Attachment 4 Scheduled Work Form TCA.xlsx

XLSX spreadsheet 53 KB Posted

Attached to
Tucson (TCA) Tactical Infrastructure Maintenance
Solicitation number
70B01C26R00000080
Issued by

About this file

This is a Scheduled Work Form and pricing template for the Tucson (TCA) Tactical Infrastructure Maintenance contract, used to capture proposed costs for maintenance services across multiple contract periods. Offerors must complete yellow-highlighted cells for the Base Period (08/16/26-08/15/27), four Option Periods (08/16/27-08/15/31), and a six-month Extension Period (08/16/31-02/15/32), with automatic price transfers to a summary sheet. The pricing structure requires offerors to utilize fixed unit prices from Attachment 3 and propose a coefficient (representing profit, overhead, and tax) that will be multiplied against totals for program management, scheduled maintenance, and unscheduled maintenance to calculate evaluated price. Annual escalation percentages must be provided for each period.

The scheduled maintenance services (Fixed Price - TCA) and unscheduled maintenance services (IDIQ - TCA) span multiple asset categories at five Arizona locations: Naco, Nogales, Douglas, Three Points, and Tucson. Scheduled maintenance tasks include quarterly and annual inspections and preventive maintenance on motorized slide drivers, swing gate operators, barrier systems, lighting systems (266-324 fixtures per location), fence lines (42 miles), and culvert/cattleguard systems (17-410 units per location), plus monthly program management. Unscheduled maintenance covers breach repairs (750 events annually for full periods, 375 for extension), gate hinge replacements (10 per year, 5 for extension), fence repairs (3,500 linear feet annually, 1,500 for extension), flood gate operations (2 events annually, 1 for extension), road maintenance and grading (1,000-1,500 miles annually), vegetation control (50-150 miles), culvert replacement and cleaning, sediment/debris removal, border lighting repairs (30 events annually, 15 for extension), transformer replacement, and cultural monitoring (195 days annually, 100 for extension).

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

ATTACHMENT 2 - LINE ITEM SUMMARY
Instructions to Offeror:
The Offeror shall complete the sheets for the Base Period, Option Period 1, Option Period 2, Option Period 3, Option Period 4 and Extension Period by filling the cells highlighted in YELLOW. After entering the proposed prices, the amounts will transfer automatically to the summary sheet to give the total evaluated price. Offerors shall use the fixed unit prices from Attachment 3 "Unit Pricing Sheet" for its maintenance pricing. The offeror shall also propose its coefficient by completing Cell B8 in the Summary sheet. The coefficient will then be multiplied by the totals for program managment, schedule maintenance, and unscheduled maintenance to calculate the total evaluated price. Additionally, please identify the elements of the coefficient on the Summary Tab in the areas specified. Ensure to provide annual escalation percentage on rows C14 thru F14

Summary

RequirementBase Period:
08/16/26 - 08/15/27Option Yr 1
08/16/27 - 08/15/28Option Yr 2
08/16/28 - 08/15/29Option Yr 3
08/16/29- 08/15/30Option Yr 4
08/16/30 - 08/15/31TotalExtension Period 08/16/31 - 02/15/32Total with 6 month extension
Scheduled Maintenance (FFP-TCA)$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Unscheduled Maintenance (IDIQ TCA)$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subtotal$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Co-Efficient Price$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Price:$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00

Coefficient (Profit+OH+Tax) % 0.00%

Coefficient Elements:
Profit0%
OH0%
Tax0%Annual escalation %Annual escalation %Annual escalation %Annual escalation %

Base Period

BASE PERIOD: TCA SCHEDULED MAINT [FFP]Description of ServiceQty of AssetCount of EventsDurationTotal PriceLaborEquipmentMaterialOtherComments/assumptions
Naco, AZ (NCO) HySecurity 50VF200 Motorized Slide Driver MaintenanceRoutine: Perform factory recommended quarterly,semi annual and annual maintenance. Remove all dust, dirt and debris. Lubricate all components on the gate and operator that require it and inspect for proper alignment. Check for proper operation and report any deficencies24$0$0.00$0.00$0.00$0.00Quarterly Maintenance
Nogales, AZ (NCO) HySecurity 50VF200 Motorized Slide Driver MaintenanceRoutine: Perform factory recommended quarterly,semi annual and annual maintenance. Remove all dust, dirt and debris. Lubricate all components on the gate and operator that require it and inspect for proper alignment. Check for proper operation and report any deficencies14$0$0.00$0.00$0.00$0.00Quarterly Maintenance
Nogales, AZ (NCO) HydraSwing Linear Swing Gate OperatorRoutine: Perform factory recommended quarterly,semi annual and annual maintenance. Remove all dust, dirt and debris. Lubricate all components on the gate and operator that require it and inspect for proper alignment. Check for proper operation and report any deficencies34$0$0.00$0.00$0.00$0.00Quarterly Maintenance
Three Points (TON) Vamori Wash - Normandy Vehicle BarrierRoutine: Remove barriers premonsoon / replace post monsoon. Includes removing sleeves and welding back in place125 feet2$0$0.00$0.00$0.00$0.00One event for removing and one event for re-installing
Douglas, AZ (DGL) Lighting inspectionsRoutine: Visually inspect lighting for proper operation and alignment. Verify all disconnect lids are closed and there are no electrical safety issues. Inspect pole condition and that pole mounting hardware is in place and secure. Inspect guy wires for proper tension and augers are in good condition. Provide detailed written report and pictures of deficencies2664$0$0.00$0.00$0.00$0.00May require two site visits per event,one during daylight hours and one during dark hours
Naco, AZ (NCO) Lighting InspectionsRoutine: Visually inspect lighting for proper operation and alignment. Verify all disconnect lids are closed and there are no electrical safety issues. Inspect pole condition and that pole mounting hardware is in place and secure. Inspect guy wires for proper tension and augers are in good condition. Provide detailed written report and pictures of deficencies3244$0$0.00$0.00$0.00$0.00May require two site visits per event,one during daylight hours and one during dark hours
Nogales, AZ (NGL) Lighting InspectionsRoutine: Visually inspect lighting for proper operation and alignment. Verify all disconnect lids are closed and there are no electrical safety issues. Inspect pole condition and that pole mounting hardware is in place and secure. Inspect guy wires for proper tension and augers are in good condition. Provide detailed written report and pictures of deficencies1134$0$0.00$0.00$0.00$0.00May require two site visits per event,one during daylight hours and one during dark hours
Casa GrandeFence InspectionRoutine: Inspect fence post and rail, post and cable and normandy style vehicle barrier for cut or broken cable, cut rail and eroded areas wher animals or vehicles could cross. Inspect washes for debris build up on fence. Provide detailed written report with supporting pictures of deficencies42 Miles4$0$0.00$0.00$0.00$0.00Quarterly Inspection
Casa Grande Culvert inspectionsRoutine: Inspect culverts for sedimentation and debris accumulation and proper drainage371$0$0.00$0.00$0.00$0.00Post monsoon
Douglas, AZ (DGL) Culvert/Cattleguard/GratesRoutine: Inspect for sedimentation and debris accumulation and proper drainage. Provide written report and pictures of noted work required1671$0$0.00$0.00$0.00$0.00Post monsoon
Naco, AZ (NCO) Culvert/Cattleguard/GratesRoutine: Inspect for sedimentation and debris accumulation and proper drainage. Provide written report and pictures of noted work required2481$0$0.00$0.00$0.00$0.00Post monsoon
Nogales, AZ (NGL) Culvert/Cattleguard/GratesRoutine: Inspect for sedimentation and debris accumulation and proper drainage. Provide written report and pictures of noted work required1431$0$0.00$0.00$0.00$0.00Post monsoon
Tucson, AZ (TUS)) Culvert/Cattleguard/GratesRoutine: Inspect for sedimentation and debris accumulation and proper drainage. Provide written report and pictures of noted work required851$0$0.00$0.00$0.00$0.00Post monsoon
Ajo, AZ (AJO) Culvert/Cattleguard/GratesRoutine: Inspect for sedimentation and debris accumulation and proper drainage. Provide written report and pictures of noted work required4101$0$0.00$0.00$0.00$0.00Post monsoon
Three Points, AZ (TPS) Culvert/Cattleguard/GratesRoutine: Inspect for sedimentation and debris accumulation and proper drainage. Provide written report and pictures of noted work required171$0$0.00$0.00$0.00$0.00Post monsoon
Program ManagementNA112$0$0.00$0.00$0.00$0.00Billed monthly
Totals:$0.00$0.00$0.00$0.00$0.00
BASE PERIOD: TCA UNKNOWN REPAIRS [IRO]Description of ServiceUOMCount of EventsDurationTotal PriceLaborEquipmentMaterialOther
1Breach RepairUrgent: Repair cut bollard with sleeve, repair re-bar and fill with concreteeach750$0$0.00$0.00$0.00$0.00Assume: 1 bollard per event
1Gate Hinge ReplacementRoutine: Remove gate, re-align and install new Hercules hingeeach10$0$0.00$0.00$0.00$0.00Assume: 1 day per event and 10 events per year
1Post and rail fence repair/installRoutine: Install missing railroad track iron on post and rail vehicle fenceLIN FT3500$0$0.00$0.00$0.00$0.00Repair/Install approx 3500 feet of railroad iron (track) per year (average of 20' lengths each)
1Flood gate opening/closing pre and post monsoonRoutine: Remove locks and slide bars and secure gate in open position pre-monsoon. Close gates, re-install slide bars and secure gate in locked position post monsoon. Lubricate hinges and locks on both efforts420 each2$0$0.00$0.00$0.00$0.00Assume: two crews during each event with 346 swing gates and 74 lift gates with 55 in Nogales AOR and 19 in Naco AOR
2Road maintenance /gradingRoutine: Blade reshape with added water and compactionmiles1000$0$0.00$0.00$0.00$0.00Assume 4 full time road crews annually to complete
2Road maintenance with added materialRoutine: Blade, reshape and add 4" AB lift with water and compactionmiles25$0$0.00$0.00$0.00$0.00Assume: 20'wide road
2Cattleguard cleaningRoutine: Remove cattleguard grates, remove and dispose of sediment at a proper location and reset cattleguard grateseach15$0$0.00$0.00$0.00$0.00Assume: cleaning one cattleguard per event
2Cultural MonitorProvide cultural monitor for staking and road maintenance /repairday195$0$0.00$0.00$0.00$0.00Cultural Monitor for ground disturbance an average of 195 days a year
3Culvert replacementRoutine: Replace damaged culvert including grouted rip-rap on inlet and outleteach2$0$0.00$0.00$0.00$0.00Average of 3 per year 12" to 48" X 25' long
3Culvert Cleaning/FlushingRoutine: Clean/Flush to remove all sediment and debris from culvert including inlet and outlet. Reshape inlet and outlet for proper water floweach15$0$0.00$0.00$0.00$0.00Average of 15 per year. Assume one day per event and 25 foot culvert
3Sediment/Debris removal and disposal from low water crossings and flood gatesRemove debris noted during post monsoon inspections3500 tons35$0$0.00$0.00$0.00$0.00Assume: 100 TONS of debris removal per event
4Border lighting repairTroubleshoot and repair/replace electrical components to restore back to operational conditioneach30$0$0.00$0.00$0.00$0.00Assume: 20 photocell contols per year, sixty 600 volt 30 amp type k fuses per year and 5 LED fixtures BLX-11-8-TA per year
4Transformer ReplacementRemove and replace on pole mounted transformereach1$0$0.00$0.00$0.00$0.00Assume: Replacing one (1) 13200 volt primary 240 volt secondary 25kva transformers per year
5Vegetation controlVegetation and brush removal five foot from the foot print along patrol roads. Cut grass and weeds to 4 to 6 inch heighth, trim trees back and chip in place or remove off sitemiles50$0$0.00$0.00$0.00$0.00Assume: One crew annually to complete
5IBR vegetation controlVegetation and brush removal an average of 60' foot north from the International Border Wall. Cut grass and weeds to 4 to 6 inch heighth, trim trees back and chip in place or remove off sitemiles150$0$0.00$0.00$0.00$0.00Assume: Two crews annually to complete
Totals:$0.00$0.00$0.00$0.00$0.00

OPT Period 1

OPT PERIOD 1: TCA SCHEDULED MAINT [FFP]Description of ServiceQty of AssetCount of EventsDurationTotal PriceLaborEquipmentMaterialOtherComments/assumptions
Naco, AZ (NCO) HySecurity 50VF200 Motorized Slide Driver MaintenanceRoutine: Perform factory recommended quarterly,semi annual and annual maintenance. Remove all dust, dirt and debris. Lubricate all components on the gate and operator that require it and inspect for proper alignment. Check for proper operation and report any deficencies24$0$0.00$0.00$0.00$0.00Quarterly Maintenance
Nogales, AZ (NCO) HySecurity 50VF200 Motorized Slide Driver MaintenanceRoutine: Perform factory recommended quarterly,semi annual and annual maintenance. Remove all dust, dirt and debris. Lubricate all components on the gate and operator that require it and inspect for proper alignment. Check for proper operation and report any deficencies14$0$0.00$0.00$0.00$0.00Quarterly Maintenance
Nogales, AZ (NCO) HydraSwing Linear Swing Gate OperatorRoutine: Perform factory recommended quarterly,semi annual and annual maintenance. Remove all dust, dirt and debris. Lubricate all components on the gate and operator that require it and inspect for proper alignment. Check for proper operation and report any deficencies34$0$0.00$0.00$0.00$0.00Quarterly Maintenance
Three Points (TON) Vamori Wash - Normandy Vehicle BarrierRoutine: Remove barriers premonsoon / replace post monsoon. Includes removing sleeves and welding back in place125 feet2$0$0.00$0.00$0.00$0.00One event for removing and one event for re-installing
Douglas, AZ (DGL) Lighting inspectionsRoutine: Visually inspect lighting for proper operation and alignment. Verify all disconnect lids are closed and there are no electrical safety issues. Inspect pole condition and that pole mounting hardware is in place and secure. Inspect guy wires for proper tension and augers are in good condition. Provide detailed written report and pictures of deficencies2664$0$0.00$0.00$0.00$0.00May require two site visits per event,one during daylight hours and one during dark hours
Naco, AZ (NCO) Lighting InspectionsRoutine: Visually inspect lighting for proper operation and alignment. Verify all disconnect lids are closed and there are no electrical safety issues. Inspect pole condition and that pole mounting hardware is in place and secure. Inspect guy wires for proper tension and augers are in good condition. Provide detailed written report and pictures of deficencies3244$0$0.00$0.00$0.00$0.00May require two site visits per event,one during daylight hours and one during dark hours
Nogales, AZ (NGL) Lighting InspectionsRoutine: Visually inspect lighting for proper operation and alignment. Verify all disconnect lids are closed and there are no electrical safety issues. Inspect pole condition and that pole mounting hardware is in place and secure. Inspect guy wires for proper tension and augers are in good condition. Provide detailed written report and pictures of deficencies1134$0$0.00$0.00$0.00$0.00May require two site visits per event,one during daylight hours and one during dark hours
Casa GrandeFence InspectionRoutine: Inspect fence post and rail, post and cable and normandy style vehicle barrier for cut or broken cable, cut rail and eroded areas wher animals or vehicles could cross. Inspect washes for debris build up on fence. Provide detailed written report with supporting pictures of deficencies42 Miles4$0$0.00$0.00$0.00$0.00Quarterly Inspection
Casa Grande Culvert inspectionsRoutine: Inspect culverts for sedimentation and debris accumulation and proper drainage371$0$0.00$0.00$0.00$0.00Post monsoon
Douglas, AZ (DGL) Culvert/Cattleguard/GratesRoutine: Inspect for sedimentation and debris accumulation and proper drainage. Provide written report and pictures of noted work required1671$0$0.00$0.00$0.00$0.00Post monsoon
Naco, AZ (NCO) Culvert/Cattleguard/GratesRoutine: Inspect for sedimentation and debris accumulation and proper drainage. Provide written report and pictures of noted work required2481$0$0.00$0.00$0.00$0.00Post monsoon
Nogales, AZ (NGL) Culvert/Cattleguard/GratesRoutine: Inspect for sedimentation and debris accumulation and proper drainage. Provide written report and pictures of noted work required1431$0$0.00$0.00$0.00$0.00Post monsoon
Tucson, AZ (TUS)) Culvert/Cattleguard/GratesRoutine: Inspect for sedimentation and debris accumulation and proper drainage. Provide written report and pictures of noted work required851$0$0.00$0.00$0.00$0.00Post monsoon
Ajo, AZ (AJO) Culvert/Cattleguard/GratesRoutine: Inspect for sedimentation and debris accumulation and proper drainage. Provide written report and pictures of noted work required4101$0$0.00$0.00$0.00$0.00Post monsoon
Three Points, AZ (TPS) Culvert/Cattleguard/GratesRoutine: Inspect for sedimentation and debris accumulation and proper drainage. Provide written report and pictures of noted work required171$0$0.00$0.00$0.00$0.00Post monsoon
Program ManagementNA112$0$0.00$0.00$0.00$0.00Billed monthly
Totals:$0.00$0.00$0.00$0.00$0.00
OPT Period 1: TCA UNKNOWN REPAIRS [IRO]Description of ServiceUOMCount of EventsDurationTotal PriceLaborEquipmentMaterialOther
1Breach RepairUrgent: Repair cut bollard with sleeve, repair re-bar and fill with concreteeach750$0$0.00$0.00$0.00$0.00Assume: 1 bollard per event
1Gate Hinge ReplacementRoutine: Remove gate, re-align and install new Hercules hingeeach10$0$0.00$0.00$0.00$0.00Assume: 1 day per event and 10 events per year
1Post and rail fence repair/installRoutine: Install missing railroad track iron on post and rail vehicle fenceLIN FT3500$0$0.00$0.00$0.00$0.00Repair/Install approx 3500 feet of railroad iron (track) per year (average of 20' lengths each)
1Flood gate opening/closing pre and post monsoonRoutine: Remove locks and slide bars and secure gate in open position pre-monsoon. Close gates, re-install slide bars and secure gate in locked position post monsoon. Lubricate hinges and locks on both efforts420 each2$0$0.00$0.00$0.00$0.00Assume: two crews during each event with 346 swing gates and 74 lift gates with 55 in Nogales AOR and 19 in Naco AOR
2Road maintenance /gradingRoutine: Blade reshape with added water and compactionmiles1000$0$0.00$0.00$0.00$0.00Assume 4 full time road crews annually to complete
2Road maintenance with added materialRoutine: Blade, reshape and add 4" AB lift with water and compactionmiles25$0$0.00$0.00$0.00$0.00Assume: 20'wide road
2Cattleguard cleaningRoutine: Remove cattleguard grates, remove and dispose of sediment at a proper location and reset cattleguard grateseach15$0$0.00$0.00$0.00$0.00Assume: cleaning one cattleguard per event
2Cultural MonitorProvide cultural monitor for staking and road maintenance /repairday195$0$0.00$0.00$0.00$0.00Cultural Monitor for ground disturbance an average of 195 days a year
3Culvert replacementRoutine: Replace damaged culvert including grouted rip-rap on inlet and outleteach2$0$0.00$0.00$0.00$0.00Average of 3 per year 12" to 48" X 25' long
3Culvert Cleaning/FlushingRoutine: Clean/Flush to remove all sediment and debris from culvert including inlet and outlet. Reshape inlet and outlet for proper water floweach15$0$0.00$0.00$0.00$0.00Average of 15 per year. Assume one day per event and 25 foot culvert
3Sediment/Debris removal and disposal from low water crossings and flood gatesRemove debris noted during post monsoon inspections3500 tons35$0$0.00$0.00$0.00$0.00Assume: 100 TONS of debris removal per event
4Border lighting repairTroubleshoot and repair/replace electrical components to restore back to operational conditioneach30$0$0.00$0.00$0.00$0.00Assume: 20 photocell contols per year, sixty 600 volt 30 amp type k fuses per year and 5 LED fixtures BLX-11-8-TA per year
4Transformer ReplacementRemove and replace on pole mounted transformereach1$0$0.00$0.00$0.00$0.00Assume: Replacing one (1) 13200 volt primary 240 volt secondary 25kva transformers per year
5Vegetation controlVegetation and brush removal five foot from the foot print along patrol roads. Cut grass and weeds to 4 to 6 inch heighth, trim trees back and chip in place or remove off sitemiles50$0$0.00$0.00$0.00$0.00Assume: One crew annually to complete
5IBR vegetation controlVegetation and brush removal an average of 60' foot north from the International Border Wall. Cut grass and weeds to 4 to 6 inch heighth, trim trees back and chip in place or remove off sitemiles150$0$0.00$0.00$0.00$0.00Assume: Two crews annually to complete
Totals:$0.00$0.00$0.00$0.00$0.00

OPT Period 2

OPT PERIOD 2: TCA SCHEDULED MAINT [FFP]Description of ServiceQty of AssetCount of EventsDurationTotal PriceLaborEquipmentMaterialOtherComments/assumptions
Naco, AZ (NCO) HySecurity 50VF200 Motorized Slide Driver MaintenanceRoutine: Perform factory recommended quarterly,semi annual and annual maintenance. Remove all dust, dirt and debris. Lubricate all components on the gate and operator that require it and inspect for proper alignment. Check for proper operation and report any deficencies24$0$0.00$0.00$0.00$0.00Quarterly Maintenance
Nogales, AZ (NCO) HySecurity 50VF200 Motorized Slide Driver MaintenanceRoutine: Perform factory recommended quarterly,semi annual and annual maintenance. Remove all dust, dirt and debris. Lubricate all components on the gate and operator that require it and inspect for proper alignment. Check for proper operation and report any deficencies14$0$0.00$0.00$0.00$0.00Quarterly Maintenance
Nogales, AZ (NCO) HydraSwing Linear Swing Gate OperatorRoutine: Perform factory recommended quarterly,semi annual and annual maintenance. Remove all dust, dirt and debris. Lubricate all components on the gate and operator that require it and inspect for proper alignment. Check for proper operation and report any deficencies34$0$0.00$0.00$0.00$0.00Quarterly Maintenance
Three Points (TON) Vamori Wash - Normandy Vehicle BarrierRoutine: Remove barriers premonsoon / replace post monsoon. Includes removing sleeves and welding back in place125 feet2$0$0.00$0.00$0.00$0.00One event for removing and one event for re-installing
Douglas, AZ (DGL) Lighting inspectionsRoutine: Visually inspect lighting for proper operation and alignment. Verify all disconnect lids are closed and there are no electrical safety issues. Inspect pole condition and that pole mounting hardware is in place and secure. Inspect guy wires for proper tension and augers are in good condition. Provide detailed written report and pictures of deficencies2664$0$0.00$0.00$0.00$0.00May require two site visits per event,one during daylight hours and one during dark hours
Naco, AZ (NCO) Lighting InspectionsRoutine: Visually inspect lighting for proper operation and alignment. Verify all disconnect lids are closed and there are no electrical safety issues. Inspect pole condition and that pole mounting hardware is in place and secure. Inspect guy wires for proper tension and augers are in good condition. Provide detailed written report and pictures of deficencies3244$0$0.00$0.00$0.00$0.00May require two site visits per event,one during daylight hours and one during dark hours
Nogales, AZ (NGL) Lighting InspectionsRoutine: Visually inspect lighting for proper operation and alignment. Verify all disconnect lids are closed and there are no electrical safety issues. Inspect pole condition and that pole mounting hardware is in place and secure. Inspect guy wires for proper tension and augers are in good condition. Provide detailed written report and pictures of deficencies1134$0$0.00$0.00$0.00$0.00May require two site visits per event,one during daylight hours and one during dark hours
Casa GrandeFence InspectionRoutine: Inspect fence post and rail, post and cable and normandy style vehicle barrier for cut or broken cable, cut rail and eroded areas wher animals or vehicles could cross. Inspect washes for debris build up on fence. Provide detailed written report with supporting pictures of deficencies42 Miles4$0$0.00$0.00$0.00$0.00Quarterly Inspection
Casa Grande Culvert inspectionsRoutine: Inspect culverts for sedimentation and debris accumulation and proper drainage371$0$0.00$0.00$0.00$0.00Post monsoon
Douglas, AZ (DGL) Culvert/Cattleguard/GratesRoutine: Inspect for sedimentation and debris accumulation and proper drainage. Provide written report and pictures of noted work required1671$0$0.00$0.00$0.00$0.00Post monsoon
Naco, AZ (NCO) Culvert/Cattleguard/GratesRoutine: Inspect for sedimentation and debris accumulation and proper drainage. Provide written report and pictures of noted work required2481$0$0.00$0.00$0.00$0.00Post monsoon
Nogales, AZ (NGL) Culvert/Cattleguard/GratesRoutine: Inspect for sedimentation and debris accumulation and proper drainage. Provide written report and pictures of noted work required1431$0$0.00$0.00$0.00$0.00Post monsoon
Tucson, AZ (TUS)) Culvert/Cattleguard/GratesRoutine: Inspect for sedimentation and debris accumulation and proper drainage. Provide written report and pictures of noted work required851$0$0.00$0.00$0.00$0.00Post monsoon
Ajo, AZ (AJO) Culvert/Cattleguard/GratesRoutine: Inspect for sedimentation and debris accumulation and proper drainage. Provide written report and pictures of noted work required4101$0$0.00$0.00$0.00$0.00Post monsoon
Three Points, AZ (TPS) Culvert/Cattleguard/GratesRoutine: Inspect for sedimentation and debris accumulation and proper drainage. Provide written report and pictures of noted work required171$0$0.00$0.00$0.00$0.00Post monsoon
Program ManagementNA112$0$0.00$0.00$0.00$0.00Billed monthly
Totals:$0.00$0.00$0.00$0.00$0.00
OPT Period 2: TCA UNKNOWN REPAIRS [IRO]Description of ServiceUOMCount of EventsDurationTotal PriceLaborEquipmentMaterialOther
1Breach RepairUrgent: Repair cut bollard with sleeve, repair re-bar and fill with concreteeach750$0$0.00$0.00$0.00$0.00Assume: 1 bollard per event
1Gate Hinge ReplacementRoutine: Remove gate, re-align and install new Hercules hingeeach10$0$0.00$0.00$0.00$0.00Assume: 1 day per event and 10 events per year
1Post and rail fence repair/installRoutine: Install missing railroad track iron on post and rail vehicle fenceLIN FT3500$0$0.00$0.00$0.00$0.00Repair/Install approx 3500 feet of railroad iron (track) per year (average of 20' lengths each)
1Flood gate opening/closing pre and post monsoonRoutine: Remove locks and slide bars and secure gate in open position pre-monsoon. Close gates, re-install slide bars and secure gate in locked position post monsoon. Lubricate hinges and locks on both efforts420 each2$0$0.00$0.00$0.00$0.00Assume: two crews during each event with 346 swing gates and 74 lift gates with 55 in Nogales AOR and 19 in Naco AOR
2Road maintenance /gradingRoutine: Blade reshape with added water and compactionmiles1000$0$0.00$0.00$0.00$0.00Assume 4 full time road crews annually to complete
2Road maintenance with added materialRoutine: Blade, reshape and add 4" AB lift with water and compactionmiles25$0$0.00$0.00$0.00$0.00Assume: 20'wide road
2Cattleguard cleaningRoutine: Remove cattleguard grates, remove and dispose of sediment at a proper location and reset cattleguard grateseach15$0$0.00$0.00$0.00$0.00Assume: cleaning one cattleguard per event
2Cultural MonitorProvide cultural monitor for staking and road maintenance /repairday195$0$0.00$0.00$0.00$0.00Cultural Monitor for ground disturbance an average of 195 days a year
3Culvert replacementRoutine: Replace damaged culvert including grouted rip-rap on inlet and outleteach2$0$0.00$0.00$0.00$0.00Average of 3 per year 12" to 48" X 25' long
3Culvert Cleaning/FlushingRoutine: Clean/Flush to remove all sediment and debris from culvert including inlet and outlet. Reshape inlet and outlet for proper water floweach15$0$0.00$0.00$0.00$0.00Average of 15 per year. Assume one day per event and 25 foot culvert
3Sediment/Debris removal and disposal from low water crossings and flood gatesRemove debris noted during post monsoon inspections3500 tons35$0$0.00$0.00$0.00$0.00Assume: 100 TONS of debris removal per event
4Border lighting repairTroubleshoot and repair/replace electrical components to restore back to operational conditioneach30$0$0.00$0.00$0.00$0.00Assume: 20 photocell contols per year, sixty 600 volt 30 amp type k fuses per year and 5 LED fixtures BLX-11-8-TA per year
4Transformer ReplacementRemove and replace on pole mounted transformereach1$0$0.00$0.00$0.00$0.00Assume: Replacing one (1) 13200 volt primary 240 volt secondary 25kva transformers per year
5Vegetation controlVegetation and brush removal five foot from the foot print along patrol roads. Cut grass and weeds to 4 to 6 inch heighth, trim trees back and chip in place or remove off sitemiles50$0$0.00$0.00$0.00$0.00Assume: One crew annually to complete
5IBR vegetation controlVegetation and brush removal an average of 60' foot north from the International Border Wall. Cut grass and weeds to 4 to 6 inch heighth, trim trees back and chip in place or remove off sitemiles150$0$0.00$0.00$0.00$0.00Assume: Two crews annually to complete
Totals:$0.00$0.00$0.00$0.00$0.00

OPT Period 3

OPT PERIOD 3: TCA SCHEDULED MAINT [FFP]Description of ServiceQty of AssetCount of EventsDurationTotal PriceLaborEquipmentMaterialOtherComments/assumptions
Naco, AZ (NCO) HySecurity 50VF200 Motorized Slide Driver MaintenanceRoutine: Perform factory recommended quarterly,semi annual and annual maintenance. Remove all dust, dirt and debris. Lubricate all components on the gate and operator that require it and inspect for proper alignment. Check for proper operation and report any deficencies24$0$0.00$0.00$0.00$0.00Quarterly Maintenance
Nogales, AZ (NCO) HySecurity 50VF200 Motorized Slide Driver MaintenanceRoutine: Perform factory recommended quarterly,semi annual and annual maintenance. Remove all dust, dirt and debris. Lubricate all components on the gate and operator that require it and inspect for proper alignment. Check for proper operation and report any deficencies14$0$0.00$0.00$0.00$0.00Quarterly Maintenance
Nogales, AZ (NCO) HydraSwing Linear Swing Gate OperatorRoutine: Perform factory recommended quarterly,semi annual and annual maintenance. Remove all dust, dirt and debris. Lubricate all components on the gate and operator that require it and inspect for proper alignment. Check for proper operation and report any deficencies34$0$0.00$0.00$0.00$0.00Quarterly Maintenance
Three Points (TON) Vamori Wash - Normandy Vehicle BarrierRoutine: Remove barriers premonsoon / replace post monsoon. Includes removing sleeves and welding back in place125 feet2$0$0.00$0.00$0.00$0.00One event for removing and one event for re-installing
Douglas, AZ (DGL) Lighting inspectionsRoutine: Visually inspect lighting for proper operation and alignment. Verify all disconnect lids are closed and there are no electrical safety issues. Inspect pole condition and that pole mounting hardware is in place and secure. Inspect guy wires for proper tension and augers are in good condition. Provide detailed written report and pictures of deficencies2664$0$0.00$0.00$0.00$0.00May require two site visits per event,one during daylight hours and one during dark hours
Naco, AZ (NCO) Lighting InspectionsRoutine: Visually inspect lighting for proper operation and alignment. Verify all disconnect lids are closed and there are no electrical safety issues. Inspect pole condition and that pole mounting hardware is in place and secure. Inspect guy wires for proper tension and augers are in good condition. Provide detailed written report and pictures of deficencies3244$0$0.00$0.00$0.00$0.00May require two site visits per event,one during daylight hours and one during dark hours
Nogales, AZ (NGL) Lighting InspectionsRoutine: Visually inspect lighting for proper operation and alignment. Verify all disconnect lids are closed and there are no electrical safety issues. Inspect pole condition and that pole mounting hardware is in place and secure. Inspect guy wires for proper tension and augers are in good condition. Provide detailed written report and pictures of deficencies1134$0$0.00$0.00$0.00$0.00May require two site visits per event,one during daylight hours and one during dark hours
Casa GrandeFence InspectionRoutine: Inspect fence post and rail, post and cable and normandy style vehicle barrier for cut or broken cable, cut rail and eroded areas wher animals or vehicles could cross. Inspect washes for debris build up on fence. Provide detailed written report with supporting pictures of deficencies42 Miles4$0$0.00$0.00$0.00$0.00Quarterly Inspection
Casa Grande Culvert inspectionsRoutine: Inspect culverts for sedimentation and debris accumulation and proper drainage371$0$0.00$0.00$0.00$0.00Post monsoon
Douglas, AZ (DGL) Culvert/Cattleguard/GratesRoutine: Inspect for sedimentation and debris accumulation and proper drainage. Provide written report and pictures of noted work required1671$0$0.00$0.00$0.00$0.00Post monsoon
Naco, AZ (NCO) Culvert/Cattleguard/GratesRoutine: Inspect for sedimentation and debris accumulation and proper drainage. Provide written report and pictures of noted work required2481$0$0.00$0.00$0.00$0.00Post monsoon
Nogales, AZ (NGL) Culvert/Cattleguard/GratesRoutine: Inspect for sedimentation and debris accumulation and proper drainage. Provide written report and pictures of noted work required1431$0$0.00$0.00$0.00$0.00Post monsoon
Tucson, AZ (TUS)) Culvert/Cattleguard/GratesRoutine: Inspect for sedimentation and debris accumulation and proper drainage. Provide written report and pictures of noted work required851$0$0.00$0.00$0.00$0.00Post monsoon
Ajo, AZ (AJO) Culvert/Cattleguard/GratesRoutine: Inspect for sedimentation and debris accumulation and proper drainage. Provide written report and pictures of noted work required4101$0$0.00$0.00$0.00$0.00Post monsoon
Three Points, AZ (TPS) Culvert/Cattleguard/GratesRoutine: Inspect for sedimentation and debris accumulation and proper drainage. Provide written report and pictures of noted work required171$0$0.00$0.00$0.00$0.00Post monsoon
Program ManagementNA112$0$0.00$0.00$0.00$0.00Billed monthly
Totals:$0.00$0.00$0.00$0.00$0.00
OPT Period 3 TCA UNKNOWN REPAIRS [IRO]Description of ServiceUOMCount of EventsDurationTotal PriceLaborEquipmentMaterialOther
1Breach RepairUrgent: Repair cut bollard with sleeve, repair re-bar and fill with concreteeach750$0$0.00$0.00$0.00$0.00Assume: 1 bollard per event
1Gate Hinge ReplacementRoutine: Remove gate, re-align and install new Hercules hingeeach10$0$0.00$0.00$0.00$0.00Assume: 1 day per event and 10 events per year
1Post and rail fence repair/installRoutine: Install missing railroad track iron on post and rail vehicle fenceLIN FT3500$0$0.00$0.00$0.00$0.00Repair/Install approx 3500 feet of railroad iron (track) per year (average of 20' lengths each)
1Flood gate opening/closing pre and post monsoonRoutine: Remove locks and slide bars and secure gate in open position pre-monsoon. Close gates, re-install slide bars and secure gate in locked position post monsoon. Lubricate hinges and locks on both efforts420 each2$0$0.00$0.00$0.00$0.00Assume: two crews during each event with 346 swing gates and 74 lift gates with 55 in Nogales AOR and 19 in Naco AOR
2Road maintenance /gradingRoutine: Blade reshape with added water and compactionmiles1000$0$0.00$0.00$0.00$0.00Assume 4 full time road crews annually to complete
2Road maintenance with added materialRoutine: Blade, reshape and add 4" AB lift with water and compactionmiles25$0$0.00$0.00$0.00$0.00Assume: 20'wide road
2Cattleguard cleaningRoutine: Remove cattleguard grates, remove and dispose of sediment at a proper location and reset cattleguard grateseach15$0$0.00$0.00$0.00$0.00Assume: cleaning one cattleguard per event
2Cultural MonitorProvide cultural monitor for staking and road maintenance /repairday195$0$0.00$0.00$0.00$0.00Cultural Monitor for ground disturbance an average of 195 days a year
3Culvert replacementRoutine: Replace damaged culvert including grouted rip-rap on inlet and outleteach2$0$0.00$0.00$0.00$0.00Average of 3 per year 12" to 48" X 25' long
3Culvert Cleaning/FlushingRoutine: Clean/Flush to remove all sediment and debris from culvert including inlet and outlet. Reshape inlet and outlet for proper water floweach15$0$0.00$0.00$0.00$0.00Average of 15 per year. Assume one day per event and 25 foot culvert
3Sediment/Debris removal and disposal from low water crossings and flood gatesRemove debris noted during post monsoon inspections3500 tons35$0$0.00$0.00$0.00$0.00Assume: 100 TONS of debris removal per event
4Border lighting repairTroubleshoot and repair/replace electrical components to restore back to operational conditioneach30$0$0.00$0.00$0.00$0.00Assume: 20 photocell contols per year, sixty 600 volt 30 amp type k fuses per year and 5 LED fixtures BLX-11-8-TA per year
4Transformer ReplacementRemove and replace on pole mounted transformereach1$0$0.00$0.00$0.00$0.00Assume: Replacing one (1) 13200 volt primary 240 volt secondary 25kva transformers per year
5Vegetation controlVegetation and brush removal five foot from the foot print along patrol roads. Cut grass and weeds to 4 to 6 inch heighth, trim trees back and chip in place or remove off sitemiles50$0$0.00$0.00$0.00$0.00Assume: One crew annually to complete
5IBR vegetation controlVegetation and brush removal an average of 60' foot north from the International Border Wall. Cut grass and weeds to 4 to 6 inch heighth, trim trees back and chip in place or remove off sitemiles150$0$0.00$0.00$0.00$0.00Assume: Two crews annually to complete
Totals:$0.00$0.00$0.00$0.00$0.00

OPT Period 4

OPT PERIOD 4 TCA SCHEDULED MAINT [FFP]Description of ServiceQty of AssetCount of EventsDurationTotal PriceLaborEquipmentMaterialOtherComments/assumptions
Naco, AZ (NCO) HySecurity 50VF200 Motorized Slide Driver MaintenanceRoutine: Perform factory recommended quarterly,semi annual and annual maintenance. Remove all dust, dirt and debris. Lubricate all components on the gate and operator that require it and inspect for proper alignment. Check for proper operation and report any deficencies24$0$0.00$0.00$0.00$0.00Quarterly Maintenance
Nogales, AZ (NCO) HySecurity 50VF200 Motorized Slide Driver MaintenanceRoutine: Perform factory recommended quarterly,semi annual and annual maintenance. Remove all dust, dirt and debris. Lubricate all components on the gate and operator that require it and inspect for proper alignment. Check for proper operation and report any deficencies14$0$0.00$0.00$0.00$0.00Quarterly Maintenance
Nogales, AZ (NCO) HydraSwing Linear Swing Gate OperatorRoutine: Perform factory recommended quarterly,semi annual and annual maintenance. Remove all dust, dirt and debris. Lubricate all components on the gate and operator that require it and inspect for proper alignment. Check for proper operation and report any deficencies34$0$0.00$0.00$0.00$0.00Quarterly Maintenance
Three Points (TON) Vamori Wash - Normandy Vehicle BarrierRoutine: Remove barriers premonsoon / replace post monsoon. Includes removing sleeves and welding back in place125 feet2$0$0.00$0.00$0.00$0.00One event for removing and one event for re-installing
Douglas, AZ (DGL) Lighting inspectionsRoutine: Visually inspect lighting for proper operation and alignment. Verify all disconnect lids are closed and there are no electrical safety issues. Inspect pole condition and that pole mounting hardware is in place and secure. Inspect guy wires for proper tension and augers are in good condition. Provide detailed written report and pictures of deficencies2664$0$0.00$0.00$0.00$0.00May require two site visits per event,one during daylight hours and one during dark hours
Naco, AZ (NCO) Lighting InspectionsRoutine: Visually inspect lighting for proper operation and alignment. Verify all disconnect lids are closed and there are no electrical safety issues. Inspect pole condition and that pole mounting hardware is in place and secure. Inspect guy wires for proper tension and augers are in good condition. Provide detailed written report and pictures of deficencies3244$0$0.00$0.00$0.00$0.00May require two site visits per event,one during daylight hours and one during dark hours
Nogales, AZ (NGL) Lighting InspectionsRoutine: Visually inspect lighting for proper operation and alignment. Verify all disconnect lids are closed and there are no electrical safety issues. Inspect pole condition and that pole mounting hardware is in place and secure. Inspect guy wires for proper tension and augers are in good condition. Provide detailed written report and pictures of deficencies1134$0$0.00$0.00$0.00$0.00May require two site visits per event,one during daylight hours and one during dark hours
Casa GrandeFence InspectionRoutine: Inspect fence post and rail, post and cable and normandy style vehicle barrier for cut or broken cable, cut rail and eroded areas wher animals or vehicles could cross. Inspect washes for debris build up on fence. Provide detailed written report with supporting pictures of deficencies42 Miles4$0$0.00$0.00$0.00$0.00Quarterly Inspection
Casa Grande Culvert inspectionsRoutine: Inspect culverts for sedimentation and debris accumulation and proper drainage371$0$0.00$0.00$0.00$0.00Post monsoon
Douglas, AZ (DGL) Culvert/Cattleguard/GratesRoutine: Inspect for sedimentation and debris accumulation and proper drainage. Provide written report and pictures of noted work required1671$0$0.00$0.00$0.00$0.00Post monsoon
Naco, AZ (NCO) Culvert/Cattleguard/GratesRoutine: Inspect for sedimentation and debris accumulation and proper drainage. Provide written report and pictures of noted work required2481$0$0.00$0.00$0.00$0.00Post monsoon
Nogales, AZ (NGL) Culvert/Cattleguard/GratesRoutine: Inspect for sedimentation and debris accumulation and proper drainage. Provide written report and pictures of noted work required1431$0$0.00$0.00$0.00$0.00Post monsoon
Tucson, AZ (TUS)) Culvert/Cattleguard/GratesRoutine: Inspect for sedimentation and debris accumulation and proper drainage. Provide written report and pictures of noted work required851$0$0.00$0.00$0.00$0.00Post monsoon
Ajo, AZ (AJO) Culvert/Cattleguard/GratesRoutine: Inspect for sedimentation and debris accumulation and proper drainage. Provide written report and pictures of noted work required4101$0$0.00$0.00$0.00$0.00Post monsoon
Three Points, AZ (TPS) Culvert/Cattleguard/GratesRoutine: Inspect for sedimentation and debris accumulation and proper drainage. Provide written report and pictures of noted work required171$0$0.00$0.00$0.00$0.00Post monsoon
Program ManagementNA112$0$0.00$0.00$0.00$0.00Billed monthly
Totals:$0.00$0.00$0.00$0.00$0.00
OPT Period 4: TCA UNKNOWN REPAIRS [IRO]Description of ServiceUOMCount of EventsDurationTotal PriceLaborEquipmentMaterialOther
1Breach RepairUrgent: Repair cut bollard with sleeve, repair re-bar and fill with concreteeach750$0$0.00$0.00$0.00$0.00Assume: 1 bollard per event
1Gate Hinge ReplacementRoutine: Remove gate, re-align and install new Hercules hingeeach10$0$0.00$0.00$0.00$0.00Assume: 1 day per event and 10 events per year
1Post and rail fence repair/installRoutine: Install missing railroad track iron on post and rail vehicle fenceLIN FT3500$0$0.00$0.00$0.00$0.00Repair/Install approx 3500 feet of railroad iron (track) per year (average of 20' lengths each)
1Flood gate opening/closing pre and post monsoonRoutine: Remove locks and slide bars and secure gate in open position pre-monsoon. Close gates, re-install slide bars and secure gate in locked position post monsoon. Lubricate hinges and locks on both efforts420 each2$0$0.00$0.00$0.00$0.00Assume: two crews during each event with 346 swing gates and 74 lift gates with 55 in Nogales AOR and 19 in Naco AOR
2Road maintenance /gradingRoutine: Blade reshape with added water and compactionmiles1000$0$0.00$0.00$0.00$0.00Assume 4 full time road crews annually to complete
2Road maintenance with added materialRoutine: Blade, reshape and add 4" AB lift with water and compactionmiles25$0$0.00$0.00$0.00$0.00Assume: 20'wide road
2Cattleguard cleaningRoutine: Remove cattleguard grates, remove and dispose of sediment at a proper location and reset cattleguard grateseach15$0$0.00$0.00$0.00$0.00Assume: cleaning one cattleguard per event
2Cultural MonitorProvide cultural monitor for staking and road maintenance /repairday195$0$0.00$0.00$0.00$0.00Cultural Monitor for ground disturbance an average of 195 days a year
3Culvert replacementRoutine: Replace damaged culvert including grouted rip-rap on inlet and outleteach2$0$0.00$0.00$0.00$0.00Average of 3 per year 12" to 48" X 25' long
3Culvert Cleaning/FlushingRoutine: Clean/Flush to remove all sediment and debris from culvert including inlet and outlet. Reshape inlet and outlet for proper water floweach15$0$0.00$0.00$0.00$0.00Average of 15 per year. Assume one day per event and 25 foot culvert
3Sediment/Debris removal and disposal from low water crossings and flood gatesRemove debris noted during post monsoon inspections3500 tons35$0$0.00$0.00$0.00$0.00Assume: 100 TONS of debris removal per event
4Border lighting repairTroubleshoot and repair/replace electrical components to restore back to operational conditioneach30$0$0.00$0.00$0.00$0.00Assume: 20 photocell contols per year, sixty 600 volt 30 amp type k fuses per year and 5 LED fixtures BLX-11-8-TA per year
4Transformer ReplacementRemove and replace on pole mounted transformereach1$0$0.00$0.00$0.00$0.00Assume: Replacing one (1) 13200 volt primary 240 volt secondary 25kva transformers per year
5Vegetation controlVegetation and brush removal five foot from the foot print along patrol roads. Cut grass and weeds to 4 to 6 inch heighth, trim trees back and chip in place or remove off sitemiles50$0$0.00$0.00$0.00$0.00Assume: One crew annually to complete
5IBR vegetation controlVegetation and brush removal an average of 60' foot north from the International Border Wall. Cut grass and weeds to 4 to 6 inch heighth, trim trees back and chip in place or remove off sitemiles150$0$0.00$0.00$0.00$0.00Assume: Two crews annually to complete
Totals:$0.00$0.00$0.00$0.00$0.00

Extension Period

Extension Period: TCA SCHEDULED MAINT [FFP]Description of ServiceQty of AssetCount of EventsDurationTotal PriceLaborEquipmentMaterialOtherComments/assumptions
Naco, AZ (NCO) HySecurity 50VF200 Motorized Slide Driver MaintenanceRoutine: Perform factory recommended quarterly,semi annual and annual maintenance. Remove all dust, dirt and debris. Lubricate all components on the gate and operator that require it and inspect for proper alignment. Check for proper operation and report any deficencies22$0$0.00$0.00$0.00$0.00Quarterly Maintenance
Nogales, AZ (NCO) HySecurity 50VF200 Motorized Slide Driver MaintenanceRoutine: Perform factory recommended quarterly,semi annual and annual maintenance. Remove all dust, dirt and debris. Lubricate all components on the gate and operator that require it and inspect for proper alignment. Check for proper operation and report any deficencies12$0$0.00$0.00$0.00$0.00Quarterly Maintenance
Nogales, AZ (NCO) HydraSwing Linear Swing Gate OperatorRoutine: Perform factory recommended quarterly,semi annual and annual maintenance. Remove all dust, dirt and debris. Lubricate all components on the gate and operator that require it and inspect for proper alignment. Check for proper operation and report any deficencies32$0$0.00$0.00$0.00$0.00Quarterly Maintenance
Three Points (TON) Vamori Wash - Normandy Vehicle BarrierRoutine: Remove barriers premonsoon / replace post monsoon. Includes removing sleeves and welding back in place125 feet1$0$0.00$0.00$0.00$0.00One event for removing and one event for re-installing
Douglas, AZ (DGL) Lighting inspectionsRoutine: Visually inspect lighting for proper operation and alignment. Verify all disconnect lids are closed and there are no electrical safety issues. Inspect pole condition and that pole mounting hardware is in place and secure. Inspect guy wires for proper tension and augers are in good condition. Provide detailed written report and pictures of deficencies2662$0$0.00$0.00$0.00$0.00May require two site visits per event,one during daylight hours and one during dark hours
Naco, AZ (NCO) Lighting InspectionsRoutine: Visually inspect lighting for proper operation and alignment. Verify all disconnect lids are closed and there are no electrical safety issues. Inspect pole condition and that pole mounting hardware is in place and secure. Inspect guy wires for proper tension and augers are in good condition. Provide detailed written report and pictures of deficencies3242$0$0.00$0.00$0.00$0.00May require two site visits per event,one during daylight hours and one during dark hours
Nogales, AZ (NGL) Lighting InspectionsRoutine: Visually inspect lighting for proper operation and alignment. Verify all disconnect lids are closed and there are no electrical safety issues. Inspect pole condition and that pole mounting hardware is in place and secure. Inspect guy wires for proper tension and augers are in good condition. Provide detailed written report and pictures of deficencies1132$0$0.00$0.00$0.00$0.00May require two site visits per event,one during daylight hours and one during dark hours
Casa GrandeFence InspectionRoutine: Inspect fence post and rail, post and cable and normandy style vehicle barrier for cut or broken cable, cut rail and eroded areas wher animals or vehicles could cross. Inspect washes for debris build up on fence. Provide detailed written report with supporting pictures of deficencies42 Miles2$0$0.00$0.00$0.00$0.00Quarterly Inspection
Casa Grande Culvert inspectionsRoutine: Inspect culverts for sedimentation and debris accumulation and proper drainage371$0$0.00$0.00$0.00$0.00Post monsoon
Douglas, AZ (DGL) Culvert/Cattleguard/GratesRoutine: Inspect for sedimentation and debris accumulation and proper drainage. Provide written report and pictures of noted work required1671$0$0.00$0.00$0.00$0.00Post monsoon