Questions_Answers_3 thru 22.pdf
PDF 97 KB Posted
- Solicitation number
- 1240LU26Q0007
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a Questions and Answers (Q&A) response set dated January 22, 2026, for federal contract 1240LU26Q0007, GAOA Condon Bunkhouse Maintenance Repairs. The solicitation requires work completion within 60 days after notice to proceed, with work anticipated in April 2026. A pre-work conference will be held after NTP issuance, requiring contractor schedule submission and Contracting Officer approval. Key work requirements include painting all doors, jambs, and trim (inside and outside); repairing visible maple flooring in Residence #3 damaged by flooding; installing new linoleum flooring in the laundry/utility room of Residence #3; moving furniture; drywall repairs with fire tape to meet current building codes; and preparing and painting interior closets and cabinets. The contractor must assume all painted areas contain lead paint, contain waste without environmental release, provide proper employee PPE, and dispose of lead paint waste per Montana Law. Mold and dust cleanup via HEPA-filtered vacuuming, tri-sodium phosphate washing, and repeat HEPA vacuuming is required in flooded areas. Basement epoxy flooring requires three coatings (primer, intermediate coat, topcoat). On-site camping is available, and Residence #3 garage may be used for equipment and furniture storage.
Additional requirements clarify that paint color transitions without trim should match the previous paint scheme "in-kind" without added trim; closet doors must be returned to functional use after painting with minor repairs performed if disassembled; drywall installation around electrical outlet boxes is required but not electrical work itself; airless sprayers are permitted for ceiling work if skilled labor is available and overspray is cleaned; electricity and heat are available, but water availability is weather-dependent; and the contractor is responsible for furniture movement. Change orders must be processed in writing from the Contracting Officer. Carpet removal and bunkhouse floor sanding/refinishing are not required—maple floor refinishing applies only to Residence #3.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q3: When is the work required?
Ans: Intent of the solicitation is for work to be accomplished within 60 days after the notice to proceed (NTP). So April 2026
(appox. 90 days from now) but pre-work conference will be held after the NTP is issued. The contractor’s schedule is required submittal for the conference & approval by Contracting Officer.
Q4: Do we paint the doors. Ans: Yes, all doors, jambs, trim inside and outside.
Q5: The visible maple flooring of bedroom in Residence #3 is damaged by the flood. Does the Contractor repair the flooring?
Ans: Yes, repairs to the maple flooring are a requirement of the pay item.
Q6: Can we camp at the Condon Work Center while work is being performed. Ans: Yes, Camping on site can be arranged.
Q7: Some areas of the bunkhouse have paint color transitions changes which are not bordered by pieces of trim. Must we supply trim for these transitions. Ans: No, the intent is to perform the work “In-Kind” to the previous paint scheme.
1240LU26Q0007
GAOA Condon Bunkhouse Maint. Repairs
Q & A dated 1/22/2026
Q8: Should the drywall repairs include fire tape when building code requires its use. There is no fire tape now? Ans: Yes, all work performed must be accomplished to meet current codes.
Q9: The specification have a notice of hazard for lead paint. Is the contractor required to test and abate for lead paint. Ans:
The project requires the Contractor to assume all painted areas contain lead paint and to contain waste without releasing lead paint into the local environment, to provide a safe working zone for employees w/ proper PPE and dispose of lead paint waste in accordance with Montana Law. Testing for lead paint by the
Contractor is only required when the Contractor wants to perform work without assumed lead paint mitigation effort.
Q10: Are the inside of closets and cabinets to be painted. Ans:
Yes, those are inside areas that are to be painted by this project.
Q11: Is there mold to be cleaned up? Ans: Yes, the stud bays of
#3’s flooded area and due to the floor sanding will require containment cleaning (includes mold). Mold and dust clean-up via HEPA filtered vacuuming, washing with tri-sodium phosphate solution and again HEPA filter vacuumed is required.
Please see the Statement of Work (SOW).
Q12: Is electricity and heat available for this project. Ans:
Yes, power and heat are available but water is currently only available inside the pump house and its availability at the bunkhouses or residence is weather dependent.
Q13: Do the bunkhouse basement floors receive a two-part epoxy or a three-part epoxy?
Ans: The specification is for type EP (though to be two-part epoxy) which requires three (3) coatings. 1) primer, 2)
Intermediate coat, followed by 3) Topcoat. Please see the specifications and manufactures recommendations.
Q14: Who will be responsible to move the furniture? Ans: The
Contractor is responsible to move the furniture.
Q15: Can we use the Residence #3 garage to store equipment and furniture from the home. Ans: Yes.
Q16: Can I use an airless sprayer on the ceiling?
Ans: Specification require that overspray be cleaned and removed but yes an airless sprayer is allowed when the contractor has skilled labor to perform the work with that equipment.
Q17: Are the carpets in the bunkhouse to be removed and are the bunkhouse floors to be sanded and refinished. Ans: No.
Maple floors to be refinished are only inside Residence #3.
Q18: Do the closet doors need to be returned to functional use after painting? Ans: Yes
Q19: What if the closet door need repairs to function? Ans: The intent of the work is to perform preparation work for painting and to paint all closet doors. If the contractor disassembles features of the buildings the expectation is that they will reassemble things such as closet doors.
Q20: Where does the new linoleum floor get installed? Ans: In the laundry/utility room of Residence #3.
Q21: How is a change order processed? Ans: In writing from the Contracting Officer.
Q22: The basement space of Residence #3 has loose wires protruding from the walls. Is the contractor required to install junction boxes and make electrical connections. Ans: No, the contractor is not required to perform electrical work but they will need to install drywall around all electrical outlet boxes.