About this file
This document contains a contractor pricing sheet for the modernization of two service elevators located at the Jacob Javits Federal Building in New York City. The General Services Administration is seeking design-build services to modernize key elevator components such as machine motors, controllers, car enclosures, doors and buttons. The pricing sheet lists line items for base contract work and five modernization options, including additional security features, regenerative drive systems, switchboard replacements and a machine room sprinkler system. It also includes two cost allowances for hazardous material abatement and hoistway patching/painting. Contractors should submit unit pricing for work. Award is expected to be a firm-fixed price contract for modernization services at the federal building located at 26 Federal Plaza in lower Manhattan.
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| CONTRACT PRICING FORM | Vendor Name: |
| Agency: General Service Administration | |
| Solicitation: | |
| Location of Performance: 26 Federal Plaza - FOB | |
| Description of Work: Two Service Elevators Modernization Services | |
| Originating Office: 2PCM |
| NOTE: | Refer to Statement of Work and associated attachments for contract description and minimum performance requirements. | |||
| BASE CONTRACT | ||||
| Line Item | Description | Qty | Unit | Price |
| 1 | Design Services | |||
| 2 | Hoist Machine Motors | |||
| 3 | Motor Drives | |||
| 4 | Controllers | |||
| 5 | Selectors | |||
| 6 | Governor | |||
| 7 | Safeties - Refurbish | |||
| 8 | Compensation Ropes | |||
| 9 | Hoist Ropes | |||
| 10 | Governor Rope | |||
| 11 | Governor Pit Sheave | |||
| 12 | Buffers - Refurbish | |||
| 13 | Car Frame & Platform (sling) - Refurbish | |||
| 14 | Guide Rails - Refurbish | |||
| 15 | Guide Shoe Assemblies | |||
| 16 | Counterweight - Refurbish | |||
| 17 | Hoistway Entrance Frame & Sills - Refurbish | |||
| 18 | Hoistway Door Tracks, Hangers, & Rollers | |||
| 19 | Hoistway Doors - Refurbish | |||
| 20 | Hoistway Door Closers & Inter-locks | |||
| 21 | Hoistway Wiring | |||
| 22 | Car Doors | |||
| 23 | Car Door Operator | |||
| 24 | Car Door Protective Device | |||
| 25 | Car Enclosures | |||
| 26 | Car Operating Panel | |||
| 27 | Car Position Indicator | |||
| 28 | Hall Push Button Fixtures | |||
| 29 | Hall Direction Lanterns | |||
| 30 | Lobby, Fire Command Center & Building Manager’s Office Control Panels | |||
| 31 | Fireman’s Service | |||
| 32 | Emergency Communication Device | |||
| 33 | Emergency Car Lighting | |||
| 34 | Traveling Cables | |||
| 35 | CCTV System | |||
| 36 | Security Operations and Features | |||
| 37 | Electrical & Emergency Power Operations | |||
| 38 | HVAC System | |||
| 39 | Machine Room Conditions | |||
| 40 | Pit and Hoistway Conditions | |||
| 41 | Mobilization | |||
| Subtotal: | ||||
| 42 | Bonds | |||
| 43 | Insurance | |||
| 44 | Profit | |||
| 45 | Overhead | |||
| BASE CONTRACT TOTAL: |
| OPTION #1 - MODERNIZATION OF SERVICE ELEVATOR #44 | ||||
| Line Item | Description | Qty | Unit | Price |
| 1 | Hoist Machine Motors | |||
| 2 | Motor Drives | |||
| 3 | Controllers - Integration with base contract | |||
| 4 | Selectors | |||
| 5 | Governor | |||
| 6 | Safeties - Refurbish | |||
| 7 | Compensation Ropes | |||
| 8 | Hoist Ropes | |||
| 9 | Governor Rope | |||
| 10 | Governor Pit Sheave | |||
| 11 | Buffers - Refurbish | |||
| 12 | Car Frame & Platform (sling) - Refurbish | |||
| 13 | Guide Rails - Refurbish | |||
| 14 | Guide Shoe Assemblies | |||
| 15 | Counterweight - Refurbish | |||
| 16 | Hoistway Entrance Frame & Sills - Refurbish | |||
| 17 | Hoistway Door Tracks, Hangers, & Rollers | |||
| 18 | Hoistway Doors - Refurbish | |||
| 19 | Hoistway Door Closers & Inter-locks | |||
| 20 | Hoistway Wiring | |||
| 21 | Car Doors | |||
| 22 | Car Door Operator | |||
| 23 | Car Door Protective Device | |||
| 24 | Car Enclosures | |||
| 25 | Car Operating Panel | |||
| 26 | Car Position Indicator | |||
| 27 | Hall Push Button Fixtures - Integration with base contract | |||
| 28 | Hall Direction Lanterns - Integration with base contract | |||
| 29 | Lobby, Fire Command Center & Building Manager’s Office Control Panels - Integration with base contract | |||
| 30 | Fireman’s Service - Interation with base contract | |||
| 31 | Emergency Communication Device | |||
| 32 | Emergency Car Lighting | |||
| 33 | Traveling Cables | |||
| 34 | CCTV System - Integration with base contract | |||
| 35 | Security Operations and Features - Integration with base contract | |||
| 36 | Electrical & Emergency Power Operations | |||
| 37 | Pit and Hoistway Conditions | |||
| Subtotal: | ||||
| 38 | Profit | |||
| 39 | Overhead | |||
| OPTION #1 TOTAL: |
| OPTION #2 - Additional Security Operations and Features | ||||
| Line Item | Description | Qty | Unit | Price |
| 1 | Furnish and Install PIV Card Readers inside service elevator cabs with integration to PACS - price unit per cab | |||
| 2 | Furnish and Install PIV Card Readers at gorund floor, 2nd floor and 6th floor with integration to PACS | |||
| 3 | Furnish and install card readers in additional floors with integratinon to PACS - price unit per floor | |||
| Subtotal: | ||||
| 4 | Profit | |||
| 5 | Overhead | |||
| OPTION #2 TOTAL: |
| OPTION #3 - Additional Design-Build services for integration of Regenerative Drive Systems. | ||||
| Line Item | Description | Qty | Unit | Price |
| 1 | Additional design service to base contract | |||
| 2 | Regenerative Drive System - per service elevator | |||
| Subtotal: | ||||
| 3 | Profit | |||
| 4 | Overhead | |||
| OPTION #3 TOTAL: |
| OPTION #4 - Design-Build services for replacement elevator switchboards “F1” and “F2”. | ||||
| Line Item | Description | Qty | Unit | Price |
| 1 | Additional design service to base contract | |||
| 2 | Replacement of switchboards F1 and F2 - price unit per switchboard | |||
| Subtotal: | ||||
| 3 | Profit | |||
| 4 | Overhead | |||
| OPTION #4 TOTAL: |
| OPTION #5 - Design-Build services for installation of automatic sprinkler system in service elevator machine room | ||||
| Line Item | Description | Qty | Unit | Price |
| 1 | Additional design service to base contract | |||
| 2 | Installation of automatic sprinkler system in service elevator machine room | |||
| Subtotal: | ||||
| 3 | Profit | |||
| 4 | Overhead | |||
| OPTION #4 TOTAL: |
| Allowance #1 - Hazardous Material Abatement Allowance ($50,000) | ||||
| Line Item | Description | Qty | Unit | Price |
| 1 | Hazardous Material Probing and Testing | |||
| 2 | Hazardous Material Abatemenet - Asbestos | |||
| 3 | Patching/Repair Fireproofing | |||
| 4 | Hazardous Material Abatemenet - Thermal Insulation | |||
| 5 | New Thermal Insulation | |||
| Subtotal: | ||||
| 6 | Profit | |||
| 7 | Overhead | |||
| Allowance #1 TOTAL: | $50,000.00 |
| Allowance #2 - Hoistway Patching and Painting Allowance ($30,000) | ||||
| Line Item | Description | Qty | Unit | Price |
| 1 | CMU Wall Patching / Repairs - to include removal / cleaning / preparation for new repair | |||
| 2 | Painting | |||
| Subtotal: | ||||
| 3 | Profit | |||
| 4 | Overhead | |||
| Allowance #2 TOTAL: | $30,000.00 |