Attachment 3 Unit Priced Bid Sheet v1.xlsx
XLSX spreadsheet 64 KB Posted
- Attached to
- Tucson (TCA) Tactical Infrastructure Maintenance
- Solicitation number
- 70B01C26R00000080
About this file
This is a Unit Priced Bid Sheet template for the Tucson Tactical Infrastructure Maintenance contract solicitation. The document serves as a pricing template for contractors to submit unit rates and costs associated with the required maintenance and repair services. As a template file, it does not contain specific pricing data, award dates, or response deadlines; rather, it establishes the framework and format that bidders must use to submit their cost proposals for consideration during the evaluation process.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions Attachment 1 - Unit BID SHEET
Instructions:
The Offeror shall complete the Unit Bid Sheet by filling-in all of the cells highlighted in yellow in each of the sheets.
Note: All pricing on in this sheet will include all associated costs such as but not limited to gas, maintenance, repairs, taxes, and fringe benefits. The only charges not to include is the coefficient, as it will be added during the performance of this contract. On the equipment tab, the Monthly Rate is based on 21 consecutive day. *EXAMPLE Monthly Day Rate: A loader is used in consecutive efforts located in the same general area and used a minimum of 21-days, then the monthly day rate would apply.
| Contractor escalation percentage (Materials / Equipment): |
| Contractor escalation percentage (Labor): |
Materials
| Tucson Sector Materials Itemized Pricing List ALL CLIN's | |||||
| Item Number | Description | UoM | Use | Use Description | Unit Price |
| 3 | 12’x8’ Modular Steel Cattle Guard Heavy Duty | EA | Barrier | Modular Steel Cattle Guard | |
| 4 | 12’x8’ Precast Cattle Guard Base | Pair | Barrier | Precast Cattle Guard Bases | |
| 5 | 12'X8' Cattle Guard W/Integral Box, HS20 Rating | EA | Barrier | Cattle Guard | |
| 6 | 14’x8’ Modular Steel Cattle Guard Heavy Duty | EA | Barrier | Modular Steel Cattle Guard | |
| 7 | 14’x8’ Precast Cattle Guard Base | Pair | Barrier | Precast Cattle Guard Bases | |
| 8 | 14'X8' Cattle Guard W/Integral Box, HS20 Rating | EA | Barrier | Cattle Guard | |
| 9 | Cattle Guard "L" Foundation Buttress, 12' | Pair | Barrier | Cattle guard foundation | |
| 10 | Cattle Guard "L" Foundation Buttress, 14' | Pair | Barrier | Cattle guard foundation | |
| 11 | Cattle Guard Wing Posts | Pair | Barrier | Cattle guard | |
| 12 | Guard Rail Post (Plate mounted), 3'H x 4"D x 6"W | EA | Barrier | Guard Rail | |
| 13 | Guard Rail Post W6X8.5 Steel | EA | Barrier | Guard Rail | |
| 14 | Guardrail End Round End, 24"L x 16.6"H x, 12"D | EA | Barrier | Guard Rail | |
| 15 | Guardrail End Terminal Type A | EA | Barrier | Guard Rail | |
| 16 | Guardrail Post 8"X8"X 8ft Wood | EA | Barrier | Guard Rail | |
| 17 | Guardrail Reflective Stickers DG 18' X 18' | EA | Barrier | Guard Rail | |
| 18 | Guardrail Reflective Stickers DG 20" x 20" | EA | Barrier | Guard Rail | |
| 19 | Guardrail Reflective Stickers DG 24" x 24" | EA | Barrier | Guard Rail | |
| 20 | Guardrail Reflective Stickers HIP 18" x 18" | EA | Barrier | Guard Rail | |
| 21 | Guardrail Reflective Stickers HIP 20" x 20" | EA | Barrier | Guard Rail | |
| 22 | Guardrail Reflective Stickers HIP 24' X 24' | EA | Barrier | Guard Rail | |
| 23 | Guardrail, W-Beam, Class A 12' 6"L x 12"H x 3"D | EA | Barrier | Guard Rail | |
| 24 | Guardrail, W-Beam, Single Face | LF | Barrier | Guard Rail | |
| 25 | Jersey Barrier (concrete) 10'L x 2'W x 3'H | EA | Barrier | Barrier | |
| 26 | Jersey Barrier (Concrete), 8'L x 2'W x 3'H | EA | Barrier | Barrier | |
| 27 | Object Marker (M-23) 6x12 up to 12x36 type 2 | EA | Barrier | AZDOT Black Yellow Diagonal Stripe | |
| 28 | Pre Cast Concrete Lego Style Block (2' x 2' x 6') | EA | Barrier | Pre Cast Concrete Lego Style Block | |
| 29 | Sheet Pile Corrugated Stock (W 18"-48" L 15'-30') | Sq. FT | Barrier | Revetment | |
| 30 | Sheet Pile Flat Stock (W 18"-48" L 15'-30') | Sq. FT | Barrier | Revetment | |
| 31 | Water Filled Plastic Barrier, 8'L x 2'W x 3'6" H | EA | Barrier | Barrier | |
| 32 | Wings, bolt on for 8' cattle guard | Pair | Barrier | Cattle guard | |
| 33 | Debris Disposal Fee | Ton | Disposal | Miscellaneous/ also covers additional roll off fee per ton | |
| 34 | Apron Endwalls for Corrugated Metal Pipe Steel 12" Pipe | EA | Drainage | Culvert | |
| 35 | Apron Endwalls for Corrugated Metal Pipe Steel 15" Pipe | EA | Drainage | Culvert | |
| 36 | Apron Endwalls for Corrugated Metal Pipe Steel 18" Pipe | EA | Drainage | Culvert | |
| 37 | Apron Endwalls for Corrugated Metal Pipe Steel 21" Pipe | EA | Drainage | Culvert | |
| 38 | Apron Endwalls for Corrugated Metal Pipe Steel 24" Pipe | EA | Drainage | Culvert | |
| 39 | Apron Endwalls for Corrugated Metal Pipe Steel 30" Pipe | EA | Drainage | Culvert | |
| 40 | Apron Endwalls for Corrugated Metal Pipe Steel 36" Pipe | EA | Drainage | Culvert | |
| 41 | Apron Endwalls for Corrugated Metal Pipe Steel 42" Pipe | EA | Drainage | Culvert | |
| 42 | Apron Endwalls for Corrugated Metal Pipe Steel 48" Pipe | EA | Drainage | Culvert | |
| 43 | Corrugated Plastic Culvert , HDPE 12" | FT | Drainage | Culvert | |
| 44 | Corrugated Plastic Culvert, HDPE 24" | FT | Drainage | Culvert | |
| 45 | Corrugated Plastic Culvert, HDPE 18" | FT | Drainage | Culvert | |
| 46 | Corrugated Plastic Culvert, HDPE 30" | FT | Drainage | Culvert | |
| 47 | Culvert Pipe Corrugated Steel 10" dia | LF | Drainage | Culvert | |
| 48 | Culvert Pipe Corrugated Steel 12" dia | LF | Drainage | Culvert | |
| 49 | Culvert Pipe Corrugated Steel 15" dia | LF | Drainage | Culvert | |
| 50 | Culvert Pipe Corrugated Steel 18" dia | LF | Drainage | Culvert | |
| 51 | Culvert Pipe Corrugated Steel 21" dia | LF | Drainage | Culvert | |
| 52 | Culvert Pipe Corrugated Steel 24" dia | LF | Drainage | Culvert | |
| 53 | Culvert Pipe Corrugated Steel 30" dia | LF | Drainage | Culvert | |
| 54 | Culvert Pipe Corrugated Steel 36" dia | LF | Drainage | Culvert | |
| 55 | Culvert Pipe Corrugated Steel 42" dia | LF | Drainage | Culvert | |
| 56 | Culvert Pipe Corrugated Steel 48" dia | LF | Drainage | Culvert | |
| 57 | Gabion Basket 4 GA, (24"x48"x6') | EA | Drainage | Gabion Basket | |
| 58 | Gabion Basket, 4 GA, 36"H x 24" Thick, 7' L | EA | Drainage | Gabion Basket | |
| 59 | Gabion Basket, 4 GA, 48"H x 33" Thick, 7'L | EA | Drainage | Gabion Basket | |
| 60 | Gabion Basket, 4 GA, 54"H x 36" Thick, 7'L | EA | Drainage | Gabion Basket | |
| 61 | Gabion Basket, 4ga (33"x33"x7'), for stacking | EA | Drainage | Gabion Basket | |
| 62 | Twisted Hex Wire Mesh 13 Gauge | SY | Drainage | Twisted Hex Wire Mesh | |
| 63 | #6 Bare Solid Copper Wire Ground | FT | Electrical | #6 Bare Solid Copper Wire Ground | |
| 64 | .75" Copper Clad Steel Grounding Rod 10' L | EA | Electrical | Grounding | |
| 65 | 1/0 Copper, 15kV THWN or XHHW | FT | Electrical | 1/0 Copper, 15kV THWN or XHHW | |
| 66 | 1/0 Okonite direct burial cable | FT | Electrical | Direct burial cable | |
| 67 | 100W Driver for Line 2.0 Symmetric (special 480V) | EA | Electrical | LED Driver | |
| 68 | 2" Rigid Radius Sweep | EA | Electrical | 2" Rigid Radius Sweep | |
| 69 | 2" Schedule 40 PVC Electrical | FT | Electrical | 2" Schedule 40 PVC Electrical | |
| 70 | 2/0 Okonite direct burial cable | FT | Electrical | Direct burriel cable | |
| 71 | 20' Light Pole, 11 ga | EA | Electrical | Light Pole | |
| 72 | 200 amp Load Break Elbow | EA | Electrical | 200 amp Load Break Elbow | |
| 73 | 200 amp Load Break Elbow, 15kv | EA | Electrical | 200 amp Load Break Elbow | |
| 74 | 200 amp Load Break Elbow, 25kv | EA | Electrical | 200 amp Load Break Elbow | |
| 75 | 200amp 600V Circuit Breaker (Part # PDU-MDS-600V-200A) | EA | Electrical | 3P 200amp 600V Circuit Breaker | |
| 76 | 25' Light Pole, 7 ga steel | EA | Electrical | Light Pole | |
| 77 | 250 MCM Okonite direct burial cable | FT | Electrical | Direct burial cable | |
| 78 | 3/0 Okonite direct burial cable | FT | Electrical | Direct burial cable | |
| 79 | 3/4" EMT Conduit | LF | Electrical | Conduit | |
| 80 | 3/4" EMT one hole Straps | EA | Electrical | Straps | |
| 81 | 3/4" EMT Waterproof box Connectors | EA | Electrical | Waterproof Connectors | |
| 82 | 3/4" EMT Waterproof Couplings | EA | Electrical | 3/4" EMT Waterproof Couplings | |
| 83 | 30' Light Pole, 7 ga steel | EA | Electrical | Light Pole | |
| 84 | 4/0 Okonite direct burial cable | FT | Electrical | Direct burial cable | |
| 85 | 750 MCM Okonite direct burial cable | FT | Electrical | Direct burial cable | |
| 86 | Bridge Light Fixture Line 2.0, Symmetric, 72” V2 High Output,3000K | EA | Electrical | Bridge Light Fixture Line 2.0, Symmetric, 72” V2 High Output,3000K | |
| 87 | Bulb high pressure sodium lamp 400-watt, 51K lumens | EA | Electrical | Lamp | |
| 88 | Bulb high pressure sodium lamps 1000-watt | EA | Electrical | Lamp | |
| 89 | Bulb metal halide lamps 1000-watt, BT56, 110k lumens | EA | Electrical | Lamp | |
| 90 | Bulb metal halide lamps 1500-watt, BT56, 170K lumens | EA | Electrical | Lamp | |
| 91 | Bulb, 36881 HPS Lamp | EA | Electrical | High Pressure Sodium Bulb | |
| 92 | Capacitor 1000 watt HPS light fixture kit | EA | Electrical | Capacitor, 480 Volt | |
| 93 | Concrete Anchors 1/4"x2" drive pin (box of 25) | Box | Electrical | Concrete Anchors 1/4" | |
| 94 | Copper Ground Wire 8 ga. | FT | Electrical | Grounding | |
| 95 | Electrical Box Cover, 2G | EA | Electrical | Electrical Box Cover, 2G | |
| 96 | Electrical Box Cover, MX1050S Flat/Waterproof | EA | Electrical | Electrical Box Cover, MX1050S Flat/Waterproof | |
| 97 | Electrical Box, 2G Deep, DD5100XS | EA | Electrical | Electrical Box, 2G Deep, DD5100XS | |
| 98 | Electrical Burial Warning Tape, 3" x 1000', Red | RL | Electrical | Electrical Burial Warning Tape | |
| 99 | Electrical Cord 6/4, SEOW 600V | FT | Electrical | Electrical Cord 6/4, SEOW 600V | |
| 100 | Fiber Electrical LID 13X24 X 18 Traffic Rated | EA | Electrical | Handhole Box | |
| 101 | Fiber Electrical LID 24X36 X 18 Traffic Rated | EA | Electrical | Handhole Box | |
| 102 | Fiber Electrical LID HPC1324 Polymer | EA | Electrical | Handhole Box | |
| 103 | Fiber Electrical LID HPC2436 Polymer | EA | Electrical | Handhole Box | |
| 104 | Fixture-Galleon 10-Bar LED 5WQ Optics,45d Ambient | EA | Electrical | LED Fixture | |
| 105 | Fixture-Galleon 10-Bar LED T4W Optics,45d Ambient | EA | Electrical | LED Fixture | |
| 106 | Fixture-Galleon 6-Bar LED SL2 Optics,45d Ambient | EA | Electrical | LED Fixture | |
| 107 | Fiber Electrical LID Name Plate | EA | Electrical | Handhole Box | |
| 108 | Fixture-Galleon 6-Bar LED T2 Optics,45d Ambient | EA | Electrical | LED Fixture | |
| 109 | Fixture-Galleon 8-Bar LED T2 Optics,45d Ambient | EA | Electrical | LED Fixture | |
| 110 | Fixture-Galleon 8-Bar LED T2 Optics,90d Ambient Rotated Left | EA | Electrical | LED Fixture | |
| 111 | Fixture-Galleon 8-Bar LED T2 Optics,90d Ambient Rotated Right | EA | Electrical | LED Fixture | |
| 112 | Fuse, 600 Volt 30 amp type k | EA | Electrical | Fuse, 600 Volt | |
| 113 | Fuse, Cutout Type XS w/ hardware 15KV | EA | Electrical | Fuse, Cutout Type XS w/ hardware | |
| 114 | Fuse, Cutout Type XS w/ hardware 25KV | EA | Electrical | Fuse, Cutout Type XS w/ hardware | |
| 115 | Handhole Lid Name Plate | EA | Electrical | Handhole Box | |
| 116 | High Pressure Sodium Ballast Kit, 1000W 240 volt | EA | Electrical | High Pressure Sodium Ballast Kit, 1000W | |
| 117 | HPS Ballast 240 Volts 1000 watt | EA | Electrical | Border Lighting | |
| 118 | Hubbell CS6365C CA STD Plug, 50 Amp | EA | Electrical | Hubbell CS6365C CA STD Plug, 50 Amp | |
| 119 | Hubbell CS6369 #2 Large Receptacle | EA | Electrical | Hubbell CS6369 #2 Large Receptacle | |
| 120 | Label, Warning Arc Flash, NFPA 70 E | EA | Electrical | Label, Warning Arc Flash | |
| 121 | LED Fixture BLX-11-8-TA | EA | Electrical | BLX-II LED Fixtures NCO/DGL | |
| 122 | LED Fixture NOVA2-1000 1000 W | EA | Electrical | NOVA 2 1000 W LED Fixture | |
| 123 | LED Tube Light 48" T8 | EA | Electrical | LED Tube Light | |
| 124 | Luminary photo cell Intermatic K4321 | EA | Electrical | Photo Cell | |
| 125 | Metal Halide Ballast 240 Volts 1000 watt | EA | Electrical | Border Lighting | |
| 126 | Metal Halide Ballast 240 Volts, 1000-watt Kit, 5 Tap | EA | Electrical | Ballast 240 Volts | |
| 127 | Photocell Control Relay 240 volt 15 amp | EA | Electrical | Relay | |
| 128 | Siemens FUS 2P3W 240V 30A NER Disconnect | EA | Electrical | 30A Disconnect for LED Poles | |
| 129 | Steel/Aluminum Power Pole 60FT | EA | Electrical | Steel/Aluminum Power Pole 60FT | |
| 130 | Switch, 2P 20A 120/277 Comm. Ground | EA | Electrical | Switch, 2P 20A 120/277 Comm. Ground | |
| 131 | T-5 Fluorescent Light Bulb 48" | EA | Electrical | T-5 Fluorescent Light Bulb | |
| 132 | Traffic Rated Pull Box/hand holes 24D x 36L x 24W including Lid (B2436 52JH) | EA | Electrical | Pull Box | |
| 133 | Transformer Primary 13,200 volts, Secondary 240 Volts | EA | Electrical | Transformer Primary 13,200 volts, Secondary 240 Volts | |
| 134 | Transformer Primary 15KVA | EA | Electrical | Transformer Primary 7200 volts, Secondary 240 Volts | |
| 135 | Transformer Primary 7,200 volts, Secondary 240 Volts 25Kva | EA | Electrical | 25 Kva 7200/240 | |
| 136 | Waterproof Fluorescent Light Fixtures 48" T8 | EA | Electrical | Fluorescent Fixtures | |
| 137 | Waterproof LED Light Fixture, 4 FT, 4.5K Lumens | EA | Electrical | Light Fixture | |
| 138 | Wire Electrical 12 AWG various colors | LF | Electrical | Wire Electrical 12 AWG various colors | |
| 139 | Wooden Utility Pole Class 5 through 7 | FT | Electrical | Utility Pole | |
| 140 | Traffic Rated Pull Box/hand holes18D x 32L x 20W | EA | Electrical | Pull Box | |
| 141 | Geotextile Filter Fabric | Sq. YD | Erosion | Filter Fabric Synthetic | |
| 142 | Straw Waddle Fiber Roll 9" x 25' | EA | Erosion | Straw Waddle Fiber Roll 9" x 25' | |
| 143 | #4 Reinforcing Bar, ASTM A615 Grade 60 | FT | Fence | Bollard Reinforcement | |
| 144 | #5 Reinforcing Bar, ASTM A615 Grade 60 | FT | Fence | Bollard Reinforcement | |
| 145 | #6 Reinforcing Bar, ASTM A615 Grade 60 | FT | Fence | Bollard Reinforcement | |
| 146 | .375" Dia Galvanized Truss Rod | EA | Fence | Brace | |
| 147 | 1.375" Dia Aluminum Rail End | EA | Fence | Hardware | |
| 148 | 1.375" Dia Dome Caps | EA | Fence | Hardware | |
| 149 | 1.375" Dia Galvanized Single Brace Bands | EA | Fence | Hardware | |
| 150 | 1.375" Dia Galvanized Tension Bands | EA | Fence | Hardware | |
| 151 | 1018 CR Steel Flat Bar 1"x3" | FT | Fence | Steel Plate | |
| 152 | 11 Gauge Top of Bollard Cap Plates | EA | Fence | Bollard Cap Plates | |
| 153 | 11 Gauge Top of Gate Post Cap Plates | EA | Fence | Gate Post Cap Plates | |
| 154 | 2" Diamond Chain Link Fence Fabric 11.5 ga. 6' H, (50' roll) Galvanized | RL | Fence | Mesh Fabric | |
| 155 | 2" Diamond Chain Link Fence Fabric 9 ga. 10' H, (50' roll) Galvanized, Zinc coating | RL | Fence | Mesh Fabric | |
| 156 | 2" Diamond Chain Link Fence Fabric 9 ga. 6' H, (50' roll) Galvanized | RL | Fence | Mesh Fabric | |
| 157 | 2.875" Dia Dome Caps | EA | Fence | Hardware | |
| 158 | 2.875" Dia Galvanized Single Brace Bands | EA | Fence | Hardware | |
| 159 | 2.875" Dia Galvanized Tension Bands | EA | Fence | Hardware | |
| 160 | 28" Clipped Concertina NATO Razor Wire (sufficient to cover 50 linear feet) | RL | Fence | Razor Wire, Galvanized | |
| 161 | 3" Diam Sched 40 Steel Pipe, L= 2.25", w/ .5" Wide Slot | EA | Fence | Puck lock housing | |
| 162 | 3" Schedule 40 Stainless Steel Pipe, L=2.25", w/ 0.5" Wide Slot | FT | Fence | Fence hardware | |
| 163 | 3.5" Zinc-plated Silver Steel Gate Hinge | EA | Fence | Hardware | |
| 164 | 3/4 CLOSURE PLUG | EA | Fence | Gate Electrical | |
| 165 | 3/4" 3H WEATHERPROOF BOX | EA | Fence | Gate Electrical | |
| 166 | 3/4" 4H WEATHERPROOF BOX | EA | Fence | Gate Electrical | |
| 167 | 3/4" Galv Rigid Coupling | EA | Fence | Gate Electrical | |
| 168 | 3/4" IMC Pipe IMC075 | FT | Fence | Gate Electrical | |
| 169 | 3/4" INS Ridgid Conduit Conn. | EA | Fence | Gate Electrical | |
| 170 | 3/4" LQDT. Conn. Zinc | EA | Fence | Gate Electrical | |
| 171 | 3/4" NON-UL FLEX L/T MET COND | FT | Fence | Gate Electrical | |
| 172 | 3/4" Sealtite Insul Straight Conn | EA | Fence | Gate Electrical | |
| 173 | 3/8-16 BEAM CLAMP STL | EA | Fence | Gate Electrical | |
| 174 | 4.0" Dia Dome Caps | EA | Fence | Hardware | |
| 175 | 4.0" Dia Galvanized Single Brace Bands | EA | Fence | Hardware | |
| 176 | 4.0" Dia Galvanized Tension Bands | EA | Fence | Hardware | |
| 177 | 5/8" Stainless Chain | FT | Fence | 5/8" Grade 50 Stainless Steel | |
| 178 | 6' Steel T Post 1.25 lb per sq foot w/anchor plate | EA | Fence | Fence hardware | |
| 179 | 7 1/2 in Stainless Steel Hasp | EA | Fence | Fence hardware | |
| 180 | 8'X4' Galvanized Steel Utility Tube Gate | EA | Fence | Tube Gate | |
| 181 | Angle Iron 4" x 4" x .25" thickness, equal legs, ASTM A36 | FT | Fence | Rail | |
| 182 | Angle Iron 4.5" x 6" x .25" thickness, unequal legs, ASTM A36 | FT | Fence | Rail | |
| 183 | Angle Iron, 1"x1"x0.125", Equal Legs | FT | Fence | Fence hardware | |
| 184 | Angle Iron, 3 x 3 x 1/4 | LF | Fence | 3 x 3 x 1/4 Angle | |
| 185 | Bar Steel 1"x1" Solid, Steel Picket | FT | Fence | Picket | |
| 186 | Bar Steel 1.5" x 3" Solid, ASTM A36 | FT | Fence | Inside Rail Expansion Joint | |
| 187 | Barbed Wire Arms Three Stand 45 Deg Galvanized | EA | Fence | Barbed Wire Arms | |
| 188 | Barbed Wire Arms V Shaped Six Stand 45 Deg Galvanized | EA | Fence | Barbed Wire Arms | |
| 189 | Barbed Wire C1, 12.5 gauge, 2 pts, 1320 FT | RL | Fence | Barbed Wire | |
| 190 | Barbless Wire 12.5 Gauge galvanized Steel 1320 foot roll | RL | Fence | Fence | |
| 191 | Barrel Hinges, 5" high x 1-3/4" dia, 600 lb support | Pair | Fence | Hinges | |
| 192 | Barrel Hinges, 7" high x 2" dia, 1K lb support | Pair | Fence | Hinges | |
| 193 | Barrel Hinges, 7" high x 2-1/2" dia, 3K lb support | Pair | Fence | Hinges | |
| 194 | Barrel Hinges, 7" high x 2-1/2" dia, 5K lb support per pair (32103P) | Pair | Fence | Hinges | |
| 195 | Bolt, quarter 20 x 2 1/2 | EA | Fence | Fence hardware | |
| 196 | Cast in Place Concrete, f'c = 3000 psi | Cu. YD | Fence | Grade Beam | |
| 197 | Chain link 9 GA swing gate, 9’Hx26’W | EA | Fence | Fence hardware | |
| 198 | Concertina NATO Razor Wire (sufficient to cover 50 linear feet.Clipped 36" | RL | Fence | Razor Wire, Galvanized | |
| 199 | DigiCode DC5166 Remote Antenna Range Extender Kit | EA | Fence | Gate Electrical | |
| 200 | EMX IRB-MON Universal Safety Photo Beam | EA | Fence | Gate Electrical | |
| 201 | Expanded Metal, 4' x 8', 3/4 #9 Raised | EA | Fence | Expanded Metal | |
| 202 | Galvanized Steel Drive Gate Hardware Set (4 pack) | EA | Fence | Hardware | |
| 203 | Grease Molybdenum Disulfide Lubricant tube | EA | Fence | Hoist Lubricate | |
| 204 | Grout, 3000 psi (Quikrete/Comm Grade) 50lb | Bag | Fence | Post Fill | |
| 205 | Grout, f'c = 3,000 psi | Cu. YD | Fence | Bollard Fill | |
| 206 | Guard Rail Flared Ends | EA | Fence | Buffer End Guard, 16in. High, Model# GR-BG | |
| 207 | Hardened Chain 1/2" | FT | Fence | 1/2 20 Foot SSG Transport Chain G70 | |
| 208 | Hardened Chain 3/8" | FT | Fence | Case Hardened Anti-Theft Security Chain | |
| 209 | HP 12 x 53, ASTM572 Grade 50 | FT | Fence | Gate Post Structural Steel Shape HP 12 x 53 | |
| 210 | HSS .25" Round Bar Solid, ASTM A36 | FT | Fence | Gate Lock Box | |
| 211 | HSS 1" x 1" Square Bar Solid, ASTM A36 | FT | Fence | Hoist Guide | |
| 212 | HSS 1.5" Round Bar Solid, ASTM A36 | FT | Fence | Gate Locking Bolt | |
| 213 | HSS 12" x 12"x .25", ASTM A500, Grade B | FT | Fence | Gate Post Tube Square | |
| 214 | HSS 2" x 2" x .187" Steel Bollard, ASTM A500, Grade B | FT | Fence | Rail Tube Square | |
| 215 | HSS 2" x 4" x .187" Steel, A500, Grade B | FT | Fence | Rail Tube Rectangular | |
| 216 | HSS 6" x 6" x .187" Steel Bollard, ASTM A500, Grade B | FT | Fence | Bollard Tube Square | |
| 217 | HSS 6" x 6" x .25" Steel Bollard, ASTM A500, Grade B | FT | Fence | Rail Tube Square | |
| 218 | HSS 6x6x1/2” Steel Bollard, ASTM A500, Grade B | FT | Fence | HSS 6x6x1/2” Steel Bollard | |
| 219 | HSS 7" x 7" x .25" Steel Bollard, ASTM A500, Grade B | FT | Fence | Rail Sleeve Tube Square | |
| 220 | HSS 7" x 7" x .25" Steel Rail Sleeve, ASTM A500, Grade B | FT | Fence | Rail Sleeve Tube Square | |
| 221 | HSS 9" x 3" x .187" Member Framing, ASTM A500 | FT | Fence | Gate Framing Member Tube Rectangular | |
| 222 | HSS Steel Bar .5" x 4", ASTM A36 | EA | Fence | Rail for Sheathing | |
| 223 | Hysecurity Gate Opener 8' Drive Wheels | EA | Fence | HY-Secirity Slide Gate Components | |
| 224 | Hysecurity Gate Opener Battery Charger | EA | Fence | HY-Secirity Slide Gate Components | |
| 225 | Hysecurity Gate Opener Guide Wheels | EA | Fence | HY-Secirity Slide Gate Components | |
| 226 | Hysecurity Gate Opener Limit Switches | EA | Fence | HY-Secirity Slide Gate Components | |
| 227 | Hysecurity Gate Opener Operator Model Slide Driver 200 UPS | EA | Fence | HY-Secirity Slide Gate Components | |
| 228 | Hysecurity Gate Opener Power Supply | EA | Fence | HY-Secirity Slide Gate Components | |
| 229 | Hysecurity Gate Opener Receivers | EA | Fence | HY-Secirity Slide Gate Components | |
| 230 | King Kong Barrel Hinges 7" 3000lbs per pair | EA | Fence | Hinges * | |
| 231 | Mesh Welded Wire 2" x 2", 6 ga | Sq. FT | Fence | Fence Fabric | |
| 232 | Mesh Welded Wire 3" x .5", 6 ga | Sq. FT | Fence | Fence Fabric Beta Fence 5000 | |
| 233 | Metal Cable 5/16" galvenized | FT | Fence | Fence | |
| 234 | Nut 1/4 in x 20 | PK | Fence | Fence hardware | |
| 235 | Plate Steel 4' x8' 11 Gage Steel Sheathing | EA | Fence | Anti climb sheathing | |
| 236 | Plate Steel 6"x8.5", 11 Gage Steel | EA | Fence | Mitered Bollard Cap | |
| 237 | Plate Steel .187" thickness, ASTM A36 | EA | Fence | Various Fabrications including Lock Box | |
| 238 | Plate Steel .5" thickness x 4" wide , ASTM A36 | FT | Fence | Rail for Sheathing | |
| 239 | Plate Steel .5" thickness x 6" wide , ASTM A36 | FT | Fence | Mount for Gap Filler Bollard | |
| 240 | Plate Steel 10" x 12" x 1" thickness, ASTM A36 | EA | Fence | Support for Framing cutoff Bollard Section | |
| 241 | Plate Steel 11.75" x 16.5" Bollard Cap 45 Deg, 11 ga | EA | Fence | Bollard Cap for 12" x 12" Post (HP 12 x 53) | |
| 242 | Plate Steel 4" x .5" thickness, ASTM A36 | FT | Fence | Rail Sheathing | |
| 243 | Plate Steel 4" x 4" x .187" thickness, ASTM A36 | EA | Fence | Cap for 4" x 4" Rectangular Tube | |
| 244 | Plate Steel 6" x 3" x .187" thickness, ASTM A36 | EA | Fence | Cap for 6" x 3" Rectangular Tube | |
| 245 | Plate Steel 6" x 6" x .187" thickness, ASTM A36 | EA | Fence | Cap for 6" x 6" Rectangular Tube | |
| 246 | Plate Steel 6" x 8.5" Bollard Cap 45 Deg, 11 ga | EA | Fence | Bollard Cap | |
| 247 | Plate Steel 8" x 9" x .187" thickness, ASTM A36 | EA | Fence | Mounting Plate Hoist Beam | |
| 248 | Plate Steel 8.5" x 1' Bollard Cap 45 Deg, w/ bollard rotated 45 Deg, 11 ga | EA | Fence | Bollard Cap | |
| 249 | Plate Steel 9" x 3" x .187" thickness, ASTM A36 | EA | Fence | Cap for 9" x 3" Rectangular Tube | |
| 250 | Plate Steel, 0.5" Thick x 1.5" Wide, Stainless Steel | FT | Fence | Fence hardware | |
| 251 | Plate Steel, 4'x8'x1/4" | EA | Fence | Steel plate | |
| 252 | Pour-in-place Safety Steel Bollard 5.5 X 42" 9 gauge (Model: H7686) | EA | Fence | Bollard | |
| 253 | Pre-fabricated 6"X6"X9"X.250 with end caps | EA | Fence | Bollard | |
| 254 | Puck Lock | EA | Fence | Re-Key not included | |
| 255 | Puck lock Key | EA | Fence | Key Puck lock | |
| 256 | Rectangular Laminated Rubber Dock Bumper (6"H x 38"W x 4.5"D) | EA | Fence | Fence hardware | |
| 257 | Stamped Bollard Cap, 11 Ga Steel | EA | Fence | Bollard Cap | |
| 258 | Steel Bar Solid 1" Dia x 7-5/16", ASTM A36 | EA | Fence | Pins | |
| 259 | Steel Pipe 8.625" OD x .322" wall, ASTM A53 | FT | Fence | Gate Hoist Beam | |
| 260 | Steel Sheathing 4' x 8' , 11 ga (Item 65-11G-4X8) | EA | Fence | Sheathing | |
| 261 | Steel Sheathing 5' x 8' , 11 ga | EA | Fence | Sheathing Anti climb | |
| 262 | Steel Square Sign Post 2", Galvanized, 10' ,14GA | EA | Fence | Fence Post | |
| 263 | Steel Square Sign Post 2", Galvanized, 8', 14GA | EA | Fence | Fence Post | |
| 264 | Steel Wire Tie 9 ga. | EA | Fence | Tmesh Ties | |
| 265 | Tension Bar Galvanized .187" x .75" x 10' | EA | Fence | Mesh Tension Bar | |
| 266 | Tension Wire 12 ga., Galvanized, 100 FT | RL | Fence | Tension Wire | |
| 267 | Truss Rod Tightner Hardware | EA | Fence | Brace Hardware | |
| 268 | Twister Proflex Mini 343 O/B, 100/BOX (wire nut) | BX | Fence | Gate Electrical | |
| 269 | Utility & Brace Wire, 9 ga (general purpose) 170 ft | RL | Fence | Mesh Ties | |
| 270 | Voltive 16/3 Shielded Riser - CL3R Rated - Oxygen-Free Copper (OFC) - White | FT | Fence | Gate Electrical | |
| 271 | W 6 x 15 Wide Flange Beam ASTM A36 | FT | Fence | Columns Structural Steel | |
| 272 | W 6 x 25 Wide Flange Beam ASTM A36 | FT | Fence | Cross Beam Structural Steel | |
| 273 | W 6 x 9 Wide Flange Beam ASTM A36 | FT | Fence | Rail Structural Steel | |
| 274 | Washer 3/4 in Dia x 1/4 center | EA | Fence | Fence hardware | |
| 275 | Welding Rod, 7018 MR, 5/32", 14" L - 10 lbs. | BX | Fence | Consumable | |
| 276 | 2"x4"X8' Prime Stud | EA | Form | 2X4 Stud | |
| 277 | 2"x6"X8' Prime Stud | EA | Form | 2X6 Stud | |
| 278 | Geocell Cellular Confinement 3", 690 SQF | Sq. FT | Form | Geocell Cellular Confinement (15'x35') | |
| 279 | Plywood 4'x8'x1/2" | EA | Form | Plywood | |
| 280 | Sonotube 12"x48" | EA | Form | Forms | |
| 281 | Sonotube 18"x48" | EA | Form | Forms | |
| 282 | Sonotube 24" x48" | EA | Form | Forms | |
| 283 | Sonotube 36"x48" | EA | Form | Forms | |
| 284 | CM 3-Ton Series 653 Lever Hoist | EA | Hardware | Lever Hoist 3 Ton | |
| 285 | HAS-R ½” x 6 ½” SS 316 Anchor Bolts | EA | Hardware | Anchor Bolts | |
| 286 | HY200 Dispenser | EA | Hardware | HY200 Dispenser | |
| 287 | HY200-R Epoxy | EA | Hardware | HY200-R Epoxy | |
| 288 | Shackle 2 Ton | EA | Hardware | Shackle 2 Ton | |
| 289 | Spray Paint, 12 oz. can | EA | Marking | Spray Paint, 12 oz. can | |
| 290 | Stencil Set, Metal 6" Brass | Set | Marking | Stencil Set, Metal 6" | |
| 291 | 2 sack Concrete Slurry | Cu. YD | Material | Concrete | |
| 292 | Cast-In-Place Concrete, f'c = 3000 psi | Cu. YD | Material | Post Shaft Footing | |
| 293 | Concrete Mix, High-strength, 5,000 psi, 80 lb | Bag | Material | Concrete | |
| 294 | Durasoil | Ton | Material | Soil Stabilizer | |
| 295 | Dust Pods 12 per case | Case | Material | Soil Stabilizer 12 jugs per case | |
| 296 | Lignin Sulfonate | Ton | Material | Soil Stabilizer | |
| 297 | Millings | Ton | Material | Aggregate | |
| 298 | Paint (2 in 1 acrylic) | Gal | Material | Paint | |
| 299 | Powdered Soil Tac | Ton | Material | Soil Stabilizer | |
| 300 | Primer | Gal | Material | Primer | |
| 301 | Quickrete concrete mix, 60 lb 5000 psi | Bag | Material | Concrete | |
| 302 | Railroad Ties 7"x9"x8.5' | FT | Material | Dunnage | |
| 303 | Soil stabalizer ( gorilla snot) | Ton | Material | Soil Stabilizer | |
| 304 | Soil Tac | Ton | Material | Soil Stabilizer | |
| 305 | Water | Gal | Material | Water | |
| 306 | 18" X 3/4" Nail Stake with holes (10 pack) | EA | Material | Forming | |
| 307 | 24" X 3/4" Nail Stake with holes (10 pack) | EA | Material | Forming | |
| 308 | Trash Bag Heavy Duty, 42 Gal, Contractor Clean-up bag (50 count) | BX | Material | Trash Removal | |
| 309 | Aggregate, AJO | Ton | Material delivered to AJO | Aggregate | |
| 310 | Bedding sand AJO | Ton | Material delivered to AJO | Bedding sand | |
| 311 | Fill material AJO | Ton | Material delivered to AJO | Fill material | |
| 312 | Gravel 3/4" Minus AJO | Ton | Material delivered to AJO | Gravel 3/4" Minus | |
| 313 | Riprap 12"- 24" average 18" AJO | Ton | Material delivered to AJO | Riprap 12"- 24" average 18" AJO | |
| 314 | Riprap 18"- 30" average 24" AJO | Ton | Material delivered to AJO | Riprap 18"- 30" average 24" AJO | |
| 315 | Riprap 4"- 12" average 6" AJO | Ton | Material delivered to AJO | Riprap 4"- 12" average 6" AJO | |
| 316 | Riprap 6"- 18" average 12" AJO | Ton | Material delivered to AJO | Riprap 6"- 18" average 12" AJO | |
| 317 | Shaker rock/track out AJO | Ton | Material delivered to AJO | Shaker rock/track out | |
| 318 | Aggregate, CAG/TON | Ton | Material delivered to CAG/TON | Aggregate | |
| 319 | Bedding sand | Ton | Material delivered to CAG/TON | Bedding sand | |
| 320 | Fill material CAG/TON | Ton | Material delivered to CAG/TON | Fill material | |
| 321 | Gravel 3/4" Minus CAG/TON | Ton | Material delivered to CAG/TON | Gravel 3/4" Minus | |
| 322 | Riprap 12"- 24" average 18" CAG/TON | Ton | Material delivered to CAG/TON | Riprap 12"- 24" average 18" CAG/TON | |
| 323 | Riprap 18"- 30" average 24" CAG/TON | Ton | Material delivered to CAG/TON | Riprap 18"- 30" average 24" CAG/TON | |
| 324 | Riprap 4"- 12" average 6" CAG/TON | Ton | Material delivered to CAG/TON | Riprap 4"- 12" average 6" CAG/TON | |
| 325 | Riprap 6"- 18" average 12" CAG/TON | Ton | Material delivered to CAG/TON | Riprap 6"- 18" average 12" CAG/TON | |
| 326 | Shaker rock/track out CAG/TON | Ton | Material delivered to CAG/TON | Shaker rock/track out | |
| 327 | Aggregate, DGL | Ton | Material delivered to DGL | Aggregate | |
| 328 | Bedding sand DGL | Ton | Material delivered to DGL | Bedding sand | |
| 329 | Fill material DGL | Ton | Material delivered to DGL | Fill material | |
| 330 | Gravel 3/4" Minus DGL | Ton | Material delivered to DGL | Gravel 3/4" Minus | |
| 331 | Riprap 12"- 24" average 18" DGL | Ton | Material delivered to DGL | Riprap 12"- 24" average 18" DGL | |
| 332 | Riprap 18"- 30" average 24" DGL | Ton | Material delivered to DGL | Riprap 18"- 30" average 24" DGL | |
| 333 | Riprap 4"- 12" average 6" DGL | Ton | Material delivered to DGL | Riprap 4"- 12" average 6" DGL | |
| 334 | Riprap 6"- 18" average 12" DGL | Ton | Material delivered to DGL | Riprap 6"- 18" average 12" DGL | |
| 335 | Shaker rock/track out DGL | Ton | Material delivered to DGL | Shaker rock/track out | |
| 336 | Aggregate, NCO | Ton | Material delivered to NCO | Aggregate | |
| 337 | Bedding sand NCO | Ton | Material delivered to NCO | Bedding sand | |
| 338 | Fill material NCO | Ton | Material delivered to NCO | Fill material | |
| 339 | Gravel 3/4" Minus NCO | Ton | Material delivered to NCO | Gravel 3/4" Minus | |
| 340 | Riprap 12"- 24" average 18" NCO | Ton | Material delivered to NCO | Riprap 12"- 24" average 18" NCO | |
| 341 | Riprap 18"- 30" average 24" NCO | Ton | Material delivered to NCO | Riprap 18"- 30" average 24" NCO | |
| 342 | Riprap 4"- 12" average 6" NCO | Ton | Material delivered to NCO | Riprap 4"- 12" average 6" NCO | |
| 343 | Riprap 6"- 18" average 12" NCO | Ton | Material delivered to NCO | Riprap 6"- 18" average 12" NCO | |
| 344 | Shaker rock/track out NCO | Ton | Material delivered to NCO | Shaker rock/track out | |
| 345 | Aggregate, NGL | Ton | Material delivered to NGL | Aggregate | |
| 346 | Bedding sand NGL | Ton | Material delivered to NGL | Bedding sand | |
| 347 | Crushed concrete | Cu. YD | Material delivered to NGL | Road aggregate | |
| 348 | Fill material NGL | Ton | Material delivered to NGL | Fill material | |
| 349 | Gravel 3/4" Minus NGL | Ton | Material delivered to NGL | Gravel 3/4" Minus | |
| 350 | Riprap 12"- 24" average 18" NGL | Ton | Material delivered to NGL | Riprap 12"- 24" average 18" NGL | |
| 351 | Riprap 18"- 30" average 24" NGL | Ton | Material delivered to NGL | Riprap 18"- 30" average 24" NGL | |
| 352 | Riprap 4"- 12" average 6" NGL | Ton | Material delivered to NGL | Riprap 4"- 12" average 6" NGL | |
| 353 | Riprap 6"- 18" average 12" NGL | Ton | Material delivered to NGL | Riprap 6"- 18" average 12" NGL | |
| 354 | Shaker rock/track out NGL | Ton | Material delivered to NGL | Shaker rock/track out | |
| 355 | Aggregate, SON | Ton | Material delivered to SON | Aggregate | |
| 356 | Bedding sand SON | Ton | Material delivered to SON | Bedding sand | |
| 357 | Fill material SON | Ton | Material delivered to SON | Fill material | |
| 358 | Gravel 3/4" Minus SON | Ton | Material delivered to SON | Gravel 3/4" Minus | |
| 359 | Riprap 12"- 24" average 18" SON | Ton | Material delivered to SON | Riprap 12"- 24" average 18" | |
| 360 | Riprap 18"- 30" average 24" SON | Ton | Material delivered to SON | Riprap 18"- 30" average 24" | |
| 361 | Riprap 4"- 12" average 6" SON | Ton | Material delivered to SON | Riprap 4"- 12" average 6" | |
| 362 | Riprap 6"- 18" average 12" SON | Ton | Material delivered to SON | Riprap 6"- 18" average 12" | |
| 363 | Shaker rock/track out SON | Ton | Material delivered to SON | Shaker rock/track out | |
| 364 | Aggregate, TON | Ton | Material delivered to TON | Aggregate | |
| 365 | Aggregate, TPS/TON | Ton | Material delivered to TPS/TON | Aggregate | |
| 366 | Bedding sand TPS | Ton | Material delivered to TPS/TON | Bedding sand | |
| 367 | Fill material TPS | Ton | Material delivered to TPS/TON | Fill material | |
| 368 | Gravel 3/4" Minus TPS | Ton | Material delivered to TPS/TON | Gravel 3/4" Minus | |
| 369 | Riprap 12"- 24" average 18" TPS/TON | Ton | Material delivered to TPS/TON | Riprap 12"- 24" average 18" TPS/TON | |
| 370 | Riprap 18"- 30" average 24" TPS/TON | Ton | Material delivered to TPS/TON | Riprap 18"- 30" average 24" TPS/TON | |
| 371 | Riprap 4"- 12" average 6" TPS/TON | Ton | Material delivered to TPS/TON | Riprap 4"- 12" average 6" TPS/TON | |
| 372 | Riprap 6"- 18" average 12" TPS/TON | Ton | Material delivered to TPS/TON | Riprap 6"- 18" average 12" TPS/TON | |
| 373 | Shaker rock/track out TPS | Ton | Material delivered to TPS/TON | Shaker rock/track out | |
| 374 | Aggregate, TUS | Ton | Material delivered to TUS | Aggregate | |
| 375 | Bedding sand TUS | Ton | Material delivered to TUS | Bedding sand | |
| 376 | Riprap 12"- 24" average 18" TUS | Ton | Material delivered to TUS | Riprap 12"- 24" average 18" TUS | |
| 377 | Riprap 18"- 30" average 24" TUS | Ton | Material delivered to TUS | Riprap 18"- 30" average 24" TUS | |
| 378 | Riprap 4"- 12" average 6" TUS | Ton | Material delivered to TUS | Riprap 4"- 12" average 6" TUS | |
| 379 | Riprap 6"- 18" average 12" TUS | Ton | Material delivered to TUS | Riprap 6"- 18" average 12" TUS | |
| 380 | TUS Fill material TUS | Ton | Material delivered to TUS | Fill material | |
| 381 | TUS Gravel 3/4" Minus TUS | Ton | Material delivered to TUS | Gravel 3/4" Minus | |
| 382 | TUS Shaker rock/track out TUS | Ton | Material delivered to TUS | Shaker rock/track out | |
| 383 | 8" Flange Kit | EA | Plumbing | Plumbing hardware | |
| 384 | 18"x24" Single Sided Black and White Sign-Chevron Sign | EA | Signage | Signage | |
| 385 | 18"x24" Single Sided Yellow and Black Sign-Grade % Sign | EA | Signage | Signage | |
| 386 | 30"x24" Black and white sign-Speed Limit | EA | Signage | Signage | |
| 387 | 30"x30" .08 single sided yellow and black sign- Pavement Ends | EA | Signage | Signage | |
| 388 | 36"x12" Black and Yellow Sign- Chevron | EA | Signage | Signage | |
| 389 | 36"x36" Single Sided Red and White Sign-Stop Sign | EA | Signage | Signage | |
| 390 | 36"x36" Single Sided Yellow and Black Sign-Winding Road | EA | Signage | Signage | |
| 391 | 48"x24" Single Sided Black and white Sign-two direction sign | EA | Signage | Signage | |
| 392 | Hysecurity Drive Rail 14foot MX3885 | EA | Slide Gate | HY-Secirity Slide Gate Components | |
| 393 | Hysecurity Invertor Battery AGM 12 volt 110 Ah | EA | Slide Gate | HY-Secirity Slide Gate Components | |
| 394 | Hysecurity Photo eye MX3990 Thru Beam | EA | Slide Gate | HY-Secirity Slide Gate Components | |
| 395 | Glyphosate Weed Preventer (2.5 Gallon) | EA | Vegetation | Weed killer |
Equipment
| Tucson Sector Equipment Pricing List | |||||||||
| Item Number | Equipment | Hourly Mobilization Fee | Monthly/Day Rate (See Instruction TAB) | UoM | Daily Rate | Weekly | Weekly Rate | Monthly | Monthly Rate |
| 1 | 20' Storage Container | Day | Week | Monthly | |||||
| 2 | 30' Travel Trailer | Day | Week | Monthly | |||||
| 3 | Articulating Bush Hog/Brush Cutter 4', Excavator Attachment | Day | Week | Monthly | |||||
| 4 | Auger, Two Person Gas Posthole Auger (5.5 HP) | Day | Week | Monthly | |||||
| 5 | Backhoe Auger Attachment | Day | Week | Monthly | |||||
| 6 | Backhoe Breaker 1000LB Class | Day | Week | Monthly | |||||
| 7 | Backhoe/Cat 416, JD 310, Case 580 | Day | Week | Monthly | |||||
| 8 | Backhoe/Cat 420, JD 410, Case 590 | Day | Week | Monthly | |||||
| 9 | Brush Hog, Tractor attachment, 60" | Day | Week | Monthly | |||||
| 10 | Bucket Attachment for Reach Lift | Day | Week | Monthly | |||||
| 11 | Bucket Truck | Day | Week | Monthly | |||||
| 12 | Bush Hog/Brush Cutter 4' Cut, Skid-Steer Attachment | Day | Week | Monthly | |||||
| 13 | Chainsaw | Day | Week | Monthly | |||||
| 14 | Compactor / Roller 3-5 Ton SD | Day | Week | Monthly | |||||
| 15 | Compactor/ Plate 20" Walk behind plate tamp | Day | Week | Monthly | |||||
| 16 | Compactor/ Rubber Tire SD 84" | Day | Week | Monthly | |||||
| 17 | Compactor/Rammer | Day | Week | Monthly | |||||
| 18 | Concrete Pump Truck | Day | Week | Monthly | |||||
| 19 | Concrete Saw/Walk Behind 14" | Day | Week | Monthly | |||||
| 20 | Crane, Truck 18 Ton 60-75' ft Reach | Day | Week | Monthly | |||||
| 21 | Crane, Truck 23 Ton 80-95' ft Reach | Day | Week | Monthly | |||||
| 22 | Dozer D9 or similar | Day | Week | Monthly | |||||
| 23 | Dozer D6 or similar | Day | Week | Monthly | |||||
| 24 | Drum cutter, Excavator attachment 15-25 ton 32" Cut ( Cat 320-325 ) | Day | Week | Monthly | |||||
| 25 | Drum cutter, Excavator attachment 30-50 ton 41" Cut ( Cat 336 ) | Day | Week | Monthly | |||||
| 26 | Drum cutter, Excavator attachment 8-15 ton 27" Cut ( Cat 308 ) | Day | Week | Monthly | |||||
| 27 | Dump Trailer Tandem Axle | Day | Week | Monthly | |||||
| 28 | Dump Truck ‐ 10-14 yd | Day | Week | Monthly | |||||
| 29 | Dump Truck ‐ 40 Ton Articulated | Day | Week | Monthly | |||||
| 30 | Dump Truck ‐ 5 yd | Day | Week | Monthly | |||||
| 31 | Excavator 25K Class | Day | Week | Monthly | |||||
| 32 | Excavator 35K Class | Day | Week | Monthly | |||||
| 33 | Excavator 50K Class | Day | Week | Monthly | |||||
| 34 | Excavator 75-80K Class | Day | Week | Monthly | |||||
| 35 | Excavator Breaker 2500LB Class | Day | Week | Monthly | |||||
| 36 | Excavator Breaker 5000LB Class | Day | Week | Monthly | |||||
| 37 | Excavator Long Reach | Day | Week | Monthly | |||||
| 38 | Generator, Portable 5-10KW | Day | Week | Monthly | |||||
| 39 | Grader ‐ 10'-14' | Day | Week | Monthly | |||||
| 40 | Heavy Haul Transport Truck/Trailer/Operator | Day | Week | Monthly | |||||
| 41 | Horizontal/Verifical Band Saw | Day | Week | Monthly | |||||
| 42 | Light Tower/30' Horizontal Mast (Diesel) | Day | Week | Monthly | |||||
| 43 | Magnetic Drill | Day | Week | Monthly | |||||
| 44 | Man Lift/Articulating Boom Lift/45ft, 4WD | Day | Week | Monthly | |||||
| 45 | Man Lift/Articulating Boom Lift/80ft, 4WD | Day | Week | Monthly | |||||
| 46 | Mini Excavator 10-12k Class | Day | Week | Monthly | |||||
| 47 | Mini Excavator 7-8K Class | Day | Week | Monthly | |||||
| 48 | Mini Excavator Breaker 600LB Class | Day | Week | Monthly | |||||
| 49 | Mower, 25 ft offset; Loader powered | Day | Week | Monthly | |||||
| 50 | Mower, Ride on Mower | Day | Week | Monthly | |||||
| 51 | Mower, Tractor attachment | Day | Week | Monthly | |||||
| 52 | Pick-up Truck, Crew Cab, 4x4 | Day | Week | Monthly | |||||
| 53 | Pile driving hammer | Day | Week | Monthly | |||||
| 54 | Portable Cement Mixer | Day | Week | Monthly | |||||
| 55 | Portable Trailer Mounted Port‐a‐John and Servicing | Day | Week | Monthly | |||||
| 56 | Pressure Washer Gas 2500-3000 psi | Day | Week | Monthly | |||||
| 57 | Professional Paint Sprayer | Day | Week | Monthly | |||||
| 58 | Reach Lift 10K with forks | Day | Week | Monthly | |||||
| 59 | Reach Lift 6K with forks | Day | Week | Monthly | |||||
| 60 | Reach Lift 8K with forks | Day | Week | Monthly | |||||
| 61 | Rock catcher for grader | Day | Week | Monthly | |||||
| 62 | Roll Off ALL AOR's 30 day fee if not swapped | N/A | N/A | Monthly | |||||
| 63 | Roll off, 20 YARD AJO | N/A | N/A | N/A | EACH | ||||
| 64 | Roll off, 20 YARD CAG/TON | N/A | N/A | N/A | EACH | ||||
| 65 | Roll off, 20 YARD DGL | N/A | N/A | N/A | EACH | ||||
| 66 | Roll off, 20 YARD NCO | N/A | N/A | N/A | EACH | ||||
| 67 | Roll off, 20 YARD NGL | N/A | N/A | N/A | EACH | ||||
| 68 | Roll off, 20 YARD TPS/TON | N/A | N/A | N/A | EACH | ||||
| 69 | Roll off, 20 YARD TUS | N/A | N/A | N/A | EACH | ||||
| 70 | Roll off, 30 YARD AJO | N/A | N/A | N/A | EACH | ||||
| 71 | Roll off, 30 YARD CAG/TON | N/A | N/A | N/A | EACH | ||||
| 72 | Roll off, 30 YARD DGL | N/A | N/A | N/A | EACH | ||||
| 73 | Roll off, 30 YARD NCO | N/A | N/A | N/A | EACH | ||||
| 74 | Roll off, 30 YARD NGL | N/A | N/A | N/A | EACH | ||||
| 75 | Roll off, 30 YARD TPS/TON | N/A | N/A | N/A | EACH | ||||
| 76 | Roll off, 30 YARD TUS | N/A | N/A | N/A | EACH | ||||
| 77 | Roll off, 40 YARD AJO | N/A | N/A | N/A | EACH | ||||
| 78 | Roll off, 40 YARD CAG/TON | N/A | N/A | N/A | EACH | ||||
| 79 | Roll off, 40 YARD DGL | N/A | N/A | N/A | EACH | ||||
| 80 | Roll off, 40 YARD NCO | N/A | N/A | N/A | EACH | ||||
| 81 | Roll off, 40 YARD NGL | N/A | N/A | N/A | EACH | ||||
| 82 | Roll off, 40 YARD TPS/TON | N/A | N/A | N/A | EACH | ||||
| 83 | Roll off, 40 YARD TUS | N/A | N/A | N/A | EACH | ||||
| 84 | Scraper 11 Cu Yards | Day | Week | Monthly | |||||
| 85 | Scraper 23 Cu Yards | Day | Week | Monthly | |||||
| 86 | Skid Steer Auger Attachment | Day | Week | Monthly | |||||
| 87 | Skid Steer Breaker 400-500LB Class | Day | Week | Monthly | |||||
| 88 | Skid Steer Broom Attachment BU115 71" | Day | Week | Monthly | |||||
| 89 | Skid Steer Forks Attachment | Day | Week | Monthly | |||||
| 90 | Skid Steer Track 2K cap. 65" Class | Day | Week | Monthly | |||||
| 91 | Skid Steer Track 3K cap. 72" Class | Day | Week | Monthly | |||||
| 92 | Skid Steer Track 4K cap. 75" Class | Day | Week | Monthly | |||||
| 93 | Skip Loader (4WD) with Gannon Box | Day | Week | Monthly | |||||
| 94 | Stand with Water Tank/Up to 12K Gal | Day | Week | Monthly | |||||
| 95 | Telescopic Boom, 45ft 4 WD | Day | Week | Monthly | |||||
| 96 | Telescopic Boom, 80ft 4 WD | Day | Week | Monthly | |||||
| 97 | Thumb, Hydraulic Backhoe Attachment | Day | Week | Monthly | |||||
| 98 | Thumb, Hydraulic Excavator Attachment | Day | Week | Monthly | |||||
| 99 | T-Post Driver Gas powered rotary | Day | Week | Monthly | |||||
| 100 | Tractor, JD 5065E | Day | Week | Monthly | |||||
| 101 | Trencher, Ride-On, 35-49 HP | Day | Week | Monthly | |||||
| 102 | Trencher, Walk Behind, 36" | Day | Week | Monthly | |||||
| 103 | UTV, 2-seat, 4WD, gas/diesel powered | Day | Week | Monthly | |||||
| 104 | Vacuum Excavator Trl. 1000CFM 800 Gal | Day | Week | Monthly | |||||
| 105 | Volumetric Truck with Operator | CY | Week | Monthly | |||||
| 106 | Water Trailer 1000 gal. | Day | Week | Monthly | |||||
| 107 | Water Trailer 500 gal. | Day | Week | Monthly | |||||
| 108 | Water Truck ‐ 2K | Day | Week | Monthly | |||||
| 109 | Water Truck ‐ 4K | Day | Week | Monthly | |||||
| 110 | Water Truck - 4K - Soil Tac Application | Day | Week | Monthly | |||||
| 111 | Water Truck - 4K- 6x6 | Day | Week | Monthly | |||||
| 112 | Weed Eater/Brush Cutter | Day | Week | Monthly | |||||
| 113 | Welding Rig | Day | Week | Monthly | |||||
| 114 | Wheel Loader 2YD | Day | Week | Monthly | |||||
| 115 | Wheel Loader 3YD | Day | Week | Monthly | |||||
| 116 | Wheel Loader 4YD | Day | Week | Monthly | |||||
| 117 | Wheel Loader 5YD | Day | Week | Monthly | |||||
| 118 | Wolverine Drum Mulcher Skid Steer Attachment 72" | Day | Week | Monthly | |||||
| 119 | Wood Chipper 10-12" | Day | Week | Monthly | |||||
| 120 | Wood Chipper 6" | Day | Week | Monthly |
Labor
Labor Itemized Pricing List
| CLIN 1 Fences and Gates Description | ||||||
| Line Item | Description | UoM | Crew Composition | QTY | Unit Rate | |
| 1 | Routine Repair & Maintenance for Tucson Sector | Daily work crew to perform routine maintenance and repairs per SOW. Routine work performed during daylight hours based on 8 hour workday Mon‐Fri | Day | Welder/ Welder Helper | 2 | $ - 0 |
| 2 | Urgent Repair & Maintenance for Tucson Sector | Hourly work crew to perform urgent maintenance and repairs per SOW. Urgent work performed during daylight hours, based on 8 hour workday Mon‐Fri | Hour | Welder/ Welder Helper | 2 | $ - 0 |
| 3 | Urgent Repair & Maintenance for Tucson Sector | Hourly work crew to perform urgent maintenance and repairs outside of the standard 8 hour M‐F schedule, inclusive of nights, weekends and holidays | Hour | Welder/ Welder Helper | 2 | $ - 0 |
| CLIN 2 Roads and Bridges | ||||||
| Line Item | Description | UoM | Crew Composition | OTY | Unit Rate | |
| 1 | Routine Repair & Maintenance for Tucson Sector | Daily work crew to perform routine maintenance and repairs per SOW. Routine work performed during daylight hours based on 8 hour workday Mon‐Fri | Day | Equipment Operator | 4 | $ - 0 |
| 2 | Routine Repair & Maintenance for Tucson Sector | Daily work crew to perform routine maintenance and repairs per SOW. Routine work performed during daylight hours based on 8 hour workday Mon‐Fri | Day | Equipment Operator | 3 | $ - 0 |
| 3 | Routine Repair & Maintenance for Tucson Sector | Cultural Monitor to perform duties per the SOW on the Tohono O'dham Nation Routine work performed during daylight hours based on 8 hour workday Mon‐Fri | Day | Cultural Monitor | 1 | $ - 0 |
| 4 | Urgent Repair & Maintenance for Tucson Sector | Hourly work crew to perform urgent maintenance and repairs per SOW. Urgent work performed during daylight hours, based on 8 hour workday Mon‐Fri | Hour | Equipment Operator | 4 | $ - 0 |
| 5 | Urgent Repair & Maintenance for Tucson Sector | Hourly work crew to perform urgent maintenance and repairs per SOW. Urgent work performed during daylight hours, based on 8 hour workday Mon‐Fri | Hour | Equipment Operator | 3 | $ - 0 |
| 6 | Urgent After-Hour Repair & Maintenance for Tucson Sector | Hourly work crew to perform urgent maintenance and repairs outside of the standard 8 hour M‐F schedule, inclusive of nights, weekends and holidays | Hour | Equipment Operator | 4 | $ - 0 |
| 7 | Urgent After-Hour Repair & Maintenance for Tucson Sector | Hourly work crew to perform urgent maintenance and repairs outside of the standard 8 hour M‐F schedule, inclusive of nights, weekends and holidays | Hour | Equipment Operator | 3 | $ - 0 |
| CLIN 3 Drainage and Grates Description | ||||||
| Line Item | Description | UoM | Crew Composition | QTY | Unit Rate | |
| 1 | Routine Repair & Maintenance for Tucson Sector | Daily work crew to perform routine maintenance and repairs per SOW. Routine work performed during daylight hours based on 8 hour workday Mon‐Fri | Day | Equipment Operator 2/Labor 1 | 3 | $ - 0 |
| 2 | Routine Repair & Maintenance for Tucson Sector | Daily work crew to perform routine maintenance and repairs per SOW. Routine work performed during daylight hours based on 8 hour workday Mon‐Fri | Day | Equipment Operator 1/Labor 1 | 2 | $ - 0 |
| 3 | Urgent Repair & Maintenance for Tucson Sector | Hourly work crew to perform urgent maintenance and repairs per SOW. Urgent work performed during daylight hours, based on 8 hour workday Mon‐Fri | Hour | Equipment Operator 2/Labor 1 | 3 | $ - 0 |
| 4 | Urgent Repair & Maintenance for Tucson Sector | Daily work crew to perform routine maintenance and repairs per SOW. Routine work performed during daylight hours based on 8 hour workday Mon‐Fri | Hour | Equipment Operator 1/Labor 1 | 2 | $ - 0 |
| 5 | Urgent After-Hour Repair & Maintenance for Tucson Sector | Hourly work crew to perform urgent maintenance and repairs outside of the standard 8 hour M‐F schedule, inclusive of nights, weekends and holidays | Hour | Equipment Operator 2/Labor 1 | 3 | $ - 0 |
| 6 | Urgent After-Hour Repair & Maintenance for Tucson Sector | Hourly work crew to perform urgent maintenance and repairs outside of the standard 8 hour M‐F schedule, inclusive of nights, weekends and holidays | Hour | Equipment Operator 1/Labor 1 | 2 | $ - 0 |
| CLIN 4 Lighting and Electrical | ||||||
| Line Item | Description | UoM | Crew Composition | QTY | Unit Rate | |
| 1 | Routine Repair & Maintenance for Tucson Sector | Daily work crew to perform routine maintenance and repairs per SOW. Routine work performed during daylight hours based on 8 hour workday Mon‐Fri | Day | Electrician/ Med Volt | 2 | $ - 0 |
| 2 | Urgent Repair & Maintenance for Tucson Sector | Hourly work crew to perform urgent maintenance and repairs per SOW. Urgent work performed during daylight hours, based on 8 hour workday Mon‐Fri | Hour | Electrician/ Med Volt | 2 | $ - 0 |
| 3 | Urgent After-Hour Repair & Maintenance for Tucson Sector | Hourly work crew to perform urgent maintenance and repairs outside of the standard 8 hour M‐F schedule, inclusive of nights, weekends and holidays | Hour | Electrician/ Med Volt | 2 | $ - 0 |
| CLIN 5 Vegetation Control and Debris Removal | ||||||
| Line Item | Description | UoM | Crew Composition | Qty | Unit Rate | |
| 1 | Routine Vegetation Control and Debris Removal for Tucson Sector | Daily work crew to perform routine vegetation and debris removal per SOW. Routine work performed during daylight hours based on 8 hour workday Mon‐Fri | Day | Equipment Operator 1/Labor 2 | 3 | $ - 0 |
| 2 | Routine Vegetation Control and Debris Removal for Tucson Sector | Daily work crew to perform routine vegetation and debris removal or to apply vegetation inhibitor per SOW. Routine work performed during daylight hours based on 8 hour workday Mon‐Fri | Day | Equipment Operator 1/Labor 1 | 2 | $ - 0 |
| 3 | Urgent Repair & Maintenance for Tucson Sector | Hourly work crew to perform urgent maintenance per SOW. Urgent work performed during daylight hours, based on 8 hour workday Mon‐Fri | Hour | Equipment Operator 1/Labor 2 | 3 | $ - 0 |
| 4 | Urgent After-Hour Repair & Maintenance for Tucson Sector | Hourly work crew to perform urgent maintenance and repairs outside of the standard 8 hour M‐F schedule, inclusive of nights, weekends and holidays | Hour | Equipment Operator 1/Labor 2 | 3 | $ - 0 |
| 5 | Urgent Repair & Maintenance for Tucson Sector | Hourly work crew to perform urgent maintenance per SOW. Urgent work performed during daylight hours, based on 8 hour workday Mon‐Fri | Hour | Equipment Operator 1/Labor 1 | 2 | $ - 0 |
| 6 | Urgent After-Hour Repair & Maintenance for Tucson Sector | Hourly work crew to perform urgent maintenance outside of the standard 8 hour M‐F schedule, inclusive of nights, weekends and holidays | Hour | Equipment Operator 1/Labor 1 | 2 | $ - 0 |
| 7 | Nesting Survey | Conduct nesting survey as required by the SOW. Includes vehicle and travel (Routine work performed during daylight hours, based on 8 hour workday Mon-Fri) | Day | Certified Surveyor | 1 | $ - 0 |
| Additional Crew Members to Supplement Crew Composition | UoM | Unit Rate | ||||
| Line Item | Description | UoM | Unit Rate | |||
| 1 | Laborer ‐ Arizona | Laborer rate in Arizona | Hour | $ - 0 | Day | $ - 0 |
| 2 | Foreman | Foreman rate in Arizona | Hour | $ - 0 | Day | $ - 0 |
| 3 | Crane Operator | Crane operator | Hour | $ - 0 | Day | $ - 0 |
| 4 | Operator Level 1 | Forklift, Ride-on trencher, mowers, pressure washer | Hour | $ - 0 | Day | $ - 0 |
| 5 | Operator Level 2 | Water truck, dump truck, flatbed, Gannon/skip loader, roller/compactor | Hour | $ - 0 | Day | $ - 0 |
| 6 | Operator Level 3 | Backhoe, loader, skid steer, articulated dump truck | Hour | $ - 0 | Day | $ - 0 |
| 7 | Operator Level 4 | Grader, excavator, bull dozer, scraper, waterpull | Hour | $ - 0 | Day | $ - 0 |
| 8 | Level 1 Trade | Concrete form setter | Hour | $ - 0 | Day | $ - 0 |
| 9 | Level 2 Trade | Concrete finisher | Hour | $ - 0 | Day | $ - 0 |
| 10 | Level 3 Trade | Grade checker | Hour | $ - 0 | Day | $ - 0 |
| 11 | Level 4 Trade | Carpenter | Hour | $ - 0 | Day | $ - 0 |
| 12 | Welder | Hour | $ - 0 | Day | $ - 0 | |
| 13 | Welder Helper | Hour | $ - 0 | Day | $ - 0 | |
| 14 | Per-Diem | Hour | $ - 0 | Day | $ - 0 | |
| Travel Rates if Authorized | ||||||
| Line Item | Travel - Routine and Urgent Activities | UoM | Unit Rate | |||
| 1 | CLIN 1 | Travel Rate Crew CLIN 1 | Hour | $ - 0 | ||
| 2 | CLIN 2 | Travel Rate Crew CLIN 2/4Man Crew | Hour | $ - 0 | ||
| 3 | CLIN 2 | Travel Rate Crew CLIN 2/3 Man Crew | Hour | $ - 0 | ||
| 4 | CLIN 3 | Travel Rate Crew CLIN 3/3 Man Crew | Hour | $ - 0 | ||
| 5 | CLIN 3 | Travel Rate Crew CLIN 3/2 Man Crew | Hour | $ - 0 | ||
| 6 | CLIN 4 | Travel Rate Crew CLIN 4 | Hour | $ - 0 | ||
| 7 | CLIN 5 | Travel Rate Crew CLIN 5/3 Man | Hour | $ - 0 | ||
| 8 | CLIN 5 | Travel Rate Crew CLIN 5/2 Man | Hour | $ - 0 | ||
| Individual Travel Rates - Routine and Urgent | UoM | Unit Rate | ||||
| Line Item | Description | |||||
| 1 | Foreman | Foreman | Hour | $ - 0 | ||
| 2 | Crane Operator | Crane operator | Hour | $ - 0 | ||
| 3 | Operator Level 1 | Forklift, Ride-on trencher, mowers, pressure washer | Hour | $ - 0 | ||
| 4 | Operator Level 2 | Water truck, dump truck, flatbed, Gannon/skip loader, roller/compactor | Hour | $ - 0 | ||
| 5 | Operator Level 3 | Backhoe, loader, skid steer, articulated dump truck | Hour | $ - 0 | ||
| 6 | Operator Level 4 | Grader, excavator, bull dozer, scraper, waterpull | Hour | $ - 0 | ||
| 7 | Level 1 Trade | Concrete form setter | Hour | $ - 0 | ||
| 8 | Level 2 Trade | Concrete finisher | Hour | $ - 0 | ||
| 9 | Level 3 Trade | Grade checker | Hour | $ - 0 | ||
| 10 | Level 4 Trade | Carpenter | Hour | $ - 0 | ||
| 11 | Laborer | Travel for Laborer | Hour | $ - 0 | ||
| Miscellaneous | Crew Composition | Qty | Unit Rate | |||
| Line Item | Description | UoM | ||||
| 1 | Routine Services Associated with the Disposal of Dead Animals | Perform routine services associated with the disposal of dead animals. Routine work performed during daylight hours based on 8 hour workday Mon‐Fri | Day | Operator 1/Labor 1 | 2 | $ - 0 |
| 2 | Routine Services Associated with the Disposal of Dead Animals | Perform routine services associated with the disposal of dead animals. Routine work performed during daylight hours based on 8 hour workday Mon‐Fri | Hour | Operator 1/Labor 1 | 2 | $ - 0 |
| 3 | Urgent Services Associated with the Disposal of Dead Animals | Perform urgent services associated with the disposal of dead animals. Routine work performed during daylight hours based on 8 hour workday Mon‐Fri | Hour | Operator 1/Labor 1 | 2 | $ - 0 |
| 4 | Urgent After-Hour Services Associated with the Disposal of Dead Animals | Perform urgent services associated with the disposal of dead animals. Urgent work performed outside of the standard 8 hour M‐F schedule, inclusive of nights, weekends and holidays | Hour | Operator 1/Labor 1 | 2 | $ - 0 |
| 5 | Routine Services Associated with the Removal of Active Bee Hives | Perform routine services associated with the removal of active bee hives. Routine work performed during daylight hours based on 8 hour workday Mon‐Fri | Day | Operator 1/Labor 1 | 2 | $ - 0 |
| 6 | Routine Services Associated with the Removal of Active Bee Hives | Perform routine services associated with the removal of active bee hives. Routine work performed during daylight hours based on 8 hour workday Mon‐Fri | Hour | Operator 1/Labor 1 | 2 | $ - 0 |
| 7 | Urgent Services Associated with the Removal of Active Bee Hives | Perform urgent services associated with the removal of active bee hives. Urgent work performed during daylight hours based on 8 hour workday Mon‐Fri | Hour | Operator 1/Labor 1 | 2 | $ - 0 |
| 8 | Urgent Services Associated with the Removal of Active Bee Hives | Perform urgent services associated with the removal of active bee hives outside the standard 8 hour M-F schedule, inclusive of nights, weekends and holidays | Hour | Operator 1/Labor 1 | 2 | $ - 0 |
| 9 | Routine Services Associated with the Repair of Animal Burrows | Perform routine services associated with the repair of animal burrows. Routine work performed during daylight hours, based on 8 hour workday Mon-Fri | Day | Operator 1/Labor 1 | 2 | $ - 0 |
| 10 | Routine Services Associated with the Repair of Animal Burrows | Perform routine services associated with the repair of animal burrows. Routine work performed during daylight hours, based on 8 hour workday Mon-Fri | Hour | Operator 1/Labor 1 | 2 | $ - 0 |
| 11 | Urgent Services Associated with the Repair of Animal Burrows | Perform urgent services associated with the repair of animal burrows. Routine work performed during daylight hours, based on 8 hour workday Mon-Fri | Hour | Operator 1/Labor 1 | 2 | $ - 0 |
| 12 | Urgent After-Hour Services Associated with the Repair of Animal Burrows | Perform urgent after-hour services associated with the repair of animal burrows outside the standard 8 hour M-F schedule, inclusive of nights, weekends and holidays | Hour | Operator 1/Labor 1 | 2 | $ - 0 |