | F | Main Entrance Foyer 153 | DISA PAC-1 | T-100 | PTZ - Point,Tilt,Zoom | ||
| C-3 | F | On 2nd Floor, Corridor 201, east end | Remove | 360 - 360° Camera | |||||
| C-4 | F | Corridor 100 | Remove | 270 - 270° Camera | |||||
| C-5 | F | Exterior, South Entrance 79 | Remove | 180 - 180° Camera | |||||
| C-6 | F | Exterior, rear loading dock 77 | Remove | 180 - 180° Camera | |||||
| C-7 | F | C-3 | F | Exterior, plan North entry 100 | DISA PAC-1 | T-102 | |||
| C-8 | F | C-4 | F | Exterior, Gen Yard 89 near Dr 90-2 | CDC | T-103 | |||
| C-9 | F | Replaced w/ New C-1 (360°), Corridor 118 | Remove | ||||||
| C-10 | F | C-5 | 360° Camera | Replaced w/ New C-5 (360°), Corridor 167 | DISA PAC-1 | T-101 | |||
| C-11 | F | Replaced w/ New C-10 (360°), Corridor 167 | Remove | T-101 | |||||
| C-12 | F | C-6 | F | Exterior, CDC Entry 69 | CDC | T-100 | |||
| C-13 | F | On 2nd Floor, Corridor 201 Replaced with New C-38 | Remove | ||||||
| C-14 | Does not exist | N/A | |||||||
| C-15 | F | C-7 | F | Interior, NE corner of Gen Yard 89 | CDC | T-103 | : | ||
| C-16 | F | C-8 | F | Lobby 196 | CDC | T-100 | |||
| C-9 | 360° Camera | Exterior, plan West side at entry door 187-1 | DISA PAC-2 | T-101 | |||||
| C-10 | F | Exterior, plan West side-outside of Rm 75, points to entry door 187-1 | DISA PAC-1 | T-101 | |||||
| C-11 | 360° Camera | Exterior plan SW corner of Store Rm 76 | DISA PAC-2 | T-101 | |||||
| C-12 | 360° Camera | Exterior, Rear Loading Dock 77 | DISA PAC-1 | T-101 | |||||
| C-13 | 360° Camera | Corridor 157 near door 140-4. To cover both hallways | DISA PAC-2 | T-101 | . | ||||
| C-14 | 180° Camera | Exterior, Main Entrance stairs & ramp. Facing road and harbor. | DISA PAC-1 | T-100 | |||||
| C-15 | PTZ | Corridor 100, interior near Door 140-2; Focus on stairwell & door 115-2 | DISA PAC-2 | T-103 | |||||
| C-16 | 270° Camera | Exterior, plan NW corner, west of entry 99 (install midway down wall) | DISA PAC-1 | T-102 | |||||
| C-17 | 360° Camera | Exterior, plan NE corner in Lanai | DISA PAC-2 | T-102 | |||||
| C-18 | F | Exterior, bottom of NE stairwell-Coverage of parking lot. | DISA PAC-2 | T-102 | |||||
| C-19 | F | Exterior, Utility Rm Stairwell, east side | DISA PAC-1 | T-102 | |||||
| C-20 | F | Exterior, Landing 87, east side | CDC | T-104 | |||||
| C-21 | 360° Camera | Exterior, east side of corner of Rm 89A | CDC | T-104 | |||||
| C-22 | F | Exterior, South Entrance 79; Will replace need for C-5 | DISA PAC-1 | T-104 | |||||
| C-23 | F | Rm 220, near door D-222 | DISA PAC-2 | T-105 | |||||
| C-24 | 270° Camera | Point at door 229-1. | DISA PAC-1 | T-105 | |||||
| C-25 | 360° Camera | Lobby Area 239 | DISA PAC-1 | T-106 | |||||
| C-26 | PTZ | Mount halfway down wall | DISA PAC-2 | T-108 | |||||
| C-27 | 360° Camera | Corridor 216 | DISA PAC-1 | T-107 | |||||
| C-28 | F | Exterior, Door D-201-3 | DISA PAC-1 | T-107 | |||||
| C-29 | PTZ | Exterior, Roof Mounted, East side stairwell | CDC | T-107 | |||||
| C-30 | PTZ | Exterior, Roof Mounted, SE overlooking gen yard | CDC | T-108 | |||||
| C-31 | PTZ | Exterior, Roof Mounted, NW corner | DISA PAC-2 | T-105 | |||||
| C-32 | F | Room 189A pointed at door 191 | DISA PAC-1 | T-100 | |||||
| C-33 | F | Room 102 pointed at Room 103 and D-102-2 | DISA PAC-1 | T-102 | |||||
| C-34 | 360° Camera | Room 140 west end, focused on D-144 and D-140-3 | DISA PAC-1 | T-104 | |||||
| C-35 | F | In Stairwell-2nd Floor 195 | DISA PAC-1 | T-105 | |||||
| C-36 | F | Room 216 NW corner, Pointing at Door 218. | DISA PAC-1 | T-107 | |||||
| C-37 | 270° Camera | Exterior west side ramp, Pointing to stairs at Loading Dock 77. | DISA PAC-1 | T-101 | |||||
| C-52 | Camera 37 will cover this area-camera not needed in this area. | Remove |