U.S. Department of the Interior FAR Clauses 52.219-14, Limitations of Subcontracting Subcontracting Percentage Worksheet
| PRIME CONTRACTOR: ____________________ | SOURCE: ________________ |
| SUBCONTRACTOR: _______________________ | SOURCE: ________________ |
| PRIME CONTRACTOR |
| SUBCONTRACTOR |
| DIRECT LABOR |
| $ |
| $ |
| FRINGE BENEFITS* |
| $ |
| $ |
| SUB TOTAL |
| (A) $ |
| (B) $ |
| LABOR G&A**@______% |
| $ |
| $ |
| TOTAL LABOR COSTS |
| (C) $ |
| (D) $ |
To calculate the subcontracting percentage, first add DIRECT LABOR and FRINGE BENEFITS and enter the figures for the prime contractor in space (A) and for the subcontractor (if available)*** in space (B).
Next, calculate the LABOR G&A by multiplying the G&A rate by the SUBTOTAL figure in space (A).
Calculate the subcontractor’s LABOR G&A by multiplying the subcontractor’s G&A rate by the subcontractor’s SUBTOTAL in figure (B).
Add the LABOR G&A to the SUBTOTAL and record that figure in the spaces for TOTAL LABOR COSTS at (C) and (D) respectively.
Next, using the formula below, calculate the subcontracting labor percentage.
| (D) | |
| ----------------------- | |
| (C) + (D) |
SUBCONTRACTING LABOR COST PERCENTAGE = __________________%
| * | The firm must demonstrate that their labor overhead is allowable in accordance with FAR 31.205- | 6(m). Failure to do so will cause the entire overhead to be eliminated from the calculations. | ||
| ** | G&A denotes General and Administrative Costs | |||
| *** | You need to compare as like figures as possible. Therefore, if you have a breakdown of the | subcontractor’s costs use it in the formulation above. If you do not have a breakdown you need to use the | TOTAL SUBCONTRACTING AMOUNT for item (D) even though you must still breakdown the | contractor’s costs. |
140R3021R0004 – Attachment 4