This is a Construction Cost Estimate template in CSI (Construction Specifications Institute) Division format for the refurbishment of elevators in Building 61 (Cars 1, 2, and 3) at VA Puget Sound Medical Center in Tacoma, Washington (Project 663A4-24-201). The spreadsheet is designed to compile cost estimates across multiple construction divisions, with sample data provided in Divisions 1 (General Requirements), 2 (Existing Conditions), and 3 (Concrete Work) to illustrate completion methodology. The template includes prefilled division sheets for labor and material cost entries organized by CSI divisions, with provisions for contractors to add missing items or fill additional divisions as required.

The cost estimate structure provides for automatic calculation of subtotals, subcontractor overhead (5%), subcontractor profit (11%), Florida sales tax (6%), prime general contractor overhead (10%), prime general contractor profit (10%), and builder's risk/performance bonds (2%) based on inputs entered in designated "Fill Here" areas. The summary page shows initial cost data with Division 01 at $50.00, Division 02 at $59.48, and Division 03 at $64.45, resulting in a hard cost total of $173.93 and a contract total of $214.66; however, these figures reflect placeholder sample data. The template contains formulas and linked cells throughout, and users are instructed to save a copy before editing to prevent accidental data loss. Contractors are expected to complete labor and material costs for each line item and select the appropriate design status code (A—No design completed, B—Preliminary design, or C—Final design).

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Use the information from the prefilled division sheets below to complete the 50 Divisions Cost Estimate CSI* Format tool to build your proposal. The information from the prefilled division sheets may not be all inclusive. The contractor is allowed to include any missing items from each division and is allowed to fill in other divisions that are not listed in the prefilled division sheets. If there is a disagreement with the prefilled division sheets, the contractor should not delete the element(s), but instead leave it blank and then include their suggested element(s) at the bottom of that division tab. Please note that on the summary page there is a place to fill in overhead and profit percentages for both the prime and the subcontractor that will self-populate the summary page and all the division tabs.

Exceptions:

(1) if each subcontractor has a different overhead and profit rates than the percentage placed on the summary page, an adjustment will have to be made to that specific division page. The spreadsheet will still calculate correctly.

(2) If the prime is self-performing the work for that division then the profit and overhead will need to be zeroed for that particular division, because the primes overhead and profit is already captured on the summary page.

The ktr is required to complete the areas marked "Fill Here" in the summary tab. The rest of the information in the summary tab will automatically tabulate from the individual division tabs except for the few exceptions listed above.
Divisions 1, 2, and 3 show sample inputs to illustrate how the spreadsheet works.
* CSI = Construction Specifications Institute

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Summary

CONSTRUCTION COST ESTIMATEDate:
Fill Here
COMPANY
Fill Here
PROJECT
663A4-24-201 - Refurbish Elevators Bldg 61 Cars 1, 2 and 3
LOCATIONPROJECT NO.663A4-24-201
VA Puget Sound Medical Center, American Lake, Tacoma, WA
DIVISIONDESCRIPTION% by
DivisionDivision Total
DIVISION 01GENERAL REQUIREMENTS28.7%50.00
DIVISION 02EXISTING CONDITIONS34.2%59.48
DIVISION 03CONCRETE WORK37.1%64.45FILL IN AS REQUIRED (this will link to the entire document)
DIVISION 05METALS0.0%- 0
DIVISION 07THERMAL AND MOISTURE PROTECTION0.0%- 0
DIVISION 09FINISHES0.0%- 0GC Overhead10.00%
DIVISION 13SPECIAL CONSTRUCTION0.0%- 0GC Profit10.00%
DIVISION 14CONVEYING EQUIPMENT0.0%- 0Sub Overhead5.00%
DIVISION 21FIRE SUPRESSION0.0%- 0Sub Profit11.00%
DIVISION 22PLUMBING0.0%- 0Sales Tax6.00%
DIVISION 23HEATING, VENTILATING AND A/C0.0%- 0Risk/Bonding2.00%
DIVISION 26ELECTRICAL0.0%- 0
DIVISION 27COMMUNICATIONS0.0%- 0This spreadsheet contains many formulas... please save a copy prior to editting in case you make a mistake. All shaded areas are either linked or contain formulas
DIVISION 28ELECTRONIC SAFETY AND SECURITY0.0%- 0
HARD COST TOTAL100%173.93
PRIME GENERAL CONTRACT OFFICE OVERHEAD (Fill in%)10%17.39
SUBTOTAL191.32
PRIME GENERAL CONTRACTOR'S PROFIT(Fill in%)10%19.13
SUBTOTAL210.45
BUILDER'S RISK / PERFORMANCE BONDS (Fill in%)2%4.21
CONTRACT TOTAL$ 214.66

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N davisjam:

Percentages listed are place fillers. Please complete as required

Div1

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
663A4-24-201 - Refurbish Elevators Bldg 61 Cars 1, 2 and 3CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
VA Puget Sound Medical Center, American Lake, Tacoma, WACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here663A4-24-201
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
GENERAL REQUIREMENTS
- 0- 0- 0
- 0- 0- 0
Sample Input2- 010.0020.0020.00
Sample Input31.0010.0030.00- 030.00
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS30.0020.00
SUBTOTAL50.00
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ 50.00

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div2

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
663A4-24-201 - Refurbish Elevators Bldg 61 Cars 1, 2 and 3CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
VA Puget Sound Medical Center, American Lake, Tacoma, WACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here663A4-24-201
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
EXISTING CONDITIONS
- 0- 0- 0
- 0- 0- 0
Sample Input2- 010.0020.0020.00
Sample Input310.0030.00- 030.00
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS30.0020.00
SUBTOTAL50.00
Sub-Contractor's Overhead5.00%2.50
Sub-Contractor's Profit11.00%5.78
FL State Sales Tax6.00%1.20
TOTAL$ 59.48

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div3

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
663A4-24-201 - Refurbish Elevators Bldg 61 Cars 1, 2 and 3CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
VA Puget Sound Medical Center, American Lake, Tacoma, WACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here663A4-24-201
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
CONCRETE WORK
- 0- 0- 0
- 0- 0- 0
Sample Input2- 010.0020.0020.00
Sample Input310.0030.00- 030.00
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS30.0020.00
SUBTOTAL50.00
Sub-Contractor's Overhead10.00%5.00
Sub-Contractor's Profit15.00%8.25
FL State Sales Tax6.00%1.20
TOTAL$ 64.45

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div5

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
663A4-24-201 - Refurbish Elevators Bldg 61 Cars 1, 2 and 3CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
VA Puget Sound Medical Center, American Lake, Tacoma, WACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here663A4-24-201
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
METALS
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div7

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
663A4-24-201 - Refurbish Elevators Bldg 61 Cars 1, 2 and 3CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
VA Puget Sound Medical Center, American Lake, Tacoma, WACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here663A4-24-201
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
THERMAL AND MOISTURE PROTECTION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div9

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
663A4-24-201 - Refurbish Elevators Bldg 61 Cars 1, 2 and 3CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
VA Puget Sound Medical Center, American Lake, Tacoma, WACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here663A4-24-201
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
FINISHES
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div13

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
663A4-24-201 - Refurbish Elevators Bldg 61 Cars 1, 2 and 3CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
VA Puget Sound Medical Center, American Lake, Tacoma, WACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here663A4-24-201
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
SPECIAL CONSTRUCTION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div14

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
663A4-24-201 - Refurbish Elevators Bldg 61 Cars 1, 2 and 3CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
VA Puget Sound Medical Center, American Lake, Tacoma, WACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here663A4-24-201
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
CONVEYING EQUIPMENT
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div21

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
663A4-24-201 - Refurbish Elevators Bldg 61 Cars 1, 2 and 3CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
VA Puget Sound Medical Center, American Lake, Tacoma, WACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here663A4-24-201
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
FIRE SUPRESSION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div22

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
663A4-24-201 - Refurbish Elevators Bldg 61 Cars 1, 2 and 3CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
VA Puget Sound Medical Center, American Lake, Tacoma, WACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here663A4-24-201
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
PLUMBING
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div23

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
663A4-24-201 - Refurbish Elevators Bldg 61 Cars 1, 2 and 3CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
VA Puget Sound Medical Center, American Lake, Tacoma, WACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here663A4-24-201
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
HEATING, VENTILATING AND A/C
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div26

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
663A4-24-201 - Refurbish Elevators Bldg 61 Cars 1, 2 and 3CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
VA Puget Sound Medical Center, American Lake, Tacoma, WACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here663A4-24-201
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
ELECTRICAL
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div27

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
663A4-24-201 - Refurbish Elevators Bldg 61 Cars 1, 2 and 3CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
VA Puget Sound Medical Center, American Lake, Tacoma, WACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here663A4-24-201
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
COMMUNICATIONS
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div28

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
663A4-24-201 - Refurbish Elevators Bldg 61 Cars 1, 2 and 3CODE A (No design completed)
LOCATIONCODE B (Preliminary design)
VA Puget Sound Medical Center, American Lake, Tacoma, WACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill Here663A4-24-201
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
ELECTRONIC SAFETY AND SECURITY
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0