Attachment 4 L-1 Solicitation Questions and Answers.pdf

PDF 158 KB Posted

Attached to
Naval Introductory Flight Evaluation (NIFE) Solicitation Amendment 0002 - Revised PWS and Updated Section L and M language Federal contract opportunity
Solicitation number
N6134024R0024
Issued by
Department of the Navy Naval Air Systems Command

About this file

This document contains questions and answers related to a solicitation for the Naval Introductory Flight Evaluation (NIFE) program. The NIFE program provides flight instruction for Student Naval Aviators, Student Air Vehicle Pilots, and Student Naval Flight Officer candidates. The key details include:

The solicitation requires a contractor to provide certified flight instructors, aircraft, training aids, supervision, materials, maintenance, publications, and other services necessary to perform flight screening, military instructor training, and other flight training and screening services. The contractor must provide sufficient identically configured Cessna-172N/P aircraft with 180HP Lycoming engines to support the training at the home airfields in Pensacola, FL and Gulf Shores, AL.

The questions address topics such as the location of the lead site manager, security clearance requirements, the estimated number of Military Flight Instructors, performance metrics and ratings, the sufficiency of proposed instruction hours and aircraft rental hours, contract maximum quantities, the period of performance, and requirements for ground training equipment. The government provided responses to each of the questions.

View the file

Other files for this federal contract opportunity

Other files attached to Naval Introductory Flight Evaluation (NIFE) Solicitation Amendment 0002 - Revised PWS and Updated Section L and M language, newest first.
File Type Posted
NIFE_PWS_Final__Rev1_22APR24.pdf PDF
N61340-24-R-0024 0002 Modification.pdf PDF
N61340-24-R-0024 0002 Conformed.pdf PDF
N6134024R0024 0001 Conformed Extend.pdf PDF
N6134024R0024 0001 Mod Extend.pdf PDF
Attch 1- PWS Appendix 5 ORM Assessment and Worksheet.xlsx XLSX spreadsheet
Attch 1- PWS Appendix 9b NIFE EXPANDED BRIEF v1.0 12FEB2024.pdf PDF
Attachment 3 NIFE_QASP_Final_12MAR24.pdf PDF
L-3 Facilities.xlsx XLSX spreadsheet
L-2 Airfields CFIs Aircraft.xlsx XLSX spreadsheet
NIFE_PWS_Rev_1_11APR24_FINAL.pdf PDF
Attch 1- PWS Appendix 6 Daily OPSUM Report.xlsx XLSX spreadsheet
Attch 1- PWS Appendix 9c NIFE Limits EPs Quiz Feb2024.pdf PDF
NAVAVSCOLCOMINST 3710.3B NIFE INFLIGHT GUIDE 5FEB2024.pdf PDF
N6134024R0024 (Amendment to N6134024R0004).pdf PDF
Attch 1- PWS Appendix 2 NIFE_Contract_Funds_Status_Report.xlsx XLSX spreadsheet
Attch 1- PWS Appendix 3 Daily Flight Schedule Report.xlsx XLSX spreadsheet
Attch 1- PWS Appendix 4 Daily Aircraft Status Report.xlsx XLSX spreadsheet
Attch 1- PWS Appendix 9e NIFE HOLLYWOOD SCRIPT 5Feb2024.pdf PDF
L-1 Question and Answer Form.xlsx XLSX spreadsheet
L-6 Past Performance Questionnaire.docx DOCX document
L-5 NIFE PP Data Sheet.xlsx XLSX spreadsheet
Attch 1- PWS Appendix 9 NIFE MASTER CURRICULUM GUIDE 4 SEPT23.pdf PDF
Attch 1- PWS Appendix 9a NIFE checklist V18 3NOV21.pdf PDF
Attch 1- PWS Appendix 9d NIFE Limits EPs Quiz Answers Feb2024.pdf PDF
Attachment 2 DOL Wage Determiniation WD 2015-4561 R24 26Dec23.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question Number Subject (title) Question Question Reference (SOW, L&M, Page #s, etc) Government Answer

1 Lead Site Manager Is it acceptable that the Lead Site Manager be located at either of the home airfields if it can be supported from an operational perspective?

PWS 3.3.1.5 Yes. Please see updated PWS.

2 NACLC Requirement Is a National Agency Check with Local Agency Check and Credit Check (NACLC) required for contract CFIs if a

Common Access Card (CAC) is not required?

PWS 3.4.2.2 and 7.2.5 No. Please see updated PWS.

3 MFI Training Please confirm the estimated number of MFIs to undergo Instruction Under Training (IUT). PWS 3.2 and 4.1 22. Please see updated PWS.

4 QASP and CPARS The government provided QASP Surveillance Performance Matrix establishes all but one Maximum Allowable

Degree of Deviation from Requirement Acceptable Quality Level (AQL) at a level of 0%. Using the CPARs guidance for the contractor's performance ratings, it appears impossible for the contractor to achieve an objective rating above satisfactory. Would the government consider adjusting and/or adding other performance indicators that allow very good or exeptional performance to be objectively measured?

Quality Assurance Surveillance Plan (QASP) including Tab

B.

The QASP is not synonymous with a CPAR.

5 Instruction Hours Analysis of the Naval Introductory Flight Evaluation Master Curriculum suggests that the annual instruction hours for CLIN X110/X210 may be understated by 7,600 hours, when factoring in awarded student extra training flights, incomplete flight missions, MFI training requirements, pre/post times, ground training events, etc. Since the contract will be an Indefinite Delivery/Indefinite Quantity (IDIQ) type award with the "max quantities" set by

Section B, any instructional hours added would not increase the government's cost if they were unused and would provide increased flexibility for ensuring the entire student load could be trained within contractual terms. Would the government consider increasing the instruction hours by at least 7,600 hours annually?

PWS Appendix 9 - Naval Introductory Flight Evaluation

Master Curriculum; PWS 3.2; and RFP Section B.

The Government made updates to the Section B Quantities.

6 Aircraft Rental Hours Analysis of the Naval Introductory Flight Evaluation Master Curriculum suggests that the annual aircraft rental hours for CLIN X120/X220 may be understated by 760 hours, when factoring in awarded student extra training flights, incomplete flight missions, MFI training requirements, etc. Since the contract will be an Indefinite

Delivery/Indefinite Quantity (IDIQ) type award with the "max quantities" set by Section B, any aircraft rental hours added would not increase the government's cost if they were unused and would provide increased flexibility for ensuring the entire student load could be trained within contractual terms. Would the government consider increasing the aircraft rental hours by at least 760 hours annually?

PWS Appendix 9 - Naval Introductory Flight Evaluation

Master Curriculum; PWS 3.2; and RFP Section B.

The Government made updates to the Section B Quantities.

7 Contract and Task Order

Minimum/Maximum Quantities

Please confirm which quantities limits the maximum contract quantities stated by CLIN versus the maximum quantities stated in Section B immediately following the CLIN listing.

RFP Section B The contract maximum is expressed on a total contract basis in dollars. (See Section B Notes)

8 Period of Performance Please confirm the period of performance (POP) for year 7, the option to extend. RFP Section B and paragraph 3.1 state 6 months; however, Section F states the POP as 1 Dec 2031 to 30 Jun 2032 which is 7 months.

RFP Sections B and F, and paragraph 3.1 See section B, the period pof performance has been reduced.

The option to extend has also been removed.

9 Ground Training Please clarify the requirement for "fully functional avionics" as it pertains to Cockpit Procedural Trainers (CPTs) that are used in-lieu of aircraft for contractor led ground graining events.

PWS 3.2.2.1 Please see the updated PWS.

10 Economic Price Adjustments Would the government consider adding an Economic Price Adjustment (EPA) clause in accordance with the

Principal Director, Defense Pricing and Contracting, Office of the Under Secretary of Defense (John M. Tenaglia) memorandum dated 25 May 2022, subject: Guidance on Inflation and Economic Price Adjustments? We are in a period of unusually high inflation and aviation fuel is a large percentage of the contract cost base and represents a significant inflation risk considering the 6.5 years of the contract year term.

RFP Section L paragraph 3.0 The government is not going to consider adding an EPA

Clause to this Firm Fixed Price contract.

Attachment 4 NIFE L-1 Question and Answers from Original Solicitation N6134024R0004 are posted in the amended Solicitiation which is N6134024R0024.

File details come from the government source that posted it. Updated .