Attachment 1 - Breakdown of Price by Divisions of Specifications.pdf

PDF 140 KB Posted

Attached to
Supply and Installation of Fire-rated doors and walls fireproofing at U. S. Embassy Madrid, Spain
Solicitation number
19SP5026Q0013
Issued by

About this file

This is a pricing template from a Request for Quotation (RFQ No. 19SP5025Q0006) issued by the United States Department of State. The template is titled "Breakdown of Price by Divisions of Specifications" and serves as Attachment 1 to the solicitation.

The form requires offerors to provide detailed pricing across 16 construction-related divisions, breaking costs into four components: Labor, Materials, Overhead, and Profit. The divisions encompass typical construction work including General Requirements/Mobilization, Site Work, Concrete, Masonry, Metals, Wood and Plastic, Thermal and Moisture, Doors and Windows, Finishes, Specialties, Equipment, Furnishings, Special Construction, Conveying Systems, Mechanical, and Electrical. Pricing is to be submitted in Euros. The template specifies that there are no allowance items and that alternates should be listed separately without being included in the total. Offerors must complete the "Proposal Price Total Euros" field and provide their company name and submission date. This pricing template is standard for State Department construction or renovation projects and establishes the cost structure baseline for proposal evaluation.

View the file

Other files

File Type Posted
RFQ 19SP5026Q0013.pdf PDF
Attachment 2 - Statement of Work with Drawings.pdf PDF
Attachment 3 - Total Cost Breakdown.xlsx XLSX spreadsheet
Invitation letter.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ No. 19SP5025Q0006 Page 53 of 55

ATTACHMENT #4

UNITED STATES DEPARTMENT OF STATE

BREAKDOWN OF PRICE BY DIVISIONS OF SPECIFICATIONS

(1) Division/Description

(2) Labor

(3) Materials

(4) Overhead

(5) Profit

(6) Total

1. General Requirements/ Mobilization

2. Site Work

3. Concrete

4. Masonry

5. Metals

6. Wood and Plastic

7. Thermal and Moisture

8. Doors and Windows

9. Finishes

10. Specialties

11. Equipment

12. Furnishings

13. Special Construction

14. Conveying Systems

15. Mechanical

16. Electrical

TOTAL EUROS:

Allowance Items: NONE

PROPOSAL PRICE TOTAL EUROS:

Alternates (list separately; do not total):

Offeror:

Date

File details come from the government source that posted it. Updated .