This is a Price Sheet template for a roof replacement project at the US Embassy in Freetown, Sierra Leone. The document outlines a comprehensive roofing system replacement covering approximately 36,000 square feet across three buildings (NOB, REC, and CACs) using a hot rubberized membrane system. Line items include roof demolition and disposal, installation of the hot rubberized membrane, drain board and fabric, new insulation, concrete pavers, and associated flashing components (penetration, base, counterflashing, and metal edge). Additional work includes miscellaneous HVAC/electrical modifications, equipment and piping supports, roof drains, overflow drains, scuppers/downspouts, sealant application, and painting.

The price sheet includes space for material costs, labor and equipment costs, and calculates subtotals with provisions for indirect costs including shipping, prevailing wage (DBA), taxes and insurance, overhead, profit, and contingency. Travel expenses are itemized separately with costs for 10 crew members including visas and immunizations, airfare, lodging at $180 per day for 195 calendar days ($35,100), and meals and incidental expenses at $101 per day ($19,695). The template demonstrates a total estimated project cost of $54,795, representing the travel expenses portion of the proposal. This price sheet is associated with RFP 19AQMM26R0332 with questions due August 19, 2026, and proposals due September 3, 2026, by 4:00 PM Eastern Time, managed by the Department of State Office of Acquisition Management.

View the file

Other files

File Type Posted
Attachment 4 - Price Sheet (Revised).xlsx XLSX spreadsheet
19AQMM26R0332 A005.pdf PDF
19AQMM26R0332 A004.pdf PDF
QandA 1.docx DOCX document
19AQMM26R0332 A003.pdf PDF
Attachment 1 - Freetown Specifications (Rev 01).pdf PDF
19AQMM26R0332 A002.pdf PDF
19AQMM26R0332 A001.pdf PDF
Attachment 7 - Freetown Site Access Information.docx DOCX document
Attachment 1 - Freetown Specifications.pdf PDF
Attachment 2 - Freetown Drawings.pdf PDF
Attachment 6 - Public Release of Information 20250219.pdf PDF
Attachment 5 - Bidders DD-254.pdf PDF
19AQMM26R0332.pdf PDF
Attachment 3 - PPQ.docx DOCX document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

LABOR TYPE: CLEARED AMERICAN POST: FREETOWN, SIERRA LEONE PROJECT NUMBER: FWP 61

PROJECT TITLE: NOB, REC, CACs ROOF REPLACEMENT

ITEM OF WORKQUANTITYUNITSMATERIAL COSTLABOR & EQUIPMENT COSTTOTAL
PER UNITSUBTOTALPER UNITSUBTOTAL
NOB, REC, CACs - Hot Rubberized PMR
Mobilization / Demobilization1Lump Sum$ - 0$ - 0$ - 0
Roof System Demolition/Disposal36,000Square Feet$ - 0$ - 0$ - 0
Hot Rubberized Membrane36,000Square Feet$ - 0$ - 0$ - 0
Drain Board / Fabric36,000Square Feet$ - 0$ - 0$ - 0
New Insulation36,000Square Feet$ - 0$ - 0$ - 0
New Concrete Pavers36,000Square Feet$ - 0$ - 0$ - 0
Penetration Flashing30Each$ - 0$ - 0$ - 0
Base Flashing and Counterflashing4,500Linear Feet$ - 0$ - 0$ - 0
Metal Edge4,500Linear Feet$ - 0$ - 0$ - 0
Equipment / Curb Flashing1,000Linear Feet$ - 0$ - 0$ - 0
Miscellaneous HVAC/Electrical Work1Lump Sum$ - 0$ - 0$ - 0
Equipment / Piping Supports15Each$ - 0$ - 0$ - 0
Roof Drains/Parts25Each$ - 0$ - 0$ - 0
Overflow Drains15Each$ - 0$ - 0$ - 0
Scuppers/Downspouts25Each$ - 0$ - 0$ - 0
Sealant4,000Linear Feet$ - 0$ - 0$ - 0
Painting1Lump Sum$ - 0$ - 0$ - 0
Subtotal - Materials and Labor$ - 0$ - 0$ - 0
INDIRECT COSTS
Shipping1Lump Sum$ - 0
DBA1Lump Sum$ - 0
Taxes & Insurance0%Labor$ - 0
Overhead0%Subtotal - M&L$ - 0
Profit0%ALL$ - 0
Contingency0%ALL$ - 0
Subtotal - Indirect Costs$ - 0

SUBTOTAL - PROJECT COST (M&L + IND.Costs) w/o Travel $ - 0

TRAVEL EXPENSES
Visas & Immunizations (10 Crew)10Each$ - 0$ - 0
Airfare10Each$ - 0$ - 0
Lodging (10 Crew x $180/Day)195Calendar Days$ 180.00$ 35,100.00
M&IE (10 Crew x $101/Day195Calendar Days$ 101.00$ 19,695.00
Local Transportation1Lump Sum$ - 0$ - 0
Subtotal - Travel Expenses$ 54,795.00

TOTAL ESTIMATED PROJECT COST $ 54,795.00