Attachment 3 - Statement of Work SPECS.pdf

PDF 620 KB Posted

Attached to
Flathead National Forest - Condon Bunkhouse Maintenance Repairs
Solicitation number
1240LU26Q0007
Issued by

About this file

This document is a solicitation (1240LU26Q0007) for maintenance and repairs of housing units at the Flathead National Forest's Condon Work Center in Montana. The project involves maintenance, repainting, and repairs for two bunkhouses and one residence, including gypsum board wall and ceiling repairs, interior and exterior painting, floor refinishing, and addressing flood-related damage in specific areas.

The scope includes detailed specifications for surface preparation, painting, and floor refinishing, with specific requirements for lead-based paint handling and dust mitigation. The contractor must provide all personnel, equipment, and materials to complete the work, which involves sanding, cleaning, priming, and painting interior and exterior surfaces according to Master Painters Institute (MPI) standards. The work is to be completed within 60 calendar days of the Notice to Proceed, with a mandatory site visit scheduled for January 22, 2026. The project requires careful lead-based paint management, including dust control, personal protective equipment, and clearance testing.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation: 1240LU26Q0007 Description/Specification/Statement of Work

GAOA Condon Bunkhouses Maintenance Repairs

FLATHEAD NATIONAL FOREST

HOUSING DEFERRED MAINTENANCE GENERAL SPECIFICATIONS PART 1 -

GENERAL SCOPE

1.1 A. This project includes maintenance repainting and repairs to floors, walls, and ceilings in 2 bunkhouses and 1 residence owned by the US Forest Service. Inside the residence flood repairs to walls and floors of a bedroom and laundry room are required, while the basement requires wall and ceiling repair work.

The 2 bunkhouses require gypsum board wall and ceiling repairs and maintenance repainting. The work locations are unoccupied housing units located at the Forest Service’s Condon, MT work center.

B. The Contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and services necessary to scrub & clean wall surfaces and cavities to remove mildew, install gypsum board, paint interior walls and ceilings, install linoleum flooring, screen, sand, and seal maple floors, and paint all interior and exterior doors.

C. Pay Items associated with this work are identified in the Schedule of Items.

1.2 REQUIRED WORK: The precise details of work, for painting and repairs, are not itemized except those considered essential for the completion of the work. The list provided should not be considered complete. The Contractor shall be aware the project includes remodeling, and the drawing are depictive of general floorplans which cannot fully show or explain the work without field observation.

Contractors who submit proposals are encouraged to visit and examine the buildings and make allowances in their proposal for all conditions which affect the work indicated by the plans, in the project specifications, and in the contract documents.

A. Prep and paint all interior surfaces to include walls, ceilings, doors, closets, trim, windows, moldings, bulkhead/cellar ways, basement walls and 2 bunkhouse basement floors.

B. Prep and paint all exterior doors and door trim.

C. When the unit has a garage, prep and paint garage exterior entry door and door trim.

D. Paint selection and finish shall be In Accordance With (IAW) Master Painters Institute, MPI and the following:

Location Coating Types & Details Finish Exterior Doors and Trim

MPI EXT 6.3L

White, Primed w/ 2 Coats Primer MPI # 50, Latex Paint MPI #141

Semi-Gloss

Interior Doors

MPI INT 6.3T

White, Primed w/ 2 Coats Primer MPI # 50, Latex Paint MPI #139

Eggshell

Interior Walls, Gypsum board

MPI INT 9.2A

White, Primed w/ 2 Coats Primer MPI # 50, Latex Paint MPI #139

Eggshell

Interior Trim, Casings & Moldings

INT 6.3T

White, Primed w/ 2 Coats Primer MPI # 50, Latex Paint MPI #140

Satin

Interior Windows

MPI INT 6.3T

Custom Color, Primed w/ 2 Coats Primer MPI # 50, Latex Paint MPI #140

Satin

Interior Ceiling

MPI INT 9.1A

White, 2 Coats, Spray Primer MPI # 50, Latex Paint MPI #53

Flat

Basement Walls, Gypsum board

MPI INT 9.2A

White, with mildewcide additive, 2 Coats Primer MPI # 50, Latex Paint MPI #53

Flat

Basement Walls, Gypsum board

MPI INT 9.2A

Gray, with mildewcide additive, 2 Coats Primer MPI # 50, Latex Paint MPI #53

Flat

Wood Floors (Sanded)

MPI INT 6.5J

2 Coats Polyurethane MPI #72 Type AU 1 Coat Stain semi-transparent MPI #90

Gloss

Wood Floors (Screened) MPI INT 6.5K 2 Coats Polyurethane MPI #72 Type AU Gloss

1.3 Spraying to paint will be allowed for the interior ceilings and basement spaces. Contractor will be required to ensure any overspray is removed and cleaned. Spraying paint for other systems requires the Contracting Officer’s (CO) approval.

1.4 Floor refinishing work for bedrooms and closets of in House #3 includes preparations to remove carpets, thoroughly clean, screen and sand prior to application of finish stains and polyurethane. Prep floors by either screening or sanding followed by staining. Refinish the hardwood floors by applying two coats of high-gloss polyurethane. The determination of methods to employ in each room (i.e., screening or sanding) shall be made by the Contracting Officer.

1.5 Types of Housing Units Estimated Floor and Wall Square Footage:

Unit Name Approximate Floor Square Footage

Approx. Basement Square Footage

Approx. Wall Square Footage

Bunkhouse A: 12 bed Dormitory, Style: Split Level

1788 1600 3745

Bunkhouse B: 12 bed Dormitory, Style: Split Level 1788 1600 3105

House #3: 3-bedroom Residence, w/ Basement 1801 1100 6410

House #3: Hardwood Flooring Style: Ranch w/ Basement 395 - -

House #3: Laundry Room tile, Style: Ranch w/ Basement 35 - -

Bunkhouse A: 12 bed Dormitory Gypsum board repairs - - 96 sqft

(3 sheets) Bunkhouse B: 12 bed Dormitory

Gypsum board repairs - - 160 sqft (5 sheets)

House #3, 3 bedroom house Gypsum board repairs - 450 sqft

(14 sheets) -

1.6

1.7

1.8

1.9

1.10

SITE VISITS: Bidders are encouraged to inspect the buildings where work is to be performed and to satisfy their understanding of conditions that may affect the cost of performing the work. Contractors may make arrangements for a site visit by contacting the Contracting Officer, any questions regarding specifications, or the work shall be addressed in writing and directed to the Contracting Officer.

A SITE VISIT FOR THIS PROJECT WILL BE CONDUCTED ON JANUARY 22, 2026 AT 11:00

AM MST. Condon Work Center (Address: 6887 MT-83, Condon, MT 59826)

BIDDERS MAY REQUEST BUILDING ACCESS BY CALLING PATRICK SIERS AT

406.758.5347 OR EMAILING PATRICK.SIERS@USDA.GOV.

LOCATION: Work will be performed at three housings units located at US Forest Service’s Condon Work Center, 6887 MT Hwy 83, Condon, MT 59826.

HOURS OF WORK: Normal working hours for the contract are 8:00 A.M. to 5:00 P.M., Monday through Friday (excluding Federal Holidays). If the Contractor desires to work other than normal duty hours, on weekends or federal holidays, he/she must request written permission from the Contracting Officer at least 36 hours in advance of such work and approval must be received prior to the requested work time. The Contractor shall coordinate the work schedule and all work with the COR.

P conference before starting construction at a time and place convenient to the Contractor. The conference shall review responsibilities and personnel assignments.

1.

AttendeRECONSTRUCTION es: Participants at theCONFERENCE: conferencThee Cshallont breacting familiar O wfficerith t s hehall prscojecthedule, s halla pr beeconstr authorucizedtion to conclude matters relating to the Work, and shall minimally include representatives of the following parties:

mailto:PATRICK.SIERS@USDA.GOV

a. Contracting Officer’s Representative

b. Contractor.

c. Major subcontractors.

2. Agenda: Subjects for discussion shall include items of significance that could effect progress, including but not limited to the following:

a. Construction schedule.

b. Critical work sequencing.

c. Designation of responsible personnel.

d. Procedures for processing field decisions and Change Orders.

e. Procedures for processing Applications for Payment.

f. Submittal of Product Data, and Samples.

1.11 SCHEDULE OF WORK: After receiving the notice to proceed, the Contractor shall submit a Schedule of Work to the Government for approval by the Contracting Officer. The Contractor shall not commence work under this contract without receiving a copy of the signed approved schedule.

1.1 PROGRESS PHOTOGRAPHS

A. Submit photographs with each application for payment, taken not more than 3 days prior to submission of application for payment.

B. Photography Type: Digital; electronic files.

C. Provide photographs of site and construction throughout progress of work produced by Contractor's personnel, acceptable to Contracting Officer.

D. In addition to periodic recurring views, take photographs of each of the following events:

1. Trenching & bedding, framing, mechanical equipment and systems installation; in-progress and upon completion.

E. Views:

1. Consult with the Contracting Officer for instructions on views required.

2. Provide factual presentation.

3. Provide correct exposure and focus, high resolution and sharpness, maximum depth of field, and minimum distortion.

1.12 SAFETY: The Contractor shall take all necessary precautions to meet proper safety standards and regulations of the State and Federal Codes. OSHA regulations apply to all work performed on site.

1.13 ON SITE SUPERVISION: The Contractor shall always provide qualified supervision when work is being conducted by Contractor employees or Sub-Contractor employees. Prior to commencing work, the Contractor shall submit a letter to the Contracting Officer designating an employee from his/her company as the foreman or supervisor. The supervisor shall be on site any time work is being performed. The supervisor shall be able to read, write, speak English, and have the authority to approve and accept work orders.

1.14 PROTECTION OF PROPERTY: The Contractor shall comply with the requirements of Paragraph 52.236-9 and 52.236-10 of the Federal Acquisition Regulation and the following: All existing grounds, fences, utilities, equipment, building components and adjacent property, including vehicles, shall be protected from any damage resulting from contract operations. Contractors will be responsible for any damage to Government property. Damaged property (done by the Contractor) shall be repaired by the Contractor, at Contractor’s expense, to meet previous existing conditions.

1.15 HAZARDOUS MATERIAL: The Government has determined the renovation and maintenance work under this contract may involve exposure to lead-based paint (LBP).

1. Paint from Forest Service buildings built prior to 1978 shall be assumed to contain lead paint unless tests indicate otherwise. The buildings were constructed between 1958 and 1961 and it is assumed lead based paint was used at some point in the life of each building. No testing has been performed at the Condon Work Center to indicated the presence of LBP.

2. Other hazardous materials are not expected to be encountered in the work. Asbestos materials are not anticipated to be impacted by work. Asbestos and Vermiculite inspections in the bunkhouse buildings and other campus buildings have not detect any asbestos containing materials.

3. The Contractor shall be solely responsible for all Contractor generated or owned hazardous materials.

4. While performing the work specific herein, if potentially hazardous materials are utilized a SD will be submitted to the COR prior to its use. If the hazardous materials are encountered, the Contractor shall notify the COR immediately.

5. The Contractor’s responsibility for handling hazardous material is incidental to work performed.

6. The Contractor shall handle, remove, and properly dispose of only those hazardous materials necessary to complete the contract work.

7. The Contractor shall submit a list of all hazardous materials with Safety Data Sheets (SDS) to the

COR for approval prior to work commencement on this project.

1.16 RESTORATION AND CLEAN-UP: All areas disturbed by construction shall be restored to match the condition and material that existed prior to the start of work. The Contractor shall always keep the work areas clean of trash and debris. The Contractor shall not allow trash or debris to blow from the work area.

1.17 INSPECTION OF WORKSITE:

A. The contractor acknowledges they have taken the necessary steps to ascertain the nature and location of work, and have investigated and satisfied themselves as to the general and local conditions that can affect the work or its cost.

B. Any failure of the contractor to take the actions described and acknowledged will not relieve the Contractor from the responsibility of estimating properly the difficulty and cost of successfully performing the work.

1.18 PERFORMANCE PERIOD: All work under this contract including site cleanup, punch list, acceptance by the COR and required submittals shall be completed within (60) calendar days of issuance of the Notice to Proceed (NTP) by the Contracting Officer unless stated otherwise.

1.19 SPECIFICATIONS

A. The following specifications are attached. Some sections in the schedule of items refer to other sections not listed and are subsidiary to, or are included in payment for other pay items in this contract. These items are considered incidental and no additional compensation will be made.

SECTION 011250 - MEASUREMENT AND PAYMENT

SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION

SECTION 013300 - SUBMITTAL PROCEDURES

SECTION 011400 - WORK RESTRICTIONS

SECTION 011900 - MOBILIZATION

SECTION 013300 - SUBMITTAL PROCEDURES

SECTION 014100 - QUALITY CONTROL

SECTION 024100 - WASTE MATERIAL DISPOSAL

SECTION 020940 – WORK INVOLVING LEAD BASED PAINT

SECTION 090190 - MAINTENANCE REPAINTING

SECTION 092900 - GYPSUM BOARD

SECTION 096519 - RESILIENT FLOORING

SECTION 099120 - INTERIOR PAINTING

SECTION 099310 – WOOD STAIN AND TRANSPARENT FINISHES

END OF SECTION C

MEASUREMENT AND PAYMENT 011250-1

USDA FOREST SERVICE

GAOA CRITICAL HOUSING DEFERRED MAINTENANCE

SECTION 011250 - MEASUREMENT AND PAYMENT

PART 1 - GENERAL

1.1 SUMMARY

A. Measurement and payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work, labor, materials, equipment, and incidentals necessary to successfully complete the project will be considered as included in the payment for items shown. This section defines the method of measurements and basis of payment for work items listed in the Schedule of Items.

B. When more than one class, size, type, thickness, etc. is specified in the Schedule of Items for any pay item, suffixes will be added to the item number to differentiate between the pay items.

1.2 DETERMINATION OF QUANTITIES

A. The following measurements and calculations shall be used to determine contract quantities for payment.

1. For individual construction items, longitudinal and lateral measurements for area computations shall be made horizontally or corrected to horizontal measurement unless otherwise specified. Measurements for geotextiles, netting and erosion control blankets shall be along slope lines.

2. For excavation or embankment volumes, the average end area method shall be used to compute volumes. However, if in the judgment of the Contracting Officer (CO), the average end area method is impractical, measurement shall be made by volume in hauling vehicles or by other three-dimensional methods.

3. For Structures, they shall be measured according to neat lines shown on the drawings or as altered by the CO, in writing, to fit field conditions.

4. For items that are measured by the linear foot, such as pipe culverts, fencing, guardrail, piping, utilities, and underdrains, measurements shall be made parallel to the base or foundation upon which the structures are placed.

5. For aggregates weighed for payment, the tonnage shall not be adjusted for moisture content, unless otherwise provided for.

6. For standard manufactured items (such as fence, wire, plates, rolled shapes, pipe conduits) identified by gauge, weight, section dimensions, and so forth, such identifications shall be considered the nominal weights or dimensions. Unless controlled by tolerances in cited specifications, manufacturer's tolerances shall be accepted.

B. Earthwork Tolerances - Adjustments of horizontal or vertical alignment, within the tolerances specified in this contract, or shifts of balance points up to 100 feet shall be made by the contractor as necessary to produce the designed sections and to balance earthwork. Such adjustments shall not be considered as "Changes."

MEASUREMENT AND PAYMENT 011250-2

1.3 UNITS OF MEASUREMENT

A. Payment shall be by units defined and determined according to U.S. Standard measure and by the following:

1. Acre: Make longitudinal and transverse measurements for area computations horizontally.

2. 50lb Bag: Measurement will be for the actual number of 50lb bags of standard bentonite grout.

3. 94lb Bag: Measurement will be for the actual number of 94lb bags of standard cement or grout.

4. Cubic Yard (CY): A measurement computed by one of the following methods:

a. Excavation, Embankment, or Borrow. The measurement computed by the average end area method from measurements made longitudinally along a centerline or reference line.

b. Material in Place or Stockpile. The measurement computed using the dimensions of the in-place material.

c. Material in the Delivery Vehicle. The measurement computed using measurements of material in the hauling vehicles at the point of delivery.

Vehicles shall be loaded to at least their water level capacity. Leveling of the loads may be required when vehicles arrive at the delivery point.

5. Each (EA): One complete unit, which may consist of one or more parts.

6. Gallons (GAL): The quantity shall be measured by any of the following methods:

a. Measured volume in container.

b. Metered volume by approved metering system.

c. Commercially package volume.

7. Hour (HR): Measurement will be for the actual number of hours (or fraction thereof) ordered by the Contracting Officer and performed by the contractor.

8. Linear Foot (LF): Measurement of work along its length from point-to-point;

parallel to the base or foundation. Do not measure overlaps.

9. Lump Sum (LS): One complete unit.

10. Mile: Measured horizontally along the centerline of each roadway, approach, or ramp.

11. Pound (LB): For sacked or packaged material, measurement will be the net weight as packed by the manufacturer.

12. Square Foot (SF): Measured on a plane parallel to the surface being measured.

13. Square Yard (SY): Measured on a plane parallel to the surface being measured.

14. Ton: Measured as a short ton consisting of 2,000 pounds.

1.4 METHOD OF MEASUREMENT

A. One of the following methods of measurement for determining final payment is designated on the Schedule of Items for each pay item:

1. ACTUAL QUANTITIES (AQ) - These quantities are determined from actual measurements of completed work.

MEASUREMENT AND PAYMENT 011250-3

2. DESIGNED QUANTITIES (DQ) - These quantities denote the final number or units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units shown in the Schedule of Items may be authorized under any of the following conditions:

a. As a result of changes in the work authorized by the CO.

b. As a result of the CO determining that errors exist in the original design that cause a pay item quantity to change by 15 percent or more.

c. As a result of the Contractor submitting to the CO a written request showing evidence of errors in the original design that cause a pay item quantity to change by 15 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is believed to be in error.

3. LUMP SUM QUANTITIES (LSQ) - These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They shall not be measured.

4. STAKED QUANTITIES (SQ) - These quantities are determined from staked measurements prior to construction.

5. VEHICLE QUANTITIES (VQ) - These quantities are measured or weighed in hauling vehicles.

PART 2 - PRODUCTS (NOT APPLICABLE)

PART 3 - EXECUTION (NOT APPLICABLE)

END OF SECTION 011250

August 2024

WORK RESTRICTIONS 011400-1

GAOA FLATHEAD HOUSING DEFERRED MAINTENANCE

SECTION 011400 - WORK RESTRICTIONS

PART 1 - GENERAL

1.1 USE OF PREMISES

A. Use of Site: Limit use of premises to work in areas indicated. Do not disturb portions of site beyond areas in which the Work is indicated.

1. Limits: Confine constructions operations to the 3 building receiving work.

2. Government Occupancy: Allow for Government occupancy of other building on site.

3. Driveways and Entrances: Keep driveways and entrances serving premises clear and available to Occupants, Government employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.

a. Schedule deliveries to minimize use of driveways and entrances.

b. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

B. Use of Existing Building: Maintain existing building in a weathertight condition throughout construction period. Repair damage caused by construction operations.

Protect building and its occupants during construction period.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 011400

MOBILIZATION 011900-1

GAOA FLATHEAD HOUSING DEFERRED MAINTENANCE

SECTION 011900 - MOBILIZATION

PART 1 - GENERAL

1.1 SUMMARY

A. This item is intended to compensate the Contractor for operations including, but not limited to, those necessary for the movement of personnel, equipment, supplies, and incidentals to the project site; for payment of premiums for bonds and insurance for the project; and for any other work and operations which must be performed or costs that must be incurred incident to the initiation of meaningful work at the site and for which payment is not otherwise provided for under the contract.

1.2 MEASUREMENT AND PAYMENT

A. The measurement shall be lump sum for mobilization. Payment shall be as follows:

1. Bond premiums will be reimbursed after receipt of the evidence of payment.

2. 50% of the lump sum, not to exceed 5% of the original contract amount, will be paid following completion of 5% of the original contract amount not including mobilization and bond premiums.

3. Payment of the remaining portion of the lump sum, up to 10% of the original contract amount, will be paid following completion of 10% of the original contract amount not including mobilization and bond premiums.

4. Any portion of the lump sum in excess of 10% of the original contract amount will be paid after final acceptance.

5. Progress payments for mobilization and preparatory work shall be subject to retainage.

PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION (NOT USED)

END OF SECTION 011900

PROJECT MANAGEMENT AND COORDINATION 013100-1

GAOA FLATHEAD HOUSING DEFERRED MAINTENANCE

SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION

PART 1 - GENERAL

1.1 SUMMARY

A. This section includes certain administrative provisions for managing and coordinating construction operations, including but not limited to the following:

1. General project coordination.

2. Cleaning and protection.

1.2 GENERAL PROJECT COORDINATION

A. Coordination of Trades: Coordinate construction operations included in the various sections of the Specifications to provide an efficient and orderly installation of each part of the Work. Coordinate construction operations included under different sections of the Specifications that depend on each other for proper installation, connection or operation.

1. Schedule construction operations in the sequence required to obtain the best results where the installation of one part of the Work depends on installation of other components before or after that part.

2. Coordinate installation of different components to provide maximum accessibility for required maintenance, service, testing and repair.

3. Accommodate items scheduled for later installation.

B. Administrative Procedures: Coordinate scheduling and timing of administrative procedures with other construction activities to avoid conflicts and promote orderly progress of the Work. Administrative procedures include but are not limited to the following:

1. Preparation of schedules.

2. Installation and removal of temporary facilities.

3. Delivery and processing of submittals.

4. Progress meetings.

5. Project closeout activities.

PROJECT MANAGEMENT AND COORDINATION 013100-2

1.6 SUBMITTALS

A. Staff Names: Within 15 days of commencement of construction operations, submit a list of the Contractor’s principal staff assignments, including the superintendent and other personnel in attendance at the site.

1.7 MEASUREMENT AND PAYMENT

A. No separate payment will be made for the work included under this section; rather payment shall be considered to be included in the items of work listed in the Schedule of Items.

PART 2 - PRODUCTS (Not applicable)

PART 3 - EXECUTION

3.1 GENERAL COORDINATION PROVISIONS

A. Inspection of Conditions: Prior to installations, require the installer of each major component to inspect both the substrate and conditions under which work is to be performed.

1. Do not proceed until unsatisfactory conditions have been corrected in an acceptable manner.

2. Coordinate temporary enclosures with required inspections and tests to minimize the necessity of uncovering completed construction for that purpose.

B. Construction in Progress: Keep construction in progress, and adjoining materials in place, clean during handling and installation. Apply protective coverings where required for protection from damage or deterioration.

C. Completed Construction: Clean completed construction, and provide maintenance, as frequently as necessary to prevent damage or soiling or other deterioration through the remainder of the construction period. Adjust and lubricate operable components as necessary to assure operability without damage.

END OF SECTION 013100

FEDRUARY 2022

SUBMITTAL PROCEDURES 013300-1

GAOA FLATHEAD HOUSING DEFERRED MAINTENANCE

SECTION 013300 - SUBMITTAL PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other miscellaneous submittals. See Table 013300-1 for a summary of required submittals.

B. See other specification section within this package for additional requirements on submittal.

1.2 SUBMITTAL PROCEDURES

A. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.

1. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination.

a. The Contracting Officer (CO) reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.

B. Processing Time: Allow enough time for submittal review, including time for re-submittals, as follows. Time for review shall commence on CO's receipt of submittal.

1. Initial Review: Allow 14 days for initial review of each submittal. Allow additional time if processing must be delayed to permit coordination with subsequent submittals. CO will advise Contractor when a submittal being processed must be delayed for coordination.

2. If intermediate submittal is necessary, process it in same manner as initial submittal.

3. Allow 14 days for processing each re-submittal.

4. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing.

C. Identification: Place a permanent label or title block on each submittal for identification.

1. Indicate name of firm or entity that prepared each submittal on label or title block.

2. Provide a space on label or beside title block to record Contractor's review and approval markings and action taken by CO.

3. Include the following information on label for processing and recording action taken:

a. Project name.

b. Date.

SUBMITTAL PROCEDURES 013300-2

c. Name and address of Contractor.

d. Name of manufacturer.

e. Unique identifier, including revision number.

f. Number and title of appropriate Specification Section.

g. Drawing number and detail references, as appropriate.

h. If more than one item is shown on submittal sheet, identify item.

D. Deviations: Highlight, encircle, or otherwise identify deviations from the Contract Documents on submittals.

E. Additional Copies: Unless additional copies are required for final submittal, and unless CO observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal.

F. Use for Construction: Use only final submittals with mark indicating action taken by CO in connection with construction.

1.3 MEASUREMENT AND PAYMENT

A. No separate measurement and/or payment will be made for this section. Payment shall be included with work shown in the schedule of items.

PART 2 - PRODUCTS

2.1 ACTION SUBMITTALS – (Submittals requiring CO approval)

A. General: Prepare and submit Action Submittals required by individual Specification Sections.

1. Number of Copies: Submit three copies of each submittal, unless otherwise indicated. CO will return two copies. Mark up and retain one returned copy as a Project Record Document.

B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.

1. If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Product Data.

2. Mark each copy of each submittal to show which products and options are applicable.

3. Include the following information, as applicable:

a. Manufacturer's written recommendations.

b. Manufacturer's product specifications.

c. Manufacturer's installation instructions.

d. Manufacturer's catalog cuts.

e. Wiring diagrams showing factory-installed wiring.

f. Compliance with recognized trade association standards.

g. Compliance with recognized testing agency standards.

SUBMITTAL PROCEDURES 013300-3

C. Contractor's Construction Schedule: The contractor shall submit a Construction Schedule, for approval by CO, in accordance with the contract provisions within 5 day of commencement of work.

CI. Samples: Prepare physical units of materials or products, including the following:

1. Samples for Initial Selection: Submit manufacturer's color charts consisting of units or sections of units showing the full range of colors, textures, and patterns available.

2.2 INFORMATIONAL SUBMITTALS – (Submittals NOT requiring CO approval)

A. General: Prepare and submit Informational Submittals required by other Specification Sections.

1. Number of Copies: Submit three copies of each submittal, unless otherwise indicated. CO will not return copies.

2. Certificates and Certifications: Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity.

3. Test and Inspection Reports: Comply with requirements in Section 014100 "Quality Control."

B. Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting test results for compliance with requirements.

C. Field Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of field tests performed either during installation of product or after product is installed in its final location, for compliance with requirements.

D. Maintenance Data: Prepare written and graphic instructions and procedures for operation and normal maintenance of products and equipment.

SUBMITTAL PROCEDURES 013300-4

E. Manufacturer's Instructions: Prepare written or published information that documents manufacturer's recommendations, guidelines, and procedures for installing or operating a product or equipment. Include name of product and name, address, and telephone number of manufacturer.

PART 3 - EXECUTION

3.1 GENERAL

A. Review each submittal and check for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to CO.

B. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.

C. CO will not review submittals that do not bear Contractor's approval stamp and will return them without action.

D. Submittals not required by the Contract Documents will not be reviewed and may be discarded.

E. Substitutions – Whenever materials, products, and equipment are listed by name or brand in the specifications and/or on the drawings, it is used as a measure of quality, utility, or standard. If the Contractor prefers to use any other brand or manufacturer of same quality, appearance and utility to that specified, he shall request substitution as provided below, not less than 30 days before the planned installation of the item. The Contracting Officer will approve or disapprove the request for substitution.

F. Requests for substitutions will only be considered if contractor submits the following:

1. Complete technical data including drawings, complete performance specifications, test data, samples and performance tests of the article proposed for substitution.

Submit additional information if required by Contracting Officer. All items in the above information shall be circled, tagged, or marked in some way to indicate all deviations or differences which the proposed item differs from the originally specified item.

2. Similar data as above for item originally specified. All items shall be marked to identify where/how the proposed substitution will differ.

3. A statement by the Contractor that the proposed substitution is in full compliance with the contract documents, applicable codes, and laws.

4. The Contractor shall be responsible for any effect upon related work in the project for any substitution and shall pay any additional costs generated by any substitutions.

3.2 SUBMITTAL SCHEDULE – Submittals shall be made as required by and called for in the drawings and specifications. The following table is a summary of the required

SUBMITTAL PROCEDURES 013300-5

submittals for the project - the table is to assist the Contractor and may not be all inclusive

– additional submittals may be required by specific specifications:

TABLE 013000-1

Section Title Required Submittal

013300 Submittal Procedures 2.1D Construction Schedule 014100 Quality Control 1.3 A Contractor quality control plan 014100 Quality Control 1.3 B Permits, Licenses, and Certificates 014100 Quality Control 1.3 C Test and inspection reports

1.3 D

017820 Operation and Maintenance Data 1.2A Manuals 090190 Maintenance Repainting 1.4A Product Data 090190 Maintenance Repainting 1.4B Samples 092900 Gypsum board 1.2.A Product Data 096519 Resilient Tile Flooring 1.2A Product Data 096519 Resilient Tile Flooring 1.2A Samples 096519 Resilient Tile Flooring 1.2A Sustainable Design 099123 Interior Paints and Coatings 1.3A-

C Product Data, Samples, Sustainable Design

END OF SECTION 013300

QUALITY CONTROL 014100-1

GAOA HOUSING DEFERRED MAINTENANCE

SECTION 014100 - QUALITY CONTROL

PART 1 - GENERAL

1.1 This work shall consist of providing quality control in conformance with the inspection, testing, and product certification requirements of this contract to ensure compliance with the drawings and specifications. The Contractor shall provide all personnel, equipment, tests, and reports necessary to meet the requirements of the contract.

1.2 QUALITY CONTROL

1.3 SUBMITTALS

A. The Contractor shall provide and maintain a quality control system that will ensure all services, supplies, and construction work required under this contract conforms to the contract requirements. The Contractor shall perform, or cause to be performed, the sampling, inspection, and testing required to substantiate that all services, supplies, and construction conform to the contract requirements.

B. Special Tests and Inspections: Contractor will engage a testing agency to conduct required special tests and inspections. The Contractor shall authorize the testing agency to perform the required testing and inspections for the work completed. The authority shall include:

1. Testing for Lead Paint, Paint chip samples collected and sent to a lab for analysis.

2. Inspections, risk assessments, or hazard screening, conducted by certified professionals.

3. Retesting/Reinspecting: Contractor shall provide quality-control services for retesting and re-inspection for repeated construction clean-up work or for work that failed to comply with the requirements under the contract.

A. Contractor Quality Control Plan

B. Permits, Licenses, and Certificates

C. Test and Inspection Reports

D. As-Built Drawings

1.4 MEASUREMENT AND PAYMENT

A. No separate payment will be made for the work included under this section; rather payment shall be considered to be included in the items of work listed in the Schedule of Items.

PART 2 - PRODUCTS (Not Applicable)

QUALITY CONTROL 014100-2

PART 3 - EXECUTION

3.1 QUALITY CONTROL SYSTEM

A. General: Perform required testing, inspections, sampling, and similar services per direction specified in the contract drawings and specifications and in accordance with established industry standards.

3.2 CONTRACTOR QUALITY CONTROL PLAN

A. At the time of the preconstruction conference, the Contractor shall submit for approval a written Contractor Quality Control Plan.

1. If the plan requires any revisions or corrections, the Contractor shall resubmit the plan within 10 days.

2. The Government reserves the right to require changes in the plan during the contract period as necessary.

3. No change in the approved plan may be made without written concurrence by the Contracting Officer.

4. At a minimum, the plan shall include the following:

a. A list of personnel responsible for quality control and assigned duties.

Include each person's qualifications.

b. A copy of a letter of direction to the Contractor's Quality Control Supervisor outlining assigned duties.

c. Names, qualifications, and descriptions of laboratories to perform sampling and testing, and samples of proposed report forms.

d. Methods of performing, documenting, and enforcing quality control of all work.

e. Methods of monitoring and controlling environmental pollution and contamination as required by all applicable regulations and laws.

3.3 TEST AND INSPECTION REPORTS

A. Submit copies of complete test results 10 days prior to work being performed.

B. Submit failing test results and proposed remedial actions within 3 days of notification of positive Lead Based Paint LBP presents.

C. Testing and Inspection Reports shall include the following:

1. Date of issue.

2. Project title and number.

3. Name, address, and telephone number of testing agency.

4. Dates and locations of samples, tests, or inspections.

5. Names of individuals performing tests and inspections.

6. Reference Specification Section(s).

7. Complete test or inspection data.

QUALITY CONTROL 014100-3

8. Test and inspection results and an interpretation of test results.

9. Ambient conditions at time sample was taken, tested, or inspected.

10. Comments or professional opinion on whether tested or inspected work complies with the Contract Document requirements.

11. Name and signature of laboratory inspector.

3.4 PERMITS, LICENSES, AND CERTIFICATES

A. For Contracting Officer’s records, submit copies of permits, licenses, certifications, 3.5 inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgments, correspondence, records, and similar documents, established for compliance with standards and regulations relevant to the on performance of the work.

SAMPLING, TESTING, AND CERTIFICATION REQUIREMENTS

A. Sampling, testing, and Certification requirements and frequency for specific items shall be as specified in the specifications.

END OF SECTION 014100

WORK INVOLVING LEAD-BASED PAINT (LBP) SECTION 020940

SECTION 020940

WORK INVOLVING LEAD-BASED PAINT (LBP)

PART 1 - GENERAL

1.01 DESCRIPTION OF WORK:

Work under this section includes those engineering controls which are necessary for surface preparation of materials to be resurfaced, or demolition/removal of materials, that are coated with lead based paint (LBP). This is a notification that the work under this contract will bring the Contractor into contact with LBP materials that will require worker protection.

1.02 NOTICE OF HAZARD:

A. The Government has determined that work under this contract will involve exposure to lead-based paint (LBP). The buildings were constructed in the around 1960 and it is assumed that lead based paint was used at some point in the life of the building. Any Forest Service building built before 1987 should be assumed to contain lead paint unless tests indicate otherwise.

B. Exposure to airborne lead contaminants is a recognized hazard to human health.

The Contractor shall assume that all painted surfaces on which work is required are coated with LBP.

1.03 SUBMITTALS:

A. Health and Safety Plan:

1. The Contractor shall provide a Health and Safety Plan for review and acceptance by the Contracting Officer. No work will commence until the plan is accepted.

2. The Health and Safety Plan will address the health-related standards and protective measures to be utilized by the Contractor during work involving exposure to airborne lead contaminants.

3. The Health and Safety Plan will also identify the engineering and work practice controls proposed to be implemented by the Contractor. Identify to the Government sufficient controls to ensure no release of lead contamination to the environment.

4. Proof of Contractor’s experience, qualifications, and renovator certification (Lead Renovation, Repair and Painting Rule) meeting required EPA standards.

5. Proof of training of Contractor’s employees for lead-related construction work.

1.04 WORKER PROTECTION:

A. OSHA requirements for worker protection shall be followed in accordance with 29 CFR 1926.62, Lead Exposure in Construction.

1.05 WASTE ANALYSIS AND MANAGEMENT:

A. This project is being conducted within housing units of which on is a residence.

The wastes generated as part of this project’s LBP activities are considered household waste, and such wastes thus are excluded from RCRA’s hazardous waste management and disposal regulations. The Contractor shall be responsible for managing and disposing the LBP waste using best management practices described herein.

B. The Contractor shall segregate dust and small debris which may contain lead-based paint. Such waste shall be double bagged and secured with tape.

C. Paint debris shall not be placed on unprotected ground and shall be shielded adequately to prevent dispersion by wind or rainwater.

D. Large waste items which cannot be bagged shall be wrapped in plastic with tape.

E. Contractor shall dispose of LBP waste in accordance with State of Montana solid waste regulations.

PART 2 - PRODUCTS

2.01 MATERIALS:

A. Disposal bags and sheeting: Provide 6 mil thick plastic disposal bags and sheeting for wrapping waste.

B. Disposal bins: Provide disposal bins for collection of waste prior to disposal by

Contractor. All bins shall be secured when not in use to prevent deposit of unauthorized waste and debris.

C. Trisodium phosphate: Industry standard to mix with water for washing solutions on site.

3.01 SITE PREPARATION:

A. The Contractor shall prepare the site in accordance with the Health and Safety Plan accepted by the Contracting Officer.

B. The Contractor is responsible for establishing and maintaining control measures sufficient to preclude any adverse affects to workers, Forest Service personnel and dependents, the public, and the environment.

3.02 REPAIR

A. The Contractor shall conduct all repair work in accordance with the Health and Safety Plan accepted by the Contracting Officer.

B. All waste from incidental repair or component removal and replacements will be handled in accordance with the provisions of this section 020940 and the directions of the Contracting Officer.

3.03 CLEANUP:

A. Daily cleanup shall be in accordance with the Health and Safety Plan accepted by the Contracting Officer. Any environmental cleanup caused by Contractor's failure to comply with the provisions of law, of this contract, or the accepted Health and Safety Plan shall be at Contractor's sole expense.

B. Paint debris shall not enter industrial waste, storm drains, or sanitary sewer lines.

3.04 LEAD-CONTAMINATION TESTING: The Contractor shall at his own cost comply with all laws, ordinances, rules, and regulations of federal, state, and local authorities regarding the handling, storing, and disposal of lead waste material.

A. The Contractor can choose to test for LBP before starting work. If the test results are negative, then the Environmental Protection Agency's (EPA) Renovation, Repair, and Painting (RRP) rule's for lead-safe work practices are not required, according to the EPA. However, if lead-based paint is found, the contractor must adhere to lead-safe work practices RRP rules.

B. Lead-Based Paint/ Lead-Containing Paint Testing: If at his own expense, a Contractor chooses to investigate buildings for the presents of LBP and intends to perform work without mitigation for lead, the Contractor shall:

1. Submit Lead-Based Paint Test Results to the Contracting Officer ten (10) days prior to the start of work disturbing painted walls and floors.

2. Document lead negative test results in accordance with EPA regulations.

3.05 PERMITS, NOTIFICATIONS AND APPROVALS

A. The Contractor shall be responsible for securing all necessary permits, applications, and the like, for work involving lead-contaminated paint and wastes, including hauling, removal, disposal, fire, materials usage, or any other required permits. The Contractor shall pay for the costs of all such permits and applications.

3.06 INSPECTION:

A. Contractor shall cooperate and coordinate all work with the Contracting Officer's inspection requirements. Inspection will center on compliance with the Health and Safety Plan accepted by the Contracting Officer.

3.07 CLEARANCE:

A. Contractor shall notify Contracting Officer of readiness for final inspection.

B. The visual inspection will occur no earlier than 24 hours after completion of the entire construction work.

C. Any visible debris will result in the Contractor recleaning the area at no additional cost to the Government.

END OF SECTION

https://www.epa.gov/lead/lead-renovation-repair-and-painting-program https://www.epa.gov/lead/lead-renovation-repair-and-painting-program

WASTE MATERIAL DISPOSAL 024100-1

GAOA FLATHEAD HOUSING DEFERRED MAINTENANCE

SECTION 024100 - WASTE MATERIAL DISPOSAL

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes the loading, handling, hauling, and waste

1.2 material, MEASUREMENT AND PAYMENT

A. There will be no separate measurement or payment for work in this Section. Waste material disposal is considered incidental to other items of work shown in the Schedule of Items.

PART 2 - PRODUCTS – NOT APPLICABLE

PART 3 - EXECUTION

3.1 WASTE MATERIAL TO BE HAULED TO A LANDFILL

A. All demolition materials, garbage, and other refuse generated shall be removed from the project site and legally disposed off of Government property in an approved landfill.

B. The contractor is responsible for all costs and permits associated with landfill disposal.

C. The Government is not responsible for waste material upon its departure from the project site.

END OF SECTION 024100

INTERIOR PAINTING SECTION 099120

SECTION 099120 - INTERIOR PAINTING

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes surface preparation and the application of paint systems on the following interior substrates:

1. Concrete.

2. Wood.

3. Gypsum board.

4. Ceilings.

1.2 NOTICE OF HAZARD

A. The Government has determined the renovation and maintenance work under this contract may involve exposure to lead-based paint (LBP). Paint from Forest Service buildings built prior to 1978 shall be assumed to contain lead paint unless tests indicate otherwise.

1. Paint removal work of sanding or scraping required to prepare existing surfaces and wood floors for refinishing or repainting may disturb lead-containing paint (LCP).

2. Perform work disturbing and handle, transport, and dispose of materials of lead-containing paint (LCP) and residue in compliance with local, state, and federal laws and regulations which govern identification, removal, labeling, handling, containerization, and transportation in accordance with but not limited to the following:

a. U.S. Department of Labor OSHA Regulations: Including but not limited to:

Title 29, Code of Federal Regulations (CFR) Section 1926.62: “Lead Exposure in Construction” and Title 29, CFR Section 1910.1200: “Hazard Communication Standard.”

b. C. U.S. Environmental Protection Agency (USEPA) Regulations: Including but not limited to: Title 40 CFR Part 262: “Standards Applicable to Generators of Hazardous Waste” and Part 263: “Standards Applicable to Transporters of Hazardous Waste.”

B. The project’s purpose is maintenance repainting and is NOT a lead paint abatement.

1.3 WORK

A. Provide all labor and materials required to complete the wood flooring work as listed in the Scope and as specified herein.

B. Work includes repair and removal of wood flooring but not more than 10 square feet total.

C. Work includes engineering controls resulting in clean and safe preparation of floor surfaces by sanding or screening previously finished wood flooring. The contractor shall contain dust and comply with Lead Dust Hazard mitigation procedures which include the following:

1. Assessment: The Contractor shall collect test samples from wood floor surfaces and submit them to a Laboratory to determine the presence of lead in floor finishes and other architectural coatings, including any floor painted surface.

2. Containment and Covering: The contractor shall contain all lead dust, paint chips, and debris to the smallest practical area (a single room), shall clean up dust and debris by wetting down prior to sweeping or HEPA vacuuming and depositing waste in heavy-duty (6 mil) plastic bags. Containment and Covering also includes:

a. Posting signs on building entrances and exits, with the phrase, “Caution Lead Hazard, Keep Out” in 2-inch bold letters.

b. Seal-off work areas with 6 mil plastic sheeting covering each room doorway.

c. Floor sanding equipment shall be equipped with HEPA dust filtering vacuum.

d. Switch off the lights and HVAC and seal fixtures, grills, and vent openings.

e. Remove furnishings and carpet rugs or cover them with plastic sheeting taped to the skirting boards.

f. Cover smoke alarms, CO2…