Attachment 3 - Total Cost Breakdown.xlsx
XLSX spreadsheet 18 KB Posted
- Attached to
- Supply and Installation of Fire-rated doors and walls fireproofing at U. S. Embassy Madrid, Spain
- Solicitation number
- 19SP5026Q0013
- Issued by
-
Department of State US Embassy Madrid
About this file
This is a Total Cost Breakdown attachment for a fire-rated doors and walls fireproofing project at the U.S. Embassy in Madrid, Spain (Solicitation 19SP5026Q0013). The cost breakdown is organized under CLIN 1: TSS Relocation and itemizes all materials, labor, and services required for the project scope.
The deliverables include mobilization and site survey; demolition and removal of existing doors and frames (63 m²); supply and installation of nine fire-rated doors with specifications including boiler room doors (1680x2100 dimensions), high voltage room door (1680x2100), mechanical room entrance door (1680x2100), boiler room to locker room door (900x2000), boiler room east door (930x2100), fire pump room door (900x2000), low voltage electrical room doors (930x2100, two units), and UPS room door (930x2100). Additional work includes supply and installation of frames, panic hardware, closers, and smoke seals (63 m²); door installation labor (63 m²); fire-rated wall construction around boiler using CMU or UL gypsum (20 units); masonry work to reduce oversized openings (112 m²); firestopping of penetrations using UL-approved systems; joint sealing, fire caulking, and finishing; waste disposal and site cleaning; certified fire door and firestop inspection; waste management; safety and security; and miscellaneous items. The document notes that all measurements are estimates and each offeror is responsible for independent site measurements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 All measurements included here are estimates. Each Offeror is responsible for taking its own measurements.
| Presupuesto | |||||
| Código | Ud | Item | Mes | CanPres | Pres |
| CLIN 1 : TSS RELOCATION | |||||
| 1.01 | ud | Mobilization, site survey, measurements | 1 | ||
| 1.02 | m2 | Demolition and removal of existing doors/frames | 63 | ||
| 1.03 | ud | Door N1. Boiler room West. Dimension 1680x2100 | 1 | ||
| 1.04 | ud | Door N5. High Voltage room. Dimension 1680x2100 | 1 | ||
| 1.05 | ud | Door N8. Mechanical room entrance door. Dimension 1680x2100 | 1 | ||
| 1.06 | ud | Door N2. Boiler room to locker room. Opening dimension 1380x2000. Dimension 900x2000 | 1 | ||
| 1.07 | ud | Door N3. Boiler room East. Dimension 930x2100 | 1 | ||
| 1.08 | ud | New door N4 Fire Pump. Opening dimension: 1400x2430. Dimension 900x2000 | 1 | ||
| 1.09 | ud | Door N7a and 7b. Low Voltage Electrical room. Dimension 930x2100 (two doors). | 1 | ||
| 1.1 | ud | Door N6. UPS. Dimension 930x2100 | 1 | ||
| 1.12 | m2 | Frames, panic hardware, closers, smoke seals | 63 | ||
| 1.13 | m2 | Door installation labor | 63 | ||
| 1.14 | ud | Fire-rated wall construction around boiler (CMU / UL gypsum) | 20 | ||
| 1.15 | m2 | Masonry work to reduce oversized openings | 112 | ||
| 1.16 | pa | Firestopping of penetrations (UL systems) | 1 | ||
| 1.17 | PA | Joint sealing, fire caulking, and finishing | 1 | ||
| 1.18 | pa | Waste disposal and site cleaning | 1 | ||
| 1.19 | pa | Certified fire door and firestop inspection | 1 | ||
| 1.2 | pa | Waste mangement | 1 | ||
| 1.21 | pa | Safety and security | 1 | ||
| 1.22 | pa | Miscellaneus | 1 |