Attachment 4 Sample Task Assignment Scenarios Worksheet.xlsx
XLSX spreadsheet 32 KB Posted
- Solicitation number
- RFP-02944
- Issued by
- Liberty County, Florida
About this file
This document is a sample task assignment worksheet related to a state and local contract opportunity for Plugging and Abandonment Services for Oil and Gas Wells issued by the Florida Department of Environmental Protection. The worksheet provides detailed line items and unit rates for well location and pre-abandonment activities, well abandonment activities, and post-well abandonment activities. The contract opportunity covers the Florida Panhandle Region and Florida Peninsula Region, and includes tasks such as historic records/aerial photo search, site reconnaissance, geophysical surveys, well abandonment operations, environmental assessments, and site restoration. The solicitation provides two sample task assignment scenarios and indicates that respondents must use the amended version provided in the addendum when preparing their responses. The contract opportunity is open to qualified vendors, with responses due as indicated in the revised Section 1.8 Timeline of Events.
The pricing terms, set-asides, funding sources, and other salient information are not explicitly provided in the document. However, the sample task assignment worksheet demonstrates the detailed scope of services and unit rates required for this plugging and abandonment contract opportunity in the state of Florida.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scenario 1- Panhandle Region
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Sample Task Assignment (Scenario) #1 Worksheet Florida Panhandle Region
Attachment 4
| Line Item | Initial Contract Term | Unit | Rate |
| 1.0 | Well Location and Pre-abandonment Activities | ||
| Unit | Number of Units/Timeframe | ||
| 1.1 | Historic Records/Aerial Photo Search | Per hour | |
| 1.2 | Preliminary Research and Recommendation Report | Each | |
| 1.3 | Title Search | Each | |
| 1.4 | Site Recon (labor @ 10-hour day & equipment: Safety gear, handheld mag, GPS, Methane & H2S monitor and hand tools etc.) | Per day | |
| 1.5 | Drone magnetometer well head survey | Per hour | |
| 1.6 | Geophysical Report (Data summary, interpretation & attached data) | Per survey | |
| 1.7 | Utility Locate (Sunshine 811 & onsite property) | Each | |
| 1.8 | Well Specific P&A Project Plan | Each | |
| 1.9 | Health & Safety Plan with H2S Plan | Each |
| 2.0 | Well Abandonment Activities | ||
| Unit | Number of Units/Timeframe | ||
| 2.1 | Mobilization - includes all labor, material and other direct cost to mobilize to the site and conduct the P&A well activities | Each | |
| 2.2 | Demobilization - includes all labor materials and other direct cost to demobilize from the sites | Each | |
| 2.3 | Access road construction | per 100 feet | |
| 2.4 | Methane/H2S & 4 gas monitoring equipment (with crew onsite) | Per day | |
| 2.5 | Remote Methane & H2S monitoring equipment | Per day | |
| 2.6 | Rig/Field Crew per diem (reimbursable per Section 112.061, Florida Statutes) | Per man/day | |
| 2.7 | Test & install/remove deadman anchors as needed | Per day | |
| 2.8 | Rig (up to 10—hour day, 3-man crew, mobilization, load permits) | Per day | |
| 2.9 | Blow Out Preventor (BOP) rentals (verified inspection & pressure test required) | Per day | |
| 2.10 | Downhole rentals casing scrapers, bits & subs, others | Per day | |
| 2.11 | Hot oil truck | Per hour | |
| 2.12 | Cementing equipment (10-hr day, transportation & pumping equipment) | Per day | |
| 2.13 | Class "G/H" Cement (w/ additives if required) | Per 1 ft3 sack | |
| 2.14 | Type 1 Cement | Per 1 ft3 sack | |
| 2.15 | Wireline Services (services: CBL, perf, other) | Per day | |
| 2.16 | Cement retainers & bridge plug (mechanical/wireline set) | 3 CR/2 BP | |
| 2.17 | Equipment Transportation (per each: tank, BOP, large machinery...) | Per Delivery | |
| 2.18 | Tanks (Including 400 bbl. upright, storage tanks) | Per day | |
| 2.19 | Import saltwater or freshwater (includes delivery and usage) | Per 42-gal Bbl | |
| 2.20 | Disposal of excess water and waste fluid (transportation & disposal) | Per 42-gal Bbl | |
| 2.21 | Transportation and disposal of NORM containing materials | Per 55-gal drum | |
| 2.22 | Transportation and disposal of NORM containing materials | Per 20-yd rolloff box | |
| 2.23 | Workstring rental | Each | |
| 2.24 | Casing jacks (if required) | Each | |
| 2.25 | Casing crew (if required) | Per day | |
| 2.26 | Portable restroom rental | Per day | |
| 2.27 | Rig pump | Per day | |
| 2.28 | Hydraulic tubing handler | Per day | |
| 2.29 | Roustabouts (dig out wellhead, cut & cap well & other services) | Per day | |
| 2.30 | In-place service line abandonment (includes cut ends, purge line, pig line, & cap ends) | Per foot | |
| 2.31 | Site cleanup/grading/decommissioning or removal of pipelines, facilities, and infrastructure. | Per day | |
| 2.32 | Preliminary limited Site Environmental Assessment Fieldwork (soil screening-OVA headspace & Chlorides, five confirmation soil samples, & surface water/groundwater evaluation | Per day | |
| 2.33 | Site contouring (including any heavy equipment) | Per day | |
| 2.34 | Other undefined (define any additional cost elements required) | ||
| 2.35 | Other undefined (define any additional cost elements required) |
| 3.0 | Post Well Abandonment Activities | ||
| Unit | Number of Units/Timeframe | ||
| 3.1 | Well Abandonment Report including Exhibit I, O&G Form 16 (draft & final preparation and submissions) | Each | |
| 3.2 | Post P&A Environmental Assessment Work Plan and Health & Safety Plan | Each | |
| 3.3 | Phase II Site Environmental Assessment (including labor & equipment and sample collection of up to 6 soil samples, 3 surface water samples and 3 groundwater samples) | Each | |
| 3.4 | Aqueous sample analysis (including BTEX, PAHs, TRPH, and Chlorides) | Each | |
| 3.5 | Solid sample analysis (solid & aqueous; including BTEX, PAHs, TRPH, Chlorides, and SPLP) | Each | |
| 3.6 | Limited soil excavation (including labor, machinery, containers, transportation, and disposal) | Per CY | |
| 3.7 | Site restoration & native species replanting (including equipment, labor, & plants) | Per acre | |
| 3.8 | Site Environmental Assessment Report (draft & final preparation and submissions) | Each |
Name of Respondent/Company
Printed/Typed Name of Authorized Signatory and Title
| ________________________________________ | _____________________________ | ||
| Signature | Date |
Footnotes, notations, and exceptions made to this form will not be considered.
Attachment 4, Sample Task Assignment Scenario #1 Worksheet- Florida Panhandle Region
Scenario 2 - Peninsula Region
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Sample Task Assignment (Scenario) #2 Worksheet Florida Peninsula Region
Attachment 4
| Line Item | Initial Contract Term | Unit | Rate |
| 1.0 | Well Location and Pre-abandonment Activities | ||
| Unit | Number of Units/Timeframe | ||
| 1.1 | Historic Records/Aerial Photo Search | Per hour | |
| 1.2 | Preliminary Research and Recommendation Report | Each | |
| 1.3 | Title Search | Each | |
| 1.4 | Site Recon (labor @ 10-hour day & equipment: Safety gear, handheld mag, GPS, Methane & H2S monitor and hand tools etc.) | Per day | |
| 1.5 | Drone magnetometer well head survey | Per hour | |
| 1.6 | Geophysical Report (Data summary, interpretation & attached data) | Per survey | |
| 1.7 | Utility Locate (Sunshine 811 & onsite property) | Each | |
| 1.8 | Well Specific P&A Project Plan | Each | |
| 1.9 | Health & Safety Plan with H2S Plan | Each |
| 2.0 | Well Abandonment Activities | ||
| Unit | Number of Units/Timeframe | ||
| 2.1 | Mobilization - includes all labor, material and other direct cost to mobilize to the site and conduct the P&A well activities | Each | |
| 2.2 | Demobilization - includes all labor materials and other direct cost to demobilize from the sites | Each | |
| 2.3 | Access road construction | per 100 feet | |
| 2.4 | Methane/H2S & 4 gas monitoring equipment (with crew onsite) | Per day | |
| 2.5 | Remote Methane & H2S monitoring equipment | Per day | |
| 2.6 | Rig/Field Crew per diem (reimbursable per Section 112.061, Florida Statutes) | Per man/day | |
| 2.7 | Test & install/remove deadman anchors as needed | Per day | |
| 2.8 | Rig (up to 10—hour day, 3-man crew, mobilization, load permits) | Per day | |
| 2.9 | Blow Out Preventor (BOP) rentals (verified inspection & pressure test required) | Per day | |
| 2.10 | Downhole rentals casing scrapers, bits & subs, others | Per day | |
| 2.11 | Hot oil truck | Per hour | |
| 2.12 | Cementing equipment (10-hr day, transportation & pumping equipment) | Per day | |
| 2.13 | Class "G/H" Cement (w/ additives if required) | Per 1 ft3 sack | |
| 2.14 | Type 1 Cement | Per 1 ft3 sack | |
| 2.15 | Wireline Services (services: CBL, perf, other) | Per day | |
| 2.16 | Cement retainers & bridge plug (mechanical/wireline set) | 3 CR/2 BP | |
| 2.17 | Equipment Transportation (per each: tank, BOP, large machinery...) | Per Delivery | |
| 2.18 | Tanks (Including 400 bbl. upright, storage tanks) | Per day | |
| 2.19 | Import saltwater or freshwater (includes delivery and usage) | Per 42-gal Bbl | |
| 2.20 | Disposal of excess water and waste fluid (transportation & disposal) | Per 42-gal Bbl | |
| 2.21 | Transportation and disposal of NORM containing materials | Per 55-gal drum | |
| 2.22 | Transportation and disposal of NORM containing materials | Per 20-yd rolloff box | |
| 2.23 | Workstring rental | Each | |
| 2.24 | Casing jacks (if required) | Each | |
| 2.25 | Casing crew (if required) | Per day | |
| 2.26 | Portable restroom rental | Per day | |
| 2.27 | Rig pump | Per day | |
| 2.28 | Hydraulic tubing handler | Per day | |
| 2.29 | Roustabouts (dig out wellhead, cut & cap well & other services) | Per day | |
| 2.30 | In-place service line abandonment (includes cut ends, purge line, pig line, & cap ends) | Per foot | |
| 2.31 | Site cleanup/grading/decommissioning or removal of pipelines, facilities, and infrastructure. | Per day | |
| 2.32 | Preliminary limited Site Environmental Assessment Fieldwork (soil screening-OVA headspace & Chlorides, five confirmation soil samples, & surface water/groundwater evaluation | Per day | |
| 2.33 | Site contouring (including any heavy equipment) | Per day | |
| 2.34 | Other undefined (define any additional cost elements required) | ||
| 2.35 | Other undefined (define any additional cost elements required) |
| 3.0 | Post Well Abandonment Activities | ||
| Unit | Number of Units/Timeframe | ||
| 3.1 | Well Abandonment Report including Exhibit I, O&G Form 16 (draft & final preparation and submissions) | Each | |
| 3.2 | Post P&A Environmental Assessment Work Plan and Health & Safety Plan | Each | |
| 3.3 | Phase II Site Environmental Assessment (including labor & equipment and sample collection of up to 6 soil samples, 3 surface water samples and 3 groundwater samples) | Each | |
| 3.4 | Aqueous sample analysis (including BTEX, PAHs, TRPH, and Chlorides) | Each | |
| 3.5 | Solid sample analysis (solid & aqueous; including BTEX, PAHs, TRPH, Chlorides, and SPLP) | Each | |
| 3.6 | Limited soil excavation (including labor, machinery, containers, transportation, and disposal) | Per CY | |
| 3.7 | Site restoration & native species replanting (including equipment, labor, & plants) | Per acre | |
| 3.8 | Site Environmental Assessment Report (draft & final preparation and submissions) | Each |
Name of Respondent/Company
Printed/Typed Name of Authorized Signatory and Title
| ________________________________________ | _____________________________ | ||
| Signature | Date |
Footnotes, notations, and exceptions made to this form will not be considered.
Attachment 4, Sample Task Assignment Scenario #2 Worksheet- Florida Peninsula Region
File details come from the government source that posted it. Updated .