Attachment 4 - 663A4-24-201 - 100 percent CD Drawings.pdf
PDF 18 MB Posted
- Solicitation number
- 36C26026R0022
About this file
This document is a Final Bid Documents package for a federal construction project managed by the U.S. Department of Veterans Affairs (VA). The project involves refurbishing elevators at Building 61 at American Lake Veterans Medical Center (VAMC) in Tacoma, Washington. The project number is 663A4-24-201. The scope of work includes refurbishing three elevators (two hydraulic and one electric traction), with work distributed across four phases. The refurbishment includes demolition and replacement of existing cab finishes, hoistway door panels, hall button panels, fire command panels, position indicators, and intercom systems. New heating/cooling systems (split VRF heat pumps) will be installed in elevator machine rooms. The project also encompasses plumbing work for sump pumps in elevator pits with floor drains, electrical system upgrades including new panels and disconnects for each elevator, fire protection modifications including relocation of smoke detectors, and telecommunications upgrades with new camera systems and control cabling integrated into elevator traveling cables.
The design documents comprise 44 sheets covering structural, architectural, mechanical, electrical, fire protection, plumbing, and telecommunications systems. Key consultants include SPUR Design (architect/MEP engineer) based in Oklahoma City and Kansas City, Rated Engineering (fire protection), Stand SEI (structural), and Force Protect (physical security). The building location is fully sprinklered and situated at 9600 Veterans Drive S.W., Tacoma, WA 98493. Design standards reference the 2024 International Building Code, 2024 NFPA 101 Life Safety Code, 2023 National Electrical Code, and VA-specific design manuals. The document package indicates these are final bid documents prepared for competitive solicitation and includes detailed architectural plans, demolition plans, reference plans, interior elevations, mechanical schedules, electrical one-line diagrams, and telecommunications system specifications with provisions for integration with existing VA campus infrastructure.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
DRAWING TITLE PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
PROJECT NUMBERCONSULTANTS:
DRAWING #
U.S. DEPARTMENT OF VETERANS AFFAIRS
VA HEALTH CARE SYSTEM APPROVAL:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
EXP. 12/31/2026
EXP. 09/30/2025
MEP/TELECOM ENGINEER / VT CONSULTANT
SPUR DESIGN
2519 MADISON AVE, STE 100
KANSAS CITY, MO 64108
(913) 369-7200
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
FIRE PROTECTION ENGINEER
RATED ENGINEERING
609 S KELLY AVE, STE H2
EDMOND, OK 73003
(405) 210-5814
FULLY SPRINKLERED
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
DRAWING NUMBER
BUILDING NUMBER
STRUCTURAL ENGINEER
STAND SEI
8234 ROBINSON ST,
OVERLAND PARK, KS 66204
(913) 214-2169
ARCH REG. NO. 12903
ENGR REG. NO. 24007067
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, STE 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
/1
/2
:3 :3
P
M
COVER SHEET
BAB 1 OF 44AJS
FINAL BID DOCUMENTS
REFURBISH ELEVATORS AT BLDG. 61
VA PROJECT NUMBER: 663A4-24-201
REFURBISH ELEVATORS AT
BLDG. 61
04/21/2025
663A4-24-201
AMERICAN LAKE VAMC
9600 VETERANS DR S.W.
TACOMA, WA 98493
AMERICAN LAKE VAMC
9600 VETERANS DR S.W.
TACOMA, WA 98493
FINAL BID DOCUMENTS
GI000
SPUR #: 2416
SHEET INDEX
SEQUENCE NUMBER SHEET NAME
[01] GENERAL
1 GI000 COVER SHEET
2 GI001 GENERAL INFORMATION
3 GI002 ICRA CONSTRUCTION DETAILS
4 GI011 PHASING PLAN
[02] STRUCTURAL
5 SS001 STRUCTURAL GENERAL NOTES
6 SS030 TYPICAL DETAILS
7 SS100 FOUNDATION PLAN
8 SS101 FRAMING PLANS
[03] ARCHITECTURAL
9 A-101 OVERALL PLANS
10 AD101 DEMOLITION PLAN - LEVEL 1
11 AD102 DEMOLITION PLAN - LEVEL 2
12 AD103 DEMOLITION PLAN - LEVEL 3
13 AD104 DEMOLITION PLAN - PENTHOUSE
14 AE101 REFERENCE PLAN - LEVEL 1
15 AE102 REFERENCE PLAN - LEVEL 2
16 AE103 REFERENCE PLAN - LEVEL 3
17 AE104 REFERENCE PLAN - PENTHOUSE
18 AE401 INTERIOR ELEVATIONS & FINISH PLANS
[04] FIRE PROTECTION
19 F-101 FIRE PROTECTION MATRICES, RISER, GENERAL NOTES, AND LEGEND
20 F-105 FIRE PROTECTION DETAILS
21 F-102 FIRE PROTECTION REFERENCE PLANS
22 F-103 FIRE PROTECTION ENLARGED PLANS
[05] PLUMBING
23 P-000 PLUMBING LEGEND
24 PL100 SANITARY SEWER WASTE PLANS
25 P-300 RISER DIAGRAM
26 P-501 PLUMBING DETAILS, SCHEDULES, AND CONTROLS
[06] MECHANICAL
27 M-000 LEGEND AND ABBREVIATIONS
28 M-100 MECHANICAL PLANS
29 M-501 MECHANICAL DETAILS
30 M-502 MECHANICAL DETAILS
31 M-601 MECHANICAL SCHEDULES
[07] ELECTRICAL
32 E-001 ELECTRICAL LEGEND AND ABBREVIATIONS
33 ED101 ELECTRICAL DEMOLITION PLANS - LEVEL 1
34 ED102 ELECTRICAL DEMOLITION PLANS - LEVEL 2
35 ED103 ELECTRICAL DEMOLITION PLANS - ATTIC
36 EP104 ELECTRICAL PLANS - LEVEL 1
37 EP105 ELECTRICAL PLANS - LEVEL 2
38 EP106 ELECTRICAL PLANS - ATTIC
39 E-601 BUILDING 61 ELECTRICAL ONE-LINE DIAGRAM
[08] TELECOMMUNICATIONS
40 T-001 TELECOMMUNICATIONS COVER SHEET
41 T-101 TELECOMMUNICATIONS PLAN - BUILDING 61 - LEVEL 1 AND 2
42 T-102 TELECOMMUNICATIONS PLAN - BUILDING 61 - LEVEL 3 AND 4
43 T-501 TELECOMMUNICATIONS DETAILS
44 T-601 TELECOMMUNICATIONS RISERS
TOTAL SHEETS: 44
LOCATION
PLAN
AREA
PLAN
N N
PROJECT LOCATION
PROJECT
LOCATION
NUMBER REVISION DESCRIPTION DATE
ABBREVIATIONS CODES STANDARDS AND EXECUTIVE ORDERS
1. GENERAL CONTRACTOR TO PROVIDE METAL SUPPORT
BLOCKING FOR ALL WALL MOUNTED ACCESSORIES,
FIXTURES, AND EQUIPMENT.
2. PROVIDE ADA SUPPORT BRACKETS PLACED AT ALL OPEN
COUNTERTOPS @ 36"-48" MAX ON CENTER.
3. SPECIFIED MAXIMUMS ARE MEASURED FROM AFTER
FINISHED FLOOR TO THE OPERABLE PART OF THE FIXTURE.
4. FIXTURES SHOWN ARE REPRESENTATIONAL ONLY. NOT ALL
FIXTURES MAY BE USED. REFER TO SPECIFICATIONS FOR
FIXTURE TYPES USED IN THIS PROJECT.
5. FIXTURES MAY OVERLAP WAINSCOT. WHERE APPLICABLE,
BACKING TO BE PROVIDED AS SHIM FOR FLUSH
APPLICATION. SHIM TO MATCH SCHEDULED WALL FINISH.
VA TOILET ROOM
TURNING RADIUS
CLEAR FLOOR SPACE
@ WATER CLOSET
5'-6"
2'-6"
4' -0
2'-6"
4' -0
FIXTURE MOUNTING HEIGHTS AND CLEARANCES
DOOR AND FIXTURE CLEARANCES
MATERIALS LEGEND
PURPOSE: THE PUBLIC BUILDINGS AMENDMENT ACT OF 1988, PUBLIC LAW (PUB. L.) 100-678 REQUIRES FEDERAL AGENCIES TO FOLLOW NATIONAL RECOGNIZED "MODEL" BUILDING CODES. THE FEDERAL PARTICIPATION IN THE DEVELOPMENT AND USE OF VOLUNTARY STANDARDS, OFFICE OF MANAGEMENT AND BUDGET (OMB) CIRCULAR A-119, REQUIRES ALL EXECUTIVE AGENCIES TO RELY ON VOLUNTARY STANDARDS, BOTH DOMESTIC AND INTERNATIONAL, WHENEVER FEASIBLE, AND TO PARTICIPATE IN
VOLUNTARY STANDARD BODIES.
GENERAL: VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION, OR IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW STRUCTURES. VA DESIGN MANUALS AND MASTER SPECIFICATIONS SPECIFY OTHER CODES AND STANDARDS THAT VA FOLLOWS ON ITS PROJECTS. REFERENCE RELEVANT ADDENDA FOR EACH OF THE ADOPTED CODES AND STANDARDS:
• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL
INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).
• 2024 INTERNATIONAL BUILDING CODE (IBC) (ONLY WHEN SPECIFICALLY REFERENCED IN VA DESIGN DOCUMENTS, SEE NOTES BELOW)
• 2024 INTERNATIONAL EXISTING BUILDING CODE (IEBC) (IF APPLICABLE)
• 2024 NFPA 101 LIFE SAFETY CODE (SEE NOTES BELOW)
• 2024 NATIONAL FIRE CODES (NFPA)
• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.
• 2023 VA SEISMIC DESIGN REQUIREMENTS, H-18-8
• 2024 INTERNATIONAL MECHANICAL CODE
• 2023 NATIONAL ELECTRICAL CODE (NEC), NFPA 70
• 2024 INTERNATIONAL PLUMBING CODE (IPC)
• 2022 SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) A 17.1.
• ARCHITECTURAL BARRIERS ACT (ABA) STANDARDS INCLUDING VA SUPPLEMENT, VA BARRIER FREE DESIGN STANDARD (PG-18-13)
• 2022 ANSI ICC A117.1 ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES
• 2022 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE AND COMMENTARY, AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318-19)
• 2023 STEEL CONSTRUCTION MANUAL (16TH EDITION), AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
• ENERGY POLICY ACT OF 2005 (EPACT)
• 2007 DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND
NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435.
• 2006 FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)
• 2018 EXECUTIVE ORDER 13834: EFFICIENT FEDERAL OPERATIONS
• 2021 THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS SECTION 010000 OF THE VA MASTER CONSTRUCTION
SPECIFICATION.
• 2022 VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1
• 2022 SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15
• 2020 PHYSICAL SECURITY AND RESILIENCY DESIGN MANUAL (1 MAY 24 REVISION)
• 2023 VA ELEVATOR DESIGN MANUAL (1 JULY 23 REVISION)
LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR INSPECTION FEES.
NOTES:
1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT
NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN.
DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES
EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).
2. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.
ASHRAE 90.1 - 2019 EDITION
BUILDING LOCATION: TACOMA, WA
CLIMATE ZONE (TABLE ANNEX 1-1): ZONE 4C
INTERIOR DESIGN CONDITIONS:
THE INTERIOR DESIGN TEMPERATURES FOR HEATING AND COOLING AS DEPICTED IN THE PROJECT DESIGN CONDITIONS SCHEDULE IN THE MECHANICAL CONTROL DRAWINGS SHALL BE THE MAXIMUM
AND MINIMUM VALUES FOR THE ASSOCIATED TEMPERATURE CONTROL ZONES.
BUILDING ENVELOPE REQUIREMENTS (5.5 )
BUILDING ENVELOPE REQUIREMENTS FOR CLIMATE ZONE 4 (A,B,C)
ROOFS REQUIRED DESIGNED
INSULATION: R-30 c.i. EXISTING METAL BUILDINGS: R-19 + R-11 Ls or R-25 + R-8 Ls EXISTING
ATTIC AND OTHER: R-49 EXISTING
WALLS, ABOVE GRADE
MASS: R-9.5 c.i. EXISTING METAL BUILDING: R-0 + R-15.8 c.i. EXISTING STEEL-FRAMED: R-13 + R-7.5 c.i. EXISTING WOOD-FRAMED AND OTHER: R-13 + R-3.8 c.i. or R-20 EXISTING
WALL, BELOW GRADE
BELOW-GRADE WALL: R-7.5 c.i. EXISTING
FLOORS
MASS: R-14.6 c.i. EXISTING
STEEL-FRAMED: R-30 EXISTING
WOOD-FRAMED AND OTHER: R-30 EXISTING
SLAB-ON-GRADE FLOORS
UNHEATED SLABS: R-15 for 24 in. EXISTING HEATED SLABS: R-20 for 24 in. EXISTING.
OPAQUE DOORS
SWINGING: U-0.370 EXISTING
NONSWINGING: U-0.310 EXISTING
FENESTRATION (TABLE 5.5-4):
VERTICAL FENESTRATION, U-FACTOR
FIXED: U-0.36 EXISTING
OPERABLE: U-0.45 EXISTING
ENTRANCE DOOR: U-0.63 EXISTING
DEFINITIONS
c.i = CONTINUOUS INSULATION Ls = LINEAR SYSTEM
NR = NO (INSULATION) REQUIREMENT
ENERGY REQUIREMENTS
N
1. DRAWINGS ARE PART OF A COMPLETE DOCUMENTS SET. CONTRACTOR SHALL CONFIRM
ALL ITEMS REQUIRED BASED UPON THE OVERALL DESIGN INTENT OF THE ENTIRE
DOCUMENT SET.
2. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, PRIOR TO BEGINNING ANY WORK,
TO CONFIRM THE ACCURACY OF THE DRAWINGS AND REPORT ANY DISCREPANCIES TO
THE ARCHITECT. DO NOT SCALE THE DRAWINGS. FIELD VERIFY ALL DIMENSIONS AND
EXISTING STRUCTURAL CONDITIONS.
3. ALL AREAS NOT INVOLVED IN THE SCOPE OF WORK FOR THIS PROJECT SHALL BE KEPT
CLEAN AND FREE OF OBSTRUCTIONS AT ALL TIMES.
4. ERECT BARRICADES AND WARNING SIGNS TO DIVERT AND WARN PASSERS-BY OF THE
CONSTRUCTION WORK. PROVIDE DUST PROOFING ENCLOSURES TO SEPARATE WORK
AREAS FROM THE EXISTING FACILITIES.
5. ALL TRASH AND DEBRIS TO BE REMOVED ON A DAILY BASIS.
6. PROVIDE PROTECTION FOR ALL EXISTING SURFACES AND CONDITIONS TO REMAIN IN
PLACE DURING THE SCOPE OF WORK. SHOULD ANY DAMAGE OCCUR, PATCH AND REPAIR
ANY DAMAGE TO ADJACENT FINISHES TO MATCH EXISTING.
7. ANY DAMAGE CAUSED TO THE BUILDING OR OWNER EQUIPMENT SHALL BE REPAIRED OR
REPLACED BACK TO ITS ORIGINAL CONDITIONS AT NO ADDITIONAL COST TO THE OWNER.
8. COVER ALL RETURN AIR GRILLES WITHIN THE AREA OF CONSTRUCTION TO PREVENT
PARTICULATE MATERIAL FROM EXHAUSTING INTO SURROUNDING SPACES.
9. APPROPRIATE LIGHT FIXTURES SHALL BE TEMPORARILY SUSPENDED TO PROVIDE
ADEQUATE LIGHTING LEVELS FOR CONSTRUCTION.
10. CONTRACTOR AND SUBCONTRACTORS ARE REQUIRED TO COORDINATE WITH OTHER
DISCIPLINES TO INSTALL COMPLETE AND OPERATIONAL SYSTEMS. DRAWINGS, AS A
WHOLE, REPRESENT A COMPLETE SET AND DEPICT REQUIREMENTS FOR COMPLETE AND
OPERATIONAL SYSTEMS. INDIVIDUAL DRAWINGS MAY NOT DEPICT COMPLETE AND
ACCURATE INFORMATION TO COORDINATE COMPLETE AND OPERATIONAL SYSTEMS, BUT
DO SO AS AN ENTIRE DOCUMENT TO BE REFERENCED WITH OTHER INDIVIDUAL DRAWINGS.
CONTRACTOR AND SUBCONTRACTORS ARE REQUIRED TO REFERENCE OTHER SHEETS
AND SPECIFICATIONS AS AN ENTIRE SET OF CONSTRUCTION DOCUMENTS THAT REFLECT
WORK REQUIRED TO ACHIEVE A COMPLETE AND OPERATIONAL GOAL. LACK OF
COORDINATION AND REVIEW OF DRAWINGS AND SPECIFICATIONS AS AN ENTIRE
DOCUMENT TO INSTALL COMPLETE AND OPERATIONAL SYSTEMS, BEING OBVIOUS AND
TYPICAL INDUSTRY STANDARD, IDENTIFIED IN THE DRAWINGS AND SPECIFICATIONS, SHALL
NOT BE IN ANY WAY AN ADDITIONAL COST TO THE GOVERNMENT.
11. CONTRACTOR SHALL SUBMIT A REQUEST, IN WRITING, TO INTERRUPT ANY SUCH SERVICES
TO COR (CONTRACTING OFFICER’S REPRESENTATIVE) 48 HOURS IN ADVANCE OF
PROPOSED INTERRUPTION. REQUEST SHALL STATE REASON, DATE, EXACT TIME OF, AND
APPROXIMATE DURATION OF SUCH INTERRUPTION. MAJOR INTERRUPTIONS OF ANY
SYSTEM MUST BE REQUESTED, IN WRITING, AT LEAST 60 CALENDAR DAYS PRIOR TO THE
DESIRED TIME AND SHALL BE PERFORMED AS DIRECTED BY THE COR. MAJOR
INTERRUPTIONS SHALL BE COORDINATED WITH OTHER MAJOR INTERRUPTIONS AND MAY
NOT BE SCHEDULED FOR ONE DISCIPLINE MORE THAN TWICE THROUGHOUT THE OVERALL
CONSTRUCTION SCHEDULE UNLESS REQUESTED IN WRITING AND APPROVED BY THE COR.
CONTRACTOR WILL BE ADVISED, IN WRITING, OF APPROVAL OF REQUEST, OR OF WHICH
OTHER DATE AND/OR TIME SUCH INTERRUPTION WILL CAUSE THE LEAST INCONVENIENCE
TO OPERATIONS OF THE MEDICAL CENTER. INTERRUPTION TIME APPROVED BY THE
MEDICAL CENTER MAY OCCUR AT TIMES OTHER THAN CONTRACTOR'S NORMAL WORKING
HOURS. SCHEDULE INTERRUPTION MAY BE ON WEEKENDS OR LATE HOURS AND MAY NOT
BE AN ADDITIONAL COST TO THE GOVERNMENT. COORDINATE ALL INTERRUPTIONS THAT
MAY AFFECT THE NORMAL OPERATION OF THE FACILITY WITH THE COR WHEN SUBMITTING
THE CONSTRUCTION SCHEDULE OR UPDATES TO THE CONSTRUCTION SCHEDULE.
12. NO ASBESTOS CONTAINING MATERIALS ARE TO BE USED ON THIS PROJECT. SPUR DESIGN, THE A/E OF RECORD, CAN CERTIFY THAT NO ASBESTOS CONTAINING BUILDING MATERIALS
(ACBM) OR LEAD BASED PAINT (LBP) PRODUCTS WERE DESIGNED/SPECIFIED AS BUILDING
MATERIAL IN ANY OF THE CONSTRUCTION DOCUMENTS.
13. REFER TO THE DESIGN BINDER FOR THE ICRA INFORMATION DOCUMENTATION.
GENERAL NOTES
AREA NAME
150 SF
A101
A101
SIM
A
00.0
A101
1 1
A101
LEVEL NAME
00'-00"
00'-00" 4B
3A
FIBERGLASS BATT
INSULATION
RIGID INSULATION
CONCRETE / PRECAST
CONCRETE
EARTH / SOIL
SAND, EIFS FINISH, OR
PLASTER FINISH
GYPSUM BOARD FINISH
BRICK
CONCRETE MASONRY
UNIT
STONE / CAST STONE
GYPSUM BOARD SECTION
EXTERIOR SHEATHING
BOARD SECTION
PLYWOOD SECTION
CLEAN UTILITY
000A
150 SF
/1 A101
X0000
ROOM TAG
AREA TAG
SPECIALTY EQUIPMENT TAG
DOOR TAG
KEYED NOTE TAG
WALL TAG
WINDOW TAG
A101
SIM
A101
SIM
A
ACB ACOUSTIC CEILING BAFFLE
ACP ACOUSTIC CEILING PANEL
ACST ACOUSTIC
ADA AMERICANS WITH DISABILITIES ACT
ACT ACOUSTICAL CEILING TILE
ADDL ADDITIONAL
ADDN ADDITION
ADJ ADJACENT, ADJOINING, OR
ADJUSTABLE
ADMIN ADMINISTRATION
AE ARCHITECT/ENGINEER
AF ACCESS FLOORING
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHJ AUTHORITY HAVING JURISDICTION
AIA AMERICAN INSTITUTE OF
ARCHITECTS
ALT ALTERNATE
ALT NO ALTERNATE NUMBER
ALUM ALUMINIUM (TRIM)
AMT AMOUNT
APPROX APPROXIMATE
ARCH ARCHITECT
ASC ABOVE SUSPENDED CEILING
AT ACOUSTIC CEILING TILE
AVG AVERAGE
B
BD BOARD
BG BUMPER GUARD
BLDG BUILDING
BLKG BLOCKING
BLT IN BUILT-IN
BOS BOTTOM OF STEEL
BOT BOTTOM
BRKT BRACKET
BTWN BETWEEN
C
CAB CABINET
CAV CAVITY
CBB CONCRETE BACKER BOARD
C/C CONTRACTOR PROVIDED /
CONTRACTOR INSTALLED
CD CONSTRUCTION DOCUMENTS
CFM CUBIC FEET PER MINUTE
CFS CUBIC FEET PER SECOND
CG CORNER GUARD
CH BD CHALKBOARD
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CL CENTERLINE
CLG CEILING
CLG HT CEILING HEIGHT
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CO CONTRACTING OFFICER
COL COLUMN
COMM COMMUNICATION
CONC CONCRETE
CONT CONTINUOUS
COORD COORDINATE
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CP CONTRACTOR PROVIDED
CPT CARPET/CARPET TILE
CS CONCRETE SEALED
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTR CENTER
CU FT CUBIC FEET
D
DBL DOUBLE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DIA DIAMETER
DIR DIRECTION
DIST DISTANCE
DOC DOCUMENT
DR DOOR
DS DOWNSPOUT
DWG DRAWING
DWP DIMENSIONAL WALL PANEL
E
EA EACH
EJ EXPANSION JOINT
EL ELEVATION
ELEV ELEVATOR
ENTR ENTRANCE
EPY EPOXY FLOORING
EQ EQUAL
ETR EXISTING TO REMAIN
EX EXISTING
EXP EXPOSED
EXT EXTERIOR
F
FAB FABRIC
FED FEDERAL
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FIN FINISH
FIN BS FINISH BOTH SIDES
FIN FLR FINISH FLOOR
FIN GR FINISH GRADE
FIXT FIXTURE
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLMT FLUSH MOUNT
FLR FLOOR
FOC FACE OF CONCRETE
FOM FACE OF MASONRY
FP FIRE PROTECTION
FR FIRE RESISTANT
FT FEET
FTG FOOTING
FV FIELD VERIFY
FWC FABRIC WALL COVERING
G
GDR GUARDRAIL
GL GLASS/GLAZING
GRAN GRANITE
GR FL GROUND FLOOR
GT GROUT
GSM GALVANIZED SHEET METAL
GYP BD GYPSUM BOARD
H
HDW HARDWARE
HEPA HIGH EFFICIENCY
PARTICULATE AIR (FILTER)
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HANDRAIL
HT HEIGHT
I
IBC INTERNATIONAL BUILDING CODE
INSUL INSULATION
INT INTERIOR
ILO IN LIEU OF
J
J-BOX JUNCTION BOX
L
LAV LAVATORY
LBS POUND
LDG LANDING
LF LINEAR FEET (FOOT)
LIN LINEAR
LN LINOLEUM
LOC LOCATION
LT LIGHT
LVR LOUVER
LVT LUXURY VINYL TILE
M
MAT CARPET MAT / WALK-OFF MAT
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MEMB MEMBRANE
MFR MANUFACTURER
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MOD MODIFY
MTG MOUNTING
MTL METAL
MVBL MOVABLE
N
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
O
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OPNG OPENING
OPP OPPOSITE
OPR OPERABLE
ORD OVERFLOW ROOF DRAIN
ORIG ORIGINAL
P
P PAINT
PA PUBLIC ADDRESS
PBD PARTICLE BOARD
PCF POUNDS PER CUBIC FOOT
PCT PERCENT
PERF PERFORATED
PERIM PERIMETER
PERP PERPENDICULAR
PL PROPERTY LINE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PNL PANEL
PR PAIR
PRB PROFILE BASE
PRKG PARKING
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PORCELAIN TILE
PWR POWER
Q
QA QUALITY ASSURANCE
QC QUALITY CONTROL
QTY QUANTITY
QT QUARRY TILE
REFERENCE SYMBOLS IDENTIFICATION TAGS
NOTE: NOT ALL ABBREVIATIONS OR SYMBOLS WILL BE UTILIZED FOR THIS PROJECT.
GRID HEAD AND
LINE
LEVEL INDICATOR
MATCH LINE AND
VIEW REFERENCE
NORTH ARROW W/
PROJECT NORTH
SPOT ELEVATION
DETAIL
SECTION
WALL
SECTION
BUILDING
SECTION
DETAIL
ELEVATION
INTERIOR
ELEVATION
BUILDING
ELEVATION
1 1
6'- 0"
5'- 6"
BARIATRIC TOILET ROOM
TURNING RADIUS
CLEAR FLOOR SPACE
@ ADA LAVATORY
CLEAR FLOOR SPACE @ ADA
DRINKING FOUNTAIN
6' -0
R
RAF RESILIENT ATHLETIC FLOORING
RB RUBBER BASE/RESILIENT BASE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REC RECESSED
REF REFERENCE
REM REMOVABLE
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RES RESINOUS FLOORING
RES-W RESINOUS / EPOXY WALL / CEILING
RF RUBBER FLOORING
RFG ROOFING
RM ROOM
RO ROUGH OPENING
RP RESIN PANEL
RSF RESILIENT SHEET FLOORING
RV ROOF VENT
RWC RIGID VINYL WALLCOVERING
S
SC SPECIALTY COATING
SD STATIC DISSIPATIVE FLOORING/TILE
SCHED SCHEDULE
SECT SECTION
SF SQUARE FOOT (FEET)
SGL SINGLE
SIM SIMILAR
SJ SCORED JOINT
SLNT SEALANT
SM SHEET METAL
SPEC SPECIFICATION
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SS SOLID SURFACE
ST STONE
STD STANDARD
STOR STORAGE
SV SHEET VINYL (ROLLED OR TILE)
SWC STAINLESS STEEL WALLCOVERING
T
TEL TELEPHONE
TEMP TEMPORARY
TER TERRAZZO
TOF TOP OF FOOTING/ FOUNDATION
TOM TOP OF MASONRY
TOS TOP OF SLAB/ STEEL
U
UNO UNLESS NOTED OTHERWISE
UTIL UTILITY
V
VAR VARIES
V/C VA PROVIDED / CONTRACTOR
INSTALLED
VCT VINYL COMPOSITION TILE
VFAT VINYL-FACED ACOUSTICAL TILE
VP VENEERED PLASTER
VT VINYL TILE
V/V VA PROVIDED / VA INSTALLED
VWC VINYL WALLCOVERING
VWF VINYL WALL FABRIC
W
W/ WITH
W/O WITHOUT
W/C WATER CLOSET
WC WHEELCHAIR
WD WOOD
WFAB WALL FABRIC
WPM WATERPROOF MEMBRANE
WSF WELDED SHEET FLOOR
X
X BRACE CROSS BRACE
TRUE
NORTH
18" MIN
M
IN
FRONT APPROACH,
PULL SIDE
36" MIN
M
IN
HINGE APPROACH,
PULL SIDE
HINGE APPROACH,
PULL SIDE
*12" MIN48
M
IN
FRONT APPROACH,
PUSH SIDE
M
IN
HINGE APPROACH,
PUSH SIDE
22" MIN 24" MIN
*4 8"
M
IN
LATCH APPROACH,
PULL SIDE
24" MIN*4
2"
M
IN
LATCH APPROACH,
PUSH SIDE
*IF BOTH CLOSER
AND LATCH ARE
PROVIDED
*54" MIN IF CLOSER
IS PROVIDED
*48" IF CLOSER IS
PROVIDED
FRONT APPROACH,
PUSH SIDE
M
IN
42" MIN
**48" MIN IF BOTH CLOSER
AND LATCH PROVIDED
M
IN
4' -0
M
A X
4' -0
M
A X
DRINKING
FOUNTAIN
PAPER TOWEL
DISPENSER
SANITARY
NAPKIN
DISPENSER
4' -0
"M A
X
WASTE
RECEPTACLE
4' -0
M
A X
SOAP
DISPENSER
3' -0
M
A X
1'-6" MIN
WALL
4' -0
M
A X
WALL HOOK
7' -0
CLOCK
FINISHED FLOOR
FIRE EXTINGUISHER
CABINET
WEIGHT > 40LBS
FIRE EXTINGUISHER
CABINET
WEIGHT < 40LBS
4' -0
"M A
X
4' -0
M
A X
TOILET SEAT
COVER
DISPENSER
BABY
CHANGING
STATION
HANDRAILS AND
BUMPER GUARDS
6"2' -1
0"
'-2
3' -6
M
A X
5' -0
M
A X
M A
X
ELEVATOR LOBBY
CALL STATION PANEL
M A
X
AUXILIARY CAR
OPERATING PANEL
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
DRAWING TITLE PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
PROJECT NUMBERCONSULTANTS:
DRAWING #
VA HEALTH CARE SYSTEM APPROVAL:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
EXP. 12/31/2026
EXP. 09/30/2025
MEP/TELECOM ENGINEER / VT CONSULTANT
SPUR DESIGN
2519 MADISON AVE, STE 100
KANSAS CITY, MO 64108
(913) 369-7200
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
FIRE PROTECTION ENGINEER
RATED ENGINEERING
609 S KELLY AVE, STE H2
EDMOND, OK 73003
(405) 210-5814
FULLY SPRINKLERED
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
DRAWING NUMBER
BUILDING NUMBER
STRUCTURAL ENGINEER
STAND SEI
8234 ROBINSON ST,
OVERLAND PARK, KS 66204
(913) 214-2169
ARCH REG. NO. 12903
ENGR REG. NO. 24007067
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, STE 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
/1
/2
:3 :4
P
M
GENERAL INFORMATION
BAB 2 OF 44AJS
FINAL BID DOCUMENTS
REFURBISH ELEVATORS AT
BLDG. 61
04/21/2025
663A4-24-201
AMERICAN LAKE VAMC
9600 VETERANS DR S.W.
TACOMA, WA 98493
GI001
SPUR #: 2416NUMBER REVISION DESCRIPTION DATE
OUTSIDE OF BUILDING
WEEKLY CHANGED
HEPA FILTER
HEPA NEGATIVE
AIR UNIT
WEEKLY CHANGED
(OR MORE AS
NEEDED) PRE FILTER
FIRE RATED PLYWOOD
F
LE
X D
U C
T
SUPPLY DUCTS EITHER KEEP
RUNNING OR COVER WHEN
RUNNING TO KEEP DUST OUT.
TAPE ALL SERVICES
TO PROTECT AGAINST
CONTAMINATION A
O
V
FIRE EXTINGUISHER ON PORTABLE
FLOOR BRACKET (ILSM MAY REQUIRE
MORE THAN ONE)
SUSPENDED PLASTIC
ZIPPER WALL
CURTAIN BARRIER
6 MIL PLASTIC
TEMPORARY DIGITAL MANOMETER FOR NEGATIVE
PRESSURE MONITORING OUTSIDE OF ICRA BARRIER
FOR VA'S INSPECTION. INDICATOR SHALL BE AT -0.01
OR GREATER (VERIFY DAILY). IF NOT, VERIFY ALL
OPENINGS, SUCH AS DOOR CLOSED, AND/OR CHANGE
OUT NEGATIVE AIR PRE-FILTER.
PROVIDE STICKY MAT, DRY MAT, WET MAT
(CHANGED END OF SHIFT OR MORE IF
NECESSARYTO MAINTAIN CLEANLINESS)
PROVIDE WIPES AND SPRAY FOR WET MAT
POST ICRA ILSM FIRE
INSPECTION SHEETS
CONTAINER VISIBLE
TO PUBLIC
COVER ALL RETURNS AT THE
GRATE/DIFFUSERS
OPTIONAL EXHAUST DUCTS
(COVER THE GRATES AND THE DIFFUSERS)
E
DOOR OPENING
VENT TO OUTSIDE ROUTE
TO BE APPROVED BY COR.
FIRE PULL STATION WITH AUDIO/
VISUAL
ILSM SIGNAGE
ICRA BARRIER, SEE PLANS FOR TYPE AND LOCATION
GI002
GI002
PLASTIC WINDOW
SWIVEL CASTERS
WITH TWO LOCKING
BRAKES
MOBILE CART
A D
JU
S
T A
B
LE
H E
IG
H
T
HEPA NEGATIVE AIR
UNIT
EXISTING WALL
EXISTING CEILING
FLEX DUCT
HEATED DETECTOR CUT-OFF
BASIS OF DESIGN: HEPA NEGATIVE AIR UNIT
INTEGRAL WITH EDGEGUARD BARRIER SYSTEM.
FIRE RATED PLYWOOD (TEMP.
REMOVE GLASS PANEL)
EXISTING WINDOW FRAME
TYPE A OR C ICRA BARRIER,
SEE PLANS FOR TYPE AND
LOCATION
TYPE B OR D ICRA BARRIER,
SEE PLANS FOR TYPE AND
LOCATION
EXISTING CEILING
EXISTING CONCRETE SLAB FLOOR OR
ROOF ASSEMBLY
FINISHED FLOORING TO BE KEPT
CLEAN. FLOORS NOT BEING
REPLACED MUST BE PROTECTED.
COVER WITH ROSIN PAPER/ FIRE
RATED PLYWOOD.
WHEN WORKING ABOVE CEILING WITH
BARRIERS THAT TERMINATE AT CEILING,
PROVIDE PLASTIC ENCLOSURE IN
PLENUM SPACE.
XXXXXX
XXXXXX
XXXXXX
A .F
.F
4' -0
THIS IS A RESTRICTED AREA
AREA UNDER CONSTRUCTION
PERSONNEL ENTERING MUST HAVE: HARD HAT,
SAFETY GLASSES AND PROPER I.D.
COMING SOON!!
--DESCRIPTION ON NEWLY PROPOSED OCCUPANCY--
ICRA, ISLM, WATCH,
MISC. FORMS
PAPER CADDY
INDICATOR
(REFER TO
PLAN AND
ELEVATION)
FRAMED PICTURE
OF C.O.R. WITH
CONTACT
INFORMATION
CONSTRUCTION
SUPERVISOR
NAME AND CELL NUMBER
XXXXX
BOILER/CHILLER PLANT AFTER
HOURS CONTACT PHONE XXXXX
FIRE EMERGENCY DIAL 911
3 5/8" INSULATED WALL WITH 16
GAUGE METAL STUDS @ 16" O.C.
WALL TO EXTEND TO UNDERSIDE
OF DECK
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH EXISTING
AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH EXISTING
AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
/2
3 5/8" 16 GAUGE METAL STUDS @
16" O.C. WALL TO EXTEND TO
UNDERSIDE OF DECK
CB
3 5/8" INSULATED WALL WITH 16
GAUGE METAL STUDS @ 16" O.C.
(2) LAYERS 5/8" GYPSUM BOARD
EACH SIDE. WALL TO EXTEND TO
UNDERSIDE OF DECK
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH EXISTING
AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
D
FIRE RESISTANT SEALANT, BOTH
SIDES
FIRE RESISTANT SEALANT, BOTH
SIDES
FIRE RESISTANT SEALANT, BOTH
SIDES
1-HR RATED AND SMOKE RATED
U.L. DESIGN NO. U404
SMOKE RATED 2-HR RATED AND SMOKE
RATED
U.L. DESIGN NO. U404A
PLASTIC SHEET BARRIER
NON RATED
PLASTIC SHEET
BARRIER
EXISTING WALL
ASSEMBLY
EXISTING CEILING
BOTTOM SEALING RUNNER
TOP SEALING RUNNER
SUPPORT POLES,
QUANTITY PER MANUF.
RECOMMENDATIONS
CONTROLS DEFINED BELOW FOR THE LEVEL OF PRECAUTIONS IDENTIFIED FOR THE ACTIVITY MUST BE IN PLACE BEFORE THE ACTIVITY BEGINS AND MAINTAINED UNTIL WORK IS COMPLETED AND THE AREA IS ACTIVATED. CONTROL MEASURES FOR EACH PRECAUTION LEVEL MUST ALSO INCLUDE THE CONTROL MEASURES IN THE PRECEDING LEVEL(S). AS THE ACTIVITY PROGRESSES, A FULL RE-
EVALUATION OF REMAINING ACTIVITY TYPE AND PATIENT RISK IS REQUIRED PRIOR TO
DOWNGRADING THE LEVEL OF PRECAUTIONS.
LEVEL I:
1. PERFORM WORK ACTIVITY IN A MANNER THAT DOES NOT CREATE DUST.
2. IMMEDIATELY REPLACE ANY CEILING TILE, CLOSE ACCESS PANELS, ETC., UPON COMPLETION
OF WORK.
3. ANY MATERIALS AND EQUIPMENT BEING BROUGHT INTO THE FACILITY MUST BE FREE OF
CONTAMINANTS AND LOOSE MATERIAL.
LEVEL II:
ALL CONTROL MEASURES IN LEVEL I AND THE FOLLOWING:
1. PROVIDE ACTIVE MEANS TO CONTROL AIRBORNE DUST FROM DISPERSING INTO OCCUPIED
AREAS AND/OR WATER MIST SURFACE TO CONTROL DUST (E.G., MOBILE DUST CONTAINMENT
CART OR SOME OTHER SYSTEM).
2. IF WORK SITE CONTAINED, MUST BE NEUTRAL OR NEGATIVELY PRESSURIZED.
3. ENSURE WORKER CLOTHING IS CLEAN AND FREE OF VISIBLE DUST BEFORE LEAVING THE
WORK AREA.
4. REMOVE/ISOLATE/TAPE OFF AIR DIFFUSERS (SUPPLY AND RETURN) TO PROTECT THE HVAC
SYSTEM FROM DUST AND REDUCE AIR TURBULENCE. REBALANCE SYSTEM TO ADDRESS
DIFFUSER ISOLATION.
5. WHEN THE WORK INVOLVES OR IMPACTS POTABLE WATER SYSTEMS INCLUDING
STAGNATION DUE TO REDUCED USAGE, THE PIPING SHALL BE FLUSHED TWICE A WEEK OR
ISOLATED FROM THE MAIN SYSTEM.
6. SEAL/CLOSE DOORS TO PREVENT DUST MIGRATION. MAY PUT ZIPPER PLASTIC BARRIER
OVER DOOR.
7. CONSIDER HEPA CART USE.
8. CONTAIN ALL TRASH AND DEBRIS IN THE WORK AREA. PERFORM DAILY CLEANING AND
DISPOSAL OF TRASH (COVERED) FROM WORK AREA USING AN IDENTIFIED EXIT ROUTE.
9. ANY EQUIPMENT, TOOLS, OR MATERIALS REMOVED FROM THE WORK AREA MUST BE IN
SEALED CONTAINERS AND/OR CLEANED OF DUST AND DEBRIS PRIOR TO REMOVAL FROM THE
AREA.
10. NONPOROUS/SMOOTH AND CLEANABLE CONTAINERS (WITH A HARD LID) MUST BE USED TO
TRANSPORT TRASH AND DEBRIS FROM THE CONSTRUCTION AREAS. THESE CONTAINERS
MUST BE DAMP-WIPED CLEANED AND FREE OF VISIBLE DUST/DEBRIS BEFORE LEAVING THE
CONTAINED WORK AREA.
11. INSTALL A STICKY (DUST COLLECTION) MAT AT ENTRANCE OF CONTAINED WORK AREA
BASED ON FACILITY POLICY. STICKY MATS MUST BE CHANGED ROUTINELY AND WHEN VISIBLY
SOILED.
12. MAINTAIN CLEAN SURROUNDINGS WHEN AREA IS NOT CONTAINED BY DAMP MOPPING OR
HEPA VACUUMING SURFACES AT LEAST DAILY.
LEVEL III:
ALL CONTROL MEASURES IN LEVELS I AND II AND THE FOLLOWING:
1. ENSURE AVAILABILITY OF EQUIPMENT FOR CLEANING HANDS.
2. CONSTRUCT AND COMPLETE CRITICAL BARRIERS MEETING NFPA 241 REQUIREMENTS.
BARRIERS MUST EXTEND TO THE CEILING OR IF CEILING TILE IS REMOVED, TO THE DECK
ABOVE.
3. ALL (PLASTIC OR HARD) BARRIER CONSTRUCTION ACTIVITIES MUST BE COMPLETED IN A
MANNER THAT PREVENTS DUST RELEASE. PLASTIC BARRIERS MUST BE EFFECTIVELY
AFFIXED TO FLOOR AND CEILING (OR FLOOR/ROOF DECK ABOVE) AND SECURE FROM
MOVEMENT OR DAMAGE.
4. SEAL ALL PENETRATIONS IN CONTAINMENT BARRIERS, INCLUDING FLOORS AND CEILING,
USING APPROVED MATERIALS (UL SCHEDULE FIRESTOP IF APPLICABLE FOR BARRIER TYPE).
5. MAINTAIN .01 INCHES /WATER GAUGE NEGATIVE PRESSURIZATION OF THE ENTIRE
WORKSPACE BY USE OF HEPA EXHAUST AIR SYSTEMS DIRECTED OUTDOORS (UNLESS A
WORK SPECIFIC WAIVER IS APPROVED BY VHA’S OFFICE OF HEALTHCARE ENGINEERING);
THIS MUST BE MAINTAINED CONTINUOUSLY 24/7 FOR THE DURATION OF THE PROJECT.
EXHAUST DISCHARGED DIRECTLY TO THE OUTDOORS THAT IS 25 FEET OR GREATER FROM
ENTRANCES, AIR INTAKES AND WINDOWS IS NOT REQUIRED TO BE HEPA-FILTERED.
EXHAUSTING DISCHARGED AIR INTO SHARED OR RECIRCULATING HVAC SYSTEMS, OR OTHER
SHARED EXHAUST SYSTEMS (E.G., BATHROOM EXHAUST) IS PROHIBITED.
6. INSTALL A DIFFERENTIAL PRESSURE SENSING DEVICE (E.G., MAGNEHELIC, MANOMETER, OR
DIGITAL MONITORING) ON EXTERIOR OF WORK CONTAINMENT TO CONTINUALLY MONITOR
AND DOCUMENT NEGATIVE PRESSURIZATION. THE “BALL IN THE WALL” OR SIMILAR
APPARATUS ARE NOT ACCEPTABLE.
LEVEL IV:
ALL CONTROL MEASURES IN LEVELS I, II AND III AND THE FOLLOWING:
1. BARRIERS MUST BE HARD BARRIERS UNLESS TEMPORARY TO INSTALL FINAL BARRIER.
2. CONTAINMENT MUST INCLUDE AN ANTEROOM TO ENSURE PRESSURE CONTROL. ANTEROOM
MUST BE LARGE ENOUGH FOR EQUIPMENT STAGING, CART CLEANING, WORKERS’ PPE AND
CLEANING.
3. WORKER CLOTHING AND/OR PPE MUST BE REMOVED OR CLEAN AND FREE OF VISIBLE DUST
BEFORE LEAVING THE WORK AREA ANTEROOM. HEPA VACUUMING OF CLOTHING OR USE OF
COVER SUITS IS ACCEPTABLE.
4. WORKERS MUST WEAR SHOE COVERS OR HAVE A METHOD TO CLEAN SHOES IN ANTEROOM.
SHOE COVERS MUST BE REMOVED PRIOR TO EXITING THE ANTEROOM TO THE OCCUPIED
SPACE (NON-WORK AREA). DAMAGED SHOE COVERS MUST BE CHANGED IMMEDIATELY.
GENERAL ICRA NOTES - LEVEL OF PRECAUTIONS & CONTROL MEASURES
CONTROLS DEFINED BELOW SHALL BE COMPLETED UPON COMPLETION OF THE ACTIVITY AND
INSPECTED PRIOR TO TERMINATING MEASURES DEFINED IN TABLE 5.
LEVELS I -II:
CLEANING:
1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL
SURFACES AND FLOORING MATERIALS.
2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER
SURFACES AS WELL AS AIR DIFFUSER SURFACES.
HVAC SYSTEMS:
1. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.
2. VERIFY THE HVAC SYSTEMS MEET ORIGINAL AIRFLOW AND AIR EXCHANGE DESIGN
SPECIFICATIONS.
WATER SYSTEMS:
1. UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL
CONTINUE AT LEAST TWICE PER WEEK IN ACCORDANCE WITH VHA DIRECTIVE 1061.
LEVELS III - IV:
CONSTRUCTION AREAS MUST BE INSPECTED BY AN INFECTION PREVENTIONIST AND
ENGINEERING REPRESENTATIVE (AND OTHERS AS DETERMINED BY THE FACILITY) FOR FINAL
ACTIVITY/PROJECT CLOSE OUT AND REMOVAL OF INFECTION PREVENTION AND CONTROL
MEASURES.
WORK AREA CLEANING:
1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL
SURFACES AND FLOORING MATERIALS.
2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER
SURFACES AS WELL AS AIR DIFFUSER SURFACES.
REMOVAL OF CRITICAL BARRIERS:
1. CRITICAL BARRIERS MUST REMAIN IN PLACE DURING ALL WORK INVOLVING DRYWALL
REMOVAL, CREATION OF DUST AND ACTIVITIES BEYOND SIMPLE TOUCH-UP WORK. THE
BARRIER MAY NOT BE REMOVED UNTIL A WORK AREA CLEANING HAS BEEN PERFORMED.
ADDITIONAL CLEANING MAY BE NEEDED AFTER REMOVAL OF BARRIER.
2. ALL (PLASTIC OR HARD) BARRIER REMOVAL ACTIVITIES MUST BE COMPLETED IN A MANNER
THAT PREVENTS DUST RELEASE. USE THE FOLLOWING PRECAUTIONS WHEN REMOVING
HARD BARRIERS:
1. CAREFULLY REMOVE SCREWS AND PAINTER TAPE.
2. IF DUST WILL BE GENERATED DURING SCREW REMOVAL, USE HAND-HELD HEPA
VACUUM.
3. DRYWALL CUTTING IS PROHIBITED DURING REMOVAL PROCESS.
4. CLEAN ALL STUD TRACKS WITH HEPA VACUUM BEFORE REMOVING OUTER HARD
BARRIER.
5. USE A PLASTIC BARRIER TO ENCLOSE AREA IF DUST COULD BE GENERATED.
NEGATIVE AIR REQUIREMENTS:
1. THE USE OF NEGATIVE AIR MUST BE DESIGNED TO REMOVE CONTAMINANTS FROM THE
WORK AREA.
2. NEGATIVE AIR DEVICES (FANS, FILTERS, MONITORING AND DOCUMENTATION EQUIPMENT)
MUST REMAIN OPERATIONAL AT ALL TIMES AND IN PLACE FOR A PERIOD AFTER COMPLETION
OF DUST CREATING ACTIVITIES TO REMOVE CONTAMINANTS FROM THE WORK AREA AND
BEFORE REMOVAL OF CRITICAL BARRIERS.
HVAC SYSTEMS:
1. UPON REMOVAL OF CRITICAL BARRIERS, REMOVE ISOLATION OF HVAC SYSTEM IN AREAS
WHERE WORK IS BEING PERFORMED.
2. VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.
3. VERIFY AND DOCUMENT THROUGH A TAB THE HVAC SYSTEMS MEETS ORIGINAL AIRFLOW
AND AIR EXCHANGE DESIGN SPECIFICATIONS.
WATER SYSTEMS:
UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL CONTINUE AT
LEAST TWICE PER WEEK IN ACCORDANCE WITH VHA DIRECTIVE 1061.
MINIMUM INFECTION PREVENTION AND CONTROL MEASURES REQUIRED
UPON COMPLETION OF THE ACTIVITY
INSPECTIONS AND NON-INVASTIVE ACTIVITES
MATRIX OF PRECAUTIONS FOR CONSTRUCTION & RENOVATION
CATEGORY A
INCLUDES BUT NOT LIMITED TO:
• WORK CAN BE COMPLETED IN A SINGLE SHIFT, DOES NOT EXCEED 10 HOURS, AND DOES NOT CREATE DUST OR DEBRIS.
• PATIENTS AND/OR EMPLOYEES MAY BE IN THE AREA DEPENDING ON THE ACTIVITY.
• REMOVAL OF CEILING TILE OR ACCESS TO MECHANICAL OR ELECTRICAL CHASE FOR VISUAL INSPECTION LIMITED TO 1 TILE
PER 50 SQUARE FEET WITH LIMITED EXPOSURE TIME (NOT TO EXCEED AN HOUR FOR EACH TILE) WITHIN THE SHIFT.
• MINOR INTERIOR UPDATES (E.G., REPLACING FLOOR OR CEILING TILES, CARPENTRY WORK TO INCLUDE HANGING SIGNAGE, AND PAINTING WITHOUT SANDING) THAT DO NOT CREATE DUST OR DEBRIS.
• LIMITED BUILDING SYSTEM MAINTENANCE SUCH AS PLUMBING ON POTABLE SYSTEMS LIMITED TO FAUCET REPLACEMENT
ETC. AND ELECTRICAL WORK SUCH AS REPLACEMENT OF BULBS, RECEPTACLES, OR SWITCHES.
SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATES MINIMAL DUSTCATEGORY B
INCLUDES BUT NOT LIMITED TO:
• PROLONGED INSPECTION AND WORK THAT MAY TAKE LONGER THAN A SINGLE SHIFT BUT NOT EXCEEDING A WEEK.
• PATIENTS AND EMPLOYEES ARE NOT TO BE IN THE AREA UNTIL ACTIVITY IS COMPLETED.
• WORK THAT CREATES MINIMAL DUST AND DEBRIS.
• INTERIOR FINISH OR SURFACE REPAIRS, UPDATES, OR MODIFICATIONS SUCH AS REPAIR OF FIREWALLS AND BARRIERS, AND
NEW FLOORING THAT PRODUCES MINIMAL DUST AND DEBRIS. CONTROLLED SANDING ACTIVITIES (E.G., WET OR DRY
SANDING) THAT PRODUCE MINIMAL DUST AND DEBRIS.
• PLUMBING WORK SUCH AS INSTALLATION OR REPLACEMENT OF A SINGLE FIXTURE OR PIPING FOR A SINGLE FIXTURE. ANY
WORK ON SANITARY PLUMBING INCLUDING SNAKING OF DRAINS.
• ELECTRICAL WORK SUCH AS INSTALLATION OF CABLING/WIRING/CONDUIT FOR A SINGLE DEVICE, INSTALLATION OF NEW
DEVICE SUCH AS A LIGHT FIXTURE THAT PRODUCES MINIMAL DUST AND DEBRIS.
• AIR HANDLER AND/OR FAN SHUTDOWN/STARTUP AND HVAC WORK SUCH AS REPLACEMENT OF A SINGLE DIFFUSER, SINGLE
TERMINAL UNIT OR A SINGLE DEVICE THAT PRODUCES MINIMAL DUST AND DEBRIS.
WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR REQUIRES
DEMOLITION OR REMOVAL OF ANY FIXED BUILDING COMPONENTS OR ASSEMBLIES
INCLUDES BUT NOT LIMITED TO:
• WORK REQUIRING LONGER THAN A SINGLE WEEK TO COMPLETE BUT NOT EXCEEDING 6 MONTHS.
• PATIENTS AND EMPLOYEES ARE NOT TO BE IN THE AREA UNTIL ACTIVITY IS COMPLETED.
• DEMOLITION/REMOVAL OF EXISTING FLOOR COVERING, CASEWORK, LAY-IN CEILING, OR OTHER ARCHITECTURAL ELEMENTS.
• DEMOLITION/REMOVAL OF MORE THAN 32 FT2 OF DRYWALL/FRAMING, HARD CEILINGS, AND DOORS/FRAMING AND MINIMAL
INFRASTRUCTURE SUCH AS ELECTRICAL CIRCUITS AND BRANCH PIPING.
• INSTALLATION OF NEW WALLS, CEILINGS AND DOORS INCLUDING FRAMING, DRYWALL/PLASTER AND ASSOCIATED WORK.
• PLUMBING WORK SUCH AS THE INSTALLATION OF NEW SINKS, SHOWERS AND TOILETS AND ASSOCIATED PLUMBING.
• SHUT DOWN OF SECTIONS OF POTABLE WATER SYSTEMS.
• ELECTRICAL WORK SUCH AS INSTALLATION OF CONDUIT AND WIRE FOR LIGHTING, RECEPTACLES AND SWITCHES, THE INSTALLATION OF CONDUIT AND WIRE FOR NEW DEVICES SUCH AS TERMINAL UNITS, FANS ETC.
• MODIFICATION OF EXISTING FIRE ALARM AND SUPPRESSION SYSTEMS.
• MECHANICAL WORK SUCH AS THE INSTALLATION OF DUCTWORK, DIFFUSERS, AND TERMINAL UNITS FOR AN AREA.
MAJOR DEMOLITION AND CONSTRUCTION PROJECTS
INCLUDES BUT NOT LIMITED TO:
• WORK DURATION EXCEEDING 6 MONTHS; PATIENTS AND EMPLOYEES NOT TO BE IN THE AREA UNTIL ACTIVITY IS COMPLETED.
• LARGE-SCALE DEMOLITION OF BUILDING COMPONENTS AND INFRASTRUCTURE INCLUDING REMOVAL OF MULTIPLE DOORS, WALLS, FRAMING, CEILINGS, FLOORING, PIPING, ELECTRICAL AND HVAC.
• THE INSTALLATION BUILDING COMPONENTS SUCH AS NEW WALLS, CEILINGS AND DOORS INCLUDING FRAMING, DRYWALL AND
ASSOCIATED PLASTER WORK.
• PLUMBING WORK SUCH AS THE INSTALLATION OF: NEW MEDICAL GAS SYSTEMS, STEAM/HEATING HOT WATER, CONDENSATE
SYSTEMS, MULTIPLE SINKS, SHOWERS AND TOILETS INCLUDING ASSOCIATED PLUMBING.
• SHUTDOWN OF POTABLE WATER, STEAM/HEATING HOT WATER, CONDENSATE, AND MEDICAL GAS SYSTEMS.
• ELECTRICAL WORK SUCH AS INSTALLATION OF ELECTRICAL FEEDERS, DISTRIBUTION PANELS, CONDUIT AND WIRE FOR
LIGHTING, RECEPTACLES AND SWITCHES, THE INSTALLATION OF CONDUIT AND WIRE FOR NEW DEVICES SUCH AS TERMINAL
UNITS, FANS, ELECTRICAL SHUTDOWN OF MULTIPLE PANELS, ETC.
• INSTALLATION OF FIRE ALARM AND SUPPRESSION SYSTEMS.
• MECHANICAL WORK SUCH AS THE INSTALLATION OF AIR HANDLING EQUIPMENT, ASSOCIATED DUCTWORK, DIFFUSERS, HEAT
EXCHANGERS, TERMINAL UNITS AND CONTROLS.
CATEGORY C
CATEGORY D
LOW RISK
PATIENT RISK GROUPS
MEDIUM RISK HIGH RISK HIGHEST RISK
• PUBLIC HALLWAYS AND
GATHERING AREAS NOT
IN CLINICAL AREAS
• OFFICE AREAS NOT IN
CLINICAL AREAS
• BREAKROOMS NOT IN
CLINICAL AREAS
• BATHROOMS OR LOCKER
ROOMS NOT IN CLINICAL
AREAS
• MECHANICAL/ELECTRICAL
ROOMS NOT IN CLINICAL
AREAS
• EMS CLOSETS NOT ON
CLINICAL UNITS
• WAITING AREAS
• CLINICAL ENGINEERING
(BIOMEDICAL/ STORAGE
CLOSETS FOR ITEMS
USED ON A CLINICAL
UNIT.)
• MATERIALS
MANAGEMENT/LOGISTICS/
TSS
• STERILE PROCESSING
DEPARTMENT – DIRTY
SIDE
• KITCHEN, CAFETERIA,
GIFT SHOP, COFFEE
SHOP, AND FOOD KIOSKS
• PATIENT CARE ROOMS AND
AREAS
• ALL ACUTE CARE UNITS,
INCLUDING MENTAL HEALTH
• ALL OUTPATIENT UNITS AND
CLINICS
• EMERGENCY DEPARTMENT
• DOMICILIARIES AND
TRANSITIONAL RESIDENCES
• EMPLOYEE HEALTH
• PHARMACY – GENERAL
WORK ZONE
• MEDICATION ROOMS AND
CLEAN UTILITY ROOMS
• IMAGING SUITES –
DIAGNOSTIC IMAGING
• LABORATORY
• ALL TRANSPLANT UNITS
• ALL INTENSIVE CARE UNITS
• ALL ONCOLOGY UNITS AND
CHEMOTHERAPY/INFUSION
CENTERS
• OR THEATERS AND
RESTRICTED AREAS
• HEMODIALYSIS UNITS
• PROCEDURAL ROOMS*
• PHARMACY COMPOUNDING
AREA
• STERILE PROCESSING
DEPARTMENT – CLEAN SIDE
• TRANSFUSION SERVICES
• IMAGING SUITES –
INTERVENTIONAL IMAGING
• DEDICATED ISOLATION
WARDS/UNITS FOR
INFECTIOUS DISEASES
RISK RELATED GROUP CATEGORY A CATEGORY B CATEGORY C CATEGORY D
LOW RISK GROUP
MEDIUM RISK GROUP
HIGH RISK GROUP
HIGHEST RISK GROUP
I
I
I
II
II
II
II
III
II
III
IV
IV
III
IV
IV
IV
CONSTRUCTION PROJECT TYPE
NOTE: AN INFECTION PREVENTION AND CONTROL PERMIT IS REQUIRED FOR LEVEL III AND LEVEL IV. CONSULT WITH INFECTION
PREVENTION AND CONTROL FOR LEVEL I AND LEVEL II.
NON-PATIENT CARE
AREAS SUCH AS:
PATIENT CARE SUPPORT
AREAS SUCH AS:
PATIENT CARE
AREAS SUCH AS:
PROCEDURAL, INVASIVE,
STERILE SUPPORT AND HIGHLY
COMPROMISED PATIENT CARE
AREAS SUCH AS:
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
DRAWING TITLE PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
PROJECT NUMBERCONSULTANTS:
DRAWING #
VA HEALTH CARE SYSTEM APPROVAL:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
EXP. 12/31/2026
EXP. 09/30/2025
MEP/TELECOM ENGINEER / VT CONSULTANT
SPUR DESIGN
2519 MADISON AVE, STE 100
KANSAS CITY, MO 64108
(913) 369-7200
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
FIRE PROTECTION ENGINEER
RATED ENGINEERING
609 S KELLY AVE, STE H2
EDMOND, OK 73003
(405) 210-5814
FULLY SPRINKLERED
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
DRAWING NUMBER
BUILDING NUMBER
STRUCTURAL ENGINEER
STAND SEI
8234 ROBINSON ST,
OVERLAND PARK, KS 66204
(913) 214-2169
ARCH REG. NO. 12903
ENGR REG. NO. 24007067
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, STE 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
/1
/2
:3 :4
P
M
ICRA CONSTRUCTION DETAILS
Author 3 OF 44Checker
FINAL BID DOCUMENTS
REFURBISH ELEVATORS AT
BLDG. 61
04/21/2025
663A4-24-201
AMERICAN LAKE VAMC
9600 VETERANS DR S.W.
TACOMA, WA 98493
GI002
SPUR #: 2416
1/2" = 1'-0"
GENERAL ICRA CONSTRUCTION PLAN LAYOUT13/8" = 1'-0"
ICRA MOBILE CONTAINMENT CART23/8" = 1'-0"
SECTION AT ICRA CONSTRUCTION PLAN3
3/8" = 1'-0"
ICRA ELEVATION4
3/4" = 1'-0"
ICRA BARRIER WALL TYPES5
ELEV #1
337 SF
MECH RM
ELEV #2
ELEV #3
LOBBY
VESTIBULE
RECEPTION
OFFICE
CORRIDOR
WAITING
OFFICE
M. TOILET
STORAGE
OFFICE
PHASING NOTES
PHASE 1
PHASE 4
PHASE 2
• ELEVATOR 3
• ELEV. 3 MACHINE ROOM
a. EQUIPMENT TO BE REMOVED FROM AND HOISTED INTO PENTHOUSE
VIA CRANE AND NEW ROOF HATCH OPENING
b. WORK IS PERMITTED DURING NORMAL BUSINESS HOURS
AREA NOT IN SCOPE
ICRA BARRIER, REF: GI002
TEMPORARY 3'-6" ICRA BARRIER
DOOR WITH FRAME SYSTEM.
SEAL DOOR AND PROVIDE LOCKING
HARDWARE
NEW FIRE COMMAND PANEL, REF:
FIRE PROTECTION
PHASING PLAN LEGEND
PHASE 3
• ELEVATOR 2
• ELEVATOR 2 MACHINE ROOM
• ELEVATOR 1
• ELEVATOR 1 MACHINE ROOM
• LEVEL 1 MECHANICAL ROOM
• INSTALL CONDENSING UNITS; REFER: MECHANICAL DRAWINGS
• FIRE COMMAND PANEL
351 SF
MECH ROOM
0"
F V
'-9
FV
10'-7"
F V
7' -1
0"
FV
12'-0"
ELEV MECH
ROOM
GENERAL PHASING NOTES
1. ALL CONSTRUCTION PHASING TO BE COORDINATED WITH VA COR FOR WORK RELATED TIMES
OF DAY, NIGHT, AND WEEKEND WORK.
2. CONTRACTOR TO COORDINATE WITH THE AHJ FOR CODE AND LIFE SAFETY MEASURES
ASSOCIATED WITH PHASING OF DEMOLITION CONSTRUCTION WORK TO MAINTAIN LIFE SAFETY
MEASURES.
3. CONTRACTOR TO COORDINATE PHASING WITH PROCUREMENT SCHEDULES OF ELEVATOR
EQUIPMENT AND NOTIFY OWNER, VA COR AND ARCHITECT FOR PHASING MODIFICATIONS
NECESSARY TO COMPLETE WORK.
4. CONTRACTOR TO PROTECT ELEVATOR LOBBIES ON FLOORS ABOVE TO MITIGATE THE SPREAD
OF CONSTRUCTION DEBRIS.
5. CONTRACTOR TO PROTECT ADJACENT FURNITURE AND MILLWORK NEAR CONSTRUCTION
ACTIVITIES.
6. IF CORE DRILLING OR OTHER MAJOR NOISE GENERATING WORK IS REQUIRED, CONTRACTOR IS
TO PERFORM SAID WORK AFTER 1PM ON SATURDAYS OR ANY TIME ON SUNDAY
ELEV #2ELEV #1
ELEV LOBBY
ELEV
EQUIPMENT
ELEV
EQUIPMENT
ROOF BELOW
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
DRAWING TITLE PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
PROJECT NUMBERCONSULTANTS:
DRAWING #
VA HEALTH CARE SYSTEM APPROVAL:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
EXP. 12/31/2026
EXP. 09/30/2025
MEP/TELECOM ENGINEER / VT CONSULTANT
SPUR DESIGN
2519 MADISON AVE, STE 100
KANSAS CITY, MO 64108
(913) 369-7200
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
FIRE PROTECTION ENGINEER
RATED ENGINEERING
609 S KELLY AVE, STE H2
EDMOND, OK 73003
(405) 210-5814
FULLY SPRINKLERED
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
DRAWING NUMBER
BUILDING NUMBER
STRUCTURAL ENGINEER
STAND SEI
8234 ROBINSON ST,
OVERLAND PARK, KS 66204
(913) 214-2169
ARCH REG. NO. 12903
ENGR REG. NO. 24007067
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, STE 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
/1
/2
:3 :4
P
M
PHASING PLAN
BAB 4 OF 44AJS
FINAL BID DOCUMENTS
REFURBISH ELEVATORS AT
BLDG. 61
04/21/2025
663A4-24-201
AMERICAN LAKE VAMC
9600 VETERANS DR S.W.
TACOMA, WA 98493
GI011
SPUR #: 2416
N
1/4" = 1'-0"
PHASING PLAN - ELEV. 1-3, TYP.1
N
1/4" = 1'-0"
PHASING PLAN - MECHANICAL ROOM2
N
1/4" = 1'-0"
LEVEL 2 - PHASING PLAN - ELEV 1&2 EQUIP. ROOMS3
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
DRAWING TITLE PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
PROJECT NUMBERCONSULTANTS:
DRAWING #
VA HEALTH CARE SYSTEM APPROVAL:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
ARCH REG. NO. 12903 EXP. 12/31/2026
ENGR REG. NO. 24007067 EXP. 09/30/2025
STRUCTURAL ENGINEER
STAND SEI
8234 ROBINSON ST
OVERLAND PARK, KS 66204
(913) 214-2169
MECH / TELECOM ENGINEER
SPUR DESIGN
2519 MADISON AVE, SUITE 100
KANSAS CITY, MO 64108
(913) 369-7200
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
FIRE PROTECTION ENGINEER
RATED ENGINEERING
609 S KELLY AVE, STE H2
EDMOND, OK 73003
(405) 210-5814
FULLY SPRINKLERED
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
DRAWING NUMBER
BUILDING NUMBER
SPUR #: 2416
663A4-24-201
/1
/2
:0 :5
P
M
STRUCTURAL GENERAL NOTES
TJS 5 OF 44TFH
FINAL BID DOCUMENTS
REFURBISH ELEVATORS AT
BLDG. 61
04/21/2025
AMERICAN LAKE VAMC
9600 VETERANS DR S.W.
TACOMA, WA 98493
SS001
03_Abbreviation Schedule
Abbreviation Abbreviation Name
+/- PLUS OR MINUS
ADDNL ADDITIONAL
ADJ ADJACENT
AESS ARCHITECTURALLY EXPOSED
STRUCTURAL STEEL
AFF ABOVE FINISHED FLOOR
ALT ALTERNATE
AR ANCHOR ROD
ARCH ARCHITECT OR ARCHITECTURAL
B/ BOTTOM OF
B/W BETWEEN
BLDG BUILDING
BLKG BLOCKING
BM BEAM
BOT BOTTOM
BRG BEARING
BWP BRACED WALL PANEL
CFS COLD FORMED STEEL
CHKD CHECKED
CIP CAST IN PLACE
CJ CONTROL JOINT
CJP COMPLETE JOINT PENETRATION
CL CENTERLINE
CLR CLEAR
COL COLUMN
CONC CONCRETE
CONN CONNECTION
CONT CONTINUOUS
CTR CENTER
db DIA OF REINF BAR, DIA OF BOLT
DBA DEFORMED BAR ANCHOR
DIA or Ø DIAMETER
DIAG DIAGONAL
DIR DIRECTION
DWL DOWEL
EA EACH
EE EXTENDED END
EJ EXPANSION JOINT
ELEV ELEVATION
EN EDGE NAILING
ENGR ENGINEER
EOD EDGE OF DECK
EOS EDGE OF SLAB
EQ EQUAL
EW EACH WAY
EXIST EXISTING
EXT EXTERIOR
FDN FOUNDATION
FLG FLANGE
FLR FLOOR
FS FAR SIDE
FTG FOOTING
FV FIELD VERIFY
GA GAUGE
GALV GALVANIZED
GB GRADE BEAM
GC GENERAL CONTRACTOR
HORIZ HORIZONTAL
HSA HEADED STUD ANCHOR
HSS HOLLOW STRUCTURAL SECTION
IF INSIDE FACE
INT INTERIOR
JST JOIST
K KIPS (1000 LBS)
LCE COMPRESSION EMBEDMENT LENGTH
LCS COMPRESSION LAP SPLICE LENGTH
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LSH LONG SLOTTED HOLE
LTE TENSION EMBEDMENT LENGTH
LTS TENSION LAP SLICE LENGTH
LW LIGHTWEIGHT
MFCR MANUFACTURER
MTL METAL
NIC NOT IN CONTRACT
NS NEAR SIDE
NTS NOT TO SCALE
OC ON CENTER
OF OUTSIDE FACE
OPP OPPOSITE
OVS OVERSIZED
P/C PRECAST
PAF POWDER ACTUATED FASTENER
PAR PARALLEL
PEMB PRE-ENGINEERED METAL BUILDING
PEN PENETRATION
PERP PERPENDICULAR
PL PLATE
PLF POUNDS PER LINEAR FOOT
PREFAB PREFABRICATED
PRELIM PRELIMINARY
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
RC REINFORCED CONCRETE
RE: REFER TO
REINF REINFORCING
REQD REQUIRED
RF RIGID FRAME
SC SLIP CRITICAL
SDS SELF DRILLING SCREW
SIM SIMILAR
SLV SHORT LEG VERTICAL
SOG SLAB ON GRADE
SQ SQUARE
SS STAINLESS STEEL
STD STANDARD
STIR STIRRUPS
STL STEEL
SW SHEAR WALL
SYM SYMMETRIC
T&B TOP AND BOTTOM
T/ TOP OF
TRANS TRANSVERSE
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
VERT VERTICAL
W/ WITH
W/O WITHOUT
WF WIDE FLANGE
WP WORK POINT
WWR WELDED WIRE REINFORCEMENT
STRUCTURAL DESIGN CRITERIA (2024 IBC AND VA DESIGN MANUAL PG-18-10 AND
ASCE 7-22 AND IEBC 2024):
1. BUILDING OCCUPANCY RISK CATEGORY II.
2. LIVE LOADS [UNIFORM (PSF) / POINT LOADS (KIPS)]: (EXISTING AREAS)
-- ROOF:………………………………………...............20 PSF
-- MACHINE ROOM FLOOR ....................................150 PSF
-- GROUND LEVEL SLAB ........................................100 PSF / 2.0 K
3. ROOF SNOW LOAD:
-- GROUND SNOW LOAD (Pg):……………………....41 PSF -- FLAT ROOF SNOW LOAD (Pf): ............................39 PSF + DRIFT -- MIN UNIFORM ROOF SNOW LOAD (Pm):…...…. 24 PSF -- RAIN ON SNOW SURCHARGE (Prs) ..................0 PSF -- SNOW EXPOSURE FACTOR (Ce):………………..1.1, EXPOSURE B & C -- SNOW LOAD IMPORTANCE FACTOR (Is):….......1.2 -- THERMAL FACTOR (Ct):……………………….......1.1 (just above freezing)
– SLOPE FACTOR (CS).............................................1.0 (for ¼ per foot roofs)
4. WIND DESIGN DATA:
-- BASIC WIND SPEED (3 SEC GUST):……………..97 MPH
-- WIND EXPOSURE:…………………………………..C
-- DIRECTIONALITY FACTOR (Kd) ..........................0.85
5. EARTHQUAKE DESIGN DATA:
-- SEISMIC IMPORTANCE FACTOR (Ie):………......1.0 -- MAPPED SPECTRAL RESP ACCEL (Ss / S1):…..1.5 / 0.47
-- SITE CLASS:………………………………………….D (DEFAULT)
-- SPECTRAL RESPONSE COEFF (Sds / Sd1):……1.08 / 0.65
-- SEISMIC DESIGN CATEGORY:……………………D
-- SEISMIC FORCE RESISTING SYSTEM:…………R=4, CONCRETE SHEAR
WALLS (EXISTING)
STRUCTURAL GENERAL NOTES:
1. DESIGN AND CONSTRUCTION SHALL CONFORM TO THE "INTERNATIONAL
BUILDING CODE, 2024 EDITION" AND APPLICABLE VA GUIDELINES. REFER TO THE
SPECIAL STRUCTURAL INSPECTION NOTES FOR ADDITIONAL REQUIREMENTS.
2. CONTRACTOR TO VERIFY ALL DIMENSIONS, ELEVATIONS AND EXISTING
CONDITIONS AND REPORT ANY DISCREPANCIES TO THE ARCHITECT PRIOR TO
COMMENCING WORK.
3. IF DISCREPANCIES EXIST BETWEEN STRUCTURAL PLANS, ARCHITECTURAL
PLANS, OTHER PLANS, OR SPECIFICATIONS, THE CONTRACTOR OR
SUBCONTRACTOR SHALL PROVIDE A WRITTEN REQUEST FOR CLARIFICATION FROM
THE ARCHITECT AND/OR ENGINEER PRIOR TO PROCEEDING WITH THE WORK.
4. THE STRUCTURE IS DESIGNED TO BE SELF-SUPPORTING AND STABLE AFTER
THE BUILDING IS FULLY COMPLETED. IT IS SOLELY THE CONTRACTOR'S
RESPONSIBILITY TO EXECUTE AND DETERMINE FINAL ERECTION PROCEDURES,
SEQUENCING AND TO ENSURE THE SAFETY OF THE BUILDING AND ITS COMPONENT
PARTS DURING ERECTION. THIS INCLUDES WHATEVER SHORING, SHEETING,
TEMPORARY BRACING, GUYING OR TIE DOWNS WHICH MIGHT BE NECESSARY.
5. THE STRUCTURE AND FOUNDATIONS ARE NOT DESIGNED FOR FUTURE
EXPANSION.
6. FABRICATORS AND SUPPLIERS SHALL CLEARLY NOTE AND HIGHLIGHT CHANGES
MADE IN SHOP DRAWINGS, WHICH DO NOT COMPLY WITH THE CONTRACT
DOCUMENTS.
7. COLUMNS, BEAMS, JOISTS, OR TRUSSES SHALL NOT BE FIELD CUT OR TRIMMED
FOR ANY REASON WITHOUT THE WRITTEN APPROVAL OF THE
ARCHITECT/ENGINEER.
8. HOLES, PIPES, SLEEVES, ETC. NOT SHOWN ON THE DRAWINGS MUST BE
REVIEWED BY THE ARCHITECT/ENGINEER BEFORE PLACEMENT THROUGH
STRUCTURAL MEMBERS.
9. IF MECHANICAL AND ELECTRICAL EQUIPMENT SIZES, WEIGHTS, OR LOCATIONS
DO NOT COINCIDE WITH EQUIPMENT SHOWN ON THE PLANS, COORDINATE
AD…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .