Attachment 4 Itemized Cost Breakdown.xlsx
XLSX spreadsheet 24 KB Posted
- Attached to
- 36C25726R0032_2 674A4-22-254 - CON CTX Consolidate Engineering Bldg. 17 Federal contract opportunity
- Solicitation number
- 36C25726R0032
About this file
The file is an Itemized Cost Breakdown Excel worksheet for Solicitation No. 36C257XXXXX, associated with a Department of Veterans Affairs construction project to consolidate Engineering Building 17. The comprehensive spreadsheet is structured with multiple construction division categories including General Requirements, Existing Conditions, Concrete, Masonry, Metals, Wood and Plastic, Thermal and Moisture Protection, Openings, Finishes, Specialties, Equipment, Furnishings, Special Construction, Conveying Equipment, Fire Suppression, Plumbing, HVAC, Integrated Automation, Electrical, Communications, Electronic Safety and Security, Earthwork, Exterior Improvements, Utilities, Transportation, and Electrical Power Generation.
The cost breakdown template allows for detailed cost allocation across four primary expense categories: Material, Labor, Equipment, and Other, with provisions for calculating subtotals, overhead, profit, bonds, and insurance. While the specific numerical values are not populated in this template, the document provides a structured framework for potential contractors to comprehensively detail their proposed project costs across 34 distinct construction and engineering division categories. The solicitation is issued by the Veterans Health Administration's Veterans Integrated Service Network 17 (VISN 17) and relates to a construction context (CON CTX) project for consolidating Engineering Building 17.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25726R0032 0005.docx | DOCX document | |
| 36C25726R0032 0004_Consolidated Engineering Building 17.docx | DOCX document | |
| 36C25726R0032 0003.docx | DOCX document | |
| PN 674A4-22-245_100ptc_VOL 2_23-12-07_EL (1).pdf | ||
| 36C25726R0032 0002.docx | DOCX document | |
| PN 674A4-22-245_100ptc_VOL 2_23-12-07_MH.pdf | ||
| PN 674A4-22-245_100ptc_VOL 2_23-12-07_FA.pdf | ||
| 36C25726R0032 0001.docx | DOCX document | |
| Site visit sign in sheet 25_12_30.pdf | ||
| PN 674A4-22-245_100ptc_VOL 2_23-12-07_PL.pdf | ||
| Attachment 1 Drawings PN 674A4-22-245_100ptc_VOL 1_23-12-07.pdf | ||
| Attachment 3 09-16368 Waco Bldg. 17 Report.pdf | ||
| Attachment 2 Specs PN674A4-22-254_100ptc_SPECS_12-08.pdf | ||
| 36C25726R0032_2.docx | DOCX document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Solicitation No. 36C257XXXXX Attachment – Cost/Price Breakdown Worksheet | |||||
| DESCRIPTION | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| Division 01 - General Requirements | |||||
| $ | $ | $ | $ - 0 | ||
| $ | $ | $ | $ - 0 | ||
| $ | $ | $ | $ - 0 | ||
| $ | $ | $ | $ - 0 | ||
| $ | $ | $ | $ - 0 | ||
| $ | $ | $ | $ - 0 | ||
| $ | $ | $ | $ - 0 | ||
| $ | $ | $ | $ - 0 | ||
| $ | $ | $ | $ - 0 | ||
| $ | $ | $ | $ - 0 | ||
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 02 – Existing Conditions | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 03 – Concrete | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 04 – Masonry | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 05 - Metals | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 06- Wood and Plastic | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 07- Thermal and Moisture Protection | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 08- Openings (Doors and Windows) | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 09- Finishes | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 10- Specialties | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 11- Equipment | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 12- Furnishings | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 13- Special Construction | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 14- Conveying Equipment | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 21- Fire Suppression | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 22- Plumbing | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 23- Heating, Ventilating, and Air conditioning (HVAC) | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ - 0 | ||
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 25- Integrated Automation | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ - 0 | ||
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 26 Electrical | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 27- Communications | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 28- Electronic Safety and Security | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 31- Earthwork | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 32- Exterior Improvements | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 33- Utilities | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 34- Transportation | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 48- Electrical Power Generation | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Other (If applicable) | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Other Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL | |
| SUB TOTAL | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Overhead | $ | $ | $ | $ | $ |
| Profit | $ | $ | $ | $ | $ |
| Bonds and Insurance | $ | $ | $ | $ | $ |
| Total Proposal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
File details come from the government source that posted it. Updated .