These documents are plumbing design and demolition plans for Building 17 at the Department of Veterans Affairs (VA) facility located at 4800 Memorial Drive in Waco, Texas. The project involves comprehensive plumbing system renovations, including demolition of existing water heaters, piping, and fixtures across the basement and first level, followed by installation of new domestic water, sanitary sewer, and vent systems. Key components include two domestic hot water recirculation pumps (17-PP-1 and 17-PP-2), a steam domestic water heater (17-SDWH-1), a sump pump (17-SP-1), and an air compressor (17-COMP-1). The plumbing fixture schedule details replacement of various fixtures like water closets, urinals, sinks, electric water coolers, and emergency eye wash stations. The design emphasizes maintaining existing system functionality while upgrading infrastructure, with specific notes on providing backflow preventers, water hammer arrestors, and adhering to VA specifications for installation and penetration sealing.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25726R0032 0005.docx | DOCX document | |
| 36C25726R0032 0004_Consolidated Engineering Building 17.docx | DOCX document | |
| 36C25726R0032 0003.docx | DOCX document | |
| PN 674A4-22-245_100ptc_VOL 2_23-12-07_EL (1).pdf | ||
| 36C25726R0032 0002.docx | DOCX document | |
| PN 674A4-22-245_100ptc_VOL 2_23-12-07_FA.pdf | ||
| Site visit sign in sheet 25_12_30.pdf | ||
| PN 674A4-22-245_100ptc_VOL 2_23-12-07_MH.pdf | ||
| 36C25726R0032 0001.docx | DOCX document | |
| Attachment 1 Drawings PN 674A4-22-245_100ptc_VOL 1_23-12-07.pdf | ||
| Attachment 4 Itemized Cost Breakdown.xlsx | XLSX spreadsheet | |
| 36C25726R0032_2.docx | DOCX document | |
| Attachment 3 09-16368 Waco Bldg. 17 Report.pdf | ||
| Attachment 2 Specs PN674A4-22-254_100ptc_SPECS_12-08.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL PLUMBING SYMBOLS
DIRECTION OF PIPE PITCH (DOWN)
DIRECTION OF FLOW
GUIDE
ANCHOR
REDUCER OR INCREASER
ECCENTRIC REDUCER
TOP CONNECTION, 45° OR 90°
BOTTOM CONNECTION, 45° OR 90°
SIDE CONNECTION
CAPPED OUTLET
RISE OR DROP IN PIPE
UNION
PIPE UP
PIPE DOWN
POINT OF CONNECTION BETWEEN NEW
AND EXISTING WORK
LIMIT OF DEMOLITION
INVERTED BUCKET TRAP SET INCLUDING
PIPING ACCESSORIES
FLOAT & THERMOSTATIC TRAP SET
INCLUDING PIPING ACCESSORIES
STRAINER
THERMOMETER
PRESSURE GAGE
FLOW ELEMENT
WALL CLEAN OUT
CLEAN OUT
HOSE BIBB, FAUCET HEAD, SHOWER HEAD
WATER HAMMER ARRESTOR (PLAN VIEW)
FE
CO
MA
MV
LA
LV
OA
IA
D
SS
SD
SD
TWR
DWS
DWR
TWS
SS
SCW
FCW
NO
O
N
NG
NG
FOD
FOS
FOR
FOV
PLUMBING PIPING SYMBOLS
DOMESTIC COLD WATER, COLD WATER
DOMESTIC HOT WATER, HOT WATER
DOMESTIC HOT WATER RETURN
MEDICAL AIR
MEDICAL VACUUM
LABORATORY AIR
LABORATORY VACUUM
ORAL EVACUATION
INDUSTRIAL AIR
DRAIN
VENT (SANITARY)
SOIL, WASTE, OR SANITARY SEWER
SANITARY SEWER, BELOW GRADE
STORM WATER
STORM WATER, BELOW GRADE
SOFTEN COLD WATER
FILTERED COLD WATER
DRINKING WATER SUPPLY
DRINKING WATER RETURN
TEMPERED WATER RETURN
TEMPERED WATER SUPPLY
NITROUS OXIDE
OXYGEN
NITROGEN
NATURAL GAS
NATURAL GAS, BELOW GRADE
FUEL OIL DISCHARGE
FUEL OIL SUPPLY
FUEL OIL VENT
FUEL OIL RETURN
REAGENT WATER
REAGENT WATER RETURN
CORROSION RESISTANT SANITARY SEWER
CORROSION RESISTANT VENT (SANITARY)
GREASE WASTE
NEW PIPING
EXISTING PIPING
PIPE TO BE DEMOLISHED
FIXTURE OR EQUIPMENT TO BE DEMOLISHED
AV
PLUMBING VALVE SYMBOLS
GENERIC VALVE (REF SPEC FOR TYPE)
GENERIC VALVE WITH 3/4" HOSE ADAPTER
CHECK VALVE
ANGLE GLOBE VALVE
BUTTERFLY VALVE
BALL VALVE
CONTROL VALVE
THREE-WAY CONTROL VALVE
PRESSURE REGULATING VALVE
AUTOMATIC FLOW CONTROL VALVE
PRESSURE RELIEF VALVE
MANUAL AIR VENT
TEST PLUG (PRESSURE/TEMPERATURE)
AUTOMATIC AIR VENT
THERMOSTATIC MIXING VALVE
RWR
RW
V CRP
SS CRP
GW
P-###
H4
H7
A
DETAIL NUMBER
DRAWING NUMBER WHERE SHOWN
SECTION LETTER
TYPICAL FIXTURE NUMBER
DRAWING NUMBER WHERE DRAWN
DRAWING SYMBOLS
NEW FIXTURE/EQUIPMENT (SHAPE VARIES, REF: SYMBOLS,
TAGS, & NOTES. SCHEDULED ITEMS ARE NEW UNO)
(E) EXISTING COMPONENT
(X) DEMOLISHED COMPONENT
26-SF 3
TYPICAL EQUIPMENT NUMBER
## GENERAL EQUIPMENT FURNISHED BY OTHERS; REF PQ
SHEET SERIES FOR CONNECTION SCHEDULE
PLUMBING GENERAL NOTES
A. PIPING IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN A FURRED
CHASE OR ABOVE THE CEILING. REF SPECIFICATION 22 05 11.
B. REFER TO ARCHITECTURAL CEILING PLANS FOR CEILING TYPES IN EACH
SPACE. MINIMUM 18"X18" ACCESS PANELS ARE REQUIRED IN HARD CEILINGS
FOR VALVES, TRAPS, DAMPERS, CLEANOUTS, CONTROLS, AND SO FORTH.
COORDINATE FINAL LOCATIONS IN THE FIELD FOR BEST ACCESS. REF
SPECIFICATION 08 31 13.
C. PROVIDE ACOUSTICAL SEALANT PER SPECIFICATION 07 92 00 AT PIPE
PENETRATIONS THROUGH SOUND RATED PARTITIONS.
D. SUBMIT COMPLETE CONSOLIDATED AND COORDINATED SHOP DRAWINGS
FOR NEW SYSTEMS, AND FOR EXISTING SYSTEMS THAT ARE IN THE SAME
AREAS. DO NOT INSTALL EQUIPMENT FOUNDATIONS, EQUIPMENT, OR PIPING
UNTIL COORDINATION/SHOP DRAWINGS HAVE BEEN APPROVED. REF
SPECIFICATION 01 33 23 AND 22 05 11.
GENERAL NOTES
A. PROVIDE TEMPORARY CONSTRUCTION PARTITIONS AND INFECTION
CONTROL BARRIERS AS APPLICABLE AROUND THE PROJECT AREA
CONSISTENT WITH THE CONTRACTOR'S PHASING PLAN AS APPROVED BY
THE VHA. REFER TO SPECIFICATION 01 35 26.
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
SEE REVISION
SCHEDULE
R E
V
IS
IO
N
S C
H E
D U
L E
C :\R ev it
\2 2.
_M
E C
H -P
LU
M
_R
_H M al et z.
rv t
/7 /2
:5
8:
A M
P-001
PLUMBING ABBREVIATIONS,
SYMBOLS, & LEGENDS
CONSOLIDATE ENGINEERING
BLDG. 17
4800 MEMORIAL DR., WACO TX 76711
674A4-22-254
MR HM
100% CONSTRUCTION
DOCUMENTS
VEG 22.12
A
A/E ARCHITECT/ENGINEER
AD AREA DRAIN/ACCESS DOOR
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AG AIR GAP
AS AUTOMATIC SPRINKLER
ASD ADJUSTABLE SPEED DRIVES
ASD AUTOMATIC SPRINKLER DRAIN
ASHRAE AMERICAN SOCIETY OF HEATING, REFRIGERATION,
AND AIR CONDITIONING ENGINEERS
ASME AMERICAN SOCIETY OF MECHANCIAL ENGINEERS
ASPE AMERICAN SOCIETY OF PLUMBING ENGINEERS
AV ACID VENT
AW ACID WASTE
B
BAS BUILDING AUTOMATION SYSTEM
BFP REDUCED PRESSURE BACKFLOW PREVENTER
BHP BREAK HORSEPOWER
BOD BASIS OF DESIGN
BSP BLACK STEEL PIPE
BT BATHTUB
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
C
CA COMPRESSED AIR
CFM CUBIC FEET PER MINUTE
CGA COMPRESSED GAS ASSOCATION
CI CAST IRON
CO CLEANOUT
COMP COMPRESSOR
CRP CORROSION RESISTANT PIPE
CS CLINICAL SINK
CV CONTROL VALVE
D
DCW DOMESTIC COLD WATER
DEMO DEMOLISH
DFU DRAINAGE FIXTURE UNITS
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DI DEIONIZED WATER
DIV DIVISION
DN DOWN
DOE DEPARTMENT OF ENERGY
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING
DWH DOMESTIC WATER HEATER
DWR DRINKING WATER RETURN
DWS DRINKING WATER SUPPLY
DWV DRAIN WASTE VENT
E
EL ELEVATION
EMCS ENERGY MANAGEMENT CONTROL SYSTEM
EPA ENVIRONMENTAL PROTECTION AGENCY
EPACT ENERGY POLICY ACT
ESC ESCUTCHEON
ESH EMERGENCY SHOWER
ET EXPANSION TANK
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EWS EYE WASH STATION
EWS/SH EYE WASH/DRENCH SHOWER
EX EXISTING
F
F FARENHEIT
FCO FLOOR CLEANOUT
FCW FILTERED COLD WATER
FD FLOOR DRAIN
FDC FIRE DEPARTMENT (HOSE) CONNECTION
FM FLOW METER
FOP FUEL OIL PUMP
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOV FUEL OIL VENT
FS FLOOR SINK
FS FLOW SWITCH
FU FIXTURE UNITS
G
GAL GALLON
GCO GRADE CLEANOUT
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GRS GAS REGULATOR STATION
GT GREASE TRAP
GVTR GAS VENT THROUGH ROOF
GWB GYPSUM WALL BOARD
PLUMBING ABBREVIATIONS
GWH GAS FIRED WATER HEATER
H
HB HOSE BIB
HD HUB DRAIN
HP HORSEPOWER
HR HR
HS HAND SINK
HST HOT WATER STORAGE TANK (DOMESTIC)
HWB HOT WATER BOILER
HWCP HOT WATER CIRCULATING PUMP
HWP HOT WATER PUMP
HX HEAT EXCHANGER
HYD HYDRANT
I
ICW INDUSTRIAL COLD WATER
ID INSIDE DIAMETER
IE INVERT ELEVATION
IHW INDUSTRIAL HOT WATER
INV INVERT
IPC INTERNATIONAL PLUMBING CODE
IRW IRRIGATION WATER
IW INDIRECT WASTE
IWH INSTANTANEOUS WATER HEATER
IWR INDUSTRIAL WATER RETURN
IWS INDUSTRIAL WATER SUPPLY
K
KW KILOWATT
KWH KILOWATT-HOUR
L
LA LABORATORY AIR
LAV LAVATORY
LB POUND
LCW LABORATORY COLD WATER
LHW LABORATORY HOT WATER
LNG LIQUID NATURAL GAS
LOX LIQUID OXYGEN
LV LABORATORY VACUUM
LW LOW WATER
M
M METER
MA MEDICAL AIR
MAV MANUAL AIR VENT
MBH 1000 BTUH
MED MEDICAL
MER MECHANICAL EQUIPMENT ROOM
MFR MANUFACTURER
MH MANHOLE
MOU MEMORANDUM OF UNDERSTANDING
MSB MOP SERVICE BASIN
MV MEDICAL VACUUM
N
N2 NITROGEN
N2O NITROUS OXIDE
NC NORMALLY CLOSED
NG NATURAL GAS
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NOM NOMINAL
NPS NOMINAL PIPE SIZE
NPW NON POTABLE WATER
NTS NOT TO SCALE
O
O2 OXYGEN
OC ON CENTER
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OH OVER HEAD
OR OPERATING ROOM
OVFL OVERFLOW
P
P&ID PROCESS & INSTRUMENTATION DIAGRAM
PB PUSH BUTTON
PD PRESSURE DROP OR DIFFERENCE
PDI PLUMBING AND DRAINAGE INSTITUTE
PG PRESSURE GAUGE
PH PHASE
PLBG PLUMBING
PLUM PLUMBING
PP PLUMBING PUMP
PPM PARTS PER MILLION
PRS PRESSURE REDUCING STATION
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH ABSOLUTE
PSIG POUNDS PER SQUARE INCH GAGE
PTRV PRESSURE TEMPERATURE RELIEF VALVE
PW POTABLE WATER
R
RD ROOF DRAIN
RDL ROOF DRAIN LEADER
REF REFERENCE OR REFER TO
RH ROOF HYDRANT
RL ROOF LEADER
RO REVERSE OSMOSIS WATER
RP RECIRCULATION PUMP
RPZA REDUCED PRESSURE BACKFLOW PREVENTION
ASSEMBLY
RW REAGENT WATER
RWL RAIN WATER LEADER
RWR REAGENT WATER RETURN
S
SAN SANITARY SEWER
SCFM STANDARD CUBIC FEET PER MINUTE
SCW SOFTENED COLD WATER
SDMH STORM DRAIN MANHOLE
SIM SIMILAR
SMACNA SHEET METAL AND AIR CONDITIONING
CONTRACTORS NATIONAL ASSOCATION
SMH SANITARY MANHOLE
SP SUMP PUMP
SPR SPRINKLER LINE
SQFT/SF SQUARE FEET
SS SANITARY SEWER
SST STAINLESS STEEL
ST STORAGE TANK
SW STORM WATER
T
TCV TEMPERATURE CONTROL VALVE
TD TEMPERATURE DIFFERENCE
TD TRENCH DRAIN
TDH TOTAL DYNAMIC HEAD
TEMP TEMPERATURE
TMV THERMOSTATIC MIXING VALVE
TP TRAP PRIMER
TSTAT THERMOSTAT
TWR TEMPERED WATER RETURN
TWS TEMPERED WATER SUPPLY
TYP TYPICAL
U
UF UNDER FLOOR
UNO UNLESS NOTED OTHERWISE
UR URINAL
V
V VENT
VAC VACUUM OR VOLTAGE (AC)
VB VACUUM BREAKER
VCO VACUUM CLEANER OUTLET
VP VACUUM PUMP
VS VENT STACK
VSD VARIABLE SPEED DRIVE
VTR VENT THROUGH ROOF
W
W WASTE
WC WATER CLOSET
WCO WALL CLEANOUT
WG WATER GAGE
WH WALL HYDRANT
WH WATER HEATER
WHA WATER HAMMER ARRESTER
WL WATER LINE
WM WATER METER
WPD WATER PRESSURE DROP
WS WASTE STACK
WSFU WATER SUPPLY FIXTURE UNITS
X
XP EXPLOSION PROOF
Y
YCO YARD CLEANOUT
YH YARD HYDRANT
Number: Revision: Date:
0 100% CONSTRUCTION DOCUMENTS 12/08/2023
STEAM SUPPLY
PRV WHERE REQUIRED
(REF SCHEDULE)
VACUUM
BREAKER
(TYP)
ST-DS ASSEMBLY
(TYP)
DCW
LPR OUT (TYP)
DHWR
DHWR PUMP
NOTE 5
DHW
ET
ROUTE BYPASS
TO DRAIN
DIGITAL WATER
TEMPERATURE CONTROL
VALVE
TEMPORARY
CONNECTION
1.
2.
3.
4.
GENERAL NOTES:
THIN LINEWEIGHT PIPING AND COMPONENTS ARE FACTORY PRE-PIPED WITH WATER HEATER.
FIELD-PROVIDE THICK LINEWEIGHT PIPING AND COMPONENTS. CONNECT TO WATER HEATER
PACKAGE FACTORY CONNECTIONS.
COORDINATE WITH WATER HEATER MFR AND FIELD-PROVIDE COMPONENTS NOT FACTORY-
PROVIDED BY OTHER THAN BASIS OF DESIGN.
PROVIDE 120V POWER FOR DIGITAL WATER TEMPERATURE CONTROL VALVE AND STEAM
CONTROL VALVES. COORDINATE WITH MFR FOR REQUIREMENTS.
STEAM DOMESTIC
WATER HEATER (TYP)
STEAM CONTROL
VALVE (TYP)
5. REDUNDANT PUMP NOT SHOWN FOR CLARITY.
TO
REDUNDANT
DWHR PUMP
AV
AV
A. FOR ALL SCHEDULED EQUIPMENT, PROVIDE BASIS OF DESIGN OR APPROVED
EQUAL. REFER TO SPECIFICATIONS 01 33 23 AND 22 05 11 FOR FURTHER
REQUIREMENTS.
REMARKS:
1. REFER ALSO TO SPECIFICATION
SECTIONS 22 40 00 AND 22 13 00.
2. FIXTURES SHALL BE ACCESSIBLE
UNO. REFER TO GENERAL AND
ARCH PLANS FOR REQUIREMENTS.
3. PROVIDE LEGIONELLA WATER
FILTER.
4. PROVIDE FD-D, SQUARE FACE
MATCHING FAUCET COLOR.
REMARKS:
1. REFER ALSO TO SPECIFICATIONS:
A. 22 11 23 FOR DCW & DHW
PUMPS.
B. 22 13 29 FOR SW PUMPS.
C. 22 14 29 FOR SUMP PUMPS.
REMARKS:
1. REFER ALSO TO SPECIFICATION
SECTION 22 35 00
REMARKS:
1. REFER ALSO TO SPECIFICATION
SECTION 22 15 00.
2. PROVIDE COMPRESSED AIR
CONDENSATE OIL/WATER
SEPARATOR CAPABLE OF
REDUCING CONDENSATE OIL
CONTENT TO AT MOST 40 PARTS
PER MILLION.
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
SEE REVISION
SCHEDULE
R E
V
IS
IO
N
S C
H E
D U
L E
C :\R ev it
\2 2.
_M
E C
H -P
LU
M
_R
_H M al et z.
rv t
/7 /2
:5
9:
A M
PQ601
EQUIPMENT & FIXTURE
SCHEDULES
CONSOLIDATE ENGINEERING
BLDG. 17
4800 MEMORIAL DR., WACO TX 76711
674A4-22-254
MR HM
100% CONSTRUCTION
DOCUMENTS
VEG 22.12
PLUMBING FIXTURE SCHEDULE
MARK DESCRIPTION
DCW
CONNECTION
(NPS)
DHW
CONNECTION
(NPS)
SS
CONNECTION
(NPS)
VENT
CONNECTION
(NPS) REMARKS
FD-D3 FLOOR DRAIN, 6" FOR MEMBRANE FLOOR - - 3 1 1/2 <varies>
FD-E FLOOR DRAIN, 9" FOR VINYL FLOOR - - 3 1 1/2 1, 2
FD-M3 FLOOR DRAIN, 7" WITH HUB FUNNEL - - 3 1 1/2 1
P-103 WC, WALL MOUNT, FLUSH VALVE 1 - 4 2 1, 2
P-201 UR, WALL MOUNT, NON-ACCESSIBLE 3/4 - 2 1 1/2 1, 2
P-417 1 COMPARTMENT SINK, WALL HUNG 1/2 1/2 3 1 1/2 1, 2
P-501 1 COMPARTMENT SINK, WALL HUNG 1/2 1/2 3 1 1/2 1, 2
P-502 MOP SERVICE SINK, FLOOR MOUNT 1/2 1/2 3 1 1/2 1, 2
P-516 SINK, 1 COMPARTMENT, CRS 1/2 1/2 1-1/2 1 1/2 1, 2
P-524 SINK, 2 COMPARTMENT, COUNTER MOUNT 1/2 1/2 1-1/2 1 1/2 1, 2
P-609 EWC, DUAL HEIGHT, RECESSED REFRIGERATION 1/2 - 1 1/2 1 1/2 1, 2
P-701 SHOWER BATH FIXTURE, DETACHABLE HOSE SPRAY 1/2 1/2 2 1 1/2 1, 2, 3, 4
P-708 EMERGENCY EYE AND FACE WASH, WALL MOUNT 3/4 3/4 - - 1, 2
P-801 WALL HYDRANT, NON-FREEZE, DETACHABLE T-HANDLE 1/2 - - - 1,2
P-812 WATER SUPPLY OUTLET BOX 1/2 - - - 1, 2
PLUMBING PUMP (PP) SCHEDULE
MARK LOCATION
AREA AND/OR BLDG
SERVED SYSTEM PUMP TYPE FLUID GPM
HEAD
(FT WG)
FLUID
TEMP
(°F)
MIN %
EFF
ELECTRICAL/MOTOR DATA
BOD MFR AND
MODEL
REMARKSHP VAC PH
MAX
RPM CONTROL
17-PP-1 BASEMENT BLDG 17 DHW RECIRCULATION INLINE WATER 10.5 6.8 140 45 1 1/2 208 3 1800 VSD
BELL & GOSSETT
PD40
17-PP-2 BASEMENT BLDG 17 DHW RECIRCULATION INLINE WATER 10.5 6.8 140 45 1 1/2 208 3 1800 VSD
BELL & GOSSETT
PD40
17-SP-1 BASEMENT BLDG 17 SUMP INLINE WATER 61 25 140 45 3/4 208 3 1800 AUTOMATIC BOESCH BC 1
STEAM DOMESTIC WATER HEATER (SDWH) SCHEDULE
MARK LOCATION
SYSTEM AND/OR
SERVICE
FLOW (GPM)
TEMPERATU
RE RISE (F)
STEAM PRESSURE (PSIG)
STEAM
LB/HR
STEAM
TRAP MARK
ELECTRICAL DATA
BASIS OF
DESIGN
REMARKS
ENTERING
CONTROL
VALVE
ENTERING
HX VAC PH MCA MOCP
17-SDWH-1 BASEMENT BLDG 17 44 80 15 10 1846 ST-3 120 1 1 15
ARMSTRONG
535PP-PR
AIR COMPRESSOR (COMP) SCHEDULE
MARK LOCATION SYSTEM SCFM
OUTLET
PRESSURE
(PSIG)
SETPOINT
DEADBAND
(PSIG)
RECEIVER SIZE
(GAL)
ELECTRICAL/MOTOR DATA
BOD MFR
AND MODEL
REMARKSHP VAC PH
17-COMP-1 BASEMENT
ENGINEERING
SHOPS
51 90 175 120 15 208 3
INGERSOLL
RAND
7100E15 1, 2
NTS
DUAL STEAM TO HOT WATER HEAT EXCHANGER
F8
A. REFER TO P-001 FOR PLUMBING SYMBOLS, ABBREVIATIONS, AND GENERAL
NOTES.
B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE
VHA COR BEFORE PROCEEDING WITH WORK.
C. REFER TO GI SHEET SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED
LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP
PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE
SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL
PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN
SHALL GOVERN.
D. REFER TO SPECIFICATIONS 01 00 00 AND 23 05 11 FOR SELECTIVE
DEMOLITION AND REPAIR REQUIREMENTS. PATCH OPENINGS REMAINING IN
EXISTING CONSTRUCTION FOLLOWING DEMOLITION OF PENETRATIONS NOT
REPLACED IN KIND. MATCH AESTHETICS AND LIFE SAFETY RATINGS OF THE
SURROUNDING CONSTRUCTION. ENGAGE LICENSED AND SITE-APPROVED
ROOFING CONTRACTOR TO PATCH AND SEAL WHERE ITEMS ARE REMOVED
THROUGH THE EXISTING ROOF. MAINTAIN EXISTING WARRANTIES.
E. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT
PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING
HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED IN
ACCORDANCE WITH THE SPECIFICATIONS.
F. REFER TO GC SHEET SERIES FOR PROJECT PHASING PLAN AND NARRATIVE.
G. PROVIDE SERVICE VALVES AT LIMITS OF DEMOLITION. CAP ENDS WHERE
NOT RECONNECTED IN NEW WORK. EXISTING SYSTEMS SHALL REMAIN IN
SERVICE FOLLOWING DEMOLITION.
H. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS OH UNO:
a. DOMESTIC WATER
b. MED GAS
c. STORM DRAINAGE
d. VENTS
I. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS UF UNO:
a. SANITARY SEWER
A
21 3 4 5 6 7 8 9 10 11 12
A'
B'
C'
D'
1' 2' 3' 4'
A'''
A''
8"ø SS
4" ø
S S
4"ø SS 1"ø DHW
1"ø SS
2" ø
D C
W 1" ø D
H W
(E) 2"ø DCW
4" ø
S S
4" ø
S S
2"ø SS
2"ø SS
4"ø SS
4"ø SS
2"ø SS
4"ø SS
2" ø
V E
N T
4" ø
S S
3"ø SS
1/
2" ø
S S
3"ø SS
2"ø DHW
1" ø
D H
W
1" ø
D H
W
1" ø
D H
W
WH-1
WH-3
WH-2
WH-4
/F1 PD111/F1 PD111
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
KEY PLAN
GENERAL NOTES
SHEET KEYNOTES
P la n N or th
True North
NORTH
BLDG 17
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
SEE REVISION
SCHEDULE
R E
V
IS
IO
N
S C
H E
D U
L E
C :\R ev it
\2 2.
_M
E C
H -P
LU
M
_R
_H M al et z.
rv t
/7 /2
:5
8:
A M
PD110
DEMOLITION PLANS - BASEMENT
NORTH
CONSOLIDATE ENGINEERING
BLDG. 17
4800 MEMORIAL DR., WACO TX 76711
674A4-22-254
MR HM
100% CONSTRUCTION
DOCUMENTS
VEG 22.12
3/16" = 1'-0"
DEMOLITION PLANS - BASEMENT NORTH
F1
1. DEMOLISH EXISTING WATER HEATERS AND ASSOCIATED PLUMBING PIPING
TYP.
2. REFER TO CIVIL SHEETS FOR DCW CONTINUATION.
3. EXISTING PLUMBING PIPING EXTENDS THROUGHOUT CRAWLSPACE.
CONTRACTOR SHALL REMOVE PIPING FROM THIS POINT TO FIXTURES ON
THE FLOOR ABOVE.
4. PLUMBING PIPING LOCATED IN CRAWLSPACE.
A
B
C
D
21 3 4 5 6 7 8 9 10 11 12
A'
1' 2' 3' 4'
A''
1"ø DHW
2"ø DCW
2" ø
D C
W
(E) 6"ø SD
3/4"ø DHW
2"ø DCW
3/ 4" ø D
H W
3/ 4" ø D
H W
3/ 4" ø D
C W
2" ø
S S
4"ø SS4"ø SS
/F1 PD110 /F1 PD110
2 2
A. REFER TO P-001 FOR PLUMBING SYMBOLS, ABBREVIATIONS, AND GENERAL
NOTES.
B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE
VHA COR BEFORE PROCEEDING WITH WORK.
C. REFER TO GI SHEET SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED
LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP
PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE
SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL
PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN
SHALL GOVERN.
D. REFER TO SPECIFICATIONS 01 00 00 AND 23 05 11 FOR SELECTIVE
DEMOLITION AND REPAIR REQUIREMENTS. PATCH OPENINGS REMAINING IN
EXISTING CONSTRUCTION FOLLOWING DEMOLITION OF PENETRATIONS NOT
REPLACED IN KIND. MATCH AESTHETICS AND LIFE SAFETY RATINGS OF THE
SURROUNDING CONSTRUCTION. ENGAGE LICENSED AND SITE-APPROVED
ROOFING CONTRACTOR TO PATCH AND SEAL WHERE ITEMS ARE REMOVED
THROUGH THE EXISTING ROOF. MAINTAIN EXISTING WARRANTIES.
E. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT
PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING
HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED IN
ACCORDANCE WITH THE SPECIFICATIONS.
F. REFER TO GC SHEET SERIES FOR PROJECT PHASING PLAN AND NARRATIVE.
G. PROVIDE SERVICE VALVES AT LIMITS OF DEMOLITION. CAP ENDS WHERE
NOT RECONNECTED IN NEW WORK. EXISTING SYSTEMS SHALL REMAIN IN
SERVICE FOLLOWING DEMOLITION.
H. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS OH UNO:
a. DOMESTIC WATER
b. MED GAS
c. STORM DRAINAGE
d. VENTS
I. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS UF UNO:
a. SANITARY SEWER
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
KEY PLAN
GENERAL NOTES
SHEET KEYNOTES
P la n N or th
True North
SOUTH
BLDG 17
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
SEE REVISION
SCHEDULE
R E
V
IS
IO
N
S C
H E
D U
L E
C :\R ev it
\2 2.
_M
E C
H -P
LU
M
_R
_H M al et z.
rv t
/7 /2
:5
8:
A M
PD111
DEMOLITION PLANS - BASEMENT
SOUTH
CONSOLIDATE ENGINEERING
BLDG. 17
4800 MEMORIAL DR., WACO TX 76711
674A4-22-254
MR HM
100% CONSTRUCTION
DOCUMENTS
VEG 22.12
3/16" = 1'-0"
DEMOLITION PLANS - BASEMENT - SOUTH
F1
1. DEMOLISH PLUMBING FIXTURE AND ALL ASSOCIATED PLUMBING BACK TO
MAIN.
2. EXISTING PLUMBING PIPING EXTENDS THROUGHOUT CRAWLSPACE.
CONTRACTOR SHALL REMOVE PIPING FROM THIS POINT TO FIXTURES ON
THE FLOOR ABOVE.
3. CAP 4" SANITARY SEWER TO EXISTING RESTROOMS AT TEE.
B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE
VHA COR BEFORE PROCEEDING WITH WORK.
C. REFER TO GI SHEET SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED
LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP
PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE
SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL
PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN
SHALL GOVERN.
D. REFER TO SPECIFICATIONS 01 00 00 AND 23 05 11 FOR SELECTIVE
DEMOLITION AND REPAIR REQUIREMENTS. PATCH OPENINGS REMAINING IN
EXISTING CONSTRUCTION FOLLOWING DEMOLITION OF PENETRATIONS NOT
REPLACED IN KIND. MATCH AESTHETICS AND LIFE SAFETY RATINGS OF THE
SURROUNDING CONSTRUCTION. ENGAGE LICENSED AND SITE-APPROVED
ROOFING CONTRACTOR TO PATCH AND SEAL WHERE ITEMS ARE REMOVED
THROUGH THE EXISTING ROOF. MAINTAIN EXISTING WARRANTIES.
E. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT
PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING
HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED IN
ACCORDANCE WITH THE SPECIFICATIONS.
F. REFER TO GC SHEET SERIES FOR PROJECT PHASING PLAN AND NARRATIVE.
G. PROVIDE SERVICE VALVES AT LIMITS OF DEMOLITION. CAP ENDS WHERE
NOT RECONNECTED IN NEW WORK. EXISTING SYSTEMS SHALL REMAIN IN
SERVICE FOLLOWING DEMOLITION.
H. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS OH UNO:
a. DOMESTIC WATER
b. MED GAS
c. STORM DRAINAGE
d. VENTS
I. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS UF UNO:
a. SANITARY SEWER
A
21 3 4 5 6 7 8 9 10 11 12
A'
B'
C'
D'
1' 2' 3' 4'
A'''
A''
/F1 PD113 /F1 PD113
4"ø VENT 4"ø SS 4"ø SS
4"ø VENT
1"ø DHW
1"ø SS
1"ø SS1
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
KEY PLAN
GENERAL NOTES
SHEET KEYNOTES
P la n N or th
True North
NORTH
BLDG 17
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
SEE REVISION
SCHEDULE
R E
V
IS
IO
N
S C
H E
D U
L E
C :\R ev it
\2 2.
_M
E C
H -P
LU
M
_R
_H M al et z.
rv t
/7 /2
:5
8:
A M
PD112
DEMOLITION PLANS - LEVEL 1
NORTH
CONSOLIDATE ENGINEERING
BLDG. 17
4800 MEMORIAL DR., WACO TX 76711
674A4-22-254
MR HM
100% CONSTRUCTION
DOCUMENTS
VEG 22.12
1. DEMOLISH PLUMBING FIXTURES AND ASSOCIATED PLUMBING BACK TO
ACTIVE MAIN.
3/16" = 1'-0"
DEMOLITION PLANS - LEVEL 1 - NORTH
F1
B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE
VHA COR BEFORE PROCEEDING WITH WORK.
C. REFER TO GI SHEET SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED
LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP
PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE
SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL
PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN
SHALL GOVERN.
D. REFER TO SPECIFICATIONS 01 00 00 AND 23 05 11 FOR SELECTIVE
DEMOLITION AND REPAIR REQUIREMENTS. PATCH OPENINGS REMAINING IN
EXISTING CONSTRUCTION FOLLOWING DEMOLITION OF PENETRATIONS NOT
REPLACED IN KIND. MATCH AESTHETICS AND LIFE SAFETY RATINGS OF THE
SURROUNDING CONSTRUCTION. ENGAGE LICENSED AND SITE-APPROVED
ROOFING CONTRACTOR TO PATCH AND SEAL WHERE ITEMS ARE REMOVED
THROUGH THE EXISTING ROOF. MAINTAIN EXISTING WARRANTIES.
E. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT
PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING
HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED IN
ACCORDANCE WITH THE SPECIFICATIONS.
F. REFER TO GC SHEET SERIES FOR PROJECT PHASING PLAN AND NARRATIVE.
G. PROVIDE SERVICE VALVES AT LIMITS OF DEMOLITION. CAP ENDS WHERE
NOT RECONNECTED IN NEW WORK. EXISTING SYSTEMS SHALL REMAIN IN
SERVICE FOLLOWING DEMOLITION.
H. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS OH UNO:
a. DOMESTIC WATER
b. MED GAS
c. STORM DRAINAGE
d. VENTS
I. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS UF UNO:
a. SANITARY SEWER
A
B
C
D
21 3 4 5 6 7 8 9 10 11 12
A'
1' 2' 3' 4'
A''
/F1 PD112 /F1 PD112
2" ø
V E
N T
2"ø SS
3/4"ø DHW
2"ø DCW
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
KEY PLAN
GENERAL NOTES
SHEET KEYNOTES
P la n N or th
True North
SOUTH
BLDG 17
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
SEE REVISION
SCHEDULE
R E
V
IS
IO
N
S C
H E
D U
L E
C :\R ev it
\2 2.
_M
E C
H -P
LU
M
_R
_H M al et z.
rv t
/7 /2
:5
9:
A M
PD113
DEMOLITION PLANS - LEVEL 1
SOUTH
CONSOLIDATE ENGINEERING
BLDG. 17
4800 MEMORIAL DR., WACO TX 76711
674A4-22-254
MR HM
100% CONSTRUCTION
DOCUMENTS
VEG 22.12
3/16" = 1'-0"
DEMOLITION PLANS - LEVEL 1 - SOUTH
F1
1. DEMOLISH PLUMBING FIXTURE AND ALL ASSOCIATED PLUMBING BACK TO
MAIN.
21 3 4 5 6 7 8 9 10 11 12
A'
B'
C'
D'
1' 2' 3' 4'
A'''
A''
17-SP-1
1/
2" ø
D H
W
3" ø
D C
W
2"ø DCW
2"ø DCW
2" ø
D C
W
1"ø DHWR
1" ø
D C
W
1"ø DCW
/F1 PP111 /F1 PP111
1/2"ø DCW
A. REFER TO P-001 FOR PLUMBING SYMBOLS, ABBREVIATIONS, AND GENERAL
NOTES.
B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE
VHA COR BEFORE PROCEEDING WITH WORK.
C. REFER TO GI-SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED
LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP
PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE
SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL
PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN
SHALL GOVERN.
D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT
PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING
HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED IN
ACCORDANCE WITH THE SPECIFICATIONS.
E. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS OH UNO:
a. DOMESTIC WATER
b. MED GAS
c. STORM DRAINAGE
d. VENTS
F. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS UF UNO:
a. SANITARY SEWER
b. STORM DRAINAGE
G. MAINTAIN A MINIMUM 2' CLEARANCE OF PLUMBING EQUIPMENT AND
PLUMBING PIPING FROM INSTALLED CEILING MOUNTED OVERHEAD FANS.
H. REFER TO SPECIFICATION 22 05 23 FOR PLUMBING VALVES.
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
KEY PLAN
GENERAL NOTES
SHEET KEYNOTES
P la n N or th
True North
NORTH
BLDG 17
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
SEE REVISION
SCHEDULE
R E
V
IS
IO
N
S C
H E
D U
L E
C :\R ev it
\2 2.
_M
E C
H -P
LU
M
_R
_H M al et z.
rv t
/7 /2
:5
9:
A M
PP110
DOMESTIC WATER PLANS -
BASEMENT NORTH
CONSOLIDATE ENGINEERING
BLDG. 17
4800 MEMORIAL DR., WACO TX 76711
674A4-22-254
MR HM
100% CONSTRUCTION
DOCUMENTS
VEG 22.12
1. CONNECT TO EXISTING DCW PLUMBING FROM MAIN. PLUMBING SHOWN
EXTERIOR TO THE BUILDING IS FOR REFERENCE.
2. EXTERIOR HOSE BIBB WATER SERVICE.
3. PLUMBING PIPING LOCATED IN CRAWLSPACE.
4. PROVIDE SUMP PUMP. REFER TO SPECIFICATION 22 14 29 AND MQ SERIES
SHEETS.
5. PROVIDE BACKFLOW PREVENTERS IN PLUMBING PIPING WHERE REQUIRED
IN SPECIFICATION 22 05 23.
3/16" = 1'-0"
DOMESTIC PLANS - BASEMENT - NORTH
F1
B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE
VHA COR BEFORE PROCEEDING WITH WORK.
C. REFER TO GI-SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED
LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP
PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE
SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL
PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN
SHALL GOVERN.
D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT
PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING
HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED IN
ACCORDANCE WITH THE SPECIFICATIONS.
E. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS OH UNO:
a. DOMESTIC WATER
b. MED GAS
c. STORM DRAINAGE
d. VENTS
F. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS UF UNO:
a. SANITARY SEWER
b. STORM DRAINAGE
G. MAINTAIN A MINIMUM 2' CLEARANCE OF PLUMBING EQUIPMENT AND
PLUMBING PIPING FROM INSTALLED CEILING MOUNTED OVERHEAD FANS.
H. REFER TO SPECIFICATION 22 05 23 FOR PLUMBING VALVES.
A
B
C
D
21 3 4 5 6 7 8 9 10 11 12
A'
1' 2' 3' 4'
A''
17-SDWH-1
17-PP-1
17-PP-2
2" ø
D C
W
3/4"ø DHWR 1 1/4"ø DHW 1 1/2"ø DCW
BASEMENT
MECHANICAL
3/4"ø DHWR
1 1/4"ø DHW
1 1/2"ø DCW
1 1/4"ø DCW 1 1/4"ø DHW
2"ø DCW1 1/2"ø DHW
1 1/4"ø DCW
/F1 PP110 /F1 PP110
1"ø DCW
1"ø DCW
1"ø DHWR
1/2"ø DCW
1/2"ø DCW
1/2"ø DCW
1" ø
D H
W R
1 1/4"ø CA
17-COMP-1
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
KEY PLAN
GENERAL NOTES
SHEET KEYNOTES
P la n N or th
True North
SOUTH
BLDG 17
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
SEE REVISION
SCHEDULE
R E
V
IS
IO
N
S C
H E
D U
L E
C :\R ev it
\2 2.
_M
E C
H -P
LU
M
_R
_H M al et z.
rv t
/7 /2
:5
9:
A M
PP111
DOMESTIC WATER PLANS -
BASEMENT SOUTH
CONSOLIDATE ENGINEERING
BLDG. 17
4800 MEMORIAL DR., WACO TX 76711
674A4-22-254
MR HM
100% CONSTRUCTION
DOCUMENTS
VEG 22.12
3/16" = 1'-0"
DOMESTIC PLANS - BASEMENT - SOUTH
F1
1. EXTERIOR HOSE BIBB WATER SERVICE.
2. ALSO REFER TO DETAIL ON PQ SERIES SHEETS.
3. PROVIDE DCW MAKE UP WITH BACKFLOW PREVENTER TO MECHANICAL
SYSTEMS. REFER TO MECHANICAL.
4. PROVIDE AUTOMATIC FLOW CONTROL DEVICE.
B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE
VHA COR BEFORE PROCEEDING WITH WORK.
C. REFER TO GI-SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED
LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP
PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE
SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL
PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN
SHALL GOVERN.
D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT
PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING
HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED IN
ACCORDANCE WITH THE SPECIFICATIONS.
E. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS OH UNO:
a. DOMESTIC WATER
b. MED GAS
c. STORM DRAINAGE
d. VENTS
F. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS UF UNO:
a. SANITARY SEWER
b. STORM DRAINAGE
G. MAINTAIN A MINIMUM 2' CLEARANCE OF PLUMBING EQUIPMENT AND
PLUMBING PIPING FROM INSTALLED CEILING MOUNTED OVERHEAD FANS.
H. REFER TO SPECIFICATION 22 05 23 FOR PLUMBING VALVES.
A
21 3 4 5 6 7 8 9 10 11 12
A'
B'
C'
D'
1' 2' 3' 4'
A'''
A''
OPEN OFFICE
OFFICE
OFFICE
WAITING
WEST ENTRY
CONFERENCE ROOM
OFFICE
OFFICE
OFFICE
INTERIOR DESIGN
OFFICE
OFFICE124
WAITING
LOCKSMITH
LOCKSMITH
OFFICE
OFFICE
OFFICE
RECEPTION
VISITOR TOILET
OFFICE
CONFERENCE ROOM
RECEPTION
C04
CORRIDOR
C01
CORRIDOR
C01
CORRIDOR
C03A
CORRIDOR
PLAN ROOM
BREAK / TRAINING
ROOM
IT ROOM
STORAGE
HAC
OFFICE
STAFF TOILET
ELECTRICAL
STORAGE
BREAK ROOM
WOMENS TOILET
MENS TOILET
C06
CORRIDOR
136B
MENS SHOWER
C02
CORRIDOR
P-103
P-103
P-501 P-103
P-103
P-501
P-502
P-502
P-524
136A
MENS LOCKERS
P-417
P-417
P-701 P-103
INTERIOR DESIGN
LIBRARY
HAC
2"ø DHW
112A
ENGINEERING
TECHNICIAN OFFICE
KITCHEN
132A
ENTRYWAY
132B
ENTRYWAY
135B
WOMENS SHOWER
C05B
CORRIDOR
ELECTRICAL ROOM
P-103
P-417
P-417
3/ 4" ø D
C W
P-609
P-201 P-201 P-201
P-609
1 1/4"ø DHW
C03C
CORRIDOR
C03B
CORRIDOR
P-524
P-201
135A
WOMENS LOCKERS
1" ø
D H
W R
2 1/2"ø DCW
3/4"ø DHW 1 1/2"ø DCW
1 1/2"ø DCW
1 1/2"ø DHW 2"ø DCW
1"ø DHWR 1 1/2"ø DHW
2"ø DCW
1 1/2"ø DCW
1"ø DCW
1"ø DCW
3/4"ø DHW
1 1/4"ø DCW
1/
4" ø
D C
W
P-801
P-801
P-801
/F1 PP113 /F1 PP113
P-812
P-812
FD-M3
FD-M3
P-812
P-801
P-801
TYP
FD-D3
FD-D3
FD-D3
1"ø DCW
1 1/4"ø DHW
P-701
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
KEY PLAN
GENERAL NOTES
SHEET KEYNOTES
P la n N or th
True North
NORTH
BLDG 17
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
SEE REVISION
SCHEDULE
R E
V
IS
IO
N
S C
H E
D U
L E
C :\R ev it
\2 2.
_M
E C
H -P
LU
M
_R
_H M al et z.
rv t
/7 /2
:5
9:
A M
PP112
DOMESTIC WATER PLANS - LEVEL
1 NORTH
CONSOLIDATE ENGINEERING
BLDG. 17
4800 MEMORIAL DR., WACO TX 76711
674A4-22-254
MR HM
100% CONSTRUCTION
DOCUMENTS
VEG 22.12
3/16" = 1'-0"
DOMESTIC PLANS - LEVEL 1 - NORTH
F1
1. DHWR RISER DOWN TO BASEMENT.
2. 2 1/2" DCW AND 2" DHW RISER MAINS UP FROM BASEMENT.
3. PROVIDE BALL VALVE AND 3/8" NIPPLE, OR MANUFACTURER REQUIRED
SIZE, AND EXTEND TO ICE MACHINE, REFRIGERATOR, AND COFFEE
MAKERS.
4. PROVIDE NEW WATER HAMMER ARRESTOR FOR DCW. REFER TO PK
SERIES SHEET FOR DETAIL. SEE ARCHITECTURAL PLAN FOR ACCESS
PANEL AND FINISH.
5. PROVIDE THERMOSTATIC MIXING VALVE TO PLUMBING FIXTURES UTILIZING
DHW. REFER TO SPECIFICATION 22 05 23.
B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE
VHA COR BEFORE PROCEEDING WITH WORK.
C. REFER TO GI-SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED
LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP
PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE
SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL
PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN
SHALL GOVERN.
D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT
PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING
HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED IN
ACCORDANCE WITH THE SPECIFICATIONS.
E. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS OH UNO:
a. DOMESTIC WATER
b. MED GAS
c. STORM DRAINAGE
d. VENTS
F. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS UF UNO:
a. SANITARY SEWER
b. STORM DRAINAGE
G. MAINTAIN A MINIMUM 2' CLEARANCE OF PLUMBING EQUIPMENT AND
PLUMBING PIPING FROM INSTALLED CEILING MOUNTED OVERHEAD FANS.
H. REFER TO SPECIFICATION 22 05 23 FOR PLUMBING VALVES.
A
B
C
D
21 3 4 5 6 7 8 9 10 11 12
A'
1' 2' 3' 4'
A''
PLAN ROOM
HVAC / PLUMBING
SHOP
RECEIVING
CARPENTRY SHOP
WELDING SHOP
148B
WELDING
FIRE RISER
148A
WELDING STORAGE
142A
OFFICE
144A
OFFICE
C05A
CORRIDOR
C05A
CORRIDOR
ELECTRICAL SHOP
142B
HVAC/PLUMBING
STORAGE
144B
CARPENTRY
STORAGE
P-708 P-516
P-516 P-516
P-708 P-801
P-801
P-801
/F1 PP112 /F1 PP112
P-801
FD-E
FD-E
1 1/4"ø CA
1/ 2" ø C
A
1 1/4"ø CA
1/ 2" ø C
A
1/ 2" ø C
A
1 1/4"ø CA
1 1/4"ø CA
1/ 2" ø C
A
1/ 2" ø C
A
1/ 2" ø C
A 1/
2" ø
C A
1/ 2" ø C
A
1 1/4"ø CA
1/2"ø CA
1/2"ø CA
1/2"ø CA
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
KEY PLAN
GENERAL NOTES
SHEET KEYNOTES
P la n N or th
True North
SOUTH
BLDG 17
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
SEE REVISION
SCHEDULE
R E
V
IS
IO
N
S C
H E
D U
L E
C :\R ev it
\2 2.
_M
E C
H -P
LU
M
_R
_H M al et z.
rv t
/7 /2
:5
9:
A M
PP113
DOMESTIC WATER PLANS - LEVEL
1 SOUTH
CONSOLIDATE ENGINEERING
BLDG. 17
4800 MEMORIAL DR., WACO TX 76711
674A4-22-254
MR HM
100% CONSTRUCTION
DOCUMENTS
VEG 22.12
3/16" = 1'-0"
DOMESTIC PLANS - LEVEL 1 - SOUTH
F1
P-501
P-417
P-103
P-103
P-103
P-417
P-502
P-524
P-502
P-103
P-201
P-103
P-103
P-201
P-201 P-201
P-417
P-609 P-524
P-609
2" ø
D H
W 3" ø D
C W
2 1/2"ø DHW
3"ø DCW
2"ø DCW
2"ø DHW
2"ø DCW
1 1/2"ø DHW
1 1/2"ø DHW
1 1/2"ø DCW
3/4"ø DHW
1 1/4"ø DCW 1"ø DCW
1 1/4"ø DHW
2"ø DCW
P-417
1 1/2"ø DHW
2"ø DCW
1"ø DHWR
2"ø DHW
2 1/2"ø DCW
FD-E
P-516
P-708
P-516
FD-E
P-708
P-516
P-801
1" ø
D C
W
1"ø DCW
1"ø DCW
P-801
1/ 2" ø D
C W
1"ø DCW
P-801
1/ 2" ø D
C W
1 1/2"ø DCW3/4"ø DHWR 1 1/4"ø DHW
1 1/2"ø DCW
1 1/2"ø DCW
1"ø DHWR
1 1/2"ø DHW2"ø DCW
3/4"ø DHW
1"ø DCW
FD-D3
FD-M3
1"ø DCW
1 1/4"ø DCW
1 1/2"ø DCW
2"ø DCW
1"ø DCW 1 1/2"ø DCW
3/4"ø DHWR
1 1/4"ø DHW
P-801
P-701
P-801
P-701
FD-D3
P-812
FD-M3
P-812
P-812
P-801
FD-D3
P-801
(E) 2"ø DCW
17-SDWH-1
P-801
P-701
P-801
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
SEE REVISION
SCHEDULE
R E
V
IS
IO
N
S C
H E
D U
L E
C :\R ev it
\2 2.
_M
E C
H -P
LU
M
_R
_H M al et z.
rv t
/7 /2
:5
9:
A M
PP601
DOMESTIC WATER RISER DIAGRAM CONSOLIDATE ENGINEERING
BLDG. 17
4800 MEMORIAL DR., WACO TX 76711
674A4-22-254
MR HM
100% CONSTRUCTION
DOCUMENTS
VEG 22.12
A. ISOMETRIC VIEWS ARE INTENDED TO DEPICT GENERAL 3-DIMENSIONAL
ARRANGMENT OF MAJOR MECHANICAL COMPONENTS FOR VISUAL
REFERENCE ONLY. NOT ALL ITEMS (EG PLUMBING, PIPING, ELECTRICAL,
STRUCTURAL, ETC) IN THE AREA MAY BE SHOWN. REFER TO PLAN VIEWS
FOR SIZES AND OTHER SCOPE DETAILS.
NTS
DOMESTIC WATER RISER DIAGRAM
F1
CONFERENCE ROOM
OFFICE
OFFICE
OFFICE
OFFICE
INTERIOR DESIGN
OFFICE
ELECTRICAL
STORAGE
BREAK ROOM
C06
CORRIDOR
WOMENS TOILET
MENS TOILET
PLAN ROOM
INTERIOR DESIGN
LIBRARY
VISITOR TOILET
RECEPTION
LOCKSMITH
OFFICE
OFFICE
OFFICE
OFFICE
C04
CORRIDOR
CONFERENCE ROOM
OPEN OFFICE
OFFICE
OFFICE
WAITING
WEST ENTRY
STAFF TOILET
C03A
CORRIDOR
BREAK / TRAINING
ROOM
STORAGE
IT ROOM
ELECTRICAL ROOM
C01
CORRIDOR
C01
CORRIDOR
136B
MENS SHOWER
WAITING
RECEPTION
OFFICE
HAC
P-501
P-502
P-524
P-103
P-103
136A
MENS LOCKERS
P-502
P-103
P-501
P-103
P-417
P-103
P-701
A
21 3 4 5 6 7 8 9 10 11 12
A'
B'
C'
D'
1' 2' 3' 4'
A'''
A''
P-103 P-201 P-201
P-201
P-417
KITCHEN
132B
ENTRYWAY
135B
WOMENS SHOWER
112A
ENGINEERING
TECHNICIAN OFFICE
C02
CORRIDOR
C03B
CORRIDOR
C03C
CORRIDOR
C05B
CORRIDOR131
HAC
132A
ENTRYWAY
2"ø SS
4" ø
S S
4"ø SS
3" ø
S S
P-201
P-417 P-417 wco
P-609
2"ø VENT
2"ø VENT
1 1/2"ø VENT
3"ø VENT
1 1/2"ø VENT
2" ø
V E
N T
2"ø VENT 2"ø VENT
1/
2" ø
V E
N T
1/
2" ø
V E
N T
1/
2" ø
V E
N T
2" ø
V E
N T
P-609
2"ø VENT
P-524
3" ø
S S
1 1/2"ø SS 4"ø SS
4" ø
S S
4"ø SS
4"ø SS
3" ø
S S
FD-D3
3"ø SS
3" ø
S S
FD-D3
FD-D3
FD-D3
3" ø
S S
3" ø
S S
FD-M3
/F1 PW112 /F1 PW112
FD-M3
P-812
P-812
P-812
/F1 PW112
P-801
P-801
P-801 wco wco wco wco wco
P-801 wco wco wco wco wco
2" ø
S D
4"ø SD
6"ø SS
6"ø SD
FD-D3
FD-D3
P-701
2"ø VENT VTR
1 1/2"ø VENT VTR
3"ø VENT VTR
4" ø
S D
6" ø
S D
4"ø SD
4"ø SD
A. REFER TO P-001 FOR PLUMBING SYMBOLS, ABBREVIATIONS, AND GENERAL
NOTES.
B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE
VHA COR BEFORE PROCEEDING WITH WORK.
C. REFER TO GI-SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED
LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP
PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE
SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL
PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN
SHALL GOVERN.
D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT
PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING
HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED IN
ACCORDANCE WITH THE SPECIFICATIONS.
E. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS OH UNO:
a. DOMESTIC WATER
b. MED GAS
c. STORM DRAINAGE
d. VENTS
F. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS UF UNO:
a. SANITARY SEWER
b. STORM DRAINAGE
G. MAINTAIN A MINIMUM 2' CLEARANCE OF PLUMBING EQUIPMENT AND
PLUMBING PIPING FROM INSTALLED CEILING MOUNTED OVERHEAD FANS.
H. REFER TO SPECIFICATION 22 05 23 FOR PLUMBING VALVES.
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
KEY PLAN
GENERAL NOTES
SHEET KEYNOTES
P la n N or th
True North
NORTH
BLDG 17
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
SEE REVISION
SCHEDULE
R E
V
IS
IO
N
S C
H E
D U
L E
C :\R ev it
\2 2.
_M
E C
H -P
LU
M
_R
_H M al et z.
rv t
/7 /2
:5
9:
A M
PW111
DRAIN-WASTE-VENT PLANS -
LEVEL 1 NORTH
CONSOLIDATE ENGINEERING
BLDG. 17
4800 MEMORIAL DR., WACO TX 76711
674A4-22-254
MR HM
100% CONSTRUCTION
DOCUMENTS
VEG 22.12
3/16" = 1'-0"
DRAIN-WASTE-VENT - LEVEL 1 - NORTH
F1
1. PROVIDE PRIME-EZE OR APPROVED EQUAL TRAP PRIMER AT LAVATORY
P-TRAPS. ROUTE 3/4" INDIRECT DRAIN PIPING TO ASSOCIATED FLOOR
DRAIN.
2. PROVIDE STORM DRAIN PLUMBING TO SUMP PUMP IN BASEMENT. REFER
TO PP SERIES SHEETS FOR SUMP PUMP LOCATION.
3. STORM AND SANITARY PLUMBING EXTERIOR TO THE BUILDING SHOWN
FOR REFERENCE. REFER TO CIVIL SHEETS FOR SS AND SD CONTINUATION.
4. PROVIDE VENT PIPING TO ROOF.
5. STORM DRAIN PIPING DOWN FROM ROOF. PROVIDE SD IN PIPE BASEMENT
FROM THIS LOCATION TO EXISTING LOCATION TIE. VIF, ASSUME
CONNECTION IS NEAR 6" SERVICE TO BUILDING.
B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE
VHA COR BEFORE PROCEEDING WITH WORK.
C. REFER TO GI-SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED
LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP
PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE
SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL
PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN
SHALL GOVERN.
D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT
PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING
HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED IN
ACCORDANCE WITH THE SPECIFICATIONS.
E. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS OH UNO:
a. DOMESTIC WATER
b. MED GAS
c. STORM DRAINAGE
d. VENTS
F. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS UF UNO:
a. SANITARY SEWER
b. STORM DRAINAGE
G. MAINTAIN A MINIMUM 2' CLEARANCE OF PLUMBING EQUIPMENT AND
PLUMBING PIPING FROM INSTALLED CEILING MOUNTED OVERHEAD FANS.
H. REFER TO SPECIFICATION 22 05 23 FOR PLUMBING VALVES.
A
B
C
D
21 3 4 5 6 7 9 10 11 12
A'
1' 2' 3' 4'
A''
148B
WELDING
RECEIVING
HVAC / PLUMBING
SHOP
CARPENTRY SHOP
WELDING SHOP
148A
WELDING STORAGE
142B
HVAC/PLUMBING
STORAGE
144B
CARPENTRY
STORAGE
3"ø SS
3" ø S
S
P-516
P-708
3" ø
S S
P-516 P-708
3" ø
S S
1 1/2"ø VENT
FD-E
3" ø
S S
P-516
FD-E
P-801
3"ø SS
1 1/2"ø VENT
3" ø
S S
1 1/2"ø VENT
3"ø SS
1 1/2"ø VENT
/F1 PW111 /F1 PW111/F1 PW111
P-801
P-801
6"ø SD
144A
OFFICE
142A
OFFICE
FIRE RISER
PLAN ROOMC05A
CORRIDOR
ELECTRICAL SHOP
WCO
WCO
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
KEY PLAN
GENERAL NOTES
SHEET KEYNOTES
P la n N or th
True North
SOUTH
BLDG 17
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
SEE REVISION
SCHEDULE
R E
V
IS
IO
N
S C
H E
D U
L E
C :\R ev it
\2 2.
_M
E C
H -P
LU
M
_R
_H M al et z.
rv t
/7 /2
:5
9:
A M
PW112
DRAIN-WASTE-VENT PLANS -
LEVEL 1 SOUTH
CONSOLIDATE ENGINEERING
BLDG. 17
4800 MEMORIAL DR., WACO TX 76711
674A4-22-254
MR HM
100% CONSTRUCTION
DOCUMENTS
VEG 22.12
3/16" = 1'-0"
DRAIN-WASTE-VENT - LEVEL 1 - SOUTH
F1
B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE
VHA COR BEFORE PROCEEDING WITH WORK.
C. REFER TO GI-SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED
LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP
PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE
SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL
PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN
SHALL GOVERN.
D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT
PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING
HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED IN
ACCORDANCE WITH THE SPECIFICATIONS.
E. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS OH UNO:
a. DOMESTIC WATER
b. MED GAS
c. STORM DRAINAGE
d. VENTS
F. HORIZONTAL PIPING FOR THE FOLLOWING SYSTEMS IS UF UNO:
a. SANITARY SEWER
b. STORM DRAINAGE
G. MAINTAIN A MINIMUM 2' CLEARANCE OF PLUMBING EQUIPMENT AND
PLUMBING PIPING FROM INSTALLED CEILING MOUNTED OVERHEAD FANS.
H. REFER TO SPECIFICATION 22 05 23 FOR PLUMBING VALVES.
A
21 3 4 5 6 7 8 9 10 11 12
A'
B'
C'
D'
1' 2' 3' 4'
A'''
1 1/2"ø VENT VTR
2"ø VENT VTR
3"ø VENT VTR
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
KEY PLAN
GENERAL NOTES
SHEET KEYNOTES
P la n N or th
True North
NORTH
BLDG 17
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
SEE REVISION
SCHEDULE
R E
V
IS
IO
N
S C
H E
D U
L E
C :\R ev it
\2 2.
_M
E C
H -P
LU
M
_R
_H M al et z.
rv t
/7 /2
:5
9:
A M
PW113
DRAIN-WASTE-VENT PLANS - ROOF
NORTH
CONSOLIDATE ENGINEERING
BLDG. 17
4800 MEMORIAL DR., WACO TX 76711
674A4-22-254
MR HM
100% CONSTRUCTION
DOCUMENTS
VEG 22.12
3/16" = 1'-0"
DRAIN-WASTE-VENT - ROOF NORTH
F1
1. EXISTING ROOF STORM DRAINS.
2. SANITARY VENT PIPING UP THROUGH ROOF.
P-502
P-524
P-103
P-103
P-502
P-103
P-103
P-609
P-103
P-103
P-201
P-201
P-201
P-524
P-609
P-201
P-417
P-417
P-417
P-417
4"ø SS
1 1/2"ø SS
4"ø SS
6"ø SS
4"ø SS
4"ø SS
2"ø SS
4"ø SS
3"ø SS
3"ø SS
3"ø VENT 1 1/2"ø VENT
3"ø SS
1 1/2"ø VENT
(E) 6"ø SS
(E) 6"ø SD
1 1/2"ø VENT
2"ø VENT
2" ø
V E
N T
V T
R
2"ø VENT
3" ø
V E
N T
V T
R
3"ø SS1 1/
2" ø
V E
N T
1/
2" ø
V E
N T
1/
2" ø
V E
N T
FD-E
P-708
P-516
FD-E
P-516
P-708
3"ø SS
FD-M3
3"ø SS
1/
2" ø
V E
N T
P-516
3"ø SS
3"ø SS
3"ø SS
3" ø
S S
3"ø SS
2"ø VENT
4"ø SS
1/
2" ø
V E
N T
2" ø
V E
N T
1/
2" ø
V E
N T
1/
2" ø
S S
3" ø
S S
1/
2" ø
V E
N T
3" ø
S S
FD-D3
FD-D3
1/
2" ø
S S
1/
2" ø
S S
1/
2" ø
V E
N T1
1/ 2" ø V
E N
T
FD-M3
FD-D3
FD-D3
3" ø
S S
3" ø
S S
2"ø VENT
1/
2" ø
V E
N T
3"ø SS
2" ø
V E
N T
2"ø VENT
2" ø
V E
N T
2" ø
V E
N T
3"ø SS
3"ø SS
1/
2" ø
V E
N T
2" ø
S S
1/
2" ø
S S
1/
2" ø
S S
2"ø VENT
1/
2" ø
V E
N T
1/
2" ø
S S
P-812
P-812
6"ø SD
6"ø SD
FD-D3
FD-D3
6"ø SD
4"ø SD
4"ø SD
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
SEE REVISION
SCHEDULE
R E
V
IS
IO
N
S C
H E
D U
L E
C :\R ev it
\2 2.
_M
E C
H -P
LU
M
_R
_H M al et z.
rv t
/7 /2
:5
9:
A M
PW601
DRAIN-WASTE-VENT RISER
DIAGRAM
CONSOLIDATE ENGINEERING
BLDG. 17
4800 MEMORIAL DR., WACO TX 76711
674A4-22-254
MR HM
100% CONSTRUCTION
DOCUMENTS
VEG 22.12
A. ISOMETRIC VIEWS ARE INTENDED TO DEPICT GENERAL 3-DIMENSIONAL
ARRANGMENT OF MAJOR MECHANICAL COMPONENTS FOR VISUAL
REFERENCE ONLY. NOT ALL ITEMS (EG PLUMBING, PIPING, ELECTRICAL,
STRUCTURAL, ETC) IN THE AREA MAY BE SHOWN. REFER TO PLAN VIEWS
FOR SIZES AND OTHER SCOPE DETAILS.
DRAIN-WASTE-VENT RISER DIAGRAM
F1
FAUCET SEE
SPECIFICATIONS
LAMINAR FLOW
CONTROL DEVICE
OFFSET
WASTE
TRAP
PARALLEL
TO WALL
LOOSE KEY STOP
ESCUTCHEON
FINISHED FLOOR
NOTE: PROVIDE COVER FOR EXPOSED PIPING
F O
R F
IX
T
U R
E H
E
IG
H T
S S
E E
R C
H
IT
E C
T U
R A
L D
R A
W
IN
G S
AA
WALL ANCHOR
STEEL WALL
PLATE
STUDS
SECTION A
FOR FIXTURE
HEIGHT SEE
ARCH DRAWINGS
STEEL HANGER
BY LAV MFGR
NOTE:
1. AT LAVS WITH FOOT PEDAL CONTROLS
PROVIDE AN ADDITIONAL 16 GAGE
GALVANIZED STEEL PLATE 12" x 16" SECURED
TO A MIN 2 STUDS PER FOOT PEDAL.
2. PROVIDE 20 GAGE STUDS WHEN HEIGHT
EXCEEDS 12'-0"
1/4" Ø MOLLY BOLT HOLLOW WALL
ANCHOR (1 EACH SIDE OF LAV)
PLAN
V A
R
IE
S
MIN 16 GAGE GALVANIZED
STEEL PLATE 12" x 48"
SECURED TO A MIN 4
STUDS PER LAVATORY
1/4"1/8"
TYP
MIN 5 1/4" Ø GALV
MACHINE BOLTS
WELDED TO PLATE
MIN (3) 1/4" MACHINE
BOLTS W/DOUBLE
LOCK NUTS ON
BACK SIDE
COMPRESSION
CHAMBER
A
J.R. SMITH
FIG. NO.
FIXTURE UNIT
RATING
A
SIZE
5005 1 - 11 3/4"
NOTES:
1. SELECT & INSTALL WATER HAMMER ARRESTORS PER PDH-WH 201, REFER TO 22 11 00.
2. INSTALL WATER HAMMER ARRESTORS AT END OF EACH BRANCH LINE BETWEEN LAST 2
FIXTURES SERVED.
3. INSTALL ADDITIONAL WATER HAMMER ARRESTOR IN BRANCH LINES EXCEEDING 20' IN
LENGTH.
4. INSTALL WATER HAMMER ARRESTORS IN UPRIGHT POSITION WITH GATE VALVE.
5. INSTALL MIN. 6"x 8" ACCESS PANEL. SEE ARCHITECTURAL SPECIFICAITON FOR FINISH.
B
SIZE
4"
1"
1"
1"
1"
1"
5"
6"
7"
8"
9"
12 - 32
33 - 60
61 - 113
114 - 154
155 - 330
SHELL
BELLOWS
B
3"ø
90°
PIPE NIPPLE
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
SEE REVISION
SCHEDULE
R E
V
IS
IO
N
S C
H E
D U
L E
C :\R ev it
\2 2.
_M
E C
H -P
LU
M
_R
_H M al et z.
rv t
/7 /2
:5
9:
A M
PK501
TYPICAL DETAILS CONSOLIDATE ENGINEERING
BLDG. 17
4800 MEMORIAL DR., WACO TX 76711
674A4-22-254
MR HM
100% CONSTRUCTION
DOCUMENTS
VEG 22.12
NTS
TYPICAL WHEELCHAIR LAVATORY DETAIL
F9
NTS
LAVATORY MOUNTING DETAIL
D9
NTS
TYPICAL WATER HAMMER ARRESTOR DETAIL
F7
File details come from the government source that posted it. Updated .