Attachment 4 Itemized Cost Breakdown.xlsx
XLSX spreadsheet 24 KB Posted
- Solicitation number
- 36C25726R0053
About this file
This is a Cost/Price Breakdown Worksheet template for Solicitation No. 36C25726R0053, which pertains to road and entrance improvements at the Olin E. Teague Veterans Medical Center in Temple, Texas. The worksheet is designed for contractors to itemize costs across multiple construction divisions using the MasterFormat classification system, which includes 24 divisions ranging from General Requirements (Division 01) through Electrical Power Generation (Division 48), plus an "Other" category for additional items if applicable.
The template requires bidders to break down costs into four categories—Material, Labor, Equipment, and Other—for each line item within every division, with subtotals calculated for each division. The worksheet culminates in a grand subtotal across all divisions, followed by separate line items for Overhead, Profit, Bonds and Insurance, and a final Total Proposal amount. The template itself is blank and contains no pre-populated cost data, serving as a standardized format for vendors to submit detailed pricing information as part of their competitive proposals for this federal construction project awarded by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Clarifications 2.docx | DOCX document | |
| Amendment 0006 36C25726R0053.docx | DOCX document | |
| Amendment 0005 36C25726R0053.docx | DOCX document | |
| Clarifications 36C25726R0053.docx | DOCX document | |
| PAST PERFORMANCE QUESTIONNAIRE TEMPLATE.docx | DOCX document | |
| Component List Pertaining to RFIs.pdf | ||
| Amendment 0004 36C25726R0053.docx | DOCX document | |
| RFIs with Responses for Solicitation 36C25726R0053.pdf | ||
| Amendment 0003 36C25726R0053.docx | DOCX document | |
| Amendment 0002 36C25726R0053.docx | DOCX document | |
| Amendment 001 36C25726R0053.docx | DOCX document | |
| Sign in sheet Solicitation 36C25726R0053.pdf | ||
| SPECIFICATIONS.pdf | ||
| DRAWINGS-1.pdf | ||
| DRAWINGS-2.pdf | ||
| DRAWINGS-4.pdf | ||
| DRAWINGS-3.pdf | ||
| DESIGN NARRITIVE.pdf | ||
| PCRA ROADS AND ENTRANCES.pdf | ||
| GEO-TECHNICAL REPORT.pdf | ||
| 36C25726R0053_1.docx | DOCX document |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Solicitation No. 36C25726R0053 Attachment – Cost/Price Breakdown Worksheet | |||||
| DESCRIPTION | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| Division 01 - General Requirements | |||||
| $ | $ | $ | $ - 0 | ||
| $ | $ | $ | $ - 0 | ||
| $ | $ | $ | $ - 0 | ||
| $ | $ | $ | $ - 0 | ||
| $ | $ | $ | $ - 0 | ||
| $ | $ | $ | $ - 0 | ||
| $ | $ | $ | $ - 0 | ||
| $ | $ | $ | $ - 0 | ||
| $ | $ | $ | $ - 0 | ||
| $ | $ | $ | $ - 0 | ||
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 02 – Existing Conditions | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 03 – Concrete | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 04 – Masonry | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 05 - Metals | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 06- Wood and Plastic | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 07- Thermal and Moisture Protection | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 08- Openings (Doors and Windows) | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 09- Finishes | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 10- Specialties | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 11- Equipment | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 12- Furnishings | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 13- Special Construction | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 14- Conveying Equipment | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 21- Fire Suppression | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 22- Plumbing | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 23- Heating, Ventilating, and Air conditioning (HVAC) | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ - 0 | ||
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 25- Integrated Automation | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ - 0 | ||
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 26 Electrical | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 27- Communications | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 28- Electronic Safety and Security | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 31- Earthwork | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 32- Exterior Improvements | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 33- Utilities | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 34- Transportation | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 48- Electrical Power Generation | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Other (If applicable) | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Other Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL | |
| SUB TOTAL | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Overhead | $ | $ | $ | $ | $ |
| Profit | $ | $ | $ | $ | $ |
| Bonds and Insurance | $ | $ | $ | $ | $ |
| Total Proposal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |