This is an addendum to RFO Provision 52.212-2 that tailors the evaluation criteria for commercial products and commercial services. The solicitation employs a Lowest Price Technically Acceptable (LPTA) source selection approach combined with a best value continuum methodology. Contract award will be made to the responsible offeror whose conforming offer is most advantageous to the government, considering price and technical factors.
The evaluation process follows a five-step methodology: Step 1 verifies contractor responsiveness through compliance with RFO 52.212-1; Step 2 ranks all responsive contractors by Total Evaluated Price (TEP) from lowest to highest; Step 3 initiates technical evaluations beginning with the lowest TEP offer and continuing until two technically acceptable responses are identified or all offers are evaluated; Step 4 (not detailed) follows; and Step 5 determines price fairness and reasonableness. For the price evaluation factor, responses are initially ordered by TEP, which is then assessed for reasonableness considering market prices, contractor capabilities, and risk. The government reserves the right to conduct price realism analysis on exceptionally low offers and may request contractors to substantiate pricing credibility, with the burden of proof resting on the contractor. Unacceptably low offers lacking explanation may result in rejection. The technical evaluation factor assesses the technical volume as either acceptable or unacceptable for each subfactor, with acceptable defined as required documents clearly meeting minimum solicitation requirements and unacceptable defined as required documents not clearly meeting those minimum requirements. The government anticipates adequate price competition and intends to award without exchanges, though reserves the right to conduct exchanges if deemed in its best interest.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| QnA - Lighting Installation for B704 - FA449726Q0020.pdf | ||
| Combined Synopsis_Solicitation Updated.pdf | ||
| Combined Synopsis_Solicitation.pdf | ||
| Attachment 4_52.212-1, Instructions to Offerors Addendum.pdf | ||
| Attachment 7_B704 Lighting Layout.pdf | ||
| Combined Synopsis - Solicitation.pdf | ||
| Attachment 1_SOW.pdf | ||
| Attachment 2 _ Quote Schedule.xlsx | XLSX spreadsheet | |
| Attachment 3_Provisions and Clauses.pdf | ||
| Attachment 6 _Wage Determination.pdf | ||
| Attachment 8_B704 Lighting Requirements.pdf | ||
| Attachment 9_B704 Photometric Study.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 5 – RFO 52.212-2 Addendum
Evaluation—Commercial Products and Commercial Services (March 16, 2026)
ADDENDUM TO RFO PROVISION 52.212-2: Paragraph (a) is tailored as follows:
Evaluation:
IAW RFO 52.212-2, Evaluation—Commercial Products and Commercial Services, the Government will award a contract resulting from this solicitation to the responsible Offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors will be used to evaluate offers:
1. Price
2. Technical
BASIS FOR CONTRACT AWARD: This is a competitive, best value continuum using the Lowest Price Technically Acceptable (LPTA), Highest Technical Rated with Fair and Reasonable Price Approach source selection process. Technical elements will be evaluated as acceptable or unacceptable for each solicitation response. Qualifications will be clear, and objectives will be outlined in the RFQ. The evaluation process shall proceed as indicated below:
Evaluation Approach:
Step 1: All contractors will be evaluated for responsiveness. Responsiveness is determined by verifying compliance with RFO 52.212-1 and its addendum.
Step 2: All responsive contractors will be ordered, by price, from the lowest to the highest Total Evaluated Price (TEP). A contractor's TEP is depicted in Attachment 2, Quote Schedule Worksheet, on the Price Schedule Tab.
Step 3: Technical evaluations will start with the lowest TEP offer and continue until two (2) solicitation responses are determined to be technically acceptable, or until all solicitation responses have been evaluated.
Step 5. The Government will make a determination of price fair and reasonable.
Evaluation Factors for Award:
Price Foreword: The government will evaluate offers for award purposes based on their TEP. The government may determine that a solicitation response is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the government to exercise the option(s).
1. Price:
a.) Initially, solicitation responses shall be ordered from lowest to highest TEP, as previously defined.
b.) The TEP will be evaluated to determine whether it is reasonable. A reasonable price/cost represents a price/cost that provides best value to the government, considering market prices, the technical and functional capabilities of the contractor, and risk. Additionally, the government reserves the right to, but is not required to, conduct a price realism analysis on offers that appear to be exceptionally low and not supported by the contractor's technical approach. In instances where a contractor's proposed price(s) appears exceptionally low, contractors may be requested to address this disparity by providing evidence of their capability and/or performance at similar price(s). The burden of proof as to price credibility rests with the contractor. An exceptionally or unrealistically low offer that's left unexplained may pose an unacceptable risk to the government and may be a reason to reject a contractor's solicitation response.
c.) The government anticipates adequate price competition and intends to award a contract without exchanges with respective contractors. The Government, however, reserves the right to conduct exchanges if deemed in its best interest.
2. Technical:
a.) The technical volume will be evaluated as either acceptable or unacceptable for each subfactor.
i. Acceptable is defined as: "Required documents clearly meet the minimum requirements of the solicitation".
ii. Unacceptable is defined as: "Required documents do not clearly meet the minimum requirements of the solicitation".