Amend0001_Attachment2_ScheduleOfItems.pdf

PDF 392 KB Posted

Attached to
Flathead National Forest - Condon Bunkhouse Maintenance Repairs
Solicitation number
1240LU26Q0007
Issued by

About this file

This is an Amendment 0001 to a Schedule of Items for the Condon Bunkhouse Maintenance Repairs contract (Solicitation # 1240LU26Q0007), updated as of 01/27/26. The schedule includes five base items and two optional line items requiring vendor quotes. Base items consist of: (1) Mobilization (Lump Sum); (2) Wall Painting (13,260 square feet); (3) Sheetrock Gypsum Board Repairs (706 square feet); (4) Hardwood Floor Re-finishing (395 square feet); and (5) Vinyl Flooring (35 square feet). Option 1 includes Ceiling Painting (5,377 square feet as a Lump Sum), and Option 2 includes Floor Painting for Bunkhouses (3,200 square feet as a Lump Sum). All quantities are designated as Lump Sum Quantities (LSQ), which represent one complete unit of work including necessary materials, equipment, and labor.

Vendors must submit pricing for all base items and are required to be currently registered in the SAM.gov database to submit bids. Unit prices and item costs are to be filled in by the responding contractor. Option items may or may not be awarded and can be awarded up to 60 days after the original award date. Per Specification section 011250 – Measurement & Payment, vendors should reference that section for complete definitions of the work items above. The document provides a pricing template with columns for unit of measure, pay unit, estimated quantity, unit price, and item cost, with a total base calculation line.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 0001 updated Schedule of Items

01/27/26 Method

Pay Item Unit of Pay Estimated Unit Item Item Description Meas. Unit Quantity Price Cost

1 Mobilization Lump Sum LSQ 1 $ $

2 Wall Painting Sqft LSQ 13260 $ $

3 Sheetrock Gypsum Board Repairs Sqft LSQ 706 $ $

4 Hardwood Floor Re-finishing Sqft LSQ 395 $ $

5 Vinyl Flooring Sqft LSQ 35 $ $

TOTAL BASE: $

Method Pay Item Unit of Pay Estimated Unit Item Item Description Meas. Unit Quantity Price Cost

6 Celing Painting Lump Sum LSQ 5377 $ $

Method Pay Item Unit of Pay Estimated Unit Item Item Description Meas. Unit Quantity Price Cost 7 Floor Painting (Bunkhouses) Lump Sum LSQ 3200 $ $

Total All Items

Option 1

Option 2

Base Items

Note: Must Quote on all items. Must be currently registered in the SAM.gov database to submit pricing.

Option items may or may not be awarded. Option items can be awarded up to 60 days after time of original award.

LUMP SUM QUANTITIES (LSQ) - These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job.

Specification section 011250 – Measurement & Payment has the full definition of items above but the vendor must work to put the 2 together, but ease of use on the Schedule is likely more important.