Attachment 4 Facility Lead Report.pdf

PDF 25 MB Posted

Attached to
Kayenta Staff Quarters Abatement and Demolition
Solicitation number
75H70123R00063
Issued by

About this file

This file is an attachment to a federal solicitation for staff quarters abatement and demolition services at Kayenta, Arizona. The Department of Health and Human Services Indian Health Service is seeking to remove hazardous materials and raze existing buildings to clear the site for future construction. Offerors must submit pricing for the abatement and demolition of multiple structures totaling over 25,000 square feet by September 30, 2022. The period of performance is 120 calendar days following award of a fixed-price contract. The solicitation targets small businesses under the 8(a) Program.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LEAD-BASED PAINT (LBP) SAMPLING REPORT

KAYENTA SERVICE UNIT – KAYENTA HEALTH CENTER

KAYENTA, APACHE COUNTY, ARIZONA

MARCH 28, 2012

4801 N. Butler Ave.

Farmington, NM 87401 www.iinábá.com Phone: (505) 327-1072

Fax: (505) 327-1517 iiná bá, Inc. Project No. IHS0000-00016 IHS Contract No. HHSI161201200001C

ATTACHMENT 4

75H70123R00063 Kayenta Staff Quarters Abatement and Demolition

Lead-Based Paint Sampling Report Kayenta Service Unit, Kayenta Health Center– March 2012 i

TABLE OF CONTENTS

1.0 EXECUTIVE SUMMARY

2.0 DESCRIPTION OF BUILDINGS INSPECTED

3.0 SURVEY METHODS

3.1 XRF INSTRUMENTATION

3.2 XRF CALIBRATION CHECK

3.3 SUBSTRATE CORRECTION

3.4 FIELD DOCUMENTATION

3.5 DUST WIPE SAMPLES

3.6 SOIL SAMPLES

4.0 LEAD-BASED PAINT DEFINITIONS

5.0 FINDINGS AND COST ESTIMATES

6.0 DISCUSSION AND RECOMMENDATIONS

Appendix 1: Functional Space Maps and Bulk Sample Logs

Building 2000 – Health Center Clinic Building 2010 – General Service Building 2020 – Administration Building 3000 – Warehouse Building 3002 – OEHE Building 3009 – Dental Clinic Building 4005 – CHN Building 4006 – Business and Nursing Office Building 4008 – Counseling Services Building 4013 – Human Resources Building 4016 – Finance Building 4017 – Facility Management Buildings 2001 to 2006 – Single-Family Housing (3 BR) Buildings 2007 to 2011 – Single-Family Housing (2 BR) Building 2012 – Single-Family Housing (3 BR) Buildings 2015 to 2017 – Single-Family Housing (2 BR) Building 3003 – General Residence Complex Buildings 3004 to 3007 – House Trailers (3 BR) Buildings 4001 to 4011 – House Trailers (3 BR) Building 4012 – House Trailer (2 BR) Buildings 4015 to 5110 – House Trailers (3 BR)

Appendix 2: XRF Field Data and Calibrations

Appendix 3: XRF Spectrum Analyzer Results, Photographs and Cost Estimate

Appendix 4: Laboratory Analytical Reports

Appendix 5: Certifications

1.0 EXECUTIVE SUMMARY

As requested by the Navajo Area Indian Health Service (IHS), a Lead-Based Paint (LBP) inspection was conducted on the Kayenta Health Center within the Kayenta Service Unit located in Kayenta, Apache County, Arizona. Sampling occurred from February 13 to 22, 2012. The purpose of the inspection was to identify lead in paint on interior and exterior painted surfaces of each building. Measurements were made using a Niton X-ray Fluorescence (XRF) Spectrum Analyzer (Model XLp 303A). Specifications on this instrument are included in Appendix 5. Confirmatory chip sampling for laboratory analysis proved to be unnecessary due to the lack of indecisive XRF readings.

iiná, bá, Inc (iiná bá) representatives Mr. Vance Aspaas, Lead Inspector, and Mr. Nate Chase and Mr. Ted Charles, Technicians, performed the lead inspections. The inspector holds current a United States Environmental Protection Agency (USEPA) accredited 24-Hour Inspector Certification. A copy of the Certification can be found in Appendix 5.

Sampling procedures similar to the United States Department of Housing and Urban Development (HUD) Guidelines for the Evaluation and Control of Lead-Based Paint Hazards in Housing (June 1995), and revised in 1997, were followed for each of the buildings. Within each building or housing groups sampled, procedures similar to the HUD multi-family housing inspection, as outlined in Chapter 7 of the HUD Guidelines, were employed.

Lead-based painted building materials identified in the Kayenta Health Center buildings included the following: walls, doors, door trim, baseboards, ceilings, ceiling trim, cabinet doors, window sills, and exterior soffit). A total of 62 painted items were identified as containing lead-based paint in 11 out of the 48 buildings tested (23%).

2.0 DESCRIPTION OF BUILDINGS INSPECTED

Building 2000 is the Kayenta Health Center (constructed in 1959) building with 10,663 square feet in its main building. Single-story, masonry decorative block building with decorative exterior textured walls constructed slightly above grade built on a foundation.

The complex consists of multiple trailers being used for office space and patient care, in addition to the main clinic, Administration, Supply, and Environmental Health buildings.

The facility was completely renovated in 1999. The entire campus was re-designed and the usable square footage nearly doubled. The Emergency Room was expanded from four beds to eight; equipment was replaced throughout, and two new buildings were added to the complex. One new modular building gives enlarged space for the Optometry and Pharmacy services and the other new building was constructed to house Environmental Services. The new modular building sits on a poured concrete footer crawl space for utilities is present beneath the building that has an earthen floor.

The interior ceiling construction includes ventilation and plumbing runs between the ceiling and the preformed cement flooring above, hanging and attached ceiling tiles, a plaster ceiling system, and a drywall ceiling system. Interior wall construction includes drywall, tape and texture, often covered by ceramic tiles. Interior flooring consists of various sheet vinyl flooring and, 12 in. by 12 in. floor tiles, carpet, and rolled vinyl floor covering. With ceramic tile flooring in bathroom, kitchen, and dining areas; and carpet and carpet tiles in waiting areas. Optometry and Pharmacy have a raised floor with metal tile flooring and a separate HVAC unit. Exterior walls consist of metal panels.

Building 2010: The General Service unit was acquired 1959 single-story, masonry center-block building with spray-on stucco exterior walls constructed slightly above grade. A poured concrete foundation utility is present above the hanging ceiling tile.

Interior walls are painted tape and textured (sheet rock) walls, also with interior (painted) masonry block walls. The floors are covered by a 12” by 12” vinyl tile adhered to a thick fibrous (composite) subfloor by an adhesive (mastic) other areas are strictly concrete flooring. The roof of the building is essentially flat and is sealed with a tar and membrane shingle covering. Aluminum-clad, single-pane windows are present on the east and western side of the building. Metal-clad steel doors are located on east side of the building for entrance/egress.

Building 2020: The General Administration Building was acquired in 1959 and is a single-story, masonry center-block building with metal panels and spray on stucco exterior walls constructed slightly above grade. A poured concrete foundation utility is present above the hanging ceiling tile. Interior walls are painted tape and textured (sheet rock) walls, also with interior (painted) masonry block walls. Interior flooring consists of various sheet vinyl flooring and, 12 in. by 12 in. floor tiles, carpet, and rolled vinyl floor covering. With ceramic tile flooring in bathroom, kitchen, and dining areas; and carpet and carpet tiles in waiting areas. The roof of the building is slightly pitched and is sealed with roof caulk and metal panel covering. Aluminum-clad, single-pane windows are present on the various side of the building. Metal-clad steel doors are located on various side of the building for entrance/egress.

Building 3000: The Maintenance Shop was acquired in 1976, and is a single-story, wood frame metal building. A poured concrete foundation utility is present above open ceiling. Interior walls are painted tape and textured (sheet rock) walls, also with interior non finished walls. The floors are covered by a 12” by 12” vinyl tile adhered to a thick fibrous (composite) subfloor by an adhesive (mastic) other areas are strictly concrete flooring. The roof of the building is slightly pitched and is sealed with a tar and metal panel covering. Aluminum-clad, single-pane windows are present on the north and south side of the building. Metal-clad steel doors are located on East side of the building for entrance/egress.

Building 3002: OEH was acquired in 1978 and is a single-story, masonry center-block building with metal panels on exterior walls constructed slightly above grade. A poured concrete foundation utility is present above the hanging ceiling tile. Interior walls are painted tape and textured (sheet rock) walls. Interior flooring consists of various, 12 in.

by 12 in. floor tiles, carpet, and with ceramic tile flooring in bathroom. The roof of the building is slightly pitched and is sealed with roof caulk and metal panel covering.

Aluminum-clad, single-pane windows are present on the various side of the building.

Metal-clad steel doors are located on various side of the building for entrance/egress.

Building 3009: The Outpatient Dental Clinic was acquired in 1994 and is a double-wide trailer set on a cement blocks and braces. It is wood framed with metal exterior wall panels and metal window. The roof of the building is essentially pitched and is sealed with roof caulk and metal panel covering. The building interior is wood panel with wood panel ceiling tiles 2 ft. wide by 6 ft. long. Interior walls are painted tape and textured (sheet rock) walls. Wood baseboards and cove based were found throughout the building. Interior flooring consists of various sheet vinyl flooring and, 12 in. by 12 in. floor tiles, carpet, and rolled vinyl floor covering. Aluminum-clad, single-pane windows are present on the north and south side of the building. Metal-clad steel doors are located on north side of the building for entrance/egress

Building 4005: CHN was acquired in 1975 and is a double-wide trailer set on a cement blocks and braces. It is wood framed with metal exterior wall panels and spray on stucco exterior walls constructed above grade. The building interior is wood panel with wood panel ceiling tiles 2 ft. wide by 6 ft. long. Interior walls are painted tape and textured (sheet rock) walls. Interior flooring consists of various, Wood baseboards and cove based were found throughout the building. Interior flooring consists of various sheet vinyl flooring and, 12 in. by 12 in. floor tiles, carpet, and rolled vinyl floor covering. The roof of the building is slightly pitched and is sealed with roof caulk and metal panel covering.

Aluminum-clad, single-pane windows are present on the north and south side of the building. Metal-clad steel doors are located on north side of the building for entrance/egress

Building 4006: The Business Office was acquired in 1975 and is a double-wide trailer set on a cement blocks and braces. It is wood framed with metal exterior wall panels and spray on stucco exterior walls constructed above grade. The building interior is wood panel with wood panel ceiling tiles 2 ft. wide by 6 ft. long. Interior walls are painted tape and textured (sheet rock) walls. Wood baseboards and cove based were found throughout the building. Interior flooring consists of various sheet vinyl flooring and, 12

in. by 12 in. floor tiles, carpet, and rolled vinyl floor covering. The roof of the building is slightly pitched and is sealed with roof tar and a membrane covering. Aluminum-clad, single-pane windows are present on the north and south side of the building. Metal-clad steel doors are located on north side of the building for entrance/egress

Building 4008: The Counseling building was acquired in 1976 and is a double-wide modular trailer set on a cement blocks and braces. It is wood framed with metal exterior wall panels and spray on stucco exterior walls constructed above grade. Interior walls are painted tape and textured (sheet rock) walls. Cove based were found throughout the building. Interior flooring consists of various sheet vinyl flooring and, 12 in. by 12 in. floor tiles, carpet, and rolled vinyl floor covering. The roof of the building is slightly pitched and is sealed with roof caulk and a metal pro-panel covering. Aluminum-clad, single-pane windows are present on the north and south side of the building. Metal-clad steel doors are located on north side of the building for entrance/egress

Building 4013: The Human Resources building was acquired in 1977 and is a single-wide trailer set on cement blocks and brackets. It is a wood frame interior, with painted wood panel walls. Ceiling consists of wood panel ceiling tiles 2 ft. wide by 6 ft. long.

Wood baseboards and cove based were found throughout the building. Interior flooring consists of 12 in. by 12 in. floor tiles, and carpet. The exterior consists of metal exterior wall panels and spray on stucco exterior walls constructed above grade. The roof of the building is slightly pitched and is sealed with roof tar and an aluminum membrane covering.

Building 4016: The Finance building was acquired in 1976 and is a single-wide trailer set on cement blocks and brackets. It is a wood frame interior, with painted tape and texture walls. Ceiling consists of wood panel ceiling tiles 12in. x 12in. Wood baseboards and cove based were found throughout the building. Interior flooring consists of 12 in. by 12 in. floor tiles, and carpet. The exterior consists of metal exterior wall panels and spray on stucco exterior walls constructed above grade. The roof of the building is slightly pitched and is sealed with roof tar and a membrane covering.

Building 4017: The Facility EMS building was acquired in 1971 and is a single-wide trailer set on cement blocks and brackets. It has a wood frame interior, with painted tape and texture walls. Ceiling consists of wood panel ceiling tiles 12in. x 12in. and 2ft by 4 ft hanging ceiling tiles. Wood baseboards and cove based were found throughout the building. Interior flooring consists of 12 in. by 12 in. floor tiles, and carpet. The exterior consists of metal exterior wall panels and spray on stucco exterior walls constructed above grade. The roof of the building is slightly pitched and is sealed with roof tar and a membrane covering.

Building 2001: This housing unit is equivalent to Unit 2002 described below. Testing for ACM was performed by others prior to this sampling event conducted by iiná, bá.

Four (4) bulk samples were tested for ACM. No additional testing was performed on this unit. The laboratory analytical results are included in Appendix 3 of this report.

Buildings 2002-2014 are pre-1960 housing units that are 2 or 3 bedroom. Some are duplexes, most are single-family units. They are wood frame on cement slabs with stucco exteriors. The interiors are drywall walls and ceilings. Most units have unfinished garages with drywall storage closets. All units have recently placed pro-panel roofing.

The windows are coated and uncoated metal with metal frames and wood window shelves. The flooring is 12 in. by 12 in. floor tiles. The units have a mixture of cove base and wood baseboards. Exterior doors are both metal and wood.

Buildings 3003-3005 were built in the 1960s and 1980s. They are wood-framed, double-wide trailers set on cement foundations with wood frame sheds attached. The exteriors are painted metal with metal window shutters, metal awnings over parking areas, and metal roof trim. The roofs are rubberized with foam insulation over metal.

The interiors are wood paneling and wood panel ceiling tiles 2 ft. wide and approximately 6 ft. long. The flooring is 12 in. by 12 in. tiles laid over an older layer of 12 in. by 12 in.

tiles over a wood substrate. In some units carpeting was found over the floor tiles in the living and bedroom areas. Most units have wood crown molding and wood baseboards.

Vinyl cove base was found in some buildings. The exterior doors are generally metal.

Buildings 3006 and 3007 are equivalent to Units 3004 and 3005 described above.

Testing for ACM was performed by others prior to this sampling event conducted by iiná, bá. Eight (8) bulk samples were tested for ACM from Building 3006. No additional testing was performed on these units. The analytical laboratory results are included in Appendix 3 in this report. The results from the testing on Building 3007 were not available at the time of this report.

Buildings 3010 to 3041 are three (3) and four (4)-bedroom single-family housing units that are classified as “new”. These units were not included in the testing performed by iiná, bá.

Buildings 4001-4018 were built in the 1970s. They are wood-framed, single-wide trailers set on cement blocks with a skirt attached. The exteriors are painted beige with metal walls and metal roof trim. The roofs are rubberized with foam insulation over plastic membrane. The interiors are wood paneling (maybe painted) and wood panel ceiling tiles 2 ft. wide and approximately 6 ft. long. The flooring is 12 in. by 12 in. tiles laid over an older layer of 12 in. by 12 in. tiles over a wood substrate. In some units carpeting was found over the floor tiles in the living and bedroom areas. Most units have wood crown molding and wood baseboards. Vinyl cove base was found in some buildings. The exterior doors are generally metal. Of these units, Buildings 4002, 4003, 4004, 4008, 4011, 4014, and 4019 were tested for ACM by others prior to this sampling event conducted by iiná, bá. The laboratory results for 4003, 4004, 4008, and 4011 are included in Appendix 3. No additional testing was performed on these units.

Buildings 4021-4026 were built in the 1980s. They are wood-framed, single-wide trailers set on cement blocks with a skirt attached. The exteriors are painted beige with wood panel walls and metal roof trim. The roofs are rubberized with foam insulation over aluminum metal sheet. The interiors are wood paneling (maybe painted) and wood panel ceiling tiles 2 ft. wide and approximately 6 ft. long. The flooring is 12 in. by 12 in.

tiles laid over an older layer of 12 in. by 12 in. tiles over a wood substrate. In some units carpeting was found over the floor tiles in the living and bedroom areas. Most units have wood crown molding and wood baseboards. Vinyl cove base was found in some buildings. The exterior doors are generally metal.

Building 5109 is equivalent to the units described below. Testing for ACM was performed by others prior to this sampling event conducted by iiná, bá. No additional testing was performed on this unit. The results of this testing were not available at the time of this report.

Buildings 5110-5113 were built in the 1960s. They are wood-framed, single-wide trailers set on cement blocks with a skirt attached. The exteriors are painted beige with metal walls and metal roof trim. The roofs are rubberized with foam insulation over plastic membrane. The interiors are wood paneling (maybe painted) and wood panel ceiling tiles 2 ft. wide and approximately 6 ft. long. The flooring is 12 in. by 12 in. tiles laid over an older layer of 12 in. by 12 in. tiles over a wood substrate. In some units carpeting was found over the floor tiles in the living and bedroom areas. Most units have wood crown molding and wood baseboards. Vinyl cove base was found in some buildings. The exterior doors are generally metal.

3.0 SURVEY METHODS

3.1 XRF Instrumentation

Measurements of lead in paint were made using a Model XLp 303A ThermoFisher Scientific Niton XRF Spectrum Analyzer (serial number 26670). The XRF Lead Paint Analyzer non-destructively measures lead concentrations of painted surfaces. The XRF system includes three (3) main components: (1) the XRF analyzer, which is a portable analytical instrument operating on the principles of X-ray fluorescence; (2) forms for recording of field data, and (3) report generation software, which allows for generation of data tables.

The criteria for classifying results obtained using the XRF are as shown in Table 1 below. These results are taken from the HUD/EPA Performance Characteristics Sheet, specific for the XRF system used in this survey.

Table 1: LBP Classification Criteria, K-Shell Value

Substrate Negative Inconclusive Positive

Brick ≤0.9 None ≥1.0 Concrete ≤0.9 None ≥1.0 Drywall ≤0.9 None ≥1.0 Metal ≤0.9 None ≥1.0 Plaster ≤0.9 None ≥1.0 Wood ≤0.9 None ≥1.0

*Values reported as milligrams per square centimeter (mg/Cm2).

iiná bá, (as a firm) and its Lead Inspectors are licensed, as well as certified by the USEPA to perform LBP inspections. Copies of the certifications are included in Appendix 5.

3.2 XRF Calibration Check

Standard quality control procedures with respect to the XRF were performed during the survey. The internal calibration of the XRF was checked by taking a minimum of three

(3) consecutive measurements on a National Institute for Standards and Technology (NIST) standard with a known concentration of lead. The results of the calibration checks were then used to verify that the instrument was operating within acceptable limits. Periodic calibration checks were performed during the course of a day, specifically at the end of the day to “bracket” the test data collected between calibrations.

These calibration checks are reported within the XRF data tables found in Appendix 2 of this report and are maintained in a file to detect changes in instrument performance over time (sign of source deterioration).

3.3 Substrate Correction

For some XRF instruments, it is necessary to make corrections for bias in XRF readings made on some painted surface or “substrates”. In accordance with the HUD/EPA Performance Characteristics Sheet for the XRF analyzer used, it is not necessary to correct for substrate bias.

3.4 Field Documentation

Field data forms were used to manually record information about individual XRF measurements. This information included the room number, the building component (such as wall, ceiling, door, baseboard, cabinet, etc.), component substrate (e.g., drywall, wood, metal, concrete), and paint condition. The field data forms were then used by the inspector to couple measurement-specific descriptive information to the sequential data once the instrument’s electronic memory was downloaded to a personal computer. This information was then manipulated by the instrument’s software to generate data tables for the written report.

Any group of building units that were similar in construction from unit to unit with 21 of more units either built before 1960, are of an unknown age, or consist of 10 or more units built between 1960 and 1977 are defined as multi-family housing. Using this guideline, a random number of units were inspected.

Random number calculations were also allowed for sampling the large Kayenta Service Unit buildings, including the Health Clinic (Building 2000). At least one room in each designated area (Dental, Ophthalmology, Nursery, Administration, ER, Pharmacy, exam rooms, and bed areas. etc.) was examined, although the selection and screening of the room was obtained through random number calculations.

According to the HUD Guidelines, each enclosed space in a structure (e.g., room, stairway, hallway, etc.) is considered a separate "room equivalent" and must be tested separately. To keep track of where individual measurement locations were made, interior and exterior walls of a structure were designated as A, B, C, and D, as shown in the attached drawings. The A wall was designated as the wall facing the main road in this inspection, and the B, C, and D walls are in clockwise order from the A wall. The wall and position on the wall (i.e., left, right, or center) was also recorded when readings were taken on components such as windows or doors. Any comments regarding a particular room were also recorded and may be found in the data tables located in Appendix 2.

Paint color and condition are noted and included in the data tables. Under Paint Condition an "I" indicates intact or sound paint; an "F" indicates fair condition (paint surfaces show minor damage); a "P" indicates poor

The report generation software combined the lead readings stored in the XRF analyzer with the test sample location information recorded in the field to produce data tables.

The transfer of data from the analyzer to the computer was made through an interface cable supplied as part of the XRF system.

condition (paint is peeling, cracking, or blistering or shows other significant damage).

3.5 Dust Wipe Samples

Studies have shown the dust is an important pathway for lead exposure. Dust lead levels are the strongest predictor of children’s blood lead levels. The primary source is lead-based paint. The most likely place for lead dust to be found is on window sills and in window troughs.

Wipe sampling methods described by HUD, EPA, and the American Society for Testing and Materials (ASTM) (ASTM E 1728). Pre-packaged lead wipes were used to sample the window components. The area was measured for length and width and the area wiped in two directions by personnel wearing disposable gloves. The wipes were folded and placed in plastic baggies for shipping. Analysis was completed by Macs Labs in Grass Valley, California. The laboratory used the wiped area and the weight of the wipes and sample analysis to calculate the total amount of lead present. Dust wipe sample locations and levels are included in Table 3 in Appendix 3 with analytical results included in Appendix 4. Positive lead levels exceeding the HUD Guideline of 250 micrograms per square foot (µg/ft2) for window sill wipes were detected in seven (7) of the 36 locations tested. This includes Buildings 4001, 4002, 4008, 4015, 4018, 4021, and 4023. Interior dust lead levels can be reduced by conscientious housekeeping, including wet wiping of floors, window sills, and window troughs.

3.6 Soil Samples

Studies have shown that soil contaminated with lead contributes significantly to the blood lead levels found in children. Exposure can occur through direct ingestion of soil, “track-in” of soil into the dwelling interior, or through a combination of the two. The soil around a dwelling may be contaminated through weathering and “chalking” of lead-based paint on the building exterior. Soil can also be contaminated through airborne emissions from leaded gasoline and emissions from smelters and manufacturing plants.

Areas of high importance include drip lines around the housing unit.

At each housing unit sampled, possible contamination areas were located and samples taken to a depth of two (2) inches. The areas were generally barren of vegetation. The samples were composited in a single sample container. In most cases a minimum of three (3) samples were taken to make the composite sample. Once the samples were returned to the iiná bá’s Farmington office, the samples were dried, mixed and crushed.

They were then analyzed using the XRF and the sample results reported in parts per million (ppm) in Table 4. None of the 30 residential units sampled and screened for lead in soil tested positive for lead paint per HUD Guidelines.

4.0 LEAD-BASED PAINT DEFINITIONS

HUD considers paint to be lead-based paint (LBP) if the concentration is 1.0 milligram of lead per square centimeter (1.0 mg/cm2) or greater, or if the lead concentration is greater than 5000 parts per million (ppm) or 0.5% by weight. The Consumer Product Safety Commission (CPSC) currently considers paint to be lead-containing if the concentration of lead exceeds 600 ppm (0.06% by weight). In 1978, the CPSC banned the sale of lead-based paint to consumers and its application to areas where consumers have direct access to painted surfaces. This survey classified LBP on the basis of the HUD 1.0 mg/cm criteria and 0.5% by weight (5,000 ppm).

By contrast, the mission of the Occupational Safety and Health Administration (OSHA), with respect to lead in paint, is to protect workers during construction activities that may generate elevated airborne lead concentrations. OSHA states that construction work (including renovation, maintenance, and demolition) carried-out on structures coated with paints that have lead concentrations lower than the HUD or CPSC limits can still result in airborne lead concentrations in excess of regulatory limits. For this reason, OSHA has not defined lead-containing paint, but states that paint having any measurable level of lead may pose a substantial exposure hazard during construction work, depending upon the work performed. The owner or employers must be aware of the OSHA Lead in Construction Standard (29 CFR 1926.62) and the Respiratory Protection Standard (29 CFR 1910.134).

5.0 FINDINGS AND COST ESTIMATES

The table below summarizes the results and information for each building inspected and provides hyperlinks (electronic copy) to XRF Results Table, Detailed Cost Estimates and XRF Field Data Results.

XRF Field Data Results are located in Appendix 2 of this report. The tables show all lead measurements in the order taken for each of the structures and sampling areas tested. Descriptions of the columns found in the data tables are also described in Appendix 2.

Location Bldg.

No.

Unit Type (Appendix 1)

Lead Present

(Yes or No)

XRF Results Tables and

Cost Estimates

XRF Field Data Results

Kayenta 2000 Health Clinic Yes Appendix 3 Appendix 2 Kayenta 2001 General Residence Yes Appendix 3 Appendix 2 Kayenta 2002 General Residence Yes Appendix 3 Appendix 2 Kayenta 2003 Single-Family Yes Appendix 3 Appendix 2 Kayenta 2004 Single-Family No Appendix 3 Appendix 2 Kayenta 2005 Single-Family Yes Appendix 3 Appendix 2 Kayenta 2006 Single-Family Yes Appendix 3 Appendix 2 Kayenta 2007 Single-Family Yes Appendix 3 Appendix 2 Kayenta 2008 Single-Family Yes Appendix 3 Appendix 2 Kayenta 2009 Single-Family Yes Appendix 3 Appendix 2 Kayenta 2010 General Services Yes Appendix 3 Appendix 2 Kayenta 2011 Single-Family No Appendix 3 Appendix 2 Kayenta 2012 Single-Family No Appendix 3 Appendix 2 Kayenta 2015 Single-Family No Appendix 3 Appendix 2 Kayenta 2016 Single-Family No Appendix 3 Appendix 2 Kayenta 2017 Single-Family No Appendix 3 Appendix 2 Kayenta 2020 General Residence No Appendix 3 Appendix 2 Kayenta 3000 Maintenance Shop No Appendix 3 Appendix 2 Kayenta 3002 OEH No Appendix 3 Appendix 2 Kayenta 3003 General Residence No Appendix 3 Appendix 2 Kayenta 3004 House Trailer No Appendix 3 Appendix 2 Kayenta 3005 House Trailer No Appendix 3 Appendix 2 Kayenta 3006 House Trailer No Appendix 3 Appendix 2 Kayenta 3007 House Trailer No Appendix 3 Appendix 2 Kayenta 3009 Dental Clinic No Appendix 3 Appendix 2 Kayenta 4001 House Trailer No Appendix 3 Appendix 2 Kayenta 4002 House Trailer No Appendix 3 Appendix 2 Kayenta 4003 House Trailer No Appendix 3 Appendix 2 Kayenta 4004 House Trailer No Appendix 3 Appendix 2 Kayenta 4005 CHN No Appendix 3 Appendix 2 Kayenta 4008 Business Office No Appendix 3 Appendix 2 Kayenta 4008 Counseling No Appendix 3 Appendix 2 Kayenta 4009 House Trailer No Appendix 3 Appendix 2 Kayenta 4011 House Trailer No Appendix 3 Appendix 2 Kayenta 4012 House Trailer No Appendix 3 Appendix 2 Kayenta 4013 Human Resources Yes Appendix 3 Appendix 2 Kayenta 4015 House Trailer No Appendix 3 Appendix 2 Kayenta 4016 Finance No Appendix 3 Appendix 2 Kayenta 4017 Facility Management No Appendix 3 Appendix 2 Kayenta 4018 House Trailer No Appendix 3 Appendix 2 Kayenta 4021 House Trailer No Appendix 3 Appendix 2 Kayenta 4022 House Trailer No Appendix 3 Appendix 2 Kayenta 4023 House Trailer No Appendix 3 Appendix 2 Kayenta 4024 House Trailer No Appendix 3 Appendix 2 Kayenta 4025 House Trailer No Appendix 3 Appendix 2 Kayenta 5110 House Trailer No Appendix 3 Appendix 2 jisham Rectangle jisham Typewritten Text

According to HUD Guidelines, lead-based paint was identified at or above 1.0 mg/cm2 on interior and exterior building components sampled during the survey. The Positive XRF Results Table (Table 2) in Appendix 3 identifies the room number, building component, paint color and condition, and approximate square footage of lead-based paint materials.

Detailed Cost Estimates (Appendix 3) were developed for the removal of lead based paint building components. The Detailed Cost Estimates were derived by abatement professionals utilizing current industry costs for the current period (2012). All applicable taxes and markup are included.

This estimate is for abatement contractor plus Environmental Professional costs. Costs for the replacement of building materials that have been removed are NOT included.

The total estimated cost for the chemical removal of lead based paint at the Kayenta Service Unit – Kayenta Health Center is $92,025.04. The total estimated cost for the component demolition of building materials applied with lead based paint at the Kayenta Service Unit – Kayenta Health Center is $71,126.42.

6.0 DISCUSSION AND RECOMMENDATIONS

Lead-based paint (LBP) was detected on interior and exterior building components during sampling conducted by iiná bá) on February 13 to February 22, 2012. The interior and exterior LBP components were generally in good condition, with some exterior deterioration. Due to the observed good condition of the LBP components, iiná bá) does not recommend abatement or maintenance attention to the LBP unless they will be disturbed by renovation or demolition activities.

The mere presence of LBP in a building poses no health hazard so long as the paint remains intact. Lead is only a hazard to adults and workers when it is inhaled, as fine dust or fume, or when it is ingested, when a painted surface is mouthed or chewed by a child, or inadvertently through contamination of surfaces, hands, and food by lead-contaminated dust. Therefore, to minimize the potential hazards associated with the presence of LBP, the following procedures should be implemented.

Identification (through testing) of all known or suspect LBP surfaces and communication of the presence of LBP surfaces to workers potentially affected by the presence of LBP.

Although the LBP testing has been completed, completion of a specific Operations and Maintenance (O&M) Program is suggested to organize a coherent, continuous program outlining procedures for routine inspections, maintenance, and immediate clean-up of damaged LBP surfaces. The O&M Program should address periodic inspections, maintenance activities, methods of safe and prompt clean-up when a licensed lead abatement contractor is not used, work procedures which are likely to create lead hazards, and a program of standard work procedures which are designed to minimize lead contamination. Development of an O&M Program was not part of iiná bá’s original Scope of Work. The on-site maintenance should perform periodic inspections to assess the condition of LBP (i.e. chip, peel, or flake). If areas of LBP become damaged or deteriorated, a licensed lead abatement contractor should be contacted regarding removal or abatement. Maintenance activities, which should be avoided in areas where known or suspect LBP is located, include, but are not limited to:

• Scraping, sanding, or using a heat gun on painted surfaces before repainting;

• Making holes in walls to access at pipes, install electrical outlets, etc.;

• Removing building components for renovation activities;

• Repeatedly bumping furniture or other objects into painted components;

• Unnecessarily opening and closing windows with LBP components. Major work or renovation performed on LBP components should be completed by a licensed LBP abatement contractor. However, if minor repair or immediate clean-up is necessary for a specific LBP component, at a minimum, the following work and clean-up procedures should be incorporated:

• Wet the painted surface with soapy water prior to working;

• Thoroughly clean area following work. Clean-up dust and chips with wet mops or rags soaked in a solution of trisodium phosphate (TSP) or phosphate containing powdered dishwashing detergent. Use two buckets of water – one for wash and one for rinse. To prevent recontamination of cleaned surfaces, wash mops and rags thoroughly after each use. Dust, chips, debris, mops, and rags should be contained in plastic bags and disposed of properly by a licensed lead abatement contractor;

• Avoid sweeping or vacuuming the work area. Sweeping and vacuuming spread lead dust particles, since the filters are not fine enough to contain LBP particles;

• If an entire LBP component (such as a window sill or door frame) requires removal, a representative sample should be taken of the LBP-coated component and this sample should be analyzed via the Toxic Characteristic Leaching Process (TCLP) method to determine whether the component must be disposed of as a hazardous waste. A licensed lead contractor should take the sample and a certifies, licensed laboratory should provide the analysis for the TCLP method;

There are three (3) general control strategies for controlling lead paint. These are component replacement, encapsulation, and paint removal. The most cost effective, up front control strategy is to encapsulate LBP by repainting areas of chipped, damaged, or deteriorating paint. Cleaning of the component and surface using procedures described above should be completed prior to encapsulation activities.

Safe and prompt clean-up of LBP debris or dust when damage of deterioration is encountered should be completed by a licensed lead abatement contractor when possible. LBP component removal and paint removal are considered LBP abatement and would need to b e completed by a licensed lead abatement contractor. Should removal or abatement be completed, an exposure assessment should be performed during the work, as required by the OSHA lead-in-construction standard.

iiná bá recommends personnel responsible for conducting maintenance of LBP components in the facility meet the training requirements for maintenance workers on LBP hazards. This training includes procedures that minimize lead dust generation and soil contamination during maintenance activities, as defined by the EPA and HUD. Portions of the OSHA 29 CFR 1910.1025 General Lead Industry Standard apply to the maintenance activities that involve making or keeping a structure, fixture, or foundation in proper condition in a routine, scheduled or anticipated fashion.

7.0 PROJECT LIMITATIONS

This project was performed using, as a minimum, practices consistent with standards acceptable within the industry at this time, and a level of diligence typically exercised by industrial hygiene and environmental consultants performing similar services.

The procedures used in this investigation attempt to establish a balance between the competing goals of limiting investigative and reporting costs and time, and reducing the uncertainty about unknown conditions. Therefore, because the findings of this report were derived from the scope, costs, time, and other limitations, the conclusions should not be construed as a guarantee that all environmental or occupational hazards have been identified and fully evaluated. Where sample collection and testing have been performed, iiná bá’s professional opinions are based in part on the interpretation of data from discrete sampling locations that may not represent conditions at non-sampled locations. iiná bá assumes no responsibility for omissions or errors resulting from inaccurate information, or data, provided by sources outside of iiná bá or from omissions or errors in public records.

Furthermore, it is emphasized that the final decision on how much risk to accept always remains with the client since iiná bá is not in a position to fully understand all of the client's needs. Clients with a greater aversion to risk may want to take additional actions while others, with less aversion to risk, may want to take no further action.

APPENDIX 1 APPENDIX 1 APPENDIX 1 ——— FUNCTIONAL SPACE MAPS FUNCTIONAL SPACE MAPS FUNCTIONAL SPACE MAPS LLLEADEADEAD---BBBASEDASEDASED PPPAINTAINTAINT (LBP) S(LBP) S(LBP) SAMPLINGAMPLINGAMPLING RRREPORTEPORTEPORT

KKKAYENTAAYENTAAYENTA SSSERVICEERVICEERVICE UUUNITNITNIT———KKKAYENTAAYENTAAYENTA HHHEALTHEALTHEALTH CCCENTERENTERENTER KKKAYENTAAYENTAAYENTA, A, A, APACHEPACHEPACHE CCCOUNTYOUNTYOUNTY, A, A, ARIZONARIZONARIZONA CCCONTRACTONTRACTONTRACT NNNOOO. HHSI161201200001C. HHSI161201200001C. HHSI161201200001C

WaterWastewaterSolid WasteRoadsStormwaterSubdivisionsSurveyingGIS

HydrologyAir QualityESASoil InvestigationsSPCCWater RightsLUST

PPREPAREDREPARED FFOROR::

IINDIANNDIAN HHEALTHEALTH SSERVICESERVICES

DDIVISIONIVISION OFOF FFACILITIESACILITIES MMANAGEMENTANAGEMENT & E& ENGINEERINGNGINEERING/OEHE/OEHE

P. O. BP. O. BOXOX 90209020

WWINDOWINDOW RROCKOCK, A, ARIZONARIZONA 8651586515

PPPREPAREDREPAREDREPARED BBBYYY:::

IINÁIINÁIINÁ BÁBÁBÁ, , , IIINCNCNC. . .

4801 N. B4801 N. B4801 N. BUTLERUTLERUTLER AAAVENUEVENUEVENUE, S, S, SUITEUITEUITE 110111011101

FFFARMINGTONARMINGTONARMINGTON, NM 87401, NM 87401, NM 87401

www.iinábá.comwww.iinábá.comwww.iinábá.com

PPPHONEHONEHONE: (505) 327: (505) 327: (505) 327---107210721072

FFFAXAXAX: (505) 327: (505) 327: (505) 327---151715171517

MMMARCHARCHARCH 28, 201228, 201228, 2012

APPENDIX 2 APPENDIX 2 APPENDIX 2 ——— XRF FIELD DATA AND CALIBRATIONSXRF FIELD DATA AND CALIBRATIONSXRF FIELD DATA AND CALIBRATIONS LLLEADEADEAD---BBBASEDASEDASED PPPAINTAINTAINT (LBP) S(LBP) S(LBP) SAMPLINGAMPLINGAMPLING RRREPORTEPORTEPORT

KKKAYENTAAYENTAAYENTA SSSERVICEERVICEERVICE UUUNITNITNIT———KKKAYENTAAYENTAAYENTA HHHEALTHEALTHEALTH CCCENTERENTERENTER

PPREPAREDREPARED FFOROR::

IINDIANNDIAN HHEALTHEALTH SSERVICESERVICES

DDIVISIONIVISION OFOF FFACILITIESACILITIES MMANAGEMENTANAGEMENT & E& ENGINEERINGNGINEERING/OEHE/OEHE

P. O. BP. O. BOXOX 90209020

WWINDOWINDOW RROCKOCK, A, ARIZONARIZONA 8651586515

PPPREPAREDREPAREDREPARED BBBYYY:::

IINÁIINÁIINÁ BÁBÁBÁ, , , IIINCNCNC. . .

4801 N. B4801 N. B4801 N. BUTLERUTLERUTLER AAAVENUEVENUEVENUE, S, S, SUITEUITEUITE 110111011101

FFFARMINGTONARMINGTONARMINGTON, NM 87401, NM 87401, NM 87401

www.iinábá.comwww.iinábá.comwww.iinábá.com

PPPHONEHONEHONE: (505) 327: (505) 327: (505) 327---107210721072

APPENDIX 3 APPENDIX 3 APPENDIX 3 ——— XRF SPECTRUM ANALYZER RESULTS, PHOTOGRAPHS AND COST XRF SPECTRUM ANALYZER RESULTS, PHOTOGRAPHS AND COST XRF SPECTRUM ANALYZER RESULTS, PHOTOGRAPHS AND COST

ESTIMATEESTIMATEESTIMATE

LLLEADEADEAD---BBBASEDASEDASED PPPAINTAINTAINT (LBP) S(LBP) S(LBP) SAMPLINGAMPLINGAMPLING RRREPORTEPORTEPORT KKKAYENTAAYENTAAYENTA SSSERVICEERVICEERVICE UUUNITNITNIT———KKKAYENTAAYENTAAYENTA HHHEALTHEALTHEALTH CCCENTERENTERENTER

PPREPAREDREPARED FFOROR::

IINDIANNDIAN HHEALTHEALTH SSERVICESERVICES

DDIVISIONIVISION OFOF FFACILITIESACILITIES MMANAGEMENTANAGEMENT & E& ENGINEERINGNGINEERING/OEHE/OEHE

P. O. BP. O. BOXOX 90209020

WWINDOWINDOW RROCKOCK, A, ARIZONARIZONA 8651586515

PPPREPAREDREPAREDREPARED BBBYYY:::

IINÁIINÁIINÁ BÁBÁBÁ, , , IIINCNCNC. . .

4801 N. B4801 N. B4801 N. BUTLERUTLERUTLER AAAVENUEVENUEVENUE, S, S, SUITEUITEUITE 110111011101

FFFARMINGTONARMINGTONARMINGTON, NM 87401, NM 87401, NM 87401

www.iinábá.comwww.iinábá.comwww.iinábá.com

PPPHONEHONEHONE: (505) 327: (505) 327: (505) 327---107210721072

Table 1: Summary of Lead-Based Paint XRF Screening Results Kayenta Service Unit - Building #2000

Kayenta, Apache County, Arizona IHS Contract No. HHSI161201200001C

Sample Index Date & Time Inspector Building Floor Room Component Wall Code Condition Color Sample Type Pb Concentration Units Results Depth Index

1349 2/15/2012 4:59 V. Aspaas 2000 GROUND ESELECT 2.5805 mg/Cm2

1350 2/15/2012 5:01 V. Aspaas 2000 GROUND Calibration Standard 1.00 mg/Cm2 Null 1.03

1351 2/15/2012 5:03 V. Aspaas 2000 GROUND Calibration Standard 1.00 mg/Cm2 Pass 1.1

1352 2/15/2012 5:07 V. Aspaas 2000 GROUND 601 WALL A Fair GREEN Paint 0.00 mg/Cm2 Negative 1

1353 2/15/2012 5:07 V. Aspaas 2000 GROUND 601 WALL B Fair GREEN Paint 0.00 mg/Cm2 Negative 1

1354 2/15/2012 5:08 V. Aspaas 2000 GROUND 601 WALL C Fair GREEN Paint 0.00 mg/Cm2 Negative 1

1355 2/15/2012 5:08 V. Aspaas 2000 GROUND 601 WALL D Fair GREEN Paint 0.00 mg/Cm2 Negative 1

1356 2/15/2012 5:08 V. Aspaas 2000 GROUND 601 DOOR TR C Fair GREEN Paint 0.00 mg/Cm2 Negative 1.01

1357 2/15/2012 5:08 V. Aspaas 2000 GROUND 601 DOOR C Fair RED Paint 0.00 mg/Cm2 Negative 1

1358 2/15/2012 5:11 V. Aspaas 2000 GROUND 602 WALL A Fair GRAY Paint 0.05 mg/Cm2 Negative 2.9

1359 2/15/2012 5:11 V. Aspaas 2000 GROUND 602 WALL B Fair GRAY Paint 0.11 mg/Cm2 Negative 5.05

1360 2/15/2012 5:12 V. Aspaas 2000 GROUND 602 WALL C Fair GRAY Paint 0.06 mg/Cm2 Negative 3.63

1361 2/15/2012 5:12 V. Aspaas 2000 GROUND 602 WALL D Fair GRAY Paint 0.04 mg/Cm2 Negative 2.55

1362 2/15/2012 5:12 V. Aspaas 2000 GROUND 602 CEILING E Fair GRAY Paint 0.00 mg/Cm2 Negative 1

1363 2/15/2012 5:12 V. Aspaas 2000 GROUND 602 FLOOR F Fair GRAY Paint 0.00 mg/Cm2 Negative 1

1364 2/15/2012 5:13 V. Aspaas 2000 GROUND 602 WALL A Fair GREEN Paint 0.00 mg/Cm2 Negative 1

1365 2/15/2012 5:13 V. Aspaas 2000 GROUND 602 WALL A Fair RED Paint 0.00 mg/Cm2 Negative 1

1366 2/15/2012 5:13 V. Aspaas 2000 GROUND 602 DOOR TR C Fair GREEN Paint 0.00 mg/Cm2 Negative 1

1367 2/15/2012 5:13 V. Aspaas 2000 GROUND 602 DOOR C Fair RED Paint 0.00 mg/Cm2 Negative 1

1368 2/15/2012 5:17 V. Aspaas 2000 GROUND 607 WALL A Fair GREEN Paint 0.00 mg/Cm2 Negative 1

1369 2/15/2012 5:17 V. Aspaas 2000 GROUND 607 WALL B Fair GREEN Paint 0.00 mg/Cm2 Negative 1

1370 2/15/2012 5:17 V. Aspaas 2000 GROUND 607 WALL C Fair GREEN Paint 0.00 mg/Cm2 Negative 1

1371 2/15/2012 5:17 V. Aspaas 2000 GROUND 607 WALL D Fair GREEN Paint 0.00 mg/Cm2 Negative 1

1372 2/15/2012 5:18 V. Aspaas 2000 GROUND 607 DOOR TR C Fair GREEN Paint 0.00 mg/Cm2 Negative 1

1373 2/15/2012 5:18 V. Aspaas 2000 GROUND 607 DOOR C Fair RED Paint 0.00 mg/Cm2 Negative 1

1374 2/15/2012 5:19 V. Aspaas 2000 GROUND 608 WALL A Fair GREEN Paint 0.00 mg/Cm2 Negative 1

1375 2/15/2012 5:19 V. Aspaas 2000 GROUND 608 WALL B Fair GREEN Paint 0.00 mg/Cm2 Negative 1

1376 2/15/2012 5:19 V. Aspaas 2000 GROUND 608 WALL C Fair GREEN Paint 0.00 mg/Cm2 Negative 1

1377 2/15/2012 5:19 V. Aspaas 2000 GROUND 608 WALL D Fair GREEN Paint 0.00 mg/Cm2 Negative 1

1378 2/15/2012 5:19 V. Aspaas 2000 GROUND 608 DOOR TR C Fair GREEN Paint 0.00 mg/Cm2 Negative 1

1379 2/15/2012 5:20 V. Aspaas 2000 GROUND 608 DOOR C Fair RED Paint 0.00 mg/Cm2 Negative 1

1380 2/15/2012 5:21 V. Aspaas 2000 GROUND 609 WALL A Fair GREEN Paint 0.00 mg/Cm2 Negative 1

1381 2/15/2012 5:22 V. Aspaas 2000 GROUND 609 WALL B Fair GREEN Paint 0.00 mg/Cm2 Negative 1

1382 2/15/2012 5:22 V. Aspaas 2000 GROUND 609 WALL C Fair GREEN Paint 0.00 mg/Cm2 Negative 1

1383 2/15/2012 5:22 V. Aspaas 2000 GROUND 609 WALL D Fair GREEN Paint 0.00 mg/Cm2 Negative 1

1384 2/15/2012 5:22 V. Aspaas 2000 GROUND 609 DOOR TR C Fair GREEN Paint 0.00 mg/Cm2 Negative 1

1385 2/15/2012 5:22 V. Aspaas 2000 GROUND 609 DOOR C Fair RED Paint 0.00 mg/Cm2 Negative 1

1386 2/15/2012 5:23 V. Aspaas 2000 GROUND 611 WALL A Fair GREEN Paint 0.00 mg/Cm2 Negative 1

1387 2/15/2012 5:24 V. Aspaas 2000 GROUND 611 WALL B Fair GREEN Paint 0.00 mg/Cm2 Negative 1

Kayenta, Apache County, Arizona IHS Contract No. HHSI161201200001C

Sample Index Date & Time Inspector Building Floor Room Component Wall Code Condition Color Sample Type Pb Concentration Units Results Depth Index

1388 2/15/2012 5:24 V. Aspaas 2000 GROUND 611 WALL C Fair GREEN Paint 0.00 mg/Cm2 Negative 1

1389 2/15/2012 5:24 V. Aspaas 2000 GROUND 611 WALL D Fair GREEN Paint 0.00 mg/Cm2 Negative 1

1390 2/15/2012 5:25 V. Aspaas 2000 GROUND 611 DOOR TR C Fair GREEN Paint 0.00 mg/Cm2 Negative 1

1391 2/15/2012 5:25 V. Aspaas 2000 GROUND 611 DOOR C Fair RED Paint 0.00 mg/Cm2 Negative 1

1392 2/15/2012 5:26 V. Aspaas 2000 GROUND 650 WALL A Fair GREEN Paint 0.01 mg/Cm2 Negative 2.81

1393 2/15/2012 5:27 V. Aspaas 2000 GROUND 650 WALL B Fair GREEN Paint 0.00 mg/Cm2 Negative 1

1394 2/15/2012 5:27 V. Aspaas 2000 GROUND 650 WALL C Fair GREEN Paint 0.00 mg/Cm2 Negative 1

1395 2/15/2012 5:28 V. Aspaas 2000 GROUND 650 WALL D Fair GREEN Paint 0.00 mg/Cm2 Negative 1.42

1396 2/15/2012 5:28 V. Aspaas 2000 GROUND 650 CEILING E Fair GREEN Paint 0.00 mg/Cm2 Negative 1

1397 2/15/2012 5:29 V. Aspaas 2000 GROUND 650 WINDOW A Fair BROWN Paint 0.00 mg/Cm2 Negative 1

1398 2/15/2012 5:30 V. Aspaas 2000 GROUND 650 DOOR TR D Fair GREEN Paint 0.00 mg/Cm2 Negative 1

1399 2/15/2012 5:30 V. Aspaas 2000 GROUND 650 DOOR D Fair RED Paint 0.00 mg/Cm2 Negative 1

1400 2/15/2012 5:32 V. Aspaas 2000 GROUND 676 WALL A Fair GREEN Paint 0.00 mg/Cm2 Negative 1

1401 2/15/2012 5:32 V. Aspaas 2000 GROUND 676 WALL C Fair GREEN Paint 0.00 mg/Cm2 Negative 1

1402 2/15/2012 5:32 V. Aspaas 2000 GROUND 676 WALL D Fair GREEN Paint 0.00 mg/Cm2 Negative 1

1403 2/15/2012 5:32 V. Aspaas 2000 GROUND 676 DOOR TR C Fair GREEN Paint 0.00 mg/Cm2 Negative 1

1404 2/15/2012 5:33 V. Aspaas 2000 GROUND 676 DOOR C Fair RED Paint 0.00 mg/Cm2 Negative 1

1405 2/15/2012 5:33 V. Aspaas 2000 GROUND 677 WALL A Fair GREEN Paint 0.00 mg/Cm2 Negative 1.74

1406 2/15/2012 5:34 V. Aspaas 2000 GROUND 677 WALL B Fair GREEN Paint 0.00 mg/Cm2 Negative 1

1407 2/15/2012 5:34 V. Aspaas 2000 GROUND 677 WALL C Fair GREEN Paint 0.02 mg/Cm2 Negative 7.91

1408 2/15/2012 5:34 V. Aspaas 2000 GROUND 677 WALL D Fair GREEN PAINT 0.00 mg/Cm2 Negative 1

1409 2/15/2012 5:34 V. Aspaas 2000 GROUND 677 DOOR TR A Fair GREEN Paint 0.02 mg/Cm2 Negative 3.98

1410 2/15/2012 5:34 V. Aspaas 2000 GROUND 677 DOOR A Fair RED Paint 0.01 mg/Cm2 Negative 1.96

1411 2/15/2012 5:36 V. Aspaas 2000 GROUND 613 WALL A Fair GREEN Paint 0.00 mg/Cm2 Negative 1

1412 2/15/2012 5:37 V. Aspaas 2000 GROUND 613 WALL B Fair GREEN Paint 0.01 mg/Cm2 Negative 2.02

1413 2/15/2012 5:37 V. Aspaas 2000 GROUND 613 WALL C Fair GREEN Paint 0.00 mg/Cm2 Negative 1

1414 2/15/2012 5:37 V. Aspaas 2000 GROUND 613 WALL D Fair GREEN Paint 0.00 mg/Cm2 Negative 1

1415 2/15/2012 5:38 V. Aspaas 2000 GROUND 613 DOOR TR C Fair GREEN Paint 0.00 mg/Cm2 Negative 1

1416 2/15/2012 5:38 V. Aspaas 2000 GROUND 613 DOOR C Fair RED Paint 0.00 mg/Cm2 Negative 1

1417 2/15/2012 5:41 V. Aspaas 2000 GROUND 625 WALL A Fair GREEN Paint 0.00 mg/Cm2 Negative 1

1418 2/15/2012 5:41 V. Aspaas 2000 GROUND 625 WALL B Fair GREEN Paint 0.00 mg/Cm2 Negative 1

1419 2/15/2012 5:42 V. Aspaas 2000 GROUND 625 WALL C Fair GREEN Paint 0.00 mg/Cm2 Negative 1

1420 2/15/2012 5:42 V. Aspaas 2000 GROUND 625 WALL D Fair GREEN Paint 0.00 mg/Cm2 Negative 1.03

1421 2/15/2012 5:42 V. Aspaas 2000 GROUND 625 DOOR TR A Fair GREEN Paint 0.00 mg/Cm2 Negative 1

1422 2/15/2012 5:42 V. Aspaas 2000 GROUND 625 DOOR A Fair RED Paint 0.00 mg/Cm2 Negative 1

1423 2/15/2012 5:42 V. Aspaas 2000 GROUND 625 CLOSET B Fair BROWN Paint 0.00 mg/Cm2 Negative 1

1424 2/15/2012 5:44 V. Aspaas 2000 GROUND 623 WALL A Fair GREEN Paint 0.00 mg/Cm2 Negative 1

1425 2/15/2012 5:44 V.