Supply and Installation of Fire-rated doors and walls fireproofing at U. S. Embassy Madrid, Spain
Solicitation number
19SP5026Q0013
Issued by

About this file

This is a Total Cost Breakdown attachment for a fire-rated doors and walls fireproofing project at the U.S. Embassy in Madrid, Spain (Solicitation 19SP5026Q0013). The cost breakdown is organized under CLIN 1: TSS Relocation and itemizes all materials, labor, and services required for the project scope.

The deliverables include mobilization and site survey; demolition and removal of existing doors and frames (63 m²); supply and installation of nine fire-rated doors with specifications including boiler room doors (1680x2100 dimensions), high voltage room door (1680x2100), mechanical room entrance door (1680x2100), boiler room to locker room door (900x2000), boiler room east door (930x2100), fire pump room door (900x2000), low voltage electrical room doors (930x2100, two units), and UPS room door (930x2100). Additional work includes supply and installation of frames, panic hardware, closers, and smoke seals (63 m²); door installation labor (63 m²); fire-rated wall construction around boiler using CMU or UL gypsum (20 units); masonry work to reduce oversized openings (112 m²); firestopping of penetrations using UL-approved systems; joint sealing, fire caulking, and finishing; waste disposal and site cleaning; certified fire door and firestop inspection; waste management; safety and security; and miscellaneous items. The document notes that all measurements are estimates and each offeror is responsible for independent site measurements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 All measurements included here are estimates. Each Offeror is responsible for taking its own measurements.

Presupuesto
CódigoUdItemMesCanPresPres
CLIN 1 : TSS RELOCATION
1.01udMobilization, site survey, measurements1
1.02m2Demolition and removal of existing doors/frames63
1.03udDoor N1. Boiler room West. Dimension 1680x21001
1.04udDoor N5. High Voltage room. Dimension 1680x21001
1.05udDoor N8. Mechanical room entrance door. Dimension 1680x21001
1.06udDoor N2. Boiler room to locker room. Opening dimension 1380x2000. Dimension 900x20001
1.07udDoor N3. Boiler room East. Dimension 930x21001
1.08udNew door N4 Fire Pump. Opening dimension: 1400x2430. Dimension 900x20001
1.09udDoor N7a and 7b. Low Voltage Electrical room. Dimension 930x2100 (two doors).1
1.1udDoor N6. UPS. Dimension 930x21001
1.12m2Frames, panic hardware, closers, smoke seals63
1.13m2Door installation labor63
1.14udFire-rated wall construction around boiler (CMU / UL gypsum)20
1.15m2Masonry work to reduce oversized openings112
1.16paFirestopping of penetrations (UL systems)1
1.17PAJoint sealing, fire caulking, and finishing1
1.18paWaste disposal and site cleaning1
1.19paCertified fire door and firestop inspection1
1.2paWaste mangement1
1.21paSafety and security1
1.22paMiscellaneus1