Attachment 4 - Price Sheet (Revised).xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Freetown NOB, Rec Center, and CAC Roof Replacement
Solicitation number
19AQMM26R0332_Freetown_Roof_Replacement_RFP
Issued by

About this file

This is a Price Sheet (Revised) for a roof replacement project at the US Embassy in Freetown, Sierra Leone, submitted as Attachment 4 to the Request for Proposal (RFP) solicitation 19AQMM26R0332. The document outlines line items and cost structure for the NOB, REC, and CACs Roof Replacement project (FWP 61), which involves replacing a 36,000 square-foot roof system with hot rubberized membrane roofing materials. The price sheet includes material costs, labor and equipment costs, and totals per unit across approximately 20 distinct work items, including roof demolition/disposal, membrane installation, insulation, concrete pavers, flashing components, drains, sealants, and miscellaneous HVAC/electrical work.

The revised price sheet incorporates indirect cost categories for shipping, Domestic Business Act (DBA) compliance, taxes and insurance, overhead, profit, and contingency, all currently shown at zero dollars. Notably, the document contains a significant travel expense section for ten crew members, with lodging calculated at $180 per day for 195 calendar days ($351,000) and meals and incidental expenses (M&IE) at $101 per day for the same period ($196,950). The subtotal for travel expenses reaches $547,950, which also serves as the total estimated project cost, as all materials and labor line items are currently blank. Amendment 05 to the RFP specifically corrected the formulas for lodging and M&IE calculations in this attachment. Proposals were due September 3, 2026, by 4:00 PM ET, with a site visit conducted August 11-13, 2026, and questions due by August 19, 2026.

View the file

Other files

File Type Posted
19AQMM26R0332 A005.pdf PDF
19AQMM26R0332 A004.pdf PDF
QandA 1.docx DOCX document
19AQMM26R0332 A003.pdf PDF
Attachment 1 - Freetown Specifications (Rev 01).pdf PDF
19AQMM26R0332 A002.pdf PDF
19AQMM26R0332 A001.pdf PDF
Attachment 7 - Freetown Site Access Information.docx DOCX document
Attachment 1 - Freetown Specifications.pdf PDF
Attachment 2 - Freetown Drawings.pdf PDF
Attachment 6 - Public Release of Information 20250219.pdf PDF
Attachment 5 - Bidders DD-254.pdf PDF
19AQMM26R0332.pdf PDF
Attachment 4 - Price Sheet.xlsx XLSX spreadsheet
Attachment 3 - PPQ.docx DOCX document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

LABOR TYPE: CLEARED AMERICAN POST: FREETOWN, SIERRA LEONE PROJECT NUMBER: FWP 61

PROJECT TITLE: NOB, REC, CACs ROOF REPLACEMENT

ITEM OF WORKQUANTITYUNITSMATERIAL COSTLABOR & EQUIPMENT COSTTOTAL
PER UNITSUBTOTALPER UNITSUBTOTAL
NOB, REC, CACs - Hot Rubberized PMR
Mobilization / Demobilization1Lump Sum$ - 0$ - 0$ - 0
Roof System Demolition/Disposal36,000Square Feet$ - 0$ - 0$ - 0
Hot Rubberized Membrane36,000Square Feet$ - 0$ - 0$ - 0
Drain Board / Fabric36,000Square Feet$ - 0$ - 0$ - 0
New Insulation36,000Square Feet$ - 0$ - 0$ - 0
New Concrete Pavers36,000Square Feet$ - 0$ - 0$ - 0
Penetration Flashing30Each$ - 0$ - 0$ - 0
Base Flashing and Counterflashing4,500Linear Feet$ - 0$ - 0$ - 0
Metal Edge4,500Linear Feet$ - 0$ - 0$ - 0
Equipment / Curb Flashing1,000Linear Feet$ - 0$ - 0$ - 0
Miscellaneous HVAC/Electrical Work1Lump Sum$ - 0$ - 0$ - 0
Equipment / Piping Supports15Each$ - 0$ - 0$ - 0
Roof Drains/Parts25Each$ - 0$ - 0$ - 0
Overflow Drains15Each$ - 0$ - 0$ - 0
Scuppers/Downspouts25Each$ - 0$ - 0$ - 0
Sealant4,000Linear Feet$ - 0$ - 0$ - 0
Painting1Lump Sum$ - 0$ - 0$ - 0
Subtotal - Materials and Labor$ - 0$ - 0$ - 0
INDIRECT COSTS
Shipping1Lump Sum$ - 0
DBA1Lump Sum$ - 0
Taxes & Insurance0%Labor$ - 0
Overhead0%Subtotal - M&L$ - 0
Profit0%ALL$ - 0
Contingency0%ALL$ - 0
Subtotal - Indirect Costs$ - 0

SUBTOTAL - PROJECT COST (M&L + IND.Costs) w/o Travel $ - 0

TRAVEL EXPENSES
Visas & Immunizations (10 Crew)10Each$ - 0$ - 0
Airfare10Each$ - 0$ - 0
Lodging (10 Crew x $180/Day)195Calendar Days$ 180.00$ 351,000.00
M&IE (10 Crew x $101/Day195Calendar Days$ 101.00$ 196,950.00
Local Transportation1Lump Sum$ - 0$ - 0
Subtotal - Travel Expenses$ 547,950.00

TOTAL ESTIMATED PROJECT COST $ 547,950.00