Addendum No. 1 - Attachment 4 Sample Task Assignment Scenarios Worksheet_Revised.xlsx

XLSX spreadsheet 32 KB Posted

Attached to
Plugging and Abandonment Services for Oil and Gas Wells
Solicitation number
RFP-02944
Issued by
Liberty County, Florida

About this file

This document is an Addendum No. 1 to a solicitation from the Florida Department of Environmental Protection for Plugging and Abandonment Services for Oil and Gas Wells. The solicitation covers two sample task assignment scenarios - one for the Florida Panhandle Region and one for the Florida Peninsula Region. The scope of work includes activities such as well location and pre-abandonment, well abandonment, and post-well abandonment. The solicitation also includes a revised timeline of events, extending the response due date.

The document provides pricing information and unit rates for various line items related to the plugging and abandonment services. It does not mention any set-asides, incumbents, or funding sources. The contract term is not specified, but the solicitation indicates that the Department is actively working on drafting responses to questions received and will be posting an addendum with the answers and a revised timeline.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scenario 1- Panhandle Region Addendum No. 1 – Revised

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Sample Task Assignment (Scenario) #1 Worksheet Florida Panhandle Region

Attachment 4

Line ItemInitial Contract TermUnitRate
1.0Well Location and Pre-abandonment Activities
UnitNumber of Units/Timeframe
1.1Historic Records/Aerial Photo SearchPer hour
1.2Preliminary Research and Recommendation ReportEach
1.3Title SearchEach
1.4Site Recon (labor @ 10-hour day & equipment: Safety gear, handheld mag, GPS, Methane & H2S monitor and hand tools etc.)Per day
1.5Drone magnetometer well head surveyPer hour
1.6Geophysical Report (Data summary, interpretation & attached data)Per survey
1.7Utility Locate (Sunshine 811 & onsite property)Each
1.8Well Specific P&A Project PlanEach
1.9Health & Safety Plan with H2S PlanEach
1.10Rig Standby TimePer hour
2.0Well Abandonment Activities
UnitNumber of Units/Timeframe
2.1Mobilization - includes all labor, material and other direct cost to mobilize to the site and conduct the P&A well activitiesEach
2.2Demobilization - includes all labor materials and other direct cost to demobilize from the sitesEach
2.3Access road constructionper 100 feet
2.4Methane/H2S & 4 gas monitoring equipment (with crew onsite)Per day
2.5Remote Methane & H2S monitoring equipmentPer day
2.6Rig/Field Crew per diem (reimbursable per Section 112.061, Florida Statutes)Per man/day
2.7Test & install/remove deadman anchors as neededPer day
2.8Rig (up to 10—hour day, 3-man crew, mobilization, load permits)
Rig (minimum 8-hour day, full crew, mobilization, load permits)Per day
2.9Blow Out Preventor (BOP) rentals (verified inspection & pressure test required)Per day
2.10Downhole rentals casing scrapers, bits & subs, othersPer day
2.11Hot oil truckPer hour
2.12Cementing equipment (10-hr day, transportation & pumping equipment)Per day
2.13Class "G/H" Cement (w/ additives if required)Per 1 ft3 sack
2.14Type 1 CementPer 1 ft3 sack
2.15Wireline Services (services: CBL, perf, other)Per day
2.16Cement retainers & bridge plug (mechanical/wireline set)3 CR/2 BP
2.17Equipment Transportation (per each: tank, BOP, large machinery...)Per Delivery
2.18Tanks (Including 400 bbl. upright, storage tanks)Per day
2.19Import saltwater or freshwater (includes delivery and usage)Per 42-gal Bbl
2.20Disposal of excess water and waste fluid (transportation & disposal)Per 42-gal Bbl
2.21Transportation and disposal of NORM containing materialsPer 55-gal drum
2.22Transportation and disposal of NORM containing materialsPer 20-yd rolloff box
2.23Workstring rentalEach
2.24Casing jacks (if required)Each
2.25Casing crew (if required)Per day
2.26Portable restroom rentalPer day
2.27Rig pumpPer day
2.28Hydraulic tubing handlerPer day
2.29Roustabouts (dig out wellhead, cut & cap well & other services)Per day
2.30In-place service line abandonment (includes cut ends, purge line, pig line, & cap ends)Per foot
2.31Site cleanup/grading/decommissioning or removal of pipelines, facilities, and infrastructure.Per day
2.32Preliminary limited Site Environmental Assessment Fieldwork (soil screening-OVA headspace & Chlorides, five confirmation soil samples, & surface water/groundwater evaluationPer day
2.33Site contouring (including any heavy equipment)Per day
2.34Other undefined (define any additional cost elements required)
2.35Other undefined (define any additional cost elements required)
3.0Post Well Abandonment Activities
UnitNumber of Units/Timeframe
3.1Well Abandonment Report including Exhibit I, O&G Form 16 (draft & final preparation and submissions)Each
3.2Post P&A Environmental Assessment Work Plan and Health & Safety PlanEach
3.3Phase II Site Environmental Assessment (including labor & equipment and sample collection of up to 6 soil samples, 3 surface water samples and 3 groundwater samples)Each
3.4Aqueous sample analysis (including BTEX, PAHs, TRPH, and Chlorides)Each
3.5Solid sample analysis (solid & aqueous; including BTEX, PAHs, TRPH, Chlorides, and SPLP)Each
3.6Limited soil excavation (including labor, machinery, containers, transportation, and disposal)Per CY
3.7Site restoration & native species replanting (including equipment, labor, & plants)Per acre
3.8Site Environmental Assessment Report (draft & final preparation and submissions)Each

Name of Respondent/Company

Printed/Typed Name of Authorized Signatory and Title

_____________________________________________________________________
SignatureDate

Footnotes, notations, and exceptions made to this form will not be considered.

Attachment 4, Sample Task Assignment Scenario #1 Worksheet- Florida Panhandle Region

Scenario 2 - Peninsula Region Addendum No. 1 – Revised

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Sample Task Assignment (Scenario) #2 Worksheet Florida Peninsula Region

Attachment 4

Line ItemInitial Contract TermUnitRate
1.0Well Location and Pre-abandonment Activities
UnitNumber of Units/Timeframe
1.1Historic Records/Aerial Photo SearchPer hour
1.2Preliminary Research and Recommendation ReportEach
1.3Title SearchEach
1.4Site Recon (labor @ 10-hour day & equipment: Safety gear, handheld mag, GPS, Methane & H2S monitor and hand tools etc.)Per day
1.5Drone magnetometer well head surveyPer hour
1.6Geophysical Report (Data summary, interpretation & attached data)Per survey
1.7Utility Locate (Sunshine 811 & onsite property)Each
1.8Well Specific P&A Project PlanEach
1.9Health & Safety Plan with H2S PlanEach
1.10Rig Standby TimePer hour
2.0Well Abandonment Activities
UnitNumber of Units/Timeframe
2.1Mobilization - includes all labor, material and other direct cost to mobilize to the site and conduct the P&A well activitiesEach
2.2Demobilization - includes all labor materials and other direct cost to demobilize from the sitesEach
2.3Access road constructionper 100 feet
2.4Methane/H2S & 4 gas monitoring equipment (with crew onsite)Per day
2.5Remote Methane & H2S monitoring equipmentPer day
2.6Rig/Field Crew per diem (reimbursable per Section 112.061, Florida Statutes)Per man/day
2.7Test & install/remove deadman anchors as neededPer day
2.8Rig (up to 10—hour day, 3-man crew, mobilization, load permits)
Rig (minimum 8-hour day, full crew, mobilization, load permits)Per day
2.9Blow Out Preventor (BOP) rentals (verified inspection & pressure test required)Per day
2.10Downhole rentals casing scrapers, bits & subs, othersPer day
2.11Hot oil truckPer hour
2.12Cementing equipment (10-hr day, transportation & pumping equipment)Per day
2.13Class "G/H" Cement (w/ additives if required)Per 1 ft3 sack
2.14Type 1 CementPer 1 ft3 sack
2.15Wireline Services (services: CBL, perf, other)Per day
2.16Cement retainers & bridge plug (mechanical/wireline set)3 CR/2 BP
2.17Equipment Transportation (per each: tank, BOP, large machinery...)Per Delivery
2.18Tanks (Including 400 bbl. upright, storage tanks)Per day
2.19Import saltwater or freshwater (includes delivery and usage)Per 42-gal Bbl
2.20Disposal of excess water and waste fluid (transportation & disposal)Per 42-gal Bbl
2.21Transportation and disposal of NORM containing materialsPer 55-gal drum
2.22Transportation and disposal of NORM containing materialsPer 20-yd rolloff box
2.23Workstring rentalEach
2.24Casing jacks (if required)Each
2.25Casing crew (if required)Per day
2.26Portable restroom rentalPer day
2.27Rig pumpPer day
2.28Hydraulic tubing handlerPer day
2.29Roustabouts (dig out wellhead, cut & cap well & other services)Per day
2.30In-place service line abandonment (includes cut ends, purge line, pig line, & cap ends)Per foot
2.31Site cleanup/grading/decommissioning or removal of pipelines, facilities, and infrastructure.Per day
2.32Preliminary limited Site Environmental Assessment Fieldwork (soil screening-OVA headspace & Chlorides, five confirmation soil samples, & surface water/groundwater evaluationPer day
2.33Site contouring (including any heavy equipment)Per day
2.34Other undefined (define any additional cost elements required)
2.35Other undefined (define any additional cost elements required)
3.0Post Well Abandonment Activities
UnitNumber of Units/Timeframe
3.1Well Abandonment Report including Exhibit I, O&G Form 16 (draft & final preparation and submissions)Each
3.2Post P&A Environmental Assessment Work Plan and Health & Safety PlanEach
3.3Phase II Site Environmental Assessment (including labor & equipment and sample collection of up to 6 soil samples, 3 surface water samples and 3 groundwater samples)Each
3.4Aqueous sample analysis (including BTEX, PAHs, TRPH, and Chlorides)Each
3.5Solid sample analysis (solid & aqueous; including BTEX, PAHs, TRPH, Chlorides, and SPLP)Each
3.6Limited soil excavation (including labor, machinery, containers, transportation, and disposal)Per CY
3.7Site restoration & native species replanting (including equipment, labor, & plants)Per acre
3.8Site Environmental Assessment Report (draft & final preparation and submissions)Each

Name of Respondent/Company

Printed/Typed Name of Authorized Signatory and Title

_____________________________________________________________________
SignatureDate

Footnotes, notations, and exceptions made to this form will not be considered.

Attachment 4, Sample Task Assignment Scenario #2 Worksheet- Florida Peninsula Region

File details come from the government source that posted it. Updated .