Attachment 4 Submittal RegisterBackUpGenCkt 2-3.pdf

PDF 232 KB Posted

Attached to
Install Backup Generators Circuit # 2-3 Federal contract opportunity
Solicitation number
SP330020B0002
Issued by
Defense Logistics Agency Distribution

View the file

Other files for this federal contract opportunity

Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Division 01 Special Requirements

FORM 4288

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION

DDJC Backup Generator Circuit 2-3 - Division 1 - General Requirements

CONTRACTOR

A C T I V I T Y

N O

R A N S M I T T

L

S P E

DESCRIPTION OF ITEM SUBMITTED

R A G R A

H

G

V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR SCHEDULE DATES CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FROM

APPR AUTH

REMARKS

SUBMIT

APPROVAL

NEEDED BY

MATERIAL

T I

D

DATE OF

DATE FWD

TO APPR

AUTH

DATE RCD

CONTR

TO OTHER

REVIEWER

DATE RCD

FROM OTH

T I

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

010110 SPECIAL REQUIREMENTS

SD-01 PRECONSTRUCTION SUBMITTALS

List of Schedule of Values 1.17.1 G List of recycled material to be used 1.2

011400 WORK RESTRICTIONS

SD-01 PRECONSTRUCTION SUBMITTALS

Special Access Determination Form 1.4.1.5 G

013201 PROJECT SCHEDULE

SD-01 PRECONSTRUCTION SUBMITTALS

Construction Project Schedule 3.3 G

013300 SUBMITTAL PROCEDURES

SD-01 PRECONSTRUCTION SUBMITTALS

Submittal Register 1.11 G

013529 SAFETY AND OCCUPATIONAL HEALTH REQTS.

SD-01 PRECONSTRUCTION SUBMITTALS

Accident Prevention Plan (APP) 1.6 G Injury Prevention Plan G Activity Hazard Analysis (AHA) 1.7 G Crane/Fork Lift plan 1.6 G

SD-06 TEST REPORTS

Accident Reports 1.11.1 G Monthly Exposure Reports 1.11.3 G Crane/Fork Lift Report 1.11.4 G

SD-07 CERTIFICATES

Hot Work Permit 1.12 G

014500 CONTRACTOR QUALITY CONTROL

SD-01 PRECONSTRUCTION SUBMITTALS

Contractor Quality Control Plan 3.2 G

Division 01 Special Requirements

DDJC Backup Generator Circuit 2-3 - Division 1 - General Requirements

T I V I

A N S M I T T

R A G R A

V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTR/

DATE RCD

APPR AUTH

T I

AUTH

DATE RCD

T I

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

015719 ENVIRONMENTAL PROTECTION

SD-01 PRECONSTRUCTION SUBMITTALS

Environmental Protection Plan 1.7 G

SD-11 CLOSEOUT SUBMITTALS

017800 PROJECT CLOSEOUT

SD-02 SHOP DRAWINGS

As-Built Drawings 1.2.1 G

SD-03 PRODUCT DATA

As-Built Record of Equipment and Material. 1.2.2 G Warranty Management Plan 1.3.1 G Final Cleaning 1.6 G

SD-11 CLOSEOUT SUBMITTALS

Record Drawings 1.2.1 G Post construction Survey 1.6.1 G

Page 3/4

TITLE AND LOCATION

DDJC Backup Generator Circuit 2-3 - Division 2 - Existing Conditions

T I V I

A N S M I T T

R A G R A

T I

AUTH

DATE RCD

T I

V C T L A O S R S I A F / I E C A R T E I V O W N R

CONTR/

DATE RCD

FROM

APPR AUTH

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

024100 DEMOLITION

SD-01 PRECONSTRCUTION SUBMITTALS

Preconstruction survey 1.2 G

SD-07 CERTIFICATES

Demolition Plan 1.2 G

Division 02 Existing Conditions

Page 4/4

DDJC Backup Generator Circuit 2-3 Division 26 - Electrical

T I V I

A N

S M I T T

R

A

G

R

A

CONTRACT

ACTION O

APPROV

AL

NEEDED

BY

MATERI

AL

NEEDED

BY

T I

DATE

OF

ACTIO

FWD

TO

APPR

AUTH

DATE

RCD

FWD TO

OTHER

REVIEW

ER

RCD

FROM

OTH

REVIEW

ER

T I

OF

ACTIO

N

V C T L A O S R S I A F / I E C A R T E I V O W N R

CONTR/

DATE

FROM

APPR

AUTH

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r ) 263213 SD 02 Product Data Generator data G 262313 SD 02 Product Data G Generator paralleling switchgear G

ATS G

Circuit Breaker G Relays G Battery, battery charger G 260500 Conduits, wires. cables G 335210 Fuel pipes and hardware G 335610 Fuel Tank G 335800 Fuel leak detection system G 010110 Ethernet switch G Relay coordination study G Handholes G Manholes G Conduits, wires G Prefab metallic enclosure G Beacon lights G LED lights G Fence material G Solar LED, battery, charger, lighting pole G NEMA 3R toggle switch for light control G

File details come from the government source that posted it. Updated .